7/31/2019 HSSN Project Floor Plans - Hirosh Tharaka ( Trazor )
1/10
CCTV Video
Cloud Server
Internet
Firewall
PSTN
Communication
Switch
G. Floor
Security
Switch
G. Floor
Com.
Switch
G. Floor
General
Switch
1st Floor
Security
Switch
1st Floor
Com.
Switch
1st
Floor
General
Swtich
2nd Floor
Security
Switch
2nd
Floor
Com.
Switch
2nd
Floor
General
Switch
Backbone Switch
(Layer 3)
CCTV Server Security Switch
Digital PABX
General Switch
Printer
Server
File Server
Application Server
Database Server
DNS Server Mail Server
Web Server
DNS / DHCP
Server
Firewall
Firewall
Ext. FirewallLoad Balancer
Router
RouterCSU / DSU - 2
( SLT 2MB _ Lease )
CSU / DSU - 1
( SLT 2MB _ Lease )
SIP Server
Staff Security Access
Data Server
VOIP Server
VPN Server
DC Server
Exchange Server
Proxy Server
Head Office Main Server Room
-
7/31/2019 HSSN Project Floor Plans - Hirosh Tharaka ( Trazor )
2/10
Car Park
Connection Room
Security Room
Reception
2 CCTV Camera 6 Port
Layer 2 Switch
C
1 Card Reader
C
1 Card Readers
6 VoIP
Phone
6 Port
Layer 2 Switch
(Security)
1 WiFI
Access Point
3 VoIP
Phones
3 Computers
C
2 Card Readers
6 Port
Layer 2 Switch
1 FAX
6 Port
Layer 2 Switch
6 Port
Layer 2 Switch(General)
6 Port
Layer 2 Switch
6 Port
12 LCDs
12 Port
6 Computers
for Security
6 Port
Layer 2 Switch
(Communication)
Server Room
4 CCTV Camera
-
7/31/2019 HSSN Project Floor Plans - Hirosh Tharaka ( Trazor )
3/10
Sales Department
Marketing Department
Software Engineering Department
Operations Department
C
1 Card Reader
6 Port
Layer 2 Switch
(Security)
C
1 Card Reader
C
1 Card Reader
6 Port
Layer 2 Switch
(Communication)
2 CCTV
Cameras
2 CCTV
Cameras
2 CCTV
Cameras
6 Port
Layer 2 Switch
2 CCTV
Cameras
C
1 Card Reader
6 Port
Layer 2 Switch6 Port
Layer 2 Switch
6 Port
Layer 2 Switch
15 Computers
2 Network Printers
18 Port
Layer 2 Switch
1 FAX
8 Computers
1 Network Printers
1 FAX
18 Port
Layer 2 Switch15 VoIP
Phones
12 Port
Layer 2 Switch
8 VoIP
Phones
12 Port
Layer 2 Switch
15 Computers 1 Network Printers
1 FAX15 VoIP
Phones
15 Computers
18 Port
Layer 2 Switch
18 Port
Layer 2 Switch
15 Computers
6 Port
Layer 2 Switch
(General)
15 VoIP
Phones
15 VoIP
Phones6 Port
Layer 2 Switch
18 Port
Layer 2 Switch
18 Port
Layer 2 Switch
6 Port
Layer 2 Switch 22 Laptops
3 WiFI
Access Point
18 Port
Layer 2 Switch
18 Port
Layer 2 Switch
-
7/31/2019 HSSN Project Floor Plans - Hirosh Tharaka ( Trazor )
4/10
6 Port
Layer 2 Switch
(General)
6 Port
Layer 2 Switch
(Communication)
6 Port
Layer 2 Switch
(Security)
Conference Room I Conference Room II
Roof Top Garden
Cafetiria
6 Port
Layer 2 Switch
6 Port
Layer 2 Switch
2 CCTV
Cameras
2 CCTV
Cameras
15 VoIP
Phones
18 Port
Layer 2 Switch15 VoIP
Phones
18 Port
Layer 2 Switch
15 Laptop
Docking Stations
1 WiFI
Access Point
18 Port
Layer 2 Switch15 VoIP
Phones
1 Laptop15 Laptop
Docking Stations
1 WiFI
Access Point
1 Laptop
18 Port
Layer
2 Switch
2 WiFI
Access Point
6 Port
Layer 2 Switch
-
7/31/2019 HSSN Project Floor Plans - Hirosh Tharaka ( Trazor )
5/10
CCTV Video
Cloud Server
Internet
Firewall
PSTN
Communication
Switch
G. Floor
Security
Switch
G. Floor
Com.
Switch
G. Floor
General
Switch
1st Floor
Security
Switch
1st Floor
Com.
Switch
1st
Floor
General
Swtich
2nd Floor
Security
Switch
2nd
Floor
Com.
