I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011.
-
Upload
aiden-maclean -
Category
Documents
-
view
218 -
download
1
Transcript of I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011.
I-95 HOV/HOT Lanes Project Update
Update
Fairfax County Transportation CommitteeFairfax County Transportation CommitteeSeptember 20, 2011September 20, 2011
The Title Would be Placed Here
Relief & new choices on I-95
Concurrent package of improvements:
• I-95 HOV/HOT Lanes Provide new choices, add capacity, extend and improve performance of existing HOV
• Department of Rail and Public Transportation Transit improvements Maximize benefit of growing HOT Lanes network by expanding bus service, Park & Ride lots
• VDOT Seminary HOV/Transit ramp Link HOV lanes on I-395 to growing Mark Center
• Seminary/Duke I-395 Auxiliary lanesImproved traffic movement on the regular lanes
The Title Would be Placed Here•Environmental Assessment
•Draft NEPA document approved for public release by FHWA
•Interchange Justification Report
•Draft IJR report being finalized
•Technical Requirements
•Preliminary Design for Design Public Hearing
Since March Transportation Committee Briefing
The Title Would be Placed Here
Key Milestones
• Combined Design Public Hearing, NEPA and Transit Study Information Meeting
• September 26th (Woodbridge)• September 28th (Springfield) • September 29th (Stafford)
• Finalize Environmental Document
• Finalize Interchange Justification Report
• Commercial Close
• Financial Close
• Construction as early as 2012
• Construction approximately 3 years
The Title Would be Placed Herewww.virginiahotlanes.com
Regional Project and Traffic Information www.vamegaprojects.com
WWW.511 VIRGINIA.ORG
Project Information Resources
The Title Would be Placed Here
Auxiliary lane
The Title Would be Placed Here
Mark Center HOV/Transit Ramp
• Delivered concurrently with HOV/HOT Lanes
• Links Seminary Road to I-395• Ramp restricted to
HOV/transit• No anticipated impact on
Winkler Nature Preserve• Environmental, traffic
studies begin 2011• Construction as early as
2013
The Title Would be Placed Here
Short & Intermediate TermImprovements