    State Himachal Pradesh

    HPSEB Ltd.,

    Operation Circle Shimla

    Ref no. of DPR HPSEBL/IPDSDPR/SHIMLA CIRCLE

    Submitted to

    Name of Govt Utility

    Implementing Project

    POWER FINANCE CORPORATION LTD.

    Date of Submission

    18/06/2015

    Name of the Project Area(Circle/ Zone/ Utility)

    INTEGRATED POWER DEVELOPMENT SCHEME(IPDS)

    Detail Project Report

    Strengthening of sub-transmission & distribution

    network including metering

  • 8/18/2019 HPSEBL Shimla Contacts

    2/52

    POWER FINANCE CORPORATION LTD.Detail Project ReportIndex

    S.

    N0. Table of Contents Page Number  

    1 Input Data for Detailed Project Report 1

    2 Guidelines for DPR Preparation & Implementation 2-3

    3 Declaration 4

    4 Executive Summary 5

    5 Background 6

    6 Volume I: Project Area Details 7

    7 Volume IIa: SUMMARY Project Cost 8

    8 Estimated Project Cost - Bill of Quantities 9 - 23

    9 Cost Benefit (24) Annexure-1

    10 Project area asset detail (25-35) Annexure-2

    11 Annexures 36-50

  • 8/18/2019 HPSEBL Shimla Contacts

    3/52

    POWER FINANCE CORPORATION LTD.Detail Project ReportINPUT DATA

    Utility DetailsHimachal Pradesh

    Himachal Pradesh State Electricity BoardHPSEB Ltd.

    Name

    Designation

     Address

    Phone Office

    Mobile No.

    Fax

    E-mail

    Utility level AT&C loss Unit AT&C Loss for FY 2012-13

    AT&C loss as provided by PFC in latest “Report on

    Performance of State Power Utilities” %  9.53%

    Project Area DetailsName of the Project Area Circle/ Zone/ Utility)

    Nos. of towns covered

    176702

    105429

    Name

    Designation Address

    Phone Office

    Mobile No.

    Fax

    E-mail

    Data for AT&C Losses Computation for Project Area (All

    statutory towns of the Circle/ Zone/ Utility) Unit Data for Previous FY 2013-14

    Energy Input M Units   438.15

    Energy Sales   M Units   383.01

    Total Revenue Billed Rs. Lac   22632.91

    Total Revenue Collected (excluding arrears)   Rs. Lac   20028.74

    Billing Efficiency %   87.41%

    Collection Efficiency %   88.49%

    AT&C Losses %   22.65%

    Dedicated team:

    HQ Level

    Name & Designation

    Er. Rajesh Singh, Chief Engineer (Operation), South Zone,

    ShimlaEr.Rajiv Awasthi, Chief Engineer (System Planning), Vidyut

    Bhawan, ShimlaEr. R.K. Pathania, Superintending Engineer (RGGVY),

    Khalini, Shimla

    Date of Submission of Proposal   Date 18/06/2015

    DPR Ref No.   No. HPSEBL/IPDSDPR/SHIMLA CIRCLE

    Proposed Project Start Date   Month-Year 21.03.2016

    Proposed Month of Completion   Month-Year 20.09.2018

    0177-2622129

    Er. Pankaj Dadwal

    Contact Details of Project Area Incharge (Govt/Govt Authorised Agency)

    Total Population of all towns covered in project area

    Contact Details of Nodal Officer (Govt Utility Implementing Project)

    Operation Circle Shimla

    Name of Pvt/Distribution Franchisee (in case of Pvt/DF/ Cooperative

    Society)

    +91-9418069834

    Name of State

    Name of Govt Utility Implementing Project (Expanded Name)Name of Govt Utility Implementing Project (Short Name)

    Er. Rajiv Awasthi

    Chief Engineer (SP)

    Vidyut Bhawan, HPSEBL, Shimla

    0177-2657901

    Operation Circle, HPSEBL, Kasumpti, Shimla

    94180-52907

    0177-2653656

    Nos. of Consumers in all towns covered in the project area

    [email protected]

    3

    [email protected]

    Superintending Engineer 

    0177-2622128

    Name, Designation & Area

    Er. Pankaj Dadwal, Superintending Engineer, Operation Circle,

    ShimlaEr. R.K. Thakur, Sr. Executive Engineer, Electrical Division No.I,

    Shimla-9 ( Shimla Town)Er. Raman Chaudhary, Sr. Executive Engineer, Shimla Rural

    Electrical Division HPSEBL Sunni ( Sunni Town)

    Field Level

    Sr. Executive Engineer, Electrical Division HPSEBL Theog. (Theog

    Town)

  • 8/18/2019 HPSEBL Shimla Contacts

    4/52

    POWER FINANCE CORPORATION LTD.Detail Project ReportGuidelines for DPR Preparation & Implementation

    1 DPR is to be prepared based on the broad scope of work validated by Nodal agency at 1st Stage during discussion withutility on NAD, on detailed field survey and latest approved schedule of rates for various items of work. The DPRs shall

    be duly recommended by the Distribution Reforms Committee (DRC) at the State level. The Nodal Agency will separately

    provide comparable costs sourced from CPSUs for major equipment for reference of the utility. These reference rates

    shall be used as ceiling rates for sanctioning of the projects

    2 The DPR under the scheme has been formulated for urban areas (Statutory Towns) only

    3 In case of private sector Discoms where the distribution of power supply in urban areas is with them, projects under the

    scheme will be implemented through a concerned State Government Agency and the assets to be created under the

    scheme will be owned by the State Government / State owned companies. The areas under franchisee shall be covered

    under the scheme subject to compliance with the terms & conditions of their respective agreements and Cooperative

    Societies shall also be eligible, but they would be required to submit Audited statements annually regarding the utilization

    under the approved project through State Cooperative Department and the concerned

    Discom. Further, all the projects need to be recommended by the State Level DRC.

    4 In case of private sector Discoms/Distribution Franchisee/Co-operative Societies, the DPR shall be submitted to PFC by

    its State Govt Agency.5 The circle/zone/Utility wise DPRs shall be prepared by the utility and recommended by Distribution Reforms Committee

    (DRC) at State level. To avoid duplication of works with scope already sanctioned under RAPDRP scheme, Utility shall

    indicate the additional work component proposed under IPDS DPRs with comparative BOQ for such R-APDRP project

    area.6 BoQ for R-APDRP towns in the project area to be filled in Sheet Vol II.b and BoQ for non-RAPDRP towns to be filled in

    sheet Vol II.c.7 For ERP & IT component a separate consolidated DPR shall be prepared by respective state.

    8 For linking of all 33 KV or 66 KV grid substations/billing offices/Regional/Circle/Zonal offices of Discoms with

    optic fiber network of NOFNA, a separate and consolidated DPR shall be prepared by the respective utility in

    consultation with BBNL or any designated agency like BSNL, RailTel, PGCIL etc.

    9 The projects shall be implemented on turn-key basis. However, in exceptional circumstances, execution on partial

    turnkey/departmental basis (to be proposed by utility along with respective DPR duly recommended by DRC) shall be

    permitted with the approval of the Monitoring Committee.

