lImplementation Case:ITIS Merloni Fabriano ItalyITIS Merloni, Fabriano, Italy

Page 3: Implementation Case - ITIS Merloni Fabriano

General data3

ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Name of the School

ITIS MERLONI Hi h S h l

Type of school 

ITIS MERLONI High School

Hi h S h lHigh School 

Number of students Owner

public398

Location

Municipality of Fabriano (AN), ItalyL S l d'A i t 2

Year of construction 

1968Largo Salvo d'Acquisto 2Altitude: 325 m AMSL

1968

Page 4: Implementation Case - ITIS Merloni Fabriano

4

General dataITIS “A M l i” Hi h S h l M i i li f F b i (AN) I l

Building typology  Heated area (m2 )

ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

4 floors building 11549 m2

Heating degree days : 2198 (DPR 412/1993 – base 20)Cooling degree days (base 26): xxxxxxx

Site

Urban Mountain

Page 5: Implementation Case - ITIS Merloni Fabriano

5

Current SituationITIS “A M l i” Hi h S h l M i i li f F b i (AN) I lITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Page 6: Implementation Case - ITIS Merloni Fabriano

6

Current Situation

Renovation needs  Building use

ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

High Priority: energy efficiency + building facade safety + waterproofing in the roofSchedule for High school: 

Standard Use: From 9th of September till 14th of June

High Priority: energy efficiency + building facade safety + waterproofing in the roof 

Reduce Use:  From 15th of June till 12th of August  

From 19th of August till 6th of September

2nd, 3rd, 4th of January

12th, 16th of April

23rd, 24th, 27th, 30th , 31st of December                           

Main Building: Monday till Friday: 07:30 to 22:30 

Saturday: 07:30 to 14:00

Gymnasium:  Monday till Friday: 07:00 to 13.30 and 16:00 to 21:00

Saturday: 07:30 to 13:30

Page 7: Implementation Case - ITIS Merloni Fabriano

7

Current SituationITIS “A M l i” Hi h S h l M i i li f F b i (AN) I l

Building envelope: WallsBrick Wall with air gap 

ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Building envelope: RoofRoof without Insulation insulation

Building envelope: GroundfloorGround floor consists of concrete

Building envelope: WindowsReplacement in Summer 2015 in 4 facades

Old window: Single‐glazed windows with wooden framesUw =  5.9 W/m².K/

New window: Aluminium Frame with thermal break ‐ Low‐e Double Glazed (Argon 16 mm)Uw =  1.1 W/m².K

Page 8: Implementation Case - ITIS Merloni Fabriano

8

Current SituationITIS “A M l i” Hi h S h l M i i li f F b i (AN) I lITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Building envelope: WindowsR l t i S 2015 i f dReplacement in Summer 2015 in some facades

Old window: Single‐glazed windows with wooden framesUw =  5.9 W/m².K

N i d Al i i F ith th l b k L3

4

New window: Aluminium Frame with thermal break ‐ Low‐e Double Glazed (Argon 16 mm)

Uw =  1.1 W/m².K

1

2

1

1

2 3

Page 9: Implementation Case - ITIS Merloni Fabriano

9

Current SituationITIS “A M l i” Hi h S h l M i i li f F b i (AN) I lITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Page 10: Implementation Case - ITIS Merloni Fabriano

10

Current Situation

Airtightness: No measurements

ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Heating/Cooling: Radiators, manual control, no sectors

V til ti N h i l V til tiVentilation: No mechanical VentilationVentilation by opening windows

Lighting: Fluorescent tubes T8 controlled by users

Appliances: Lab: PC, Projector, PrinterOffice: PC, Printer, Copy Machine

DHW: Not available

Cooking: No cooking

Current final energy consumption kWh/m2 conditioned area (from

*111.56 kWh/m² y for heating*12 51 kWh/m² y for electricitykWh/m2 conditioned area (from 

bills, metering etc.):

12.51 kWh/m y for electricity*Total =124.08 kWh/m² per year

Page 11: Implementation Case - ITIS Merloni Fabriano

11

Current Situation

Equipment Age and Maintenance Needs

ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Lighting : Fluorescent lamp T8 : continuous replacement.

