ICT Construction Plan Evaluation and Reliability Assessment Part 2

24
SPP.org 1

description

ICT Construction Plan Evaluation and Reliability Assessment Part 2. Entergy ICT Transmission Planning Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana. Map Legend. Code for Base Plan and Construction Plan Projects Indicated on Maps BP08-036 = Project Number from 2008 Base Plan - PowerPoint PPT Presentation

Transcript of ICT Construction Plan Evaluation and Reliability Assessment Part 2

Page 1: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 1

Page 2: ICT Construction Plan Evaluation and Reliability Assessment Part 2

ICT Construction Plan Evaluation and Reliability Assessment Part 2Entergy ICT Transmission Planning Summit

July 29, 2008Astor Crown PlazaNew Orleans, Louisiana

Page 3: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 3

Project is not included in

model

Code for Base Plan and Construction Plan Projects Indicated on Maps

BP08-036 = Project Number from 2008 Base PlanCP(2011) = 2008 Construction Plan and Expected In-Service YearDCP(2011) = 2009 Draft Construction Plan and In-Service Year

Map Legend

BP08-036 CP(2011)

DCP(2011)

Background Color Indicates Projects’ Inclusion In Case

Project is in 2017 model

Page 4: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 4

Page 5: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 5

Page 6: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 6

Page 7: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 7

NANA

DCP(2013)

Page 8: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 8

Page 9: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 9

Page 10: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 10

Page 11: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 11

Page 12: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 12

Page 13: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 13

Page 14: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 14

Page 15: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 15

Page 16: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 16

Page 17: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 17

Page 18: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 18

Page 19: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 19

Page 20: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 20

NANA

DCP(2013)

Page 21: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 21

Page 22: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 22

Other Areas

These concerns seen in real-time may be relieved by projects in the Base Plan, Construction Plan or Draft Construction Plan.

• Hot Springs-Bismark 115kV FTLO El Dorado-Longwood 345kV (Base Plan Project)

• Liberty-Gillsberg 115kV FTLO Franklin-Bogalusa 500kV (Construction Plan Project with ISD 2009)

• Hartburg-Inland Orange 230kV FLTO Hartburg-Cypress 500kV (Draft Construction Plan Project with ISD 2010)

Page 23: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 23

Base Plan Development Next Steps

• Stakeholder Comments

• Discuss Stakeholder Comments at September LTTIWG

• Present Draft Base Plan at October LTTIWG

• Finalize Base Plan and Post January 2009

Page 24: ICT Construction Plan Evaluation and Reliability Assessment Part 2

SPP.org 24

Steve PurdyLead Engineer, ICT Planning

[email protected]

Jason RussellEngineer II, ICT Planning

[email protected]