    10 In either mode of implementation (turnkey/partial turnkey/departmental), the maximum time limit for completion of the

    project viz award and implementation shall not be beyond thirty months  from date of communication of the approval ofthe Monitoring committee.

    11 An appropriate Project Management Agency (PMA) will be appointed preferably utility-wise to assist them in project

    management ensuring timely implementation of the project.

    12 The work(s) already executed/to be executed under R-APDRP/NEF/GOI other scheme, etc is/are not eligible under

    IPDS.

    13 The works proposed in the DPR shall aim for meeting utility level AT&C loss reduction trajectory as finalised by MoP in

    consultation of state utilities (The committed AT&C loss reduction trajectory is given in Annexure-I)

    14 Utility to ensure installation of bounadry meters for ring fencing of Non-RAPDRP Towns having population more than

    5000.

    15 The Utility will have to certify that the DPR is in line with guidlines issued by Ministry of Power/ PFC for IPDS & DRC

    clearance has been obtained, before the same is forwarded to PFC for consideration of sanction.

    16 Utility shall ensure timely availability of any other infrastructure or facilities that are essential for implementation of IPDS

    works but are not in the scope of Contractor viz. land acqusition, RoW, pole location etc.17 Utility shall provide detailed informantion regarding exisitng infrastrucuture, any bottleneck in implementation of the works

    and the works proposed in the project to the Contractor before award of contract.18 The cost estimates should not include any departmental overhead expenses. All such expenditures should be borne by

    the utility.19 No cost escalation shall be admissible for the schemes sanctioned under IPDS. Any additional cost on any account

    whatsoever to complete the project shall be borne by utility.20 Distribution Transformers procured under IPDS scheme, shall have efficiency level equivalent / better than that of three

    star ratings of BEE, where ever BEE standard is applicable. For other DTs, where, BEE standard is not applicable,

    CEA uidelines shall be followed available on CEA web site .

    21 AMI, Smart meters can be considered for deployment in the towns where SCADA has been/being established under R-

     APDRP.

    The DPR shall be prepared, base on IPDS guidelines as issued from MoP, GoI. Some salient features of IPDS

    guidelines & additional guidelines for DPR preparation is mentioned below. In case of any mis-match between IPDS

    guideline issued from MoP &DPR guideline as mentioned below, the IPDS guideline as issued from MoP, GoI shall

    prevail.

  • 8/18/2019 HPSEBL Shimla Contacts

    5/52

    22  For Solar Panels - only cost of Solar panels with support structure and Net-meters shall be permissible under IPDS.

    Utility shall bear cost of associated items.23 Additional Guideline for DPR preparation

    aLoad growth of 05 year in case of HT system & 03 years in case of LT system to be considered for proposing the DPR.

    b For replacement of existing HT & LTCT Electromechanical consumer meters (AMR compatible, open protocol) tamper 

    proof electronic metersand replacement of whole current electromechanical consumer meters, the guidelines of CEA

    shall be ado ted.c Service line for new consumers is not eligible in the scheme. In case of installation of meter pillar box or if existing

    service line is prone to tamper and pilferage the same shall be replaced with armored or XLPE cable for which minimum

    confi uration should be :(i) Single Phase consumers: min. 4 sq.mm(ii) Three Phase consumers: min. 6 sq.mm

    d Installation of new Distribution Transformers in following cases:(i) If the length of LT feeder is more than 300 mtr then new Distribution transformer may be proposed to improve HT: LT

    ratio.(ii) If existing peak load on DT is more than 70% of its rated capacity then new DT may be proposed.(iii) Even if the length of LT feeder is below 300 meter but the peak load on the feeder is more than 70% of rated thermal

    capacity of the conductor, new DT should be installed or conductor should be replaced by higher size.e Provision of Isolator, HT fuse / horn gap & LA at each Distribution Transformer, if not provided earlier. Alternatively this

    isolator, HT fuse / horn gap fuse can be replaced with drop out fuse with On Load maintenance facility thereby reducing

    s stem interru tions.f Provision of LT distribution box for control and protection of outgoing LT circuits.

    g Each Distribution Transformer of 25 KVA & above shall be provided with minimum two LT feeders.

    h If the peak load on existing 11KV feeder is more than 75% of rated thermal capacity of the conductor, conductor withhigher capacity may be proposed or feeder bifurcation may be proposed.

    iIf peak load on existing 33/11KV S/S is more than 80% of its transformer capacity, new 33/11KV S/S may be proposed.

     j 11 Kv feeder segregation may be proposed for reducing boundary metering points, fixing greater accountability and

    responsibility etc.k Ring Main Unit may be proposed in case of underground cabling area only.l Sectionaliser may be proposed in SCADA town only.

    m The Distribution Transformer may be provided with the capacitors of following ratings at LT side:(i) 100 KVA : 12 KVR(ii) 63 KVA : 8 KVR(iii) 40 KVA : 6 KVR(iv) 25 KVA : 4 KVR

    n Installation of ABC cables in dense, theft prone & congested areas. Both HT & LT ABC may be proposed. The capacity

    of ABC shall be 20% more than that of bare conductor, as thermal overloading capacity of ABC is less than Bare

    conductor.

    o In theft prone area and to improve HT:LT ratio, HVDS may be proposed. Total capacity of HVDS shall be higher by 20%than conventional LT S/S.p The following works/ items shall not be eligible for coverage under IPDS scheme:

    (i)  Works already sanctioned under other schemes of Govt. of India (like R-APDRP/RGGVY/DDUGJY/NEF etc.). The

    projects for which any other grant / subsidy from Government of India has already been received / proposed to be

    received shall not be eli ible under this scheme.(ii)   AMI in the towns where SCADA is not planned under R-APDRP(iii)  Civil works other than sub station(iv)  Service lines to new consumers(v)  GIS survey of consumers(vi)  Cost of land for sub-stations(vii)  Compensation towards right of way(viii)   Distribution automation(ix)  Office equipment / fixtures(x) Spares (other than mandatory spares prescribed by manufacturer)

    (xi)  Tools and Plants (T&P)

    (xii)  Vehicles

    (xiii) Salaries and Establishment Expenditure

  • 8/18/2019 HPSEBL Shimla Contacts

    6/52

    POWER FINANCE CORPORATION LTD.Detail Project Report

    DeclarationThis is to certify that:

    1 Items Proposed in the DPR is for implmentation in urban area (Statutory Towns only).2 DPR has been prepared in line with the guidelines of IPDS issued by Ministry of Power / PFC.

    3 The proposed DPR includes only new works & excludes other works under implementation. Works taken up under GOI scheme viz

    RAPDRP/RGGVY/ NEF, etc is/are not included in this DPR.4 Additional items proposed in R-APDRP towns has been proposed in separate sheet Vol II.b, clearly defining earlier sanction in R-APDRP,

    proposed new requirement in IPDS with proper justification.5 All works proposed in the DPR are as per DPR Formats issued by Nodal Agency. Any cost other than allowed by Monitoring Committee in

    the DPR formats shall be borne by the Utility.6 The cost estimates does not include any departmental overhead expenses. All such expenditures would be borne by the utility.

    7 Utility will henceforth, procure all meters (wherever applicable) as per guidelines/regulations issued by MoP/CEA (circular available on IPDS

    web portal).

