HUMAN RESOURCE MANAGEMENT INFORMATION SYSTEM
-
Upload
kennedy-beyan -
Category
Documents
-
view
23 -
download
4
description
Transcript of HUMAN RESOURCE MANAGEMENT INFORMATION SYSTEM
04/11/23 1
04/11/23 2
04/11/23 3
CONTENTS
Introduction Statement of the problemScope of the projectObjectives of the projectMethodology used Function of the system Application of the projectProblems faced during developmentConclusion and Recommendation
04/11/23 4
INTRODUCTION
Human Resource Management Information System (HRMIS) is the process of acquiring , training, appraising, and compensating employees, attending their labor relations, health, safety and fairness concerns.
Recruitment & Placement System manages the recruitment and placement process based on the manpower requisition
04/11/23 5
Statement of the problem
For an organization to be successful in its activities the need for well-structured system and placing the right employee in the right place is necessary.
So doing this manually is difficult to accomplish tasks easily and effectively.
04/11/23 6
Scope of the project
The scope of our project is limited to the recruitment and placement subsystem of Human Resource Management information system of Adama University.
Due to the following constraints Information Accessing, Budget Time
04/11/23 7
Objectives
General Objectives
The objective of this project is to develop a system that is computerized and applicable in improving the AU manual personnel system.
04/11/23 8
Cont…
Specific Objectives • Study the existing system• Identifying the problem under the
existing system• Identifying the Alternatives
solutions • Select the best alternative solution• System and Object design• Implementations • Testing
04/11/23 9
Methodology
Information gathering
Interview.
Observation, and reviewing related literature
Discussion among group members and advisor
04/11/23 10
Cont…
System Analysis and Design
UML (Unified Modeling Language).
use case diagrams, activity, Sequence and CRC diagrams
Component, Deployment, Persistence, and class diagrams.
04/11/23 11
Cont…
System development we use VB 6.0 for the front end as
means of communication between system & the user.
SQL 2000 as a back end to define the structure of the system for storing all the records.
04/11/23 12
Function of the system
Provides information about AU Employee
– Search– Delete– Add– update
Data storage and Retrieval
Enquiries and Reports facilities
04/11/23 13
Application of the project out put
Reduce the manpower required during
the recruitment and placement process
Easy to handle employee record after
placement
Information accessing is easy and fast
Minimize the time that it takes to achieve
a specific operation
04/11/23 14
Problems faced during development
Information accessing Resources Time and budget
Data lose due to viruses and system failure
were some of the challenges that we faced during the development.
04/11/23 15
Conclusion
HRMIS is one of the basic activity or services held in AU
AU personnel system uses manual system and has a lot of problems
We tried to solve those problems as much as possible related to recruitment and placement subsystem
We use the object oriented technique Analyze the problem of the existing
system
04/11/23 16
Cont…
We use object oriented analysis
Requirement analysis phase is the
backbone of the system development
We design the system using different
UML diagrams
We implement and accordingly test our
system
04/11/23 17
Recommendations
Based on our experience in the process of this project undertaking and as CSIT professional we recommend:-
Department of CSIT Developing a system is not an easy
task and it requires :• Time• Budget and resource
So our department should give attention to these constraints
04/11/23 18
Cont…
Adama university personnel officers Should have transparent relation with
the developer If the personnel officer use this system
it reduces time and work load knowledge of ICT/IT is very essential
for the personnel officers
04/11/23 19
Cont…
Any voluntary persons/CSIT professionals
The respective staffs should work together for the betterment of the development
It is possible to add, update and modify this project fully computerized by doing the rest of subsystems.
04/11/23 20