DES 1- F2 Rev1
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
Document Number
HST-A-TS-M-TR-0020
Rev Page
TR FOR HST MICROTURBINE HOUSING F01 1 of 25
Thang Long Joint Operating Company
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
SPECIFICATION TECHNICAL REQUISITION FOR
HST MICROTURBINE GENERATOR HOUSING
Prepared By:
PetroVietnam Technical Services Corporation
This cover page is a total record of all the revisions of this document identified by number and title. Each of the pages that follow this cover page in this document records only the latest revision for that page.
This document has been prepared on behalf of and for the exclusive use of PTSC/TLJOC and is subject to and issue in accordance with the agreement between PTSC/TLJOC and MARINE ENGINEERING SERVICES PTE LTD (MESPL). MESPL accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this document by any third party.
F01 1617-Dec-13 NQ DDM/NDK THS ISSUED FOR REVIEW
A01 04-Dec-13 NQ DDM/NDK THS ISSUED FOR IDC
REV DATE BY CHKDPTSC
M&C’S APPV
TLJOC’S APPV
DESCRIPTION
DES 1- F2 Rev1
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
Document Number
HST-A-TS-M-TR-0020
Rev Page
TR FOR HST MICROTURBINE HOUSING F01 2 of 25
CONTENTS
1. TECHNICAL DATA.................................................................................................................................... 3
2. SCOPE OF SUPPLY FOR EQUIPMENT AND MATERIAL...............................................................................5
3. ITEM LISTING.......................................................................................................................................... 7
APPENDIX A - INSPECTION AND TEST REQUIREMENTS....................................................................................8
APPENDIX B - SUPPLIER DEVIATION FORM.....................................................................................................9
APPENDIX C - VENDOR DATA REQUIREMENT LIST - VDRL..............................................................................10
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevF01
Page3 of 25
1. TECHNICAL DATA
Technical Requisition No.: HST-A-TS-M-TR-0020
THE SCOPE OF SUPPLY SHALL BE IN ACCORDANCE WITH THE DOCUMENTATION LISTED BELOW :
REFERENCE SPECIFICATION / DRAWING NUMBER
SPEC. / DWG. REV.
SPECIFICATION / DRAWING TITLE
HST-A-TS-M-SP-0001 F01 Specification for Microturbine Generator Housing
HST-A-TS-M-DS-0030 F01 Datasheet for MTG Housing Louver
GEN-A-TS-P-SP-0007 G01 Painting and Protective Coating Specification
GEN-A-TS-P-SP-0004 G01 Insulation Specification
GEN-0-00-S-SP-0002 G01 Welding Procedure and Performance Quality
GEN-0-00-S-SP-0003 G01 Welding & Fabrication Offshore Structures
GEN-0-00-S-DB-1001 G01 Structural Basis of Design
GEN-0-00-S-SP-0001 G01 Structural Steel Material Specification
GEN-0-00-S-SP-0005 G01 Specification for Structural Skid for Packaged Equipment
GEN-A-TS-M-SP-0007 G01 Specification for Microturbine Generator
HST-A-TS-V-DB-0001 G02 Safety Basis of Design
HST-A-TS-M-DW-0010-01 to 06 F01 GA Drawings for MTG Housing
HST-A-TS-P-DW-1001-00 G01 HST - Equipment Layout - Main Deck
HST-A-TS-P-DW-1008 G01 HST Equipment Layout – Elevation View - East
HST-A-TS-P-DW-1007 G01 HST Equipment Layout – Elevation View - South
HST-A-TS-M-DW-0001-02 G03 HST Wellhead Platform Mechanical Handling Layout Main Deck Sheet 2
HSTD-TS-M-2004 Microturbine Generator Package Vendor Data:
- - D01-001-Microturbine O&I Drawings (01G-8101)-D-1
- - D01-002-Fire & Gas System O&I (01G-8101)-F-1
- - D01-003-Hazloc Controller O&I (01PN-8101A)-D-1
- - D01-005-Microturbine O&I Drawings (Exhaust)-A-1
- - D01-006-Microturbine O&I Drawings (Rainhood)-A-1
