IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D...

28
IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354 [email protected] www.iesve.com

Transcript of IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D...

Page 1: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

IES Faculty BIM Integration with IES

6th September 2011

Dr Sarah GrahamB Eng, C Eng MCIBSE, Eng D

UK Sales ManagerT: +44 141 945 8500C: +44 7837 251354

[email protected]

Page 2: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

0930 – 0940 Welcome and Introduction SG

0940 – 1030 BIM Integration Overview SG

1030 – 1100 The Issues

1100 – 1110 Comfort Break

1110 – 1145 Understanding Complexity

1145 – 1230 Question and Answer

Overview

Page 3: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

• BIM (Building Information Modelling)

− A process of generating and managing building data during its life cycle. It can use three-dimensional, real-time, dynamic building modelling software to increase productivity in building design, construction and maintenance period.

− “ A model-based technology linked with a database of project information” according to American Institute of Architects

What is BIM?

Page 4: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

• Multiple models into a “composite model”

What is BIM?

Energy Model

Composite Model

Architectural Model

Structural Model

Electrical Model

Plumbing Model

BIM (linked with phasing,

sequencing, construction

schedule)

Mechanical Model

• Graphical information -3D objects visual in the

model

• Non-graphical information

- Performance data

• Linked information - Schedule & cost

informationCost Model

Compliance Model

Other Model

Page 5: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

BIM process- a collaborative process

Building Owner f

ArchitectureContractor

Civil Engineering

Facilities Manager

Construction Manager

Electrical Engineer

Mechanical EngineerBIM f

Integrated Design Process

Page 6: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Conventional design process

Building design process

Master Planning

Concept Design

Schematic Design

Detailed Design

Completion In use

Performance analysis tool

Contractors, construction manager,

commissioning authority, cost

estimator

Mechanical, electrical, & civil

engineers

Mainly architect , structural engineer &

clients

Planning staff, clients

community member

Architect & clients

A linear design process

Users

Page 7: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Conventional design process

Construction

Tender documentation

Detailed Design

Schematic Design

Concept Design

Consultation& Engagement

Project start

completion

ConstructionConstruction Documents

Detailed Design

SchematicDesign

Time

Eff

ort

Page 8: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Integrated design process

Building design process

Traditional

Eff

ort

Time

ConstructionDocuments

Detailed Design

SchematicDesign

Construction

Key elements of integrated design process

• Inter-disciplinary collaboration between architects, engineers, cost consultants and facility managers

from the beginning of the design process

• Discussion of the various important performance issues and the establishment of a consensus on this

matter between client and designers

• Budget restrictions applied at the whole building level, with no strict separation of budgets for

individual building systems.

• Involvement of specialists (e.g. energy engineering, energy simulation, daylighting, comfort)

• Data sharing

• Clear articulation of performance targets and strategies, to be updated throughout the process by

the design team

• Documentation and transparency of design decisions

Page 9: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Integrated design process

Measurem

ent

& verification

Building

des

ign

A multi-disciplinary

design team

Concept design

Mas

ter

plan

ning

Schem

atic design

Det

aile

d d

esig

n

Completion

In use

process

Building

Performance

analysis tool

Mat

er p

lan

mod

ellin

g

Conceptual modelling

Param

etric

modelling

Load

/Ene

rgy

mod

ellin

g

Predictive/incentive modelling

Compliance modelling

A multi-disciplinary design team

•Landscape architect•Ecologist•Architect

•Energy specialist•Structural engineering

•Civil engineering•Mechanical engineer•Electrical engineer•Plumbing engineer

•Other specialists(fire, acoustics, daylighting, controls, etc.)

