Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme...

20
Hydrologic Risk Analysis: Hydrologic Risk Analysis: Extreme Floods and Probability Estimates Extreme Floods and Probability Estimates

Transcript of Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme...

Page 1: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Hydrologic Risk Analysis:Hydrologic Risk Analysis: Extreme Floods and Probability EstimatesExtreme Floods and Probability Estimates

Page 2: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Hydrologic Risk Analysis:Hydrologic Risk Analysis: Extreme Floods and Probability EstimatesExtreme Floods and Probability Estimates

PMF and (Single) Deterministic Floods No PMF and (Single) Deterministic Floods No Longer Adequate Longer Adequate –– more information requiredmore information required

Need Probability Estimates and Full DistributionsNeed Probability Estimates and Full Distributions

Hydrologic Hazard CurvesHydrologic Hazard Curves

(Peak Flow and Volume Frequency Curves)(Peak Flow and Volume Frequency Curves)

1,0001,000--year to 10,000year to 10,000--year (typical for failure year (typical for failure probability)probability)

beyond 10,000beyond 10,000--year Return Period year Return Period -- extrapolation!extrapolation!

HydrographsHydrographs

range of basin responserange of basin response-- volume, timing, shape and volume, timing, shape and include uncertaintyinclude uncertainty

Maximum Reservoir LevelsMaximum Reservoir Levels

integrate initial reservoir, hydrographs, probabilitiesintegrate initial reservoir, hydrographs, probabilitiesSlide Courtesy of John England, USBR

Page 3: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Probable Maximum Flood (PMF)Probable Maximum Flood (PMF)PMF: The maximum runoff condition resulting from the most PMF: The maximum runoff condition resulting from the most severe combination of hydrologic and meteorological severe combination of hydrologic and meteorological conditions that are considered reasonably possible for the conditions that are considered reasonably possible for the drainage basin under study.drainage basin under study.

DesignDesign--Based Standard Based Standard –– Maximum Condition; NO Estimate Maximum Condition; NO Estimate of Likelihoodof Likelihood

Reclamation uses the PMF as the upper limit of flood Reclamation uses the PMF as the upper limit of flood potential (maximum) at a site for storm durations defined by potential (maximum) at a site for storm durations defined by the PMPthe PMP

PMF used as initial screen for overtoppingPMF used as initial screen for overtoppingSlide Courtesy of John England, USBR

Page 4: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

ReclamationFlood Hazard Methods

See also USACE (2008) Inflow Flood Hydrographs Report

Slide Courtesy of John England, USBR

Page 5: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

ReclamationFlood Hazard Methods

See also USACE (2008) Inflow Flood Hydrographs Report

Slide Courtesy of John England, USBR

Page 6: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Hydrologic Hazard Curves: Extreme Hydrologic Hazard Curves: Extreme Flood Probability Estimation MethodsFlood Probability Estimation MethodsFlood Frequency Analysis with Flood Frequency Analysis with

Historical/Historical/PaleofloodPaleoflood DataDataHydrograph Scaling and VolumesHydrograph Scaling and VolumesGRADEX MethodGRADEX MethodAustralian RainfallAustralian Rainfall--Runoff MethodRunoff MethodStochastic EventStochastic Event--Based Precipitation Runoff Based Precipitation Runoff

ModelingModeling (SEFM)(SEFM)Stochastic RainfallStochastic Rainfall--Runoff Runoff ModelingModeling with TREXwith TREX

Swain et al. 2004, 2006Slide Courtesy of John England, USBR

Page 7: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Hydrologic Hazard Curves and Hydrologic Hazard Curves and ExtrapolationExtrapolation

Page 8: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Hydrologic Hazard DataHydrologic Hazard Data

USBR (1999)Slide Courtesy of John England, USBR

Page 9: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

PaleofloodPaleoflood MethodsMethods

House et al. (2002) AGU Paleoflood Monograph

Slide Courtesy of John England, USBR

Page 10: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Peak Flow Frequency CurvePeak Flow Frequency Curve

Slide Courtesy of John England, USBR

Page 11: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Extreme Flood Probability Extreme Flood Probability Estimation Methods: Estimation Methods: RainfallRainfall--RunoffRunoffFlood Frequency Analysis with Flood Frequency Analysis with

Historical/Historical/PaleofloodPaleoflood DataDataHydrograph Scaling and VolumesHydrograph Scaling and VolumesGRADEX MethodGRADEX MethodAustralian RainfallAustralian Rainfall--Runoff MethodRunoff MethodStochastic EventStochastic Event--Based Precipitation Runoff Based Precipitation Runoff