- - D01-007-Fire & Gas System O&I (CO2 Cabinet)-A-1
- - Engine Removal Procedure
(APPENDIX A) - Inspection and Test Requirements
GEN-A-GE-Q-PR-0001 G01 Project Vendor Surveillance Plan for Bulk Material Specification
GEN-A-GE-Q-PR-0002 G01 General Quality Requirements Specification
GEN-A-GE-Q-PR-0003 G01 Vendor Data Requirement Specification
GEN-A-GE-Q-PR-0004 G01 Identification, Traceability, and Certification Requirement Specification
GEN-A-GE-Q-PR-0005 G01 Storage and Handling of Equipment and Materials Specification
GEN-A-GE-Q-PR-0006 F01 Master Vendor Data Requirement List (VDRL) Specification
GEN-A-GE-Q-PR-0007 G01 Equipment Protection and Preservation
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevF01
Page4 of 25
GEN-A-GE-Q-PR-0008 G01 Project Vendor Surveillance Plan for Tagged Equipment Specification
(APPENDIX C) - Vendor Data Requirement List
The revision of the above document/s may be updated subjected to Company's requirement. Vendor is required to check/request for the latest copies from the Contractor.
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevF01
Page5 of 25
2. SCOPE OF SUPPLY FOR EQUIPMENT AND MATERIAL
Technical Requisition No.: HST-A-TS-M-TR-0020
Title or Description : Technical Requisition for HST Microturbine Generator Housing
Location of Use : BLK 15-2 Development HST WHSP, Offshore Vietnam.
Reference Drawings and / or Specification :
Refer Page 3.
Scope of Supply : Manufacture, test and supply of Microturbine Generator Housing
ITEM QTY DESCRIPTION
1.0 Housing for HST Microturbine Generator
1.01Mechanical and structural design of the housing, including all attached components (doors, louvers, etc.)
1.02 Heat insulation for all roof and walls panel
1.03
Calculation and sizing for all louvers to ensure proper operation of Microturbine with requirements of airflow, water ingress protection, temperature and pressure drop to be strictly met.
1.04
Development of shop drawings for fabrication and erection, including interfacing with PURCHASER’s design staff (on various aspects of Mechanical, Structural) and interpretation on developing shop fabrication drawings and documents.
1.05
Procurement of all the housing components including doors, louvers, etc., per approved design/drawings. This procurement by VENDOR shall include all the required welding consumables and related items like jigs/fixtures etc., to assemble all the loose supplies.
1.06Shop fabrication, assembly, heat-treatment (where required), testing and certifications of all other shop fabricated components.
1.07 Progress reporting on all procurement, fabrication and erection activities.
1.08 Guarantee and warranty complete for the package and supplied items
1.09 Lifting lugs for housing
1.10 2 switchable on/off lights. One at the front, the other at the rear of MTG
1.11 Relocate F&G lamp and horn to outside of the housing
1.120Installation bolting set spare (10%)Start-up and commissioning spares (200% Washers, 10% Boltings).
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevF01
Page6 of 25
ITEM QTY DESCRIPTION
2.0Surface preparation, painting, packing, freight, transport, sea fastening secure, delivery to vesselSurface preparation, painting, packing, freight, transport, delivery to site offshore
3.0 Offshore installation
43.0 Testing & Commissioning
4.0 Guarantee and warranty complete for the package and supplied items
5.0 All the identified certification and issue of certificate of conformance
6.0Complete inspection, QA/QC and testing requirements including performance acceptance test
The HST Microturbine Generator Housing shall be provided in accordance with the Purchaser's
documents as listed on Technical Data.
