I-10 West Expansion Project - Public Hearing I-10 WEST EXPANSION PROJECT PUBLIC HEARING February 16, 2017 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

Transcript of I-10 WEST EXPANSION PROJECT -...

I-10 West Expansion Project - Public Hearing

I-10 WEST EXPANSION PROJECT PUBLIC HEARING

February 16, 2017 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

I-10 West Expansion Project - Public Hearing

Public Hearing Outline

2

Introductions

Meeting Format

Project Overview

Environmental Overview

Project Schedule and Funding

Next Steps

Public Comment Session

1

2

3

4

5

6

7

I-10 West Expansion Project - Public Hearing

Introductions

3

Elected Officials Present TxDOT Representatives Project Team Members Partner Agency Representatives

I-10 West Expansion Project - Public Hearing

Meeting Format

4

Purpose of the Public Hearing: To solicit feedback from the community regarding proposed improvements

Public Hearing Procedures and Protocols: – Sign up at speaker registration table

– Provide your name and organization (if applicable)

– Limit comments to three minutes

– Questions may be directed to project staff following the verbal comment period

Open House

I-10 West Expansion Project - Public Hearing

Additional Public Comment Opportunities

5

Give Comment Card to TxDOT Staff Tonight

Provide Comments Verbally to the Court Reporter

Email Comments To: [email protected]

Mail Comments To: I-10 West Expansion Project Team 415 Embassy Oaks, Suite 102 San Antonio, TX 78216 Deadline For Comments: Friday, March 3, 2017

I-10 West Expansion Project - Public Hearing

Project Location Map

6

I-10 West Expansion Project (FM 3351 to La Cantera Pkwy)

Approximately 5.9 Miles

I-10 West Expansion Project - Public Hearing

Project Description

Widen I-10 from FM 3351 to La Cantera Pkwy from an existing 4-lane facility to an 8-lane facility.

Provide one additional lane in each direction for High Occupancy Vehicles (HOV), such as carpools, vanpools, and buses; as well as one additional lane in each direction for General Purpose (GP) traffic.

All proposed improvements within existing ROW.

Project over both the Edwards Aquifer Recharge and Contributing Zones.

Project falls within the Upper Leon Creek watershed.

7

I-10 West Expansion Project - Public Hearing

Project Purpose & Need

The purpose of the proposed project is to improve mobility on I-10 between FM 3351 (Ralph Fair Rd) and La Cantera Pkwy to accommodate current and future traffic volumes.

The proposed project is needed because the capacity of I-10 between FM 3351 (Ralph Fair Rd) and La Cantera Pkwy is inadequate to meet current and future traffic volumes, resulting in reduced mobility (i.e. congestion).

8

I-10 West Expansion Project - Public Hearing

I-10 Corridor Development

9

I-10 West Expansion Project - Public Hearing

Existing & Projected Traffic Volume

10

7,720 14,200

30,000

59,000

79,000

101,000

146,100

0

20000

40000

60000

80000

100000

120000

140000

160000

1970 1980 1990 2000 2010 2019 2039

Aver

age

Dai

ly T

raffi

c

Year I-10 (Within Project Limits) - Average Daily Traffic

*TxDOT Traffic Count Maps; Traffic count collected on I-10 near Leon Springs. **TPP Memo (08/24/2014); Projected ADT for I-10 between FM 3351 (Ralph Fair Rd) and Dominion Drive.

* * * * * ** **

I-10 West Expansion Project - Public Hearing

Project Resolution / Approval

This project was originally proposed to incorporate a tolling component; however, through the public involvement process and actions of the Alamo Area Metropolitan Planning Organization (AAMPO) Policy Board and TxDOT Commission, the tolling component has been removed from the plan.

The AAMPO has included this project within the Transportation Improvement Program for the region.

On May 26, 2016, the TxDOT Commission passed the necessary actions to move forward with the project.

11

I-10 West Expansion Project - Public Hearing

Existing Typical Section – “No-Build” Alternative

12

I-10 West Expansion Project - Public Hearing

Proposed Typical Section – “Build Alternative”

13

I-10 West Expansion Project - Public Hearing

High Occupancy Vehicle (HOV) Lanes

What is an HOV lane?

An HOV lane, sometimes called a carpool lane, is a special lane reserved for the use of carpools, vanpools, buses, motorcycles, and emergency response vehicles.

These special lanes enable those who carpool or ride the bus to bypass the traffic in the adjacent, unrestricted General Purpose lanes. Lanes are identified as "2+" or "3+" which refers to the minimum number of occupants to qualify.

14

I-10 West Expansion Project - Public Hearing

What are the benefits of HOV lanes?

Reduction in Congestion

Increase in Ridership/Vanpools/Mass Transit Service

Moving More People

Improvement to Safety

Establishment of Corridor Reliability

Long-Term Mobility Choice

High Occupancy Vehicle (HOV) Lanes

15

I-10 West Expansion Project - Public Hearing

Existing & Projected Level of Service

16

Level of Service & Speed Analysis Results

Location 2019 "No Build" 2039 "No Build" 2019 "Build" 2039 "Build" LOS Speed LOS Speed LOS Speed LOS Speed

I-10 General Purpose Lanes D - E 58 F 48 B - C 66 C - D 63

I-10 West Expansion Project - Public Hearing

A draft Environmental Assessment (EA) was prepared along with the following technical reports:

The project would include mitigation for water resources and rare species

The Draft EA is available for public review upon request

Air Quality Technical Report Asbestos and Lead Testing Reports Biological Assessment/Biological Opinion Biological Technical Report Community Impacts Assessment Report Cumulative Impacts Assessment

Geologic Assessment / Karst Survey Hazardous Materials Site Assessment Indirect Impacts Analysis Traffic Noise Analysis Technical Report USFWS Biological Opinion Water Resources Technical Report

Environmental Considerations

17

I-10 West Expansion Project - Public Hearing

Project Development Schedule

18

Initial Planning (AAMPO

Long Range Plan)

TxDOT Advanced

Project Development

Project Stakeholder

Meeting Host Public

Meeting

Finalize Schematic

& Env Document

Host Public Hearing

Final Approval &

Begin Construction

Phase

FALL

2016

SUMM

ER 20

17

FALL

2014

SPRI

NG 20

15

WIN

TER

2009

TODA

Y

I-10 West Expansion Project - Public Hearing

I-10 West Expansion Project - Funding & Tentative Schedule

19

Project Funding: I-10 Estimated Total Project Cost - $70 Million Funding - Commission Discretionary (Category 12) Projected Timeline: Environmental Clearance - Spring 2017 Construction Letting - May 2017 Construction Start Date - Fall 2017 Anticipated Completion Date - Early 2020

I-10 West Expansion Project - Public Hearing

Recess

20

5 Minute Recess

Public Comments Following Recess

I-10 West Expansion Project - Public Hearing

Recess

21

5 Minute Recess

I-10 West Expansion Project - Public Hearing

Public Comments

22

Other Ways to Provide Comments: Give Comment Card to TxDOT Staff Tonight Provide Comments Verbally to the Court Reporter Email Comments To: [email protected] Mail Comments To: I-10 West Expansion Project Team 415 Embassy Oaks, Suite 102 San Antonio, TX 78216 Deadline For Comments: Friday, March 3, 2017

I-10 West Expansion Project - Public Hearing

Public Comments

23

3:00 TIMER

I-10 West Expansion Project - Public Hearing

Thank You

We greatly appreciate your attendance and participation.

Deadline for comments:

March 3, 2017