![Page 1: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/1.jpg)
SPP.org 1
![Page 2: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/2.jpg)
ICT Construction Plan Evaluation and Reliability Assessment Part 1Entergy Transmission Summit
July 29, 2008Astor Crown PlazaNew Orleans, Louisiana
![Page 3: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/3.jpg)
SPP.org 3
Presentation Overview
• Background, Assumptions, Procedures
• Base Plan Study Areas
• Contingency Scan of Long-Term Models
1. Near-Term (2009/2013 Models)
2. Long-Term (2017 Model)
• Low Hydro Sensitivity
• Areas Showing Up In Real-Time
• Next Steps
![Page 4: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/4.jpg)
SPP.org 4
Assumptions for Construction Plan Contingency Scan
• Models
• Base Case 2007-Series (Update 2)
• Near-term: Summer Peak 2009 and 2013.
• Longer-term: Summer Peak 2017.
• Model Changes
• The latest confirmed transmission service reservations were modeled.
• Newly in-service equipment was modeled.
• All 2009 Draft Construction Plan Projects were added in the year following the in-service year, including Supplemental upgrades.
• 2008 Base Plan upgrades were not included if they were not also in the Draft Construction Plan.
![Page 5: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/5.jpg)
SPP.org 5
Assumptions for Construction Plan Contingency Scan
• Monitored Elements and N-1 Contingencies
• All facilities within Entergy footprint including embedded areas and ties to external areas, plus CLECO and LUS at 69 kV and higher.
• First-tier areas at 345 kV and higher.
• NERC Category A:
• Thermal Limits: <100% of Rate A
• Voltage Limits: +/- 5% of Nominal
• NERC Category B:
• Thermal Limits: <100% of Rate A
• Voltage Limits: +5% / -8% of Nominal
• For elements outside the limits, the analysis was repeated for the breaker-to-breaker contingency.
• Elements that were still outside the limits were flagged.
• Elements that were within the limits, but for which the Consequential Load >100 MW were flagged. (“100 MW Rule”)
![Page 6: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/6.jpg)
SPP.org 6
Results for Category A
Thermal Overloads
Nominal kV Level 2009 2013 2017
69 0 0 5
115 0 0 1
161 0 0 1
TOTAL 0 0 7
Undervoltages
Nominal kV Level 2009 2013 2017
69 2 4 4
115 0 0 2
138 8 0 0
161 0 0 1
230 0 0 1
500 0 0 0
TOTAL 10 4 8
![Page 7: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/7.jpg)
SPP.org 7
Project is not included in
either model
Code for Base Plan and Construction Plan Projects Indicated on Maps
BP08-036 = Project Number from 2008 Base PlanCP(2011) = 2008 Construction Plan and Expected In-Service YearDCP(2011) = 2009 Draft Construction Plan and In-Service Year
Map Legend
BP08-036 CP(2011)
DCP(2011)
Background Color Indicates Projects’ Inclusion In Case
Project is in 2013 model
only
Project is in both 2009 &
2013 models
![Page 8: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/8.jpg)
SPP.org 8
Arkansas
![Page 9: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/9.jpg)
SPP.org 9
BP08-036 CP(2011)
DCP(2011)
![Page 10: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/10.jpg)
SPP.org 10
![Page 11: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/11.jpg)
SPP.org 11
BP08-003CP(?)
DCP(?)
BP08-002NANA
![Page 12: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/12.jpg)
SPP.org 12
BP08-012NANA
BP08-011NANA
BP08-047CP(2011)
DCP(2011)
NANA
DCP(2010)
![Page 13: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/13.jpg)
SPP.org 13
BP08-004NANA
BP08-005NANA
(Supplemental)CP(2008)
NA
BP08-001NA
DCP(2013)
BP08-047A-DCP(2008)
DCP(2008)
![Page 14: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/14.jpg)
SPP.org 14
BP08-013NANA
BP08-014NANA
BP08-007NANA
BP08-005NANA
BP08-004NANA
![Page 15: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/15.jpg)
SPP.org 15
BP08-027NANA
(Supplemental)CP(2010)
DCP(2010)
![Page 16: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/16.jpg)
SPP.org 16
BP08-034CP(2008)
DCP(2008)BP08-035CP(2009)
DCP(2009)
![Page 17: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/17.jpg)
SPP.org 17
BP08-010CP(2008)
DCP(2008)
![Page 18: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/18.jpg)
SPP.org 18
BP08-052CP(2011)
DCP(2011)
![Page 19: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/19.jpg)
SPP.org 19
Mississippi
![Page 20: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/20.jpg)
SPP.org 20
BP08-020NANA
BP08-058CP(2009)
DCP(2009)
![Page 21: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/21.jpg)
SPP.org 21
BP08-061CP(2012)
DCP(2012)
NANA
DCP(2009)
![Page 22: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/22.jpg)
SPP.org 22
BP08-046CP(2012)
DCP(2012)
NANA
DCP(2011)
BP08-057CP(2011)
DCP(2011)
![Page 23: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/23.jpg)
SPP.org 23
BP08-019NANA
BP08-057CP(2011)
DCP(2011)
![Page 24: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/24.jpg)
SPP.org 24
Louisiana
![Page 25: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/25.jpg)
SPP.org 25
BP08-052CP(2011)
DCP(2011)
BP08-063CP(2010)
DCP(2010)
![Page 26: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/26.jpg)
SPP.org 26
BP08-030NANA
![Page 27: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/27.jpg)
SPP.org 27
![Page 28: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/28.jpg)
SPP.org 28
![Page 29: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/29.jpg)
SPP.org 29
BP08-049CP(2008)
DCP(2008)
BP08-050CP(2010)
DCP(2010)
BP08-051CP(2010)
DCP(2010)
![Page 30: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/30.jpg)
SPP.org 30
BP08-055CP(2008)
DCP(2008) BP08-062CP(2008)
DCP(2008)
![Page 31: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/31.jpg)
SPP.org 31
BP08-054CP(2009)
DCP(2009)
![Page 32: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/32.jpg)
SPP.org 32
BP08-028NANA
BP08-029NANA
BP08-032CP(2009)
DCP(2009)
NANA
DCP(2012)
(Supplemental)CP(2009)
DCP(2009)
![Page 33: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/33.jpg)
SPP.org 33
NANA
DCP (2010)
BP08-031NANA
BP08-048CP(2010)
DCP(2010)
BP08-037CP(2008)
DCP(2008)
BP08-023NANA
![Page 34: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/34.jpg)
SPP.org 34
BP08-021NANA
NANA
DCP (2011)BP08-023
NANA
![Page 35: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/35.jpg)
SPP.org 35
Texas
![Page 36: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/36.jpg)
SPP.org 36
CP(2012)CP(2012)
BP08-024CP(2008)
DCP(2008)
BP08-053CP(2008)
DCP(2008)
NANA
DCP(2012)
![Page 37: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/37.jpg)
SPP.org 37
NANA
DCP(2010)
![Page 38: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/38.jpg)
SPP.org 38
BP08-042CP(2009)
DCP(2009)
![Page 39: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/39.jpg)
SPP.org 39
BP08-043A/BCP(2011/12)
DCP(2011/12)
BP08-041CP(2010)
DCP(2009/11)
![Page 40: SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,](https://reader030.fdocuments.us/reader030/viewer/2022032806/56649f0c5503460f94c201a6/html5/thumbnails/40.jpg)
SPP.org 40
BP08-026CP(2009)
DCP(2009)