The VENDOR shall be responsible to submit, together with the Tender, a list of deviations or
exceptions to this Specification, referenced Project Datasheets and Drawings. In the absence of any
exceptions, it will be construed that the VENDOR fully complies with this Specification.
The scope of supply for the Housing is further detailed in the Project Specification and Drawings.
The PURCHASER shall indicate the package envelope and interface points in the bid documents, and
no changes shall be made unless by mutual agreement.
The equipment shall be delivered in the minimum practical number of assemblies and to suit
transportation and receipt at site
The Vendor must provide all information requested, including a list of any exceptions and non-conformities to the specifications listed herein.
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevF01
Page7 of 25
3. ITEM LISTING
Technical Requisition No.: HST-A-TS-M-TR-0020
THE SCOPE OF SUPPLY SHALL BE IN ACCORDANCE WITH THE ITEMS LISTED BELOW :
ITEM No. TAG No. DESCRIPTION SUPPLIER QTY
1HST Microturbine Generator Housing
1
23456789
1011121314151617181920212223242526272829303132333435363738394041424344454647484950
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevF01
Page8 of 25
APPENDIX A - INSPECTION AND TEST REQUIREMENTS
RFQ Document No.:
Technical Requisition No.: HST-A-TS-M-TR-0020
Equipment Description: HST Microturbine Housing
Rev.: F01Tag No.:
Item No.Description /
Inspection ActivityInspection
CodeComments
1Approval of Vendor Data Schedule (VDS)
R
2 Approval of Vendor Documentation R3a Dimensional Checks, General
Appearance, Workmanship W, HTo Vendor Supplied
Approved FAT Procedures
4 Painting Inspection M, H
5 Inspection / NDT / Testing R, HRefer to
GEN-0-TS-M-SP-0002for further details
6Preparation for Shipment / Inspection Release
H
7 Final Documentation (IOM / MDR) R
NOTES:
1. Inspection and testing requirements shall be compliant with the “Specification for HST Microturbine Generator Housing” HST-A-TS-M-SP-0001.
2. The items listed above are the minimum requirements for the ITR. Vendor shall include these items inside their ITP. This shall be submitted as part of bidding documents.
INSPECTION CODES:
H = HoldW = Witness Point
R = Review PointM = Monitor Point
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevF01
Page9 of 25
APPENDIX B - SUPPLIER DEVIATION FORM
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page10 of 25
APPENDIX C - VENDOR DATA REQUIREMENT LIST - VDRL
MASTER VDRL ASSIGNMENT
C - CalculationsD -– DrawingsE - Equipment Performance DataG -– GeneralM - Operations and MaintenanceP - ProceduresR - Records and Certificates (NOTE 2)
Each category has an "alpha" code identifier and individual data items are numbered consecutively within each category. Recommended selections of required data submittals (i.e., "Q"--with quotation, "A"--approval, "C"--certified and "R"--record) for project use are provided below with the standard data codes and data descriptions/definitions.
Notes:
1. Vendor shall be responsible for liaising with 3rd party Certifying Authority with regards to the requirement for certified documents, in order to achieve full certification of this package. Purchaser will not be indicating a full list of “C” requirements in this VDRL
2. Bidder shall fully comply to the requirements as per latest revision of Master Vendor Data Requirement list (VDRL) specification, Doc. No. GEN-A-GE-Q-PR-0006.
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page11 of 25
RECOMMENDED DATA DATA SUBMITTALS REMARKS
CODE DATA DESCRIPTION/DEFINITION Q A C R
C – CALCULATIONS
C3 STRUCTURAL STEEL CALCULATIONS 4 2 A – X weeks after POC – X weeks after Approval
Calculations shall determine that the structure and any lifting aids are suitable for all phases of lifting, transportation, installation and operation without overstressing any member. This shall include fatigue calculations, if applicable.