Switch
2nd
Floor
General
Switch
Backbone Switch
(Layer 3)
CCTV Server Security Switch
Digital PABX
General Switch
Printer Server
File Server
Application Server
Database Server
DNS Server Mail Server
Web Server
DNS / DHCP
Server
Firewall
Firewall
Ext. FirewallLoad Balancer
Router
RouterCSU / DSU - 2
( SLT 2MB _ Lease )
CSU / DSU - 1
( SLT 2MB _ Lease )
SIP Server
Staff Security Access
Data Server
VOIP Server
VPN Server
DC Server
Exchange Server
Proxy Server
Proposed Site Two - Main Server Room
-
7/31/2019 HSSN Project Floor Plans - Hirosh Tharaka ( Trazor )
6/10
Reception
6 Port
Layer 2 Switch
(Security)
6 Port
Layer 2 Switch(General)
6 Port
Layer 2 Switch
(Communication)
2 CCTV Camera 6 Port
Layer 2 SwitchC
1 Card Readers1 WiFI
Access Point
3 VoIP
Phones
3 Computers
1 FAX
6 Port
Layer 2 Switch
6 Port
Layer 2 Switch
Security Room
6 VoIP
Phone
6 Port
12 LCDs 6 Computers
for Security
C
1 Card Reader
Server Room
Conference Room
1 WiFI
Access Point
12 Port
10 VoIP
Phones
10 Laptop
Docking Stations
1 Laptop
12 Port
12 Port
C
1 Card Reader
2 VoIP
Phones
-
7/31/2019 HSSN Project Floor Plans - Hirosh Tharaka ( Trazor )
7/10
Sales Dept. Marketing Dept.
6 Port
Layer 2 Switch
(Security)
6 Port
Layer 2 Switch
(Communication)
6 Port
Layer 2 Switch
(General)
18 Port
Layer 2 Switch
18 Port
Layer 2 Switch
2 CCTV Camera
2 CCTV CameraC
1 Card Reader C
1 Card Reader
6 Port
Layer 2 Switch6 Port
Layer 2 Switch
15 VoIP
Phones
15 VoIP
Phones
18 Port
Layer 2 Switch
18 Port
Layer 2 Switch
18 PortLayer 2 Switch
15 Computers
15 Computers
1 FAX
18 PortLayer 2 Switch
1 Network Printers
1 Network Printers
18 Port
Layer 2 Switch
1 WiFI
Access Point
18 Port
Layer 2 Switch
18 Port
Layer 2 Switch
15 VoIP
Phones
15 VoIP
Phones
18 Port
Layer 2 Switch
18 Port
Layer 2 Switch
1 WiFI
Access Point15 Computers 15 Computers
1 Network Printers
18 Port
Layer 2 Switch
1 Network Printers
-
7/31/2019 HSSN Project Floor Plans - Hirosh Tharaka ( Trazor )
8/10
CCTV Video
Cloud Server
Internet
Firewall
PSTN
G. Floor
Security
Switch
G. Floor
Com.
Switch
G. Floor
General
Switch
1st Floor
Security
Switch
1st Floor
Com.
Switch
1st
Floor
General
Swtich
2nd Floor
Security
Switch
2nd
Floor
Com.
Switch
2nd
Floor
General
Switch
CCTV Server Security Switch
Digital PABX
Printer Server
File Server
Application Server
Database Server
DNS Server Mail Server
Web Server
DNS / DHCP
Server
Firewall
Ext. FirewallLoad Balancer
Router
RouterCSU / DSU - 2
( SLT 2MB _ Lease )
CSU / DSU - 1
( SLT 2MB _ Lease )
SIP Server
Staff Security Access
Data Server
VOIP Server
VPN Server
DC Server
Exchange Server
Firewall
Fiber optic transmitter
Optical fiber cable
Proxy Server
Backbone Switch
(Layer 3)
General Switch
Communication
Switch
Proposed Site One - Main Server Room
-
7/31/2019 HSSN Project Floor Plans - Hirosh Tharaka ( Trazor )
9/10
Soft. Eng Depatrment
6 PortLayer 2 Switch
(Security)
6 PortLayer 2 Switch
(Communication)
6 PortLayer 2 Switch
(General)
F.O Cable
F.O Transmitter
Server
Room
Diagram
6 Port
Layer 2 Switch 6 Port
Layer 2 Switch
24 Port
Layer 2 Switch
24 Port
Layer 2 Switch
24 Port
Layer 2 Switch
6 Port
Layer 2 Switch
24 Computers 23 Laptop
Docking Stations
1 WiFI
Access Point
24 Port
Layer 2 Switch
24 VoIP
Phones
24 VoIP
Phones
3 CCTV Camera
C
1 Card Reader
C
1 Card Reader
12 Port
Layer 2 Switch12 Port
Layer 2 Switch
10 Laptop
Docking Stations
10 VoIP
Phones
Conf. Room
Reception
6 Port
Layer 2 Switch
6 Port
Layer 2 Switch
6 Port
Layer 2 Switch
3 Computers
3 VoIP
Phones
1 WiFI
Access Point
2 CCTV Camera
C
1 Card Reader
1 Network Printers
-
7/31/2019 HSSN Project Floor Plans - Hirosh Tharaka ( Trazor )
10/10
Sales Dept
6 PortLayer 2 Switch
(Security)
6 PortLayer 2 Switch
(Communication)
6 PortLayer 2 Switch
(General)
F.O Cable
F.O Transmitter
6 Port
Layer 2 Switch 6 Port
Layer 2 Switch
24 Port
Layer 2 Switch
24 Port
Layer 2 Switch
24 Port
Layer 2 Switch
6 Port
Layer 2 Switch
24 Computers 23 Laptop
Docking Stations
1 WiFI
Access Point
24 Port
Layer 2 Switch
24 VoIP
Phones
24 VoIP
Phones
3 CCTV Camera
C
1 Card Reader
C
1 Card Reader
12 Port
Layer 2 Switch12 Port
Layer 2 Switch
10 Laptop
Docking Stations
10 VoIP
Phones
Conf. Room
Reception
6 Port
Layer 2 Switch
6 Port
Layer 2 Switch
6 Port
Layer 2 Switch
3 Computers
3 VoIP
Phones
1 WiFI
Access Point
2 CCTV Camera
C
1 Card Reader
1 Network Printers