    8 Utility shall ensure timely availability of any other infrastructure or facilities that are essential for implementation of IPDS works but are not in

    the scope of Contractor viz. land acqusition, Row, pole location etc.

    9 Following items have been excluded from the scope of the DPR:

    (i) Works already sanctioned under other schemes of Govt. of India (like R-APDRP/RGGVY/DDUGJY/NEF etc.). The projects for which any

    other grant / subsidy from Government of India has already been received / proposed to be received shall not be eligible under this scheme.

    (ii) AMI in the towns where SCADA is not planned under R-APDRP(iii) Civil works other than sub station(iv) Service lines to new consumers(v) GIS survey of consumers(vi) Cost of land for sub-stations(vii) Compensation towards right of way(viii) Distribution automation(ix) Office equipment / fixtures(x) Spares (other than mandatory spares prescribed by manufacturer)

    (xi) Tools and Plants (T&P)(xii) Vehicles(xiii) Salaries and Establishment Expenditure

    10 A senior level officer has been appointed by the Utility as Nodal Officer , who shall be involved from concept to commissioning of the system

    and co-ordinate from the Utility side for all issues related to implementation of the project. The details of Nodal Officer are given in Input

    Sheet.

    11 Utility has created a dedicated team for implementation of projects at field & HQ levels to ensure smooth implementation of scheme. Detalis

    of the team are given in Input sheet.12 Utility has appointed M/s WAPCOS Ltd, a Project Management Agency (PMA) for monitoring & ensuring timely implementation of the

    scheme.13 Cost of consumer meters installed under R-APDRP will not be charged to consumers.14 Work shall be awared within 06 months from date of communication of the approval of the Monitoring committee. & will be completed within

    24 months from date of award. In case of departmental execution, the work will be completed within 30 months from date of communication

    of the approval of the Monitoring committee.. In either mode of implementation (turnkey/partial turnkey/departmental), the maximum time

    limit for completion of the project viz award and implementation shall not be beyond thirty months from date of communication of the

    approval of the Monitoring committee.

    15 The item rates taken for the materials for preparation of the DPR is based on the approved latest Schedule of Rates.  For the materials for

    which the rates are not avilable in Schedule of Rates, market Rates (duly approvd as per Utility system/procedure) or approved schedule

    rate of works / stock issue rate of other utility (indicated in the cost estimate) has been taken for this purpose. The Nodal Agency will

    separately provide comparable costs sourced from CPSUs for major equipment for reference of the utility. These reference rates shall be

    used as ceiling rates for sanctioning of the projects.

    16 No cost escalation shall be admissible for the schemes sanctioned under IPDS. Any additional cost on any account whatsoever to complete

    the project shall be borne by utility.

    17 10% of the project cost as approved by monitoring committee will be arranged by utility from own source & 30% will be arranged from

    PFC/REC or other Fis within three months of award/start of project.

    18 Metering of all feeders and distribution transformers including metering at all input points to the utility shall be ensured under this scheme.

    Utility shall ensure installation of bounadry meters for ring fencing of Non-RAPDRP Towns having population more than 5000.

    19 Projects sanctioned under R-APDRP scheme in the state/utility will continue to be implemented as per R-APDRP guidelines.

    20 DPR has been prepared after detailed field survey, study of sytem & with full justification. No revision of DPR OR cost escalation will be

    proposed by Utility.

    21 While formulating this DPR, consultation with the respective public representatives including Member of Parliament has been ensured.

    22 The information and data given in this DPR are correct.23 The DPR is technically & financially viable and tangible & intangible benefits will be achieved from implementation of this DPR making it

    bankable.24 In case of private sector Discoms/Distribution Franchisee/Co-operative Societies, the project shall be implemented by

    ………………………….. State Govt A enc .

    Project Area In-charge (Govt/Govt Authorised Agency)

    Signature:

    Name: Er. Pankaj Dadwal, Tel. No. / Mobile No. : 0177-2622129/ 94180-52907Designation: Superintending Engineer (OP) Circle HPSEBL Shimla-9. Email address : [email protected].

    Nodal Officer (Govt Utility Implementing Project)

    Approved by:

    Signature:

    Name: Er. Rajiv Awasthi Tel. No. / Mobile No. : 0177-2657901 / 9418069834Designation: Chief Engineer (SP) Email address : [email protected]

  • 8/18/2019 HPSEBL Shimla Contacts

    7/52

    POWER FINANCE CORPORATION LTD.Detail Project ReportExecutive Summary

    Project objective:-

    Tripartite/Bipartite Agreement Date

    Brief Profile of State/Utilityame o tate

    Name of Utility (Short Name)Total Number of Utility Consumers

    AT&C loss as rovided b PFC in latest “Re ort on Performance of State Power Utilities”AT&C Losses   %

    Project Area Profile

    Operation

    Circle, Shimla

    105429

    Unit

    Data for

    Previous FY

    2013-14

    M Units 438.152

    M Units 383.006

    Rs. Lac 22632.91

    Rs. Lac 20028.74

    % 87.41%

    % 88.49%

    % 22.65%

    Name of the towns covered in project area and & its In-charges

    Name of Town

    Shimla

    Sunni

    Theog

    Project Funding

    Recommended Project Cost for

    Sanction  Rs. Lac 756.26

    Say Rs.7.56 Cr 

    Cost Item TotalCost

    GoI PFC/ FIs Own

    Total Setup Cost   Rs.Lac 756.26 642.82 75.63 37.81

    Say Rs.7.56 Cr 

     Base

     Year-0 Year-1 Year-2

    Phasing of Capital Expenditure   Rs.Lac 226.88  302.50  226.88 

    Sr.Executive Engineer,

    ED-Shimla  0177-2623952

    Sr.Executive Engineer,

    ED-Sunni  0177-2786538

    Sr.Executive Engineer,

    ED-Theog  01783-238247

    Total Revenue Billed

    Total Revenue Collected (excluding arrears)

    Billing Efficiency

    Collection Efficiency

    AT&C Losses

    Town In Charge Contact No.

    Name of the Project Area Circle/ Zone/ Utility)

    os. o towns covere

    Nos. of Consumers in all towns covered in the project area

    Data for AT&C Losses Computation for Project Area (All statutory towns of

    the Circle/ Zone/ Utility)

    Energy Input

    Energy Sales

    This project aims at -

    (i) 24x7 power supply for consumers in urban area,

    (ii) reduction of AT&C losses as per trajectory (discom-wise) finalized by

    the Ministry of Power in consultation with States

    (iii) providing access to all urban households

    Himachal PradeshHPSEB Ltd.

    2087604

    9.53%

  • 8/18/2019 HPSEBL Shimla Contacts

    8/52

    POWER FINANCE CORPORATION LTD.

    Detail Project Report

    Background

    1.1  Distribution is the most critical segment of the electricity business chain. The realchallenge in the power sector today lies in efficient management of the distribution

    sector. Availability of a robust sub-transmission and distribution network along with

    adequate metering arrangements is the need of the day for efficient management of 

    the distribution s stem.1.2  Electricity is the key ingredient for accelerated economic growth and is

    considered vital for nation’s overall development. Providing reliable and quality power 

    supply in an efficient manner is an immediate requirement of the day. Amongst the

    three major layers of Power Sector i.e. Generation, Transmission and Distribution, the

    Distribution Sector has direct interface with the end consumers and is largely

    accountable for consumer satisfaction and also for flow of revenues in the entire valuechain of Power Sector. Thus, Distribution Sector plays a significant role in sustenance

    as well as growth of the Power Sector.