C10 WIND LOAD CALCULATIONS 4 2 A – X weeks after POC – X weeks after Approval
C16
ACOUSTIC ENCLOSURE VENTILATION SYSTEM CALCULATIONSCalculation of air flow requirements and power requirement to substantiate design and sizing criteria. Taking into account the following:
a.) Air mass flowsb.) Inlet and exhaust pressure dropsc.) Temperature rise, heat loads and temperature gradientsd.) Filtration requirementse.) Back pressure at worst wind conditionsf.) Fire protection system requirements for extinguishing medium
concentrations, etc.Drawing of system to be provided. Full details of all assumptions shall be stated
4 2
A – X weeks after PO
C – X weeks after Approval
C29 INTAKE AND EXHAUST LOUVERS SIZING CALCULATIONS4 2
A – X weeks after PO
C – X weeks after Approval
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page12 of 25
RECOMMENDED DATA DATA SUBMITTALS REMARKS
CODE DATA DESCRIPTION/DEFINITION Q A C R
D – DRAWINGS
D1 OUTLINE DRAWINGS X 2 2 Q – Typically w/ Quote A – X weeks after POC – X weeks after Approval
Plan/elevation drawings with overall dimensions, connection dimensions and ratings, and required clearances for assembly, operation, and maintenance access.
D2 SHOP DETAIL DRAWINGS
6 2
A – X weeks after POC – X weeks after Approval
D3 EQUIPMENT ARRANGEMENT DRAWINGS X 2 2 Q – Typically w/ Quote A – X weeks after POC – X weeks after Approval
Relative dimensioned location of VENDOR supplied components.
D4 ASSEMBLY DRAWINGS 4 2 A – X weeks after POC – X weeks after ApprovalRelative location and dimensions of components and subassemblies
required for field assembly.
D5 EXPLODED VIEW DRAWINGS 4 2Show parts of an assembly, separated, but in proper relative position in relation to each other
A – X weeks after POC – X weeks after Approval
D6 SUPPORT LOADING DIAGRAM X 4 2 Q – Typically w/ Quote A – X weeks after POIdentify/show distribution of loads and moments on support structures.
Show maximum, design, and normal operating conditions.
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page13 of 25
D7 ANCHOR BOLT LOCATION DRAWINGS 4 2 A – X weeks after POShow size and dimensioned locations of anchor/ support bolts to equipment centerlines in three planes. Include bolt length and projection and detail of installation.
C – X weeks after Approval
D9 FLOOR PLAN DRAWINGS8 2
Q – Typically w/ Quote A – X weeks after PO
Show location of conduit areas, ventilation ducts, plumbing runs, and other similar data with dimensions
D18 DETAIL DRAWINGS 6 2Q – Typically w/ Quote A – X weeks after PO
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page14 of 25
RECOMMENDED DATA DATA SUBMITTALS REMARKS
CODE DATA DESCRIPTION/DEFINITION Q A C R
G – GENERAL
G1 VENDOR DATA SCHEDULE X 2 Q – Typically w/ Quote A – X weeks after POSubmit with quote and monthly after PO
Itemized list of VENDOR data with document titles and numbers referenced to COMPANY’S VDRL data item code numbers; include submittal dates/timing for issue. Preliminary List to be submitted with Proposal.
G2 FABRICATION/PRODUCTION SCHEDULE X 2 2 Q – Typically w/ Quote A – X weeks after PO R – X weeks after PO
G3 ACKNOWLEDGEMENT OF PURCHASE ORDER 1 R – X weeks after POVENDOR shall provide a signed acknowledgement copy of the formal Purchase Order and all Change Orders as a condition of payment.
G4 BILL OF INSTALLATION/ASSEMBLY MATERIALS X 6 Q – Typically w/ Quote A – X weeks after PO List of items, fasteners, doors, louvers, bearings, and subassemblies
(with quantities and material specifications) required for field assembly/ installation. Identify items supplied.