HVAC/ B il 1 N t l G B il i t ll d i 1982 2 N t l G B il l d i 2010HVAC/ Boiler: 1 Natural Gas Boiler installed in 1982, 2 Natural Gas Boiler replaced in 2010

HVAC/Distribution Network:

HVAC/other components

HVAC/other components

Windows Completion of replacement is needed

Other Building Components

Other Maintenance NeedsOther Maintenance Needs

Other Renovation Needs Structural Compliance to be assessed, developed and executed

Page 12: Implementation Case - ITIS Merloni Fabriano

12

Current Situation

Health & Comfort

ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Summer comfort: No data

I t i i lit N d tInterior air quality: No data

Visual comfort: No data

Running Contracts and Management

Running cost: Energy (2013): 109557 (G)+28130 (E) = 137.687 €Water: no dataMaintenance: no data

Energy Supply Contract CONSIP – Ministerial Central Society for PA SupplyingContract expiring in November 2016

Energy Management Contract CONSIP – Ministerial Central Society for PA SupplyingContract expiring in November 2016

M d di l b h P i h i l ffiBuilding Maintenance Managed directly by the Province technical office

Page 13: Implementation Case - ITIS Merloni Fabriano

13NZEB RenovationITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

ZEMedS Goals: ‐ Requeriment 1: CPE‐ProdRES≤ 0

Primary energy consumption yearly (heating, cooling, ventillation, DHW and lighting) is produced bylocal renewable energieslocal renewable energies.

‐ Requeriment 2: CFE≤ 25 kWh/m2 y

FE consumption yearly (heating, cooling, ventillation and lighting) per conditioned area

‐ Requeriment 3: Indoor air quality guaranteed (CO2≤1000 ppm) and temperature above 28ºC ≤40 hours yearly during occupancy

National factors for conversion in energy and CO2 have been taken into account (data 2014).gy 2 ( )

Primary Energy from non‐renewable energy sources covered by rene able energ

Final energy consumption (all uses except DHW & cooking)

Overheating limited toIndoor Environmental 

Quality (IEQ) is guaranteedrenewable energy

0

p g) g

0 kWh/m².year 

(annual balance)

CFE  ≤ 25 kWh/m².year

40 hours over 28ºC annually

CO2 ≤ 1000 ppm

Page 14: Implementation Case - ITIS Merloni Fabriano

14NZEB Renovation StatusITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Actual status refering to the the foreseen ZEMedS Renovation Process

Diagnostic/Current Planning Design Companies Works Reception Use and /Currentsituation

Planning Design consulting Works of works maintenance

Diagnostic/ Current Situtation:An extended energy audit (including at least a basic environmental monitoring) is needed in order to collectAn extended energy audit (including at least a basic environmental monitoring) is needed, in order to collect detail information.

Page 15: Implementation Case - ITIS Merloni Fabriano

15Energy Saving PotentialITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Actual Final Energy Consumption ZEMedS Targetgy p(heating, cooling, ventillation and lighting)

Consumption by Bills (data before Windows Replacement)Final energy 

consumption (all uses 

ZEMedS Target

Consumption by Bills (data before Windows Replacement)Natural Gas: 123.368 nm3/year = 111.56 kWh/m².yearElectricity: 12.51 kWh/m².yearOther Fuel: 0 kWh/m² year

p (except DHW & cooking)

CFE  ≤ 25 kWh/m² yearOther Fuel: 0 kWh/m .year

Total: 124.08 kWh/m².year

Estimation:

kWh/m .year

Heating/Cooling and Ventilation: Estimation:

Specific Electricity Consumption (not including Lighting): 11 kWh/m².yearDomestic Hot Water Consumption: 1 kWh/m².yearExpected Total Consumption after successful ZEMedS Renovation:

CHVAC ≤ 20 kWh/m².year

Lighting: Cligh ≤ 5 kWh/m².year

Expected Total Consumption after successful ZEMedS Renovation: 37 kWh/m².year

Energy Saving Potential(heating, cooling, ventillation and lighting)

