Hyper efficient data centres – key ingredient intelligence networkshop44
Transcript of Hyper efficient data centres – key ingredient intelligence networkshop44
>30MANUFACTURING
FACILITIES
$5.3B LTM
6/30/15 SALES
GLOBAL LEADERIN
INFRASTRUCTURE SOLUTIONS
FOR COMMUNICATION
S NETWORKS
~9800PATENTS AND
PENDING APPLICATIONS
>$200MIN ANNUAL R&D
~25,000EMPLOYEES
CSC maintains and develops the state-owned centralized IT infrastructure and uses it to provide nationwide IT services for research, libraries, archives, museums and culture as well as information, education and research management.
CSC has the task of promoting the operational framework of Finnish research, education, culture and administration. As a non-profit, government organization, it is our duty to foster exemplary transparency, honesty and responsibility.
History - CSC Datacentres
HPC, HTCHigh CapacityMed to high redundancyIAAS / DR -siteGrowth pathHighly efficient
Digital PreservationHosting for Helsinki metropolitan customersMedium capacityHigh redundancyHigh securityIAAS
Former paper mill site, now a thriving business park.
Heavy duty power grid operated by the landlord.
Brownfield /greenfield opportunities.
Good logistics & services Local industrial/building
competences.
The Site: Kajaani
Plug & Play.
10 fully loaded trucks. Physical assembly, power
connections, functionality and blackout tests, load tests with heat banks, air tightness for fire suppression systems tested etc.
From arrival to handover in two weeks.
1st installation was fast, 2nd was even faster
Challenges with Brick-and-Mortar
CAPACITYWhat does the business need – and where?
COST CapEx and OpEx
CALENDAR 2-5 years
Benefits of Modular
CAPACITY Right-sized from Day One – expand how YOU want
COST Lower CapEx as well as lower PUE and OpEx
CALENDAR 14-20 weeks
» Lower CAPEX
» Closer Alignment of CAPEX and Income
» Lower OPEX
» Time to Deploy
» Real White Space
» Lower Architect, Mechanical, Electrical Consultant costs
» Build What, Where and When required only
» Flexibility, Modules to Suit Requirements, (Density, Tier, Environmental etc.)
» Mobility, Move as Network Evolves
Modular Designed Purpose-Built Data Centres
CAPEX Saving
$
OPEX Savings
SmartAir™ Intelligent Cooling• Close-Coupled Cooling• Adaptable• Automated• Average pPUE as low as
1.03-1.06 • Lowest Possible
Facility PUE
Cooling Efficiency
Multiple Cooling Options1. Direct Outside Air with
Evaporative (Adiabatic)
2. Direct Outside Air with Evaporative + Chilled Water
3. Direct Outside Air with Evaporative + DX
4. Standalone Chilled Water cooling
5. Standalone DX Cooling
Cooling Efficiency
StructuralIntegrity
EnvironmentalLoad
DeploymentMaintenance
Space
Choice of 5 units:1-rack, 4-rack,
10-rack, 20-rack,30-rack
Plus: adjoining Vestibule white space
Power
Choice of 1 to 35kW per Rack, AC and
DC Power
Efficiency GreenCapExOpEx
Flexible Configuration
Scalable IntelligentManagement
UptimeTIER
TimescalesCapacity
Controls
ManageControlAlarm
OperateiTRACS DCIM
preconfigurable
Choice ofFree Air,
Evaporative,DX, Chilled Water,
or combination
Cooling
Design Freedom
Site Layout – Example
True Collocation Hallway, Ample room for Rack and Pallet Movement,Doors on IT Rooms and Electrical Panels Not ShownCustomizable Room for Technician Benches, Patch Panels (MDF/IDF), UPS
ASHRAE
Class Recommended Working temperatures
Allowable Working Temperatures Relative Humidity
A12004: 20 to 25 °C2008: 18 to 27 °C
2011: 18 to 27 °C15 to 32 °C
2004: 40 to 55 %Hr2008: max 60 %Hr2011: 8 to 80 %Hr
A2 Idem 10 to 35 °C 2008: 20 to 80 %Hr2011: 8 to 80 %Hr
A3 Idem 5 to 40 °C 8 to 85 %Hr
A4 Idem 5 to 45 °C 8 to 90 %Hr
ProductCold Aisle Temp
Cold Aisle RH
CommScope LxS-16016 QAM Chassis(~ A4) 0C – 45C 5% - 95%
Cisco 9000 Nexus Switch(~ A3)
0C – 40C 5% - 95%
IBM Lenovo BladeCenter H Server(~ A2) 10C – 35C 8% - 80%
EMC VNX Storage (~ RE/A2, A3)
18C – 27C (10C – 35C permitted, 5C – 40C if
<10% annual)
5.5C DP - 60% RH & 15C DP(20% - 80% permitted, 8% - 85% if
<10% annual)
Technical Performance > Internal Cold Aisle
Recommended
Accepted
Permitted
Briefly
Understanding Weather – Maximize Efficiency
Internal Conditions
Reaction
Out of Envelope
pPUE Calcs
Water Usage
ElectricalUtilization
Reaction
ASHRAE A2 (Annual)pPUE 1.082Water 262 m3/yearChiller hours 1
ASHRAE Recommended (Annual)
pPUE 1.089Water 4,067 m3/yearChiller hours 118
ASHRAE A1 (Annual)pPUE 1.084Water 523 m3/yearChiller hours 38
Weather Analysis Kijaani
Actual Results Jan –Dec 2015Set-point: 17-25oC, 20-80% RH
pPUE 1.038Water 146 m3/yearChiller hours N/A
Welcome to the Connected and Efficient Data Center
Data Center on Demand™
iTRACS® Data Center Infrastructure Management
imVision® Intelligent Infrastructure Solutions
P O W E R I N G Y O U R F U T U R E
CommScope Fiber Infrastructure
CommScope Copper Infrastructure
• Fibre Guide• Osmium• MPO/MRJ21
CSC Kajaani : CommScope in Action
12 week Delivery
1.038 PUE (year to date)
0.018 WUE (ltr./kWh)
Second DCU20 installation at Kajaani
Summary
Major Challenges• How much space will be require?• When will we require it?• What density will we require?• What resilience will we require?• Will I be able to move some applications to the Cloud?• How can I demonstrate reduction in Carbon emission ?• Energy loads/costs rising.• Headache.
Solution: Build efficient units only what is required, when it is required and where it is required.
=MODULAR