G6 EQUIPMENT WEIGHTS AND CENTER OF GRAVITY X 4 2 Q – Typically w/ Quote A – X weeks after POC – X weeks after Approval
Empty, operating and shipping weight. The center of gravity shall also be defined as well as projected allowances. Estimated weight and max. “not to exceed weight” submitted with proposal
G8 COMPLETED VENDOR’S DATA SHEETS X 4 Q – Typically w/ Quote A – X weeks after PODetail characteristics of completed item (if not covered under G7 above).
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page15 of 25
G9 CATALOG DATA X 4 Q – Typically w/ Quote A – X weeks after PO
G12 BOLT / FASTENER AND GASKET SCHEDULES 6 A – X weeks after POBill of material for bolts / fasteners and gaskets.
G13 ASSEMBLY/DISASSEMBLY SIZES AND WEIGHTS X 6 2 Q-Typically w/ Quote A – X weeks after POC – X weeks after Approval
Overall dimensions/weights of main components to be moved in assembly/ disassembly for construction or major overhaul.
G21 VENDOR EXPERIENCE LIST X Q – Typically w/ QuoteVENDOR to provide equipment model number, time in service, user contact name and contact number for all equipment of similar size and rating.
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page16 of 25
RECOMMENDED DATA DATA SUBMITTALS REMARKS
CODE DATA DESCRIPTION/DEFINITION Q A C R
M – OPERATIONS AND MAINTENANCE DATA
M1 OPERATING INSTRUCTIONS 12 A – X weeks after PO
Instructions for pre-commissioning, startup, normal operation, off-design operation, emergency operation, and shutdown.
M3 PRICED, RECOMMENDED SPARE PARTS FOR STARTUP/ COMMISSIONING X 2 2
Q – Typically w/ Quote A – X weeks after POR – X weeks after POFor commissioning spares and for special maintenance/ handling tools.
Include wearing parts such as bushings, seals, gaskets which need replacement after startup, test and shutdown prior to production start. Include gaskets and other similar components replaced after testing.
M4 PRICED, RECOMMENDED SPARE PARTS FOR TWO (2) YEARS OPERATION X 2 2 Q – Typically w/ Quote
A – X weeks after POR – X weeks after PO
M5 MINIMUM SPECIFIED OPERATING SPARES
X 2 2 Q – Typically w/ Quote A – X weeks after POR – X weeks after PO
M6 SPECIFIED CAPITAL SPARES
X 2 2 Q – Typically w/ Quote A – X weeks after POR – X weeks after PO
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page17 of 25
RECOMMENDED DATA DATA SUBMITTALS REMARKS
CODE DATA DESCRIPTION/DEFINITION Q A C R
P – PROCEDURES
P1 QUALITY CONTROL PROCEDURES X 2 Q – Typically w/ Quote A – X weeks after POVENDOR’S Quality Plan/Procedure shall be job specific and shall
clearly identify all Quality Control activities performed by the VENDOR including all holds points and witness points for COMPANY to comment and indicate those activities to be witnessed by COMPANY Surveillance Representative.
P3 NON-DESTRUCTIVE TEST PROCEDURES 4 2 A – X weeks after PO C – X weeks after ApprovalProvide procedures as applicable for radiographic, dye penetrant,
magnetic particle, or ultrasonic testing.
P4 WELDING PROCEDURE FOR SHOP, FIELD AND REPAIR WELDS, WELDER QUALIFICATION 4 2 A – X weeks after PO
C – X weeks after ApprovalP5 FACTORY/FIELD ACCEPTANCE TEST PROCEDURE 4 2 A – X weeks after PO
C – X weeks after ApprovalVENDOR and SUB-VENDOR procedure to determine that specified equipment components and total package operates according to purchase requirements. Including all major components to be tested and package testing.
P7 SURFACE PREPARATION AND PAINTING PROCEDURE 4 2 A – X weeks after PO C – X weeks after ApprovalProcedure used for cleaning and preparing surfaces for welding,
corrosion protection, and painting.