    1.3  There is a consistent increase in electricity demand, particularly in urban areas,

    due to increase in customer base, changes in lifestyle and consumption pattern, which

    requires continual up-gradation and creation of infrastructure for electricity distribution.

    However, the poor financial health of the distribution utilities has resulted in

    inadequate investment in the distribution network.

    1.4  The Government of India has been providing support to State owned

    Discoms/Power Departments by extending financial assistance through various

    programmes. However, the State owned Discoms/Power Departments have not beenable to keep pace with the growth in demand of electricity, resulting in critical

    gaps/missing links in the sub transmission and distribution network. The sub-

    transmission and distribution network has therefore become a bottleneck in ensuring

    reliable and quality power supply to the consumers.

    1.5   Apart from bridging the gaps in the requisite distribution infrastructure, there is

    also a need to focus on metering of consumers. End-to-end metering is a vital need of 

    the power sector. Effective metering of all consumers will ensure proper accounting,

    billing, load pattern assessment and planning of infrastructure required. It also helps in

    identifying high loss pockets so as to initiate remedial measures towards reduction of 

    losses.

    Keeping in view the present financial condition of Discoms/Power Deptt., GoI has

    launched the Integrated Power Development Scheme (IPDS) to extend financial

    assistance against capital expenditure to address the gaps in sub transmission &

    distribution network and metering in Urban areas to supplement the resources of 

    DISCOMs/Power Deptt.

  • 8/18/2019 HPSEBL Shimla Contacts

    9/52

    POWER FINANCE CORPORATION LTD.Detail Project ReportVolume I: Project Area Details

    Assets Unit Current PositionProposed under

    IPDS

    Total Number 66/33 kV Feeders   Nos.   7

    Total Length of 66/33 kV Feeders

    (Overhead)  kM 74.00

    Total Length of 66/33 kV Feeders (Under-

    ground)  kM

    Total Number of 66/11 kV and 33/11 kV

    Sub-stations feeding the Project Area

      Nos. 13

    Total Number of Power Transformers   Nos.   23

    Total Capacity of Power Transformers   MVA   161.75

    Total Number 11 kV Feeders   Nos.   72   0

    Number of Metered 11 kV Feeders   Nos.   72   0

    Total Length of 11 kV Feeders (Overhead) kM 803.24 34.700

    Total Length of 11 kV Feeders (Under-

    ground)  kM 45.035 0

    Total Length of LT Lines (Overhead)   kM 1034.90 54.382

    Total Length of LT Lines (Under-ground)   kM   27.00 0.00

    HT/LT Ratio 1:1.25 1:1.57

    Total Number of Distribution Transformers Nos. 954 20

    Total Capacity of Distribution Transformers MVA 232.566 4.230

    Total Annual Energy Input of previous FY MUs   438.15   438.15

    Current Peak Demand MVA   110.6 110.6

    Current Average Demand   MVA   69.43 69.43

    Please specify name of town of Project area

    covered under Part-A (IT) of R-APDRP, if

    any.

    Shimla

    Please specify name of town of Project area

    covered under Part-A (SCADA/DMS) of R-

     APDRP, if any.

    Project Area Asset Information: Restricted to Urban area (Statutory Towns) only, to be

    considered under IPDS

  • 8/18/2019 HPSEBL Shimla Contacts

    10/52

    POWER FINANCE CORPORATION LTD.

    Detail Project ReportVolume IIa: SUMMARY Project Cost

    4.1 Summary of Project Cost (Bill of Quantities)

    SN Particular Unit Qty Project Cost from

    Iib & IicRs. In Lac

    A 33/11 KV or 66/22 kV S/S : New Nos 0 0

    B 33/11 KV S/S : Additional Transformer Nos. 0 0

    C 33/11 KV S/S : Transformer capacity enhancement Nos. 0 0

    D Renovation & Modernisation of 33/11 kV SS Nos. 0 0

    E New 33 KV new feeders/Bifurcation of feeders: Kms 0 0

    F 33 KV feeders Reconductoring/Augmentation Kms 0 0

    G 33 kV Line Bay Extension at EHV station Nos 0 0

    H 22 KV or 11 kV Line : New Feeder/ Feeder Bifurcation Kms 5.800 46.551

    I 22 kV or 11 kV Line : Augmentation/Reconductoring Kms 25.500 78.872

    J Arial Bunched Cable Kms 31.480 177.218

    K UG Cable Kms 0 0

    L 11 KV Bay Extension Kms 0 0

    M Installation of Distribution Transformer Nos. 19 88.941

    N Capacity enhancement of LT sub-station Nos. 1 12.449

    O LT Line : New Feeder/ Feeder Bifurcation Kms 5.000 28.195

    P LT Line : Augmentation/Reconductoring Kms 22.802 32.720

    Q Capacitor Bank Nos. 0 0

    R HVDS Nos. 0 0

    S Metering Nos. 8264 213.108

    T Provisioning of solar panel Lot 98 78

    U RMU,Sectionaliser, Auto reclosures, FPI etc. Lot 0 0

    V Others Lot 0 0GRAND TOTAL 756.258

    Say Rs.7.56 Cr 

  • 8/18/2019 HPSEBL Shimla Contacts

    11/52

    POWER FINANCE CORPORATION LTD.Detail Project Report Shimla RAPDRP TownEstimated Project Cost - Bill of Quantities

    Bill of Quantities

    Unit

    Price

    Cost

    proposed

    under IPDS

    Qty Cost (Rs Lac) Qty Cost (Rs Lac) Rs. Lac Rs. Lac Annx No. Location

    A 33/11 KV or 66/22 kV S/S : New

    1   Nos   9  1  763.13  1  1,220.00  - 2   Nos   6  2,056.92  6.00  2,265.75  - 

    3   Nos. - 

    Sub Total  9 7 2820.05 7 3485.75 0 0

    B 33/11 KV S/S : Additional Transformer    1.00  2,030.98  1.00  2,030.98 

    1   Nos.

    2   Nos.

    3   Nos.

    Sub Total  0 1 2030.98 1 2030.98 0 0

    C 33/11 KV S/S : Transformer capacity enhancement   1  597.150  1  597.150 

    1   Nos. - 

    2   Nos. - 

    3   Nos.

    Sub Total  0 1.00 597.15 1.00 597.15 0 0

    D Renovation & Modernisation of 33/11 kV SS   3.000  380.220  3.000  392.830 

    1   Nos.

    2   Nos. - 

    3   Nos.

    Sub Total  0 3.00 380.22 3.00 392.83 0 0

    E New 33 KV new feeders/Bifurcation of feeders:   48 29.63 439.13 18.6 308.17

    1   Kms - 

    2   Kms - 

    3   Kms - Sub Total  48.00 29.63 439.13 18.60 308.17 0 0

    F 33 KV feeders Reconductoring/Augmentation   36.55  742.08  14.00  276.15 

    1   Kms - 

    2   Kms - 

    3   Kms

    Sub Total  0 36.55 742.08 14.00 276.15 0 0

    G 33 kV Line Bay Extension at EHV station   7.000  220.810  1.000  41.760 

    1   Nos - 

    2   Nos - 

    3   Nos

    Sub Total  0 7 220.81 1 41.76 0 0

    H 22 KV or 11 kV Line : New Feeder/ Feeder Bifurcation   780.738 124.356 1072.330 116.311 945.610

    1   Kms

    2   Kms

    3   Kms

    Sub Total  780.738 124.356 1072.33 116.311 945.61 0.000 - 

    ReferenceExecuted/ to-be executed (as

    awarded) under R-APDRP

    For R-APDRP Towns (Separate BOQ sheet to be furnished for each town)

    Qty

    proposed

    under IPDS

    Item Details   UnitS. No.

