HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory...
Transcript of HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory...
HYUNDAI WIND TURBINE 2010.10.15.
Hyundai Heavy Industries’
Clean energy for the better future
1/12
Global Leader
in Shipbuilding
1,800 Acre
About 27,000
Employees
Hyundai Heavy Industries Co.,LTD. (HHI)
450 times of football fields
2/12
Business Divisions
ENGINE &
MACHINERY
INDUSTRIAL PLANT
& ENGINEERING
CONSTRUCTION
EQUIPMENT
SHIPBUILDING
OFFSHORE &
ENGINEERING
RENEWABLE ENERGY - WIND TURBINE
- SOLAR CELL & MODULE
ELECTRO ELECTRIC
SYSTEMS
3/11
Hyundai Wind Turbine Factory
Annual Capacity
600MW 33 Acres
100 Employees
Hyundai Wind Turbine Gunsan factory <Completed on September 2009>
4/11
1. Assembly & Factory Test Shop
2. Shipping Area
Hyundai Wind Turbine Factory
5/11
W/T model introduction-1
1) HQ1650 2) HQ2000
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
0 5 10 15 20
Pow
er
[kW
]
Wind Speed [m/s]
HQ1650/82
HQ1650/77
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
0 5 10 15 20 25
Pow
er
[kW
]
Wind Speed [m/s]
HQ2000/86
HQ2000/93
- Rated Power : 1.65MW
- Generator : DFIG
- Rotor Diameter : 80M
- Hub Height : 70M
– Rated Power : 2.0MW
– Generator : DFIG
– Rotor Diameter : 86M
– Hub Height : 80M
6/11
3) AV928(on-shore/off-shore) 4) HQ5000(Off-Shore)
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
0 5 10 15 20 25
Po
wer
[kW
]
Wind Speed [m/s]
– Rated Power : 2.5MW
– Generator : PMG
– Rotor Diameter 92M
– Hub Height : 80M
– Rated Power : 5MW
– Generator : PMSG
– Rotor Diameter 140M
– Hub Height 100M :
: :
W/T model introduction-2
7/11
• Location : 2 Yard in HHI
• Operation Start : 2009. 7.
• Availability : 98.5 %
• C.F(Capacity Factor) : 21.6 %
• Total Energy Production : 3.46 GWh
(Operation Period : 2009. 7.~2010.9.)
HQ1650 Prototype
W/T model introduction-3
8/11
• Location : Gunsan
• Operation Start : 2010. 6.
• Availability : 93.9 %
• C.F(Capacity Factor) : 9.4 %
• Total Energy Production : 378 MWh
(Operation Period : 2010. 6.~2010.9.)
HQ2000 Prototype
W/T model introduction-5
9/11
• Location : Beihai in china
• Operation Start : 2010. 6.
• Availability : 97.5 %
• C.F (Capacity Factor) : 29.4 %
• Total Energy Production : 1.6 GWh
( Operation Period : 2010. 6.~2010.9. )
AV928 Prototype
W/T model introduction-6
10/11
Thank you for your attention. 11/11