P8 FIELD SUPPORT RECOMMENDATIONS 4 2 A – X weeks after POC – X weeks after ApprovalProcedure for VENDOR’S recommendation for supporting
equipment/skid to COMPANY’S deck.
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page18 of 25
P9 SHIPPING, HANDLING AND STORAGE PROCEDURES X 4 4 Q – Typically w/ Quote For equipment shipped in more than one piece, a schedule is to be submitted which identifies all the major components of the package for use as a Check List at the receiving point to ensure all items have been received. Copy of documents shall accompany shipment.
A – X weeks after POR – X weeks after PO
VENDOR to propose techniques. Indicate size of container, number, weight, identification and contents, include detailed preservation procedure detailing inspection periods, materials required, etc. both prior to installation and post installation but prior to commissioning. Any special unpacking / handling requirements shall be stated. Material Safety Data Sheets (MSDS) shall be included. Export Control Compliance Number (ECCN) documents shall be included if applicable for shipment.
VENDOR to provide typical packing list with bid proposal.
P10 INSTALLATION/ERECTION PROCEDURE 4 2 A – X weeks after POC – X weeks after ApprovalDetailed description and procedures for installation of equipment to be
supplied and to be used at the fabrication site. The following information shall be included:
a.) Lifting points
b.) Lifting weights
c.) Shipping break points for panels and switchboard assemblies
d.) Erection match markings
e.) Fixing points
f.) Leveling procedures
g.) Alignment procedures
h.) Erection fasteners summary list
i.) Details of any special unpacking/handling requirements shall be stated.
P13 QUALITY CONTROL INSPECTION AND TEST PLANS X 2 2 2 Q – Typically w/ Quote A – X weeks after PO C – X weeks after ApprovalR – X weeks after PO
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page19 of 25
P19 DIMENSIONAL CHECK PROCEDURES 4 A – X weeks after PO
P21 MANUFACTURING PROCEDURE 4 A – X weeks after PO
P22 WEIGHT AND CENTER OF GRAVITY CONTROL 4 2 A – X weeks after POC – X weeks after ApprovalProcedure for weight and center of gravity estimating, reporting and
control.
P23 POSITIVE MATERIAL IDENTIFICATION PROCEDURE 4 2 A – X weeks after POC – X weeks after Approval
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page20 of 25
RECOMMENDED DATA DATA SUBMITTALS REMARKS
CODE DATA DESCRIPTION/DEFINITION Q A C R
R – RECORDS AND CERTIFICATES
R1 MECHANICAL COMPLETION CERTIFICATE 6 2 2 A – X weeks after POC – X weeks after ApprovalR – X weeks before Shipment
R2 CODE COMPLIANCE CERTIFICATE 6 2 2 A – X weeks after POC – X weeks after Approval R – X weeks before Shipments
R8 NAMEPLATE RUBBINGS OR PHOTOGRAPH 6 2 6
A – X weeks after POC – X weeks after ApprovalR – X weeks before Shipment
R11 PERFORMANCE/ACCEPTANCE TEST REPORT
4 2 After TestA – X weeks after POC – X weeks after Approval(R - Not to exceed 1 week after Testing)
R19 WELDING ROD CHEMICAL ANALYSIS CERTIFICATE 2 6 C – X weeks after Approval R – X weeks after PO
R20 WELDER CODE QUALIFICATION CERTIFICATE 4 2 6 A – X weeks after PO C – X weeks after ApprovalR – X weeks after PO
R21 WELDING PROCEDURE QUALIFICATION CERTIFICATE 4 2 6 A – X weeks after PO
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page21 of 25
C – X weeks after ApprovalR – X weeks after PO
R22 INSPECTOR’S QUALIFICATION CERTIFICATE NON DESTRUCTIVE TESTING 4 2 6
A – X weeks after PO C – X weeks after ApprovalR – X weeks after PO
R23 TEST RECORDS FOR NONDESTRUCTIVE TESTING 4 2 After Test A – X weeks after PO C – X weeks after Approval(R - Not to exceed 1 week after Testing)
Including all radiographic sheets.