    Existing/

    Current

    Position

    Sanctioned under R-APDRP

  • 8/18/2019 HPSEBL Shimla Contacts

    12/52

    Unit

    Price

    Cost

    proposed

    under IPDS

    Qty Cost (Rs Lac) Qty Cost (Rs Lac) Rs. Lac Rs. Lac Annx No. Location

    ReferenceExecuted/ to-be executed (as

    awarded) under R-APDRPQty

    proposed

    under IPDS

    Item Details   UnitS. No.

    Existing/

    Current

    Position

    Sanctioned under R-APDRP

    I 22 kV or 11 kV Line : Augmentation/Reconductoring   42.105  954.850  72.981  605.410 

    1  Re Cond of 22 / 11 /15 kV from ACSR 6/1/2.59 mm sq to ACSR

    6/1/4.09 mm sq  Kms   -  -  -  -  13.500 3.093  41.756  Ann-HT_24

    22 kV Dhalli Feeder, 11 kV

    Cementary Feeder & 15 kV

    Bharari to Sanjauli Feeder.

    2   Kms   -  -  -  - 

    3   Kms - 

    Sub Total  0 42.105 954.85 72.98 605.41 13.500 41.756 

    J Arial Bunched Cablei) HT (New) 10.00 

    1   11 kV New Line with AB Cable 95 mm sq on 9 Mtr S/T Poles.   Kms   4. 90 0 9 .0 66 4 4.4 23  Ann-HTAB_11

    Spur Lines for new DTRs

    Near Cemetary Chamyana

    Road, Lower Shanan

    Byepass, Nav Bahar, Near

    Housing Board, Sector-I New

    Shimla, Rajhana, Tibetian

    Mandir Panthaghatti, IAS

    Colony, Shakti Vihar, Lower

    Sangti, Yarrows & Titla Hotel.

    2   Kms

    3   Kms

    Sub Total  10.00 0 0 0 4.900 44.423

    ii) LT 5.00  

    1   N ew Line w ith AB C able 120 mm sq on 8 Mtr. S/T Poles. Kms   4. 48 0 6 .1 95 2 7.7 54  Ann-LTAB_11

    For area Near Cemetary

    Chamyana Road, Lower

    Shanan Byepass, Nav

    Bahar, Near Housing Board,

    Sector-I New Shimla,

    Rajhana, Tibetian Mandir

    Panthaghatti, IAS Colony,

    Shakti Vihar, Lower Sangti,

    Yarrows & Titla Hotel.

    2   Re- Cond LT line from ACSR (20/30 mm sq) to AB Cable 120 mm sq Kms   10.100   4.753  48.005  Ann-LTAB_12

    Mini Kufta, Badash ,

    Chamyana, Navbahar ,

    Badhai Shanan , HRTC,

    Krishna Nagar, Old KNH

    & Rippon.

    Sub Total  5.000 0 0 0 14.580 75.759

    Total  15.000 0 0 0 19.480 120.182

    K UG Cable

    i) HT

    Kms   45.035 

    Kms

    Kms

    Sub Total  45.035 0 0 0 0 0

    ii) LT

    Kms   27.000

    Kms

    Kms

    Sub Total  27.000 0 0 0 0 0

  • 8/18/2019 HPSEBL Shimla Contacts

    13/52

    Unit

    Price

    Cost

    proposed

    under IPDS

    Qty Cost (Rs Lac) Qty Cost (Rs Lac) Rs. Lac Rs. Lac Annx No. Location

    ReferenceExecuted/ to-be executed (as

    awarded) under R-APDRPQty

    proposed

    under IPDS

    Item Details   UnitS. No.

    Existing/

    Current

    Position

    Sanctioned under R-APDRP

    Total  72.035 0 0 0 0 0

    L 11 KV Bay Extension

    Kms

    Kms

    Kms

    Sub Total  0 0 0 0 0 0

    MInstallation of Distribution Transformer 935 45 215.49 57 262.13

    1   11/0.4 kV, 100 KVA SS Nos. -  3.086 -  Ann-DT_11

    2   11/0.4 kV, 250 KVA SS   Nos.   11 4.497 49.467 Ann-DT_11

    Near Cemetary Chamyana

    Road, Lower Shanan

    Byepass, Nav Bahar, Near

    Housing Board, Sector-I New

    Shimla, Rajhana, Tibetian

    Mandir Panthaghatti, IAS

    Colony, Shakti Vihar, Lower

    Sangti, Yarrows & Titla Hotel.

    3   22/0.4 kV, 100 KVA SS   Nos.   -  4.238    -  Ann-DT_21

    4   22/0.4 kV, 250 KVA SS   Nos.   -  7.023   -  Ann-DT_21Sub Total 935 45 215.49 57 262.13 11 49.467

    N Capacity enhancement of LT sub-station 28 303.670 24 351.540

    1   250 KVA to 630 KVA   Nos.   -  12.449   -  Ann-DT_22

    Nos.

    Nos.

    Sub Total 0 28 303.67 24 351.54 0 0

    O LT Line : New Feeder/ Feeder Bifurcation   998.1 5.633 25.83 5.633 32.06

    Kms - Kms

    Kms

    Sub Total 998.100 5.633 25.830 5.633 32.060 0 0

    P LT Line : Augmentation/Reconductoring   41.746 126.580 41.746 179.750

    1   Augmentation from 1Ø to 3Ø with ACSR 50 mm sq Conductor.   Kms   10 .600 1. 213 12. 858 Ann-LT_22

    Cemetary IV , Mashobra ,Dhalli-IV, Shiva Temple, PD

    Complex, Ram Nagar ,

    Lower Phagli, Near Tibetian

    Mandir Panthaghatti, IAS

    Colony, Shakti Vihar, Gorkhu

    Lodge, Bye Pass Road

    Pantha Ghatti & LT Shakrala.

    2   Re-Cond. LT line with ACSR 6/1/4.09mm sq conductor.   Kms -  1.936  -  Ann-LT_23

    3   Kms

    Sub Total 0 41.746 126.58 41.746 179.75 10.600 12.858 

    Q Capacitor Bank   3 100.803 8 3.700

    Nos.

    Nos.

    Nos.

    Sub Total 0 3.000 100.803 8.000 3.700 0 0

    R HVDS   79 110.430 76 192.030

    Nos.

    Nos.

