Objectives and goals

•  EIA context: –  Define physical characteristics of study area –  Define present influence of river flow –  Determine future influence of river flow

•  Minimum requirement to characterize –  Open water conditions –  Ice cover conditions

•  Determine river area of influence –  Plume delineation (salinity) –  Water masses characteristics –  Sediment transport

•  Define physical setting of habitats –  Salinity –  Temperature –  Turbidity –  Others

Page 3: Hydro Power Planning Department Power Projects Development ...

Available data 2005-2007, 2009 • 2005:

• Early July to Early September: • 9 weeks near shore • 3-4 weeks offshore (Sept. 11)

• CT-Tu, wave, TSS, hydrological, bathymetry • 2006:

• Early September to Mid-October • 4-6 weeks near and offshore (Oct. 11)

• Limited ADCP • CT-Tu, wave, TSS, hydrological, sediment

• 2007: • Near-shore only • Month of August

• 2009: • Winter survey (March) • Combined MH-ArcticNet

Page 4: Hydro Power Planning Department Power Projects Development ...

Available data 2005

Page 5: Hydro Power Planning Department Power Projects Development ...

Available data 2006

Page 6: Hydro Power Planning Department Power Projects Development ...

Available data 2006

Page 7: Hydro Power Planning Department Power Projects Development ...

Available data 2007

Page 8: Hydro Power Planning Department Power Projects Development ...

Study area •  Location of CTD – Ice profiles

Page 9: Hydro Power Planning Department Power Projects Development ...

Study area •  Location of water sampling (ArcticNet)

Page 10: Hydro Power Planning Department Power Projects Development ...

Study area •  Location of ADCP profiling

Page 11: Hydro Power Planning Department Power Projects Development ...

Study area •  Location of Ice Drifter

Page 12: Hydro Power Planning Department Power Projects Development ...

Study area •  Location of EMI survey

Page 13: Hydro Power Planning Department Power Projects Development ...

• Sediment sampling stations Available data 2006-2007

Page 14: Hydro Power Planning Department Power Projects Development ...

Results

•  Results

– Time series CT-Tu •  Overall descriptive statistics •  Tidal stages descriptive statistics

– Relative influence of tide and river flow

Page 15: Hydro Power Planning Department Power Projects Development ...

Descriptive statistics Median temperature

Page 16: Hydro Power Planning Department Power Projects Development ...

Descriptive statistics Median salinity

Page 17: Hydro Power Planning Department Power Projects Development ...

Mixing processes

Page 18: Hydro Power Planning Department Power Projects Development ...

Mixing processes

Page 19: Hydro Power Planning Department Power Projects Development ...

Surface salinity

Page 20: Hydro Power Planning Department Power Projects Development ...

Peculiarities: Relative importance of forcing agents on salinity

Page 21: Hydro Power Planning Department Power Projects Development ...

Results: turbidity

•  Cross-section of Turbidity – Data gaps – Missing data

Page 22: Hydro Power Planning Department Power Projects Development ...

Transect 1: Surface turbidity

Page 23: Hydro Power Planning Department Power Projects Development ...

Transect 1: Surface turbidity

Page 24: Hydro Power Planning Department Power Projects Development ...

Transect 1: Surface turbidity

Page 25: Hydro Power Planning Department Power Projects Development ...

Transect 1: Surface turbidity

Page 26: Hydro Power Planning Department Power Projects Development ...

Transect 1: Surface turbidity

Page 27: Hydro Power Planning Department Power Projects Development ...

Transect 1: Surface turbidity

Page 28: Hydro Power Planning Department Power Projects Development ...

Transect 1: Surface turbidity

Page 29: Hydro Power Planning Department Power Projects Development ...

Transect 1: Surface turbidity

Page 30: Hydro Power Planning Department Power Projects Development ...

Transect 1: Surface turbidity

Page 31: Hydro Power Planning Department Power Projects Development ...

Transect 1: Surface turbidity

Page 32: Hydro Power Planning Department Power Projects Development ...

Transect 1: Tidal variation of turbidity

Page 33: Hydro Power Planning Department Power Projects Development ...

Turbidity variations

Slight tidal effect No Neap-Spring

Page 34: Hydro Power Planning Department Power Projects Development ...

Peculiarities: Relative importance of forcing agents on turbidity

Page 35: Hydro Power Planning Department Power Projects Development ...

Tide related limits of fluvial or marine dominated zones

Page 36: Hydro Power Planning Department Power Projects Development ...

• Contrasting North and South Shores

• North

• Muddy

• South

• Sandy

• Narrow and Sinuous Streams

• Vegetation far from shore

• Vegetation close to shore

• Braided or Unchannelized Streams

• Remnant Beach Deposits