•Facility manager•Contractor

•Construction manager•Cost estimator

Page 10: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Building design process

Building design process

Master Planning

Concept Design

Schematic Design

Detailed Design

Completion In use

Climate

Locality

Site features

Nat resources

Urban form

Urban solar

Urban light

Visualise

Brief consequences

Building type

Climate & bldg type

Building form

Footprint headlines

Headline design directions

Headline sustainability

directions

Visualise

Baseline solution

Baseline outcomes

Footprint

Scheme directions

Building solar

Building light

Renewable directions

Sustainability directions

Basic loads

Compliance directions

Visualise

Brief refinement

Detail definitions

Systems

HVAC

Air flows

Building detail feature design

Loads – steady state

Energy – dynamic

Plant size

Optimisation

Energy compliance

Sustainability compliance

Certification

CFD etc studies

Visualise

Certification

Energy in use

Re-certification

Controls

Re-furbish & improve

Page 11: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Integrated approach to project delivery

<Virtual Environment> model of the Scottish Parliament

Building

Project location: Glasgow

Master planning

What if climate change?

2050?

Page 12: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Integrated approach to project delivery

<Virtual Environment> model of the Scottish Parliament

Building

Concept design

Sketch model

VE model

VE models with different glazing percentage

Page 13: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Integrated approach to project delivery

Schematic design

VE model with 20% glazing Suncast

EPC

Thermal result

Radiance

MacroFlo

Apache System

Page 14: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Integrated approach to project delivery

Detailed design

CFD

HVAC Cost Plan

Suncast

Simulex

EPC

Radiance

Page 15: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Model Merge

Original Model Room Data

New Model Room Data

• Changes to Imported Geometry are Updated in <VE> Model

Without Overwriting Input Data

Page 16: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

• Autodesk Revit Architecture 2008, 2009, 2010, 2011

• Autodesk Revit MEP 2008, 2009, 2010, 2011

• ArchiCAD via gbXML

•Microstation, Allplan via gbMXL

•Google Sketchup 6 & 7

• Google Sketchup Pro 6 & 7

The benefits….

…don’t have to rebuild geometry to run analysis…the potential to change the dialog between architects and engineers

What does software does IES work with?

Graphisoft ArchiCAD gbXML

Other gbXML

Page 17: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

IES VE: Autodesk Revit Plug-in Updates

gb

XM

L<

VE

>

How it works:1.Draw Geometry in Autodesk Revit

2. From the Revit Toolbar:

• Set Building Location

• Define Building Parameters:• Building Type• Construction Materials• Building System Types• Room Types

3. Launch IES VE-Toolkits/VE-Pro

4. Choose Analysis Type

Page 18: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

gbXML Hierarchy

Page 19: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Adjacencies

Adjacencies

We spoke about the importanceof ‘rooms’. Within Revit, you candefine a wall to be an exteriorwall, but this will mean nothingwhen it comes to the gbXMLtranslation. The only way a wallis recognized as an exterior vsan interior wall is by theiradjacencies.

So for an element to be definedas ground floor slab, it is ahorizontal surface adjacent to aroom (otherwise it is a shadingdevice) that is not in contact withany room below. For a floor, it’sa horizontal surface that is incontact with a room above andbelow. For a roof, it’s ahorizontal surface that is not incontact with any room above.

Exterior walls are verticalsurface that is not in contact withan adjacent room on one side

Page 20: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Adjacencies

Page 21: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Keep It Simple

Keep your geometry as simple as possible!

• Is this geometry absolutely necessary for the type of analysis I am running?

• Can I eliminate anything from my model? (Purge unused, etc)

• There are often thousands of shading surfaces in a Revit file. If you are doing a daylight analysis, are the 4 cm mullions going to affect the outcome? They will affect the runtime significantly.

Page 22: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Basic Modelling - Columns

Page 23: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Basic Modelling – Problem Wall Conditions

Page 24: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Basic Modelling – Problem Wall Conditions

Page 25: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Basic Modelling – Shading Elements

Page 26: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

Basic Modelling – Openings

Page 27: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

IES VE: gbXML “Healing Tools”

Page 28: IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354.

<Virtual Environment> Software Suite Integrated sustainable building design analysis toolsDr Sarah Graham ([email protected])