  • 8/18/2019 HPSEBL Shimla Contacts

    14/52

    Unit

    Price

    Cost

    proposed

    under IPDS

    Qty Cost (Rs Lac) Qty Cost (Rs Lac) Rs. Lac Rs. Lac Annx No. Location

    ReferenceExecuted/ to-be executed (as

    awarded) under R-APDRPQty

    proposed

    under IPDS

    Item Details   UnitS. No.

    Existing/

    Current

    Position

    Sanctioned under R-APDRP

    Nos. - 

    Sub Total 0 79 110.43 76 192.03 0 0

    S Metering

    i) Prepaid / smart meters in Govt. establishment   Nos.

    ii) AMI, Smart meters in the towns where SCADA being

    established under R-APDRP.   Nos.

    iii) Boundary meters for ring fencing of Non-RAPDRP Towns with

    population more than 5000

    Nos.   7 3 4.77 4 6.35 1.227  0.000 Ann-MT_FD  Per unit cost includes

    modem cost also.

    iv) AMR for feeders, Distribution transformer and high load

    consumersNos.

    a Metering-Feeder    Nos.   79 55 5.83 26 1.22 0.195  0.000 Ann-MT  Per unit cost includes

    modem cost also.

    b Metering- DT   Nos.   708 372 57.11 346 57.62 11 0.195  2.145 Ann-MT

    c Metering-HT   Nos.   66 31 3.286 16 0.83

    d Modems   Nos.   781 747 40.84 747 40.84 0.055  -  As per RAPDRP

    v)  Consumers for existing un-metered connections, replacement

    of faulty meters & electro-mechanical meters   Nos.99000 46135 570.07 46135 702.38

    a 1 Ø  Meter    Nos.   6000 0.017  102.00 Ann-MT

    b 3 Ø  Meter    Nos.   200 0.064  12.80 Ann-MT

    vi) Installation of Pillar Box for relocation of meters outside the

    premises of consumers including associated cables and

    accessories   Nos.a   Meter Boxes

    b  1-Phase Each 960 0.030 28.800 Ann-MT_Boxes

    c  3-Phase Each 143 0.042 6.006 Ann-MT_Boxes

    d  Piller Boxes for 8 Nos. meters Each 95 0.100 9.500 Ann-MT_Boxes

    Sub Total 100641 47343 681.91 47274 809.24 6211 161.25

    T Provisioning of solar panel

    1 Solar Panel with Net Metering   KWe   54 0.798 43.092 As per PFC

     At SDA Complex

    (Kasumpti), 33/11 kV SS

    Bhattakuffer, SLDC-Totu,

    Directorate of Health

    Secretariat, Nirman Bhawan

    & DGP H eadquater

    2 Location 2 ……………. /( Capacity)   KWe

    3 Location 3 ……………. /( Capacity)   KWe

    4 N et -Me ter s   Nos.

    Sub Total 0 0 0 0 54.00 43.092

    U RMU,Sectionaliser, Auto reclosures, FPI etc.

    i) 33 kV Line : Installation of switchable breaker/switches   Nos.

    ii) 33 kV Line : Installation of commnuicable/non-communicable FPIs

    (O/C&E/F)   Nos.

    iii) 11 kV Line : Installation of RMUs/Sectionaliser alongwith aux power supply

    to operate sw/breaker.   Nos.

    iv) 11 kV Line :- Installation of communicable/non communicable FPIs (

    O/C,E/F)   Nos.

    v) 11 kV Line : Installation of switchable breakers alongwith aux power supply

    to operate sw/breaker Nos.

  • 8/18/2019 HPSEBL Shimla Contacts

    15/52

    Unit

    Price

    Cost

    proposed

    under IPDS

    Qty Cost (Rs Lac) Qty Cost (Rs Lac) Rs. Lac Rs. Lac Annx No. Location

    ReferenceExecuted/ to-be executed (as

    awarded) under R-APDRPQty

    proposed

    under IPDS

    Item Details   UnitS. No.

    Existing/

    Current

    Position

    Sanctioned under R-APDRP

    vi) Installation of remote operable switches for breaker/switches operation

    for Distribution Transformer alongwith aux power supply to operate

    sw/breaker Nos.

    vii)Installation of remote operable switches for breaker/switches operation

    for cap bank alongwith aux power supply to operate sw/breaker .Nos.

    Sub Total 0 0 0 0 0 0

    V Others

    1   Mobile service centres   job   2 1 6.98 2 32.06

    2   Replacement of AB/PVC cables   job   1 1038.88 1 262.34

    3   Revamping of DTRs   Nos.   1 213.83 1 77.99

    Sub Total 0 2 1269.69 372.39 0

    Grand Total 12,092.000  10,886.645  428.606 

    Note: Unit price and Total Cost are inclusive of all taxes and duties

  • 8/18/2019 HPSEBL Shimla Contacts

    16/52

    POWER FINANCE CORPORATION LTD.Detail Project Report Seoni Town (Seouni)Estimated Project Cost - Bill of Quantities

    Bill of Quantities-Sunni Town

    Unit Price

    Cost

    proposed

    under IPDSRs. Lac Rs. Lac Annx No. Location

    A 33/11 KV or 66/22 kV S/S : New1 66/22KV   Nos 1  - 

    2   Nos - 

    3   Nos. - 

    Sub Total  1 0 0

    B 33/11 KV S/S : Additional Transformer 

    1   Nos.

    2   Nos.

    3   Nos.

    Sub Total  0 0 0

    C 33/11 KV S/S : Transformer capacity enhancement

    1   Nos. - 

    2   Nos. - 

    3   Nos.

    Sub Total  0 0 0

    D Renovation & Modernisation of 33/11 kV SS

    1   Nos.

    For Non R-APDRP Towns (Separate BOQ sheet to be furnished for each town)

    S. No. Item Details Unit

    Existing/

    Current

    Position

    Qty proposed

    under IPDS

    Reference

    2   Nos. - 

    3   Nos.

    Sub Total  0 0 0

    E New 33 KV new feeders/Bifurcation of feeders:

    1   Kms - 

    2   Kms - 

    3   Kms - 

    Sub Total  0 0 0

    F 33 KV feeders Reconductoring/Augmentation

    1   Kms - 

    2   Kms - 

    3   Kms

    Sub Total  0 0 0

  • 8/18/2019 HPSEBL Shimla Contacts

    17/52

    Unit Price

    Cost

    proposed

    under IPDS

    Rs. Lac Rs. Lac Annx No. Location

    S. No. Item Details Unit

    Existing/

    Current

    Position

    Qty proposed

    under IPDS

    Reference

    G 33 kV Line Bay Extension at EHV station

    1   Nos - 

    2   Nos - 

    3   Nos

    Sub Total  0 0 0

    H 22 KV or 11 kV Line : New Feeder/ Feeder Bifurcation

    1   22 KV Line with ACSR 6/1/4.09 mm sq Conductor on 9 Mtr S/T Poles. Kms 3.00  1.500 8.026  12.039  Ann-HT_23From PWD RestHouse to Sunni

    Feeder 

    2   Kms - 

    3   Kms - 

    Sub Total  3 1.500 12.039

    I 22 kV or 11 kV Line : Augmentation/Reconductoring

    1   Kms

    2   Kms

    3   Kms

    Sub Total  0 0 0

    J Arial Bunched Cable

    i) HT

    Kms

    Kms

    Kms

    Sub Total  0 0 0

    ii LT

    1   Re- Cond LT line from ACSR (20/30 mm sq) to AB Cable 120 mm sq Kms   7.000 4.753  33.271  Ann-LTAB_12

     At PWD Rest House

    Sunni, Kol Dam

    Colony, Hanuman

    Mandir, Police

    Thana, Civil

    Hospital, Sunni-V &

    IV.

