Ig4 production diary film trailer

4
Extended Diploma in Creative Media Production IG3 Assignment Production Diary PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including Possible Contingency Plans If Problems Anticipated) Mon W/B 24/01/14 (Detailed Weekly Summary) I collected the results from survey monkey and analysed them giving me a better understanding of what people would like to see from my Trailer. This task helped me to understand what my audience wanted to see. Create a risk assessment for my trailer. Look at all of the possible safety hazards that could occur. Mon W/B 31/01/14 (Detailed Weekly Summary) Completed my Risk Assessment looking at all the possible safety hazards. Started working on the Script for my Movie Trailer. Continue working on the script for my Movie Trailer, adding different camera angles/shots. Mon W/B 07/02/14 (Detailed Weekly Summary) Finished my Movie Trailer Script and started to work on Call sheets Finish Call Sheet and start work on storyboard. Mon W/B 14/02/14 (Detailed Weekly Summary) I managed to finish my call sheet and started to work on my storyboards planning out the different shots that will be in my Trailer. Finish Storyboards, start working on location recce. Mon W/B 21/02/14 (Detailed Weekly Summary) - - Mon W/B 28/02/14 (Detailed Weekly Summary) I Finished my Storyboards and started working on my location Recce. I plan to finish my Location Recce and start working on Shooting Schedules. Mon W/B 07/03/14 (Detailed Weekly Summary I managed to create my Shooting Schedule. The next thing that I need to do is start filming my trailer, filming will take place between 14/03/14 – 18/04/13. Mon W/B 14/03/14 I started filming some test shots, looking Shoot some footage that can be used in

description

 

Transcript of Ig4 production diary film trailer

Page 1: Ig4 production diary film trailer

Extended Diploma in Creative Media ProductionIG3 Assignment Production Diary

PROGRESS UPDATEPLAN FOR NEXT MONTH / WEEK (Including Possible Contingency Plans If Problems Anticipated)

Mon W/B 24/01/14(Detailed Weekly Summary)

I collected the results from survey monkey and analysed them giving me a better understanding of what people would like to see from my Trailer. This task helped me to understand what my audience wanted to see.

Create a risk assessment for my trailer. Look at all of the possible safety hazards that could occur.

Mon W/B 31/01/14(Detailed Weekly Summary)

Completed my Risk Assessment looking at all the possible safety hazards. Started working on the Script for my Movie Trailer.

Continue working on the script for my Movie Trailer, adding different camera angles/shots.

Mon W/B 07/02/14(Detailed Weekly Summary)

Finished my Movie Trailer Script and started to work on Call sheets Finish Call Sheet and start work on storyboard.

Mon W/B 14/02/14(Detailed Weekly Summary)

I managed to finish my call sheet and started to work on my storyboards planning out the different shots that will be in my Trailer.

Finish Storyboards, start working on location recce.

Mon W/B 21/02/14(Detailed Weekly Summary)

- -

Mon W/B 28/02/14(Detailed Weekly Summary)

I Finished my Storyboards and started working on my location Recce.

I plan to finish my Location Recce and start working on Shooting Schedules.

Mon W/B 07/03/14(Detailed Weekly Summary

I managed to create my Shooting Schedule. The next thing that I need to do is start filming my trailer, filming will take place between 14/03/14 – 18/04/13.

Mon W/B 14/03/14(Detailed Weekly Summary

I started filming some test shots, looking the different types of camera angles.

Shoot some footage that can be used in my final Trailer

Mon W/B 21/03/14(Detailed Weekly Summary

Due to people not being available to film, I filmed some footage that didn’t require any people such as hallways and stairs.

My plan for next week is to find the time to film more important scenes with people in them. I want to shoot scenes with different camera angles in order to get the best look I can for my trailer. This will also help when I am putting my trailer together because I will have more

Page 2: Ig4 production diary film trailer

Extended Diploma in Creative Media ProductionIG3 Assignment Production Diary

footage to use.Mon W/B 28/03/14(Detailed Weekly Summary

I didn’t manage to film any scenes this week due to being ill on the days I planned to film. I started working on editing the footage that I already have leaving parts blank in the project where I will later add in the scenes that I have not yet filmed.

For next week I plan to have some new scenes to work on for my final trailer and add any effects needed through editing.

Mon W/B 04/04/14(Detailed Weekly Summary

I filmed some new scenes however I think I can improve their camera angles to make them look more professional.

I will be re shooting the scenes that I had this week to see if I can improve any of their camera angles and quality.

Mon W/B 11/04/14(Detailed Weekly Summary

I filmed some scenes but ran into problems; most of the scenes that I had filmed didn’t turn out like I had planned for the second time. This gave me the idea to create a simpler trailer that doesn’t require much talking. I now plan on creating a shorter trailer than I originally planned to. My trailer will have the same storyline but It will act as a teaser trailer. This way I will not need to properly explain or introduce any characters as it’s a teaser trailer and they are supposed to be unclear.

We have a two week break from college. I have thought out my new Idea and plan to shoot the rest of my footage in these two weeks off college. Whilst away I will be looking at different soundtracks which I can use for my Trailer. Once back from the two week holidays I plan to have my soundtrack chosen and all my footage filmed so I can focus on finishing my edit.

Mon W/B 18/04/14(Detailed Weekly Summary

N/A N/A

Mon W/B 25/04/14(Detailed Weekly Summary

I am back from the two week holiday and have managed to film most of the scenes for my trailer. The scenes are of good quality and will help to improve the overall quality of the final product.

My Plan for next week is to film the rest of the scenes for my trailer and try to finish the final edit of my trailer

Mon W/B 02/05/14(Detailed Weekly Summary

I filmed a few more scenes of my trailer but have still not yet managed to complete filming or the final edit.

Finish filming my trailer and complete the final edit.

Mon W/B 09/05/14(Detailed Weekly Summary

I managed to finish filming the rest of the scenes and edit most of my final trailer however; I have not yet managed to finish editing.

I have almost completed my final edit but I need to spend more time creating the movie titles and production logos to give them a more professional look.

Page 3: Ig4 production diary film trailer

Extended Diploma in Creative Media ProductionIG3 Assignment Production Diary

Mon W/B 16/05/14(Detailed Weekly Summary

My movie titles are complete and I believe to be good quality. I have added them to my final edit and managed to finish my trailer. I created a new survey on survey monkey where I will gather responses from people on how well they believe I did my final project. There are different questions in the survey that need to be answered. These answers will give me some feedback on how well I created my Teaser Trailer. I have also managed to start working on my final evaluation.

I plan to upload any work that is outstanding on my blog and gather the responses from the survey that I sent out. I will then try to complete my evaluation of my final product for next week.

Mon W/B 17/04/14(Detailed Weekly Summary

I have uploaded all of my work that was missing from my blog and completed my final evaluation.

Mon W/B 17/04/14(Detailed Weekly Summary

PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including Possible Contingency Plans)