ModelingModeling (SEFM)(SEFM)Stochastic RainfallStochastic Rainfall--Runoff Runoff ModelingModeling with TREXwith TREX

Slide Courtesy of John England, USBR

Page 12: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Principles for Improving estimation with annual Principles for Improving estimation with annual exceedance probabilities on the order of 10exceedance probabilities on the order of 10--33 or or smallersmaller

1.1. Substitution of space for timeSubstitution of space for time2.2. Introduction of more Introduction of more ‘‘structurestructure’’ into modelsinto models3.3. Focus of extremes or Focus of extremes or ‘‘tailstails’’ as opposed to or as opposed to or

even to the exclusion of central even to the exclusion of central characteristicscharacteristics

Extreme Flood Probability Extreme Flood Probability Estimation MethodsEstimation Methods

NRC (1988) Estimating Probabilities of Extreme Floods

Slide Courtesy of John England, USBR

Page 13: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Stochastic EventStochastic Event--Based RainfallBased Rainfall--Runoff Model Runoff Model (SEFM) Key Elements(SEFM) Key Elements

Regional Rainfall Frequency using LRegional Rainfall Frequency using L--MomentsMoments

HydrometeorologicalHydrometeorological parameters treated as parameters treated as random variables (snowpack , infiltration..)random variables (snowpack , infiltration..)

Utilize Storm Patterns and Sequence of StormsUtilize Storm Patterns and Sequence of Storms

Runoff Computed using HRU Approach with Unit Runoff Computed using HRU Approach with Unit HydrographHydrograph

Perform Monte Carlo Simulations Perform Monte Carlo Simulations -- Frequency Frequency Analysis on output; examine combinations that Analysis on output; examine combinations that cause largest floodscause largest floods

Slide Courtesy of John England, USBR

Page 14: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Stochastic Event Flood Model: Peak Flow

y = 4.6937x4 - 127.47x3 + 1422.9x2 + 5099.9x + 5380.4

0

20

40

60

80

100

120

140

Thou

sand

s

ANNUAL EXCEEDANCE PROBABILITY

PEA

K D

ISC

HA

RG

E (ft3 /s

)

10-6

Extreme Value Type 1 Plotting Paper

10-2 10-3 10-510-1.5 10-4

Stochastic Model

Slide Courtesy of John England, USBR

Page 15: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Stochastic Event Flood Model: Reservoir Elevation

1195

1200

1205

1210

1215

1220

1225

1230

1235

ANNUAL EXCEEDANCE PROBABILITY

RES

ERVO

IR S

TAG

E (fe

et)

10-6

Extreme Value Type 1 Plotting Paper

10-2 10-3 10-510-1.5 10-4

Stochastic Model

Top of Dam = 1231

Slide Courtesy of John England, USBR

Page 16: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Hydrologic Hazard SummaryHydrologic Hazard SummaryReclamation utilizes a suite of methods for Reclamation utilizes a suite of methods for

estimating hydrologic hazard curves for estimating hydrologic hazard curves for dam safetydam safetyCombining streamflow, Combining streamflow, paleofloodpaleoflood and and

rainfall data allows more confidence in rainfall data allows more confidence in extrapolated flood frequency curvesextrapolated flood frequency curvesThe procedure relies on extracting The procedure relies on extracting

information from existing studies and information from existing studies and available dataavailable dataInitial characterization of hydrologic hazard Initial characterization of hydrologic hazard

can usually be accomplished with minimal can usually be accomplished with minimal efforteffort

Slide Courtesy of John England, USBR

Page 17: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Final Hydrologic Hazard Curve Final Hydrologic Hazard Curve

The amount of effort expended on analyzing a The amount of effort expended on analyzing a hydrologic hazard is dependent on the nature of hydrologic hazard is dependent on the nature of the problem and potential cost of the solutionthe problem and potential cost of the solution

When multiple methods are used, best estimate When multiple methods are used, best estimate is based on sound physical and scientific is based on sound physical and scientific reasoning for weighting or combining resultsreasoning for weighting or combining results

Initial characterization is usually replaced by more Initial characterization is usually replaced by more detailed studiesdetailed studies

Reclamation uses the PMF as the upper limit of Reclamation uses the PMF as the upper limit of flood potential at a site for storm durations flood potential at a site for storm durations defined by the PMP defined by the PMP

Slide Courtesy of John England, USBR

Page 18: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Slide Courtesy of John England, USBR

Page 19: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Slide Courtesy of John England, USBR

Page 20: Hydrologic Risk Analysis: Extreme Floods and Probability ......Hydrologic Risk Analysis: Extreme Floods and Probability Estimates, industries, hydropower, safety, initiatives, risk

Gibson Dam, MT June 1964

QUESTIONS????