    Kms

    Kms

    Sub Total  0 7.000 33.271

    Total  0 7.000 33.271

    K UG Cable

    i) HT

    Kms

    Kms

  • 8/18/2019 HPSEBL Shimla Contacts

    18/52

    Unit Price

    Cost

    proposed

    under IPDS

    Rs. Lac Rs. Lac Annx No. Location

    S. No. Item Details Unit

    Existing/

    Current

    Position

    Qty proposed

    under IPDS

    Reference

    Kms

    Sub Total  0 0 0

    ii) LT

    Kms

    Kms

    Kms

    Sub Total  0 0 0Total  0 0 0

    L 11 KV Bay Extension

    Kms

    Kms

    Kms

    Sub Total  0 0 0

    M Installation of Distribution Transformer 7

    1   11/0.4 kV, 100 KVA SS Nos. -  3.086 -  Ann-DT_11

    2   11/0.4 kV, 250 KVA SS   Nos.   -  4.497 -  Ann-DT_11

    3   22/0.4 kV, 100 KVA SS   Nos.   3 4.238 12.714 Ann-DT_21

    PWD Rest House

    Sunni, Kol Dam

    Colony, Hanuman

    Mandir 

    4   22/0.4 kV, 250 KVA SS   Nos.   2 7.023 14.046 Ann-DT_21  Police Thana &

    Civil Hospital

    Sub Total 7 5 26.760

    N Capacity enhancement of LT sub-station

    1   250 KVA to 630 KVA   Nos.   -  12.449   -  Ann-DT_22

    Nos.

    Nos.

    Sub Total 0 0 0

    O LT Line : New Feeder/ Feeder Bifurcation 16.400

    1  3-Phase LT line with ACSR 6/1/4.09 mm sq Conductor on 8 Mtr S/T

    Poles.  Kms 3.000 5.639  16.917  Ann-LT_14

    For new DTR at

    PWD Rest House

    Sunni, Kol Dam

    Colony, Hanuman

    Mandir, Police

    Thana & Near Civil

    Hospital

    2   Kms

    3   Kms

    Sub Total 16.400 3.000 16.917

    P LT Line : Augmentation/Reconductoring

  • 8/18/2019 HPSEBL Shimla Contacts

    19/52

    Unit Price

    Cost

    proposed

    under IPDS

    Rs. Lac Rs. Lac Annx No. Location

    S. No. Item Details Unit

    Existing/

    Current

    Position

    Qty proposed

    under IPDS

    Reference

    1   Augmentation from 1Ø to 3Ø with ACSR 50 mm sq Conductor.   Kms   2.000   1.213 2.426 Ann-LT_22

    For new DTR at

    PWD Rest House

    Sunni, Kol Dam

    Colony, Hanuman

    Mandir, Police

    Thana & Near Civil

    Hospital

    2   Re-Cond. LT line with ACSR 6/1/4.09mm sq conductor.   Kms   2.500 1.936  4.840 Ann-LT_23   Near Civil Hospital &Sunni-IV.

    3   Kms

    Sub Total 0 4.500 7.266

    Q Capacitor Bank

    Nos.

    Nos.

    Nos.

    Sub Total 0 0 0

    R HVDS

    Nos.

    Nos.

    Nos. - 

    Sub Total 0 0 0

    S Metering

    i)   Prepaid / smart meters in Govt. establishment   Nos.

    ii)   AMI, Smart meters in the towns where SCADA being established under

    R-APDRP.   Nos.

    iii)   Boundary meters for ring fencing of Non-RAPDRP Towns with

    population more than 5000 Nos.

    iv)  AMR for feeders, Distribution transformer and high load consumers   Nos.

    a  Metering-Feeder    Nos.

    b Metering- DT Nos. 7 10 0.195  1.950 Ann-MT Per unit cost

    includes modem

    cost also.

    c  Metering-HT   Nos.

    d Modems Nos.

    v)  Consumers for existing un-metered connections, replacement of faulty

    meters & electro-mechanical meters  Nos.   2076

    a 1 Ø  Meter    Nos.   803 0.017  13.651 Ann-MT

    b 3 Ø  Meter    Nos.   18 0.064  1.152 Ann-MT

  • 8/18/2019 HPSEBL Shimla Contacts

    20/52

    Unit Price

    Cost

    proposed

    under IPDS

    Rs. Lac Rs. Lac Annx No. Location

    S. No. Item Details Unit

    Existing/

    Current

    Position

    Qty proposed

    under IPDS

    Reference

    vi)Installation of Pillar Box for relocation of meters outside the premises of

    consumers including associated cables and accessories Nos.

    a Meter Boxes

    b  1-Phase Each 79 0.030 2.370 Ann-MT_Boxes

    c   3-Phase Each 10 0.042 0.420 Ann-MT_Boxes

    d  Piller Boxes for 8 Nos. meters Each 10 0 .100 1.000 Ann-MT_BoxesSub Total 2083 831 20.543

    T Provisioning of solar panel

    1   Solar Panel with Net Metering KWe 24 0.798 19.152 As per PFC

      Electrical Division

    (Sunni), Store

    Division-Sunni,

    Community Health

    Center & Vridha

     Aashram.

    2   Location 2 ……………. /( Capacity) KWe

    3   Location 3 ……………. /( Capacity) KWe

    4   Net-Meters Nos.

    Sub Total 0 24 19.152

    U RMU,Sectionaliser, Auto reclosures, FPI etc.

    i)   33 kV Line : Installation of switchable breaker/switches   Nos.

    ii)   33 kV Line : Installation of commnuicable/non-communicable FPIs

    (O/C&E/F)   Nos.

    iii)   11 kV Line : Installation of RMUs/Sectionaliser alongwith aux power

    su l to o erate sw/breaker.  .   .

    iv)  11 kV Line :- Installation of communicable/non communicable FPIs (

    O/C,E/F)  Nos.

    v)  11 kV Line : Installation of switchable breakers alongwith aux power

    supply to operate sw/breaker Nos.

    vi)  Installation of remote operable switches for breaker/switches operation

    for Distribution Transformer alongwith aux power supply to operate

    sw/breaker Nos.

    vii)Installation of remote operable switches for breaker/switches operation

    for cap bank alongwith aux power supply to operate sw/breaker .   Nos.

    Sub Total 0 0 0

    V Others

    Sub Total 0 0 0

    Grand Total 135.948

    Note: Unit price and Total Cost are inclusive of all taxes and duties

  • 8/18/2019 HPSEBL Shimla Contacts

    21/52

    POWER FINANCE CORPORATION LTD.Detail Project Report Theog TownEstimated Project Cost - Bill of Quantities

    Bill of Quantities-Theog Town

    Unit Price

    Cost

    proposed

    under IPDSRs. Lac Rs. Lac Annx No. Location

    A 33/11 KV or 66/22 kV S/S : New

    1 66/22KV   Nos   2  - 

    2   Nos - Nos - 

    Sub Total  2 0 0

    B 33/11 KV S/S : Additional Transformer 

    1   Nos.2   Nos.

    Nos.