Theoretical Saving87.08 kWh/m².year

Theoretical Gain70 %

Page 16: Implementation Case - ITIS Merloni Fabriano

16Energy Saving PotentialITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Actual Final Energy Consumption ZEMedS Targetgy p(heating, cooling, ventillation and lighting)

Consumption by Bills (data before Windows Replacement)Final energy 

consumption (all uses 

ZEMedS Target

Consumption by Bills (data before Windows Replacement)Natural Gas: 123.368 nm3/year = 1.288.455 kWh/yearElectricity: 144.531 kWh/yearOther Fuel: 0 kWh/year

p (except DHW & cooking)

CFE  ≤ 25 kWh/m² yearOther Fuel: 0 kWh/year

Total: 1.432.987 kWh/year

Estimation:

kWh/m .year

Heating/Cooling and Ventilation: Estimation:

Specific Electricity Consumption (not including Lighting): 127.039 kWh/yearDomestic Hot Water Consumption: 11.549 kWh/yearExpected Total Consumption after successful ZEMedS Renovation:

CHVAC ≤ 20 kWh/m².year

Lighting: Cligh ≤ 5 kWh/m².year

Expected Total Consumption after successful ZEMedS Renovation: 427.313 kWh/year

Energy Saving Potential(heating, cooling, ventillation and lighting)

Theoretical Saving1.005.674 kWh/year

Theoretical Gain70 %

Page 17: Implementation Case - ITIS Merloni Fabriano

17Renewable Energy Source PotentialITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

System Considerations and Recommendation PotentialSystem Considerations and Recommendation PotentialProduction

Photo VoltaicS

Flat Roof, south oriented panels125 kW ( b 3000 2 f f f )

13.2 kWh/ ²System 125 kWp (about 3000 m2 of roof surface) kWh/m².year

Solar Thermal for DHW

XX kWh/m².yearfor DHW kWh/m .year

RES Heat Pump XX kWh/m².year

Others

RES Potential RES Production Potential13.2 kWh/m².year

Page 18: Implementation Case - ITIS Merloni Fabriano

18Recommended MeasuresITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Lighting System ReplacementReplacement

E Building

NOW Use and management

Demandreduction

Energyefficientsystems

Renewable energysupply

u d gManagement System

NZEB

PV System on the Gym Roof

Windows Replacementy

Heating: Functional Sectors and Level Sectors managed by BMSLighting: Presence Control

Page 19: Implementation Case - ITIS Merloni Fabriano

19Recommended MeasuresITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

Measure Why is recommended and whatMeasure Why is recommended and what

Windows Replacementb l d

Very poor performance windows are still present, theyd b l d i h lto be completed need to be replaced with low‐e ones.

Photovolatic System Further Electric Energy Production

Building ManagementSystem

For reducing energy waste and optimizing usageefficinecy

Lighting Replacementand Management System

Very poor lighting system is deployed. Luminaires needto be replaced and a management system integrated.

Syste

Page 20: Implementation Case - ITIS Merloni Fabriano

20Specific Features and RemarksITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

f kSpecific Remarks

The school has a lot of “evening courses”, thus it is opened till night.

There are a lot of glazed facades. Windows Replacement was started in 2015 with 4 facades. It needs to be completed.

Seismic Compliance needs to be assessed. After the assessment works could be needed.

Page 21: Implementation Case - ITIS Merloni Fabriano

21Funding OpportunitiesITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy

l f iRelevant Information:• Until the Energy Supplying and Management Contract are managed through 

CONSIP (Ministerial Central Society for PA Supplying and Purchasing), the ESCOs cannot be involved in the funding mechanism

Funding Potential:g• Self funding: no • Regional Initiatives: 

– DGR 124 02 03 2015 – Regional Government Criteria for getting Ministerial Fund “3‐year PlanningDGR 124 02.03.2015  Regional Government Criteria for getting Ministerial Fund  3 year Planning for School Buildings” (art.10 Law 128/2013, DM 23.01.2015, also known as “IEB loan decree”

– ERDF – Thematic Objective 4 – Action 13.1 Promozione dell’eco‐efficienza e riduzione di consumi di energia primaria negli edifici e strutture pubbliche

• National Funding: 

• European Direct Funding: