Project Fact Sheet. Sainj – 100 MW Hydro Electric Power Plant
Hydro Power Project Management
description
Transcript of Hydro Power Project Management
![Page 1: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/1.jpg)
HYDRO POWER PROJECT MANAGEMENT
![Page 2: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/2.jpg)
STEP 1 – Site identification
Determine some potential sites to be visitedVisited the different sitesDetermine with experience the best potential
projectMake some calculations to confirm initial
ideasIMAGINE the project
![Page 3: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/3.jpg)
Step 1 - Initial reconnaissance
The river The intake
![Page 4: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/4.jpg)
Step 1 – Initial reconnaissance
La plateforme
![Page 5: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/5.jpg)
Step 2 - Prefeasibility study
Expecting results
Investment / ROI Sales price per Kw/h
Potentialités
Power (Mw) Energy (Mw/h)
Environmental situation
Geologic Hydrology Topographie
![Page 6: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/6.jpg)
Step 3 - Administrative phase
Negotiate Power Purchase Agreement (PPA) with local electricity company
Negotiate Concession Contract with the Ministry of Energy
Obtain all administrative permit depending of the country request
Obtain eventually authorization for taxes exoneration regarding import equipment (local investment code)
Implement local office and recruit human necessary resources
![Page 7: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/7.jpg)
Step 4 - Feasibility study
The blueprint of the project and any technical studies on: The water intake and related works The feeder canal and penstock The layout of the power house platform The power plant and its equipments External power station/facilities The evacuation channel Road access Base camp
![Page 8: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/8.jpg)
Step 4 - Feasibility study
Establish call of tenders and consultation of in and outside supplier / sub contractor
Establish budgets and planningStart the environmental studyStart construction access roads and base
camp
![Page 9: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/9.jpg)
Step 5 - Construction phase Equipment order processing
Control in supplier factory
Control before shipment
![Page 10: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/10.jpg)
Control before shipment Control at the arrival on site
Step 5 – Construction phaseLogistic and quality control
![Page 11: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/11.jpg)
Step 5 – Construction PhaseLogistic at reception pipes
![Page 12: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/12.jpg)
Step 5 – Construction phaseLanding preparation
![Page 13: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/13.jpg)
Step 5 – Construction PhaseAccess roads to finalize
![Page 14: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/14.jpg)
Step 5 – Construction PhaseAccess roads / bridge
![Page 15: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/15.jpg)
Step 5 – Construction PhaseIntake construction
![Page 16: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/16.jpg)
Step 5 - Construction phase Intake construction
![Page 17: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/17.jpg)
Step 5 – Construction phasePipes installation
![Page 18: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/18.jpg)
Step 5 – Construction phasePipes installation
![Page 19: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/19.jpg)
Step 5 – Construction phasePipes installation
![Page 20: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/20.jpg)
Step 5 – Construction phaseManifold installation
![Page 21: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/21.jpg)
Step 5 – Construction phasePower house installation
![Page 22: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/22.jpg)
Step 5 – Construction phasePower house installation
![Page 23: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/23.jpg)
Step 5 – Construction phasePower house installation
![Page 24: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/24.jpg)
Step 5 – Construction phaseEquipment installation
Trashing cleanOperational room
![Page 25: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/25.jpg)
Step 5 – Construction phaseEquipments installation - Turbines
![Page 26: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/26.jpg)
Step 5 – Construction phaseEquipments installation
![Page 27: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/27.jpg)
Step 5 – Construction phaseEquipments installation
![Page 28: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/28.jpg)
Step 5 – Construction phaseEquipment installation
![Page 29: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/29.jpg)
Step 5 Construction phaseWork supervision and quality control
Concrete testsWeekly meetings
![Page 30: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/30.jpg)
Step 5 – Construction phaseSocial and environmental comportment
Construction of a health center Seed lank
![Page 31: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/31.jpg)
Step 6 – Tests and operations
![Page 32: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/32.jpg)
Step 6 – Tests and operation
![Page 33: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/33.jpg)
Step 6 – Tests and operation
![Page 34: Hydro Power Project Management](https://reader038.fdocuments.us/reader038/viewer/2022102804/54c5d4a44a79596b4a8b4572/html5/thumbnails/34.jpg)
Inauguration