    Sub Total  0 0 0

    C 33/11 KV S/S : Transformer capacity enhancement

    1   Nos. - 

    2   Nos. - 

    3   Nos.

    Sub Total  0 0 0

     

    Reference

    For Non R-APDRP Towns (Separate BOQ sheet to be furnished for each town)

    S. No. Item Details Unit

    Existing/

    Current

    Position

    Qty proposed

    under IPDS

    D Renovation & Modernisation of 33/11 kV SS

    1   Nos.

    2   Nos. - 

    Nos.

    Sub Total  0 0 0

    E New 33 KV new feeders/Bifurcation of feeders:

    1   Kms - 

    2   Kms - 

    Sub Total  0 0 0

    F 33 KV feeders Reconductoring/Augmentation

    1   Kms - 

    2   Kms - 

    3

    Sub Total  0 0 0

    G 33 kV Line Bay Extension at EHV station

    1   Nos - 

    2   Nos - 

    3   Nos

    Sub Total  0 0 0

  • 8/18/2019 HPSEBL Shimla Contacts

    22/52

    H 22 KV or 11 kV Line : New Feeder/ Feeder Bifurcation 12.50 

    1   2 2 KV Line with ACSR 6/1/4.09 mm sq Conductor on 9 Mtr S/T Poles. Kms 4.300 8.026  34.512  Ann-HT_23

    Spur line from

    Bazaar Feeder t

    Court Colony, Fa

    to Muel Road &

    Fagu to Nangla

    2   Kms

    3   Kms

    Sub Total  12.50 4.300 34.512 

    I 22 kV or 11 kV Line : Augmentation/Reconductoring

    1Re Cond of 22KV from ACSR 6/1/2.59 mm sq to ACSR 6/1/4.09 mm

    sq  Kms   12.00 3.093  37.116  Ann-HT_24

    Shalii Bazar to

    Theog feeder &

    Jais to Theog

    Feeder 2   Kms

    3   Kms - 

    Sub Total  0 12.00 37.116 

    J Arial Bunched Cable

    i) HT

    Kms

    Kms

    Kms

    Sub Total  0 0 0

    ii) LT

    1   Re- Cond LT line from ACSR (20/30 mm sq) to AB Cable 120 mm sq Kms 5.000 4.753  23.765  Ann-LTAB_12

    Rahighat, Premgh

    Shalli Bazar-I, Nay

    Bazar & Court

    .

    2   Kms

    3   Kms

    Sub Total  0 5.000 23.765

    Total  0 5.000 23.765

    K UG Cablei) HT

    Kms

    Kms

    Kms

    Sub Total  0 0 0

    ii) LT

    Kms

    Kms

    Kms

    Sub Total  0 0 0

    Total  0 0 0

    L 11 KV Bay Extension

    Kms

  • 8/18/2019 HPSEBL Shimla Contacts

    23/52

    Kms

    Kms

    Sub Total  0 0 0

    M Installation of Distribution Transformer 12

    1   11/0.4 kV, 100 KVA SS   Nos.   -  3.086 -  Ann-DT_11

    2   11/0.4 kV, 250 KVA SS   Nos.   -  4.497 -  Ann-DT_11

    3   22/0.4 kV, 100 KVA SS Nos. 3 4.238 12.714 Ann-DT_21Court Colony DTR

    Muel Road Rahi G

    DTR, Nangla Dev

    4   22/0.4 kV, 250 KVA SS -  7.023 -  Ann-DT_21

    Sub Total 12 3 12.714

    N Capacity enhancement of LT sub-station1   250 KVA to 630 KVA   Nos.   1 12.449   12.449 Ann-DT_22   Shalli Bazar-I

    Nos.

    Nos.

    Sub Total 0 1 12.449

    O LT Line : New Feeder/ Feeder Bifurcation   15.400

    1  3-Phase LT line with ACSR 6/1/4.09 mm sq Conductor on 8 Mtr S/T

    Poles.  Kms 2.000 5.639  11.278  Ann-LT_14

    Court Colony, M

    Road Rahighat &

    Nangla Devi.

    2   Kms

    3   Kms

    Sub Total 15.400 2.000 11.278

    P LT Line : Augmentation/Reconductoring

     

    1   Augmentation from 1Ø to 3Ø with ACSR 50 mm sq Conductor.   Kms 3.202   1.213 3.885 Ann-LT_22our o ony,

    Road Rahighat &

    Nangla Devi.

    2   Re-Cond. LT line with ACSR 6/1/4.09 mm sq conductor. Kms 4.500 1.936  8.712 Ann-LT_23  Rahighat, Prem

    & Janogghat.

    3

    Sub Total 0 7.702 12.597

    Q Capacitor Bank

    Nos.

    Nos.

    Nos.

    Sub Total 0 0 0

    R HVDS

    Nos.

    Nos.

    Nos. - 

    Sub Total 0 0 0

  • 8/18/2019 HPSEBL Shimla Contacts

    24/52

    S Metering

    i)   Prepaid / smart meters in Govt. establishment   Nos.

    ii)  AMI, Smart meters in the towns where SCADA being established

    under R-APDRP.   Nos.

    iii)  Boundary meters for ring fencing of Non-RAPDRP Towns with

    population more than 5000 Nos.

    iv)  AMR for feeders, Distribution transformer and high load consumers Nos.

    a   Metering-Feeder    Nos.

    b  Metering- DT Nos. 10 30 0.195  5.850 Ann-MT Per unit cos

    includes mode

    cost also.

    c   Metering-HT   Nos.

    d  Modems Nos.v)  Consumers for existing un-metered connections, replacement of faulty

    meters & electro-mechanical meters   Nos.  4353

    a 1 Ø  Meter    Nos.   1172 0.017  19.924 Ann-MT

    b  3 Ø  Meter    Nos.   20 0.064  1.280 Ann-MT

    vi)Installation of Pillar Box for relocation of meters outside the premises

    of consumers including associated cables and accessories   Nos.

    a  Meter Boxes

    b   1-Phase Each   98 0.030 2.940 Ann-MT_Boxes

    c   3-Phase Each   10 0.042 0.420 Ann-MT_Boxes

    d   Piller Boxes for 8 Nos. meters Each   9 0.100 0.900 Ann-MT_Boxes

    Sub Total 4363 1222 31.314 

    T Provisioning of solar panel

    1   Solar Panel with Net Metering KWe 20.00 0.798 15.960 As per PFC

      22 kV Control Po

    BDO office, Judic

    Court Complex &

    SDM office.

    2   Location 2 ……………. /( Capacity) KWe

    3   Location 3 ……………. /( Capacity) KWe

    4   Net-Meters Nos.

    Sub Total 0 20.000 15.960

    U RMU,Sectionaliser, Auto reclosures, FPI etc.

    i)  33 kV Line : Installation of switchable breaker/switches   Nos.

    ii)  33 kV Line : Installat ion of commnuicable/non -communicable FPIs

    (O/C&E/F)   Nos.

    iii) 11 kV Line : Installation of RMUs/Sectionaliser alongwith aux power

    