R24 HEAT TREATMENT RECORDS
4 2After Heat Treatment
A – X weeks after PO C – X weeks after Approval(R - Not to exceed 1 week after Heat Treatment)
R25 DIMENSIONAL CHECK REPORT 2
After Check
C – X weeks after Approval (R - Not to exceed 1 week after Checking)
R26 SURFACE PREPARATION AND PAINTING REPORTS 4 2
After Check
A – X weeks after PO C – X weeks after Approval(R - Not to exceed 1 week after Checking)
R27 MATERIAL TEST CERTIFICATES (MILL CERTIFICATES) 4 2
As Required A – X weeks after PO
C – X weeks after Approval
R29 LIFTING EQUIPMENT TEST CERTIFICATES 2 2 C – X weeks after Approval R – X weeks after TestRequired for all:
a.) Hoists
b.) Cranes
c.) Wire ropes
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page22 of 25
d.) Shackles
e.) Padeyes
R30 POSITIVE MATERIAL IDENTIFICATION DATA 4 2 After Test A – X weeks after POC – X weeks after Approval(R - Not to exceed 1 week after Testing)
R40 CHEMICAL COMPOSITION CERTIFICATE
As Required (R - Not to exceed 1 week
after Testing)
R50 WELD MAP 4 2 A – X weeks after POC – X weeks after ApprovalTo be submitted with Weld Procedures. Include welder identification code
and WPS number for each structural and process weld.
R54 INSPECTION AND TEST PLAN X 2 2 2 Q – Typically w/ Quote A – X weeks after POC – X weeks after ApprovalR – X weeks after PO
R59 LIST OF MATERIALS FOR COMPONENTS X 4 2 2 Q – Typically w/ Quote A – X weeks after PO C – X weeks after ApprovalR – X weeks before Shipment
R60 NON-CONFORMITY REPORTS 2 2 C – X weeks after TestingR – X weeks after Testing
R61 RADIOGRAPHIC INSPECTOR’S QUALIFICATION CERTIFICATE 6 R – X weeks after PO
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page23 of 25
R62 RADIOGRAPHIC TEST RECORDS After Test
(R - Not to exceed 1 week after Testing)
R63 NON-DESTRUCTIVE INSPECTION RESULTS AND CALIBRATION RECORDS After Test
(R - Not to exceed 1 week after Testing)
R64 DESTRUCTIVE TEST RESULTS/CERTIFICATES (if applicable)
After Test
(R - Not to exceed 1 week after Testing)
document.docx
Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TR FOR HST MICROTURBINE GENERATOR HOUSING RevA01F01
Page24 of 25
RECOMMENDED
DATA DATA SUBMITTALS REMARKS
CODE DATA DESCRIPTION/DEFINITION Q A C R
DB – DATA BOOKS
DB-1 DATA BOOKS 2
R – X weeks after Shipment
Data Book shall compile all design data (DD), fabrication data (FD), and operating and maintenance manuals (OM).
DD – DESIGN DATA
DD-1 DESIGN DATA 4
R – X weeks before shipment
Design Data shall compile all calculations (C).
FD – FABRICATION DATA
FD-1 FABRICATION DATA 4 R – X weeks before
shipmentFabrication Data shall compile all procedures (P), records (R) , certificates (R), and some required detail drawings (D).
OM – OPERATING AND MAINTENANCE MANUAL
OM-1 OPERATING AND MAINTENANCE MANUAL 4 R – X weeks before
shipmentOperating and Maintenance Manual shall compile all drawings (D), equipment performance data (E), general document (G), operations and maintenance data (M), and some of required procedures (P).