HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… ·...

17
HS2: the opportunity Kate Allen, Supply Chain Manager HS2 Ltd www.gov.uk/hs2

Transcript of HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… ·...

Page 1: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

HS2: the opportunityKate Allen, Supply Chain ManagerHS2 Ltd

www.gov.uk/hs2

Page 2: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

HS2:the new backbone of Britain’s

rail network

Page 3: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •
Page 4: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

HS2 vision:To be a catalyst for growth across 

Britain

Page 5: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

More than double the seats

12,1002017

2033with HS2

31,200 8,620 4,860

3,490 1,720

London Euston Manchester Piccadilly (Crewe/Stoke Corridor)

Leeds (Doncaster Corridor)

evening rush hourtotal seated capacity

Page 6: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •
Page 7: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

216km ROUTE LENGTH

49.5kmTUNNELS

74kmCUTTINGS

152STRUCTURES UNDER 

BRIDGES

145STRUCTURES OVER BRIDGES

128 mtEXCAVATED MATERIAL

(90% TO BE RE USED)

31MAIN COMPOUNDS FOR 

CONSTRUCTION

299SATELLITE COMPOUNDS

Phase One construction statistics 

Page 8: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

Catalyst for growth

Capacity & connectivity

Value for money

Passenger experience

Skills and employment

World class standards

Sustainable & a     good neighbour

HS2’s strategic goals

Page 9: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

Tier 1 ITT issue

Tier 1award

Supply chain opportunities

Enabling works Complete Complete 2017+

Main works civils Complete Summer 2017 2017/18+

Stations

Design Q2 2017 Q1 2018 2018+

ConstructionNorth Q2 2019 Q2 2020 2020+South Q1 2018 Q3 2018 2018/19+

Railway systems Q3 2018 Q4 2019 2019/20+

Rolling stock Q2 2018 Q4 2019 2019/20+

When we are buying

Page 10: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

Phase One enabling works contracts

NORTH

SOUTH

CENTRAL

LM JV

CS JV

Fusion JV

• Costain Group Plc• Skanska Construction UK Ltd

• Laing O’Rourke Construction Ltd • J. Murphy & Sons Ltd

• Morgan Sindall Construction & Infrastructure Ltd 

• BAM Nuttall Ltd• Ferrovial Agroman (UK) Ltd

Page 11: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

11

Enabling Works

Page 12: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

£6.6bn

Main works civils contracts

3in area central

2in area north

2in area south

Phase One, plusPhase 2a option

7 Packages4 Contractors

Page 13: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

2in area north

BBV JV

• Balfour Beatty Group Limited • Vinci Construction UK Limited• Vinci Construction Terrassement• BeMo Tunnelling GmBH

3in area central

Align JV

CEK JV

• Bouygues Travaux Publics• Sir Robert McAlpine Limited• Volker Fitzpatrick Limited

• Carillion Construction Limited• Eiffage Genie Civil• Kier Infrastructure and Overseas Limited 

2in area south

SCS JV • Skanska Construction UK Limited• Costain Limited• Strabag AG

Main works civils contractors

Page 14: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

Our culture

Page 15: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

BIRMINGHAMDONCASTER

National College for High Speed Rail

Page 16: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

HS2 BIM upskilling platform 

www.bimupskilling.com

[email protected] 

Page 17: HS2: the opportunity - MEBCmebc.org.uk/wp-content/uploads/2017/10/HS2-Presentation-12-10-1… · 12/10/2017  · rail network. HS2 vision: To be a catalyst for growth across ... •

How to engage with HS2

RegisterQuestion

sResource

s

gov.uk/contracts‐findercompetefor.com

Supplier GuideSupply Chain FAQs

Contract Opportunities Tablebimupskilling.com

gov.uk/hs2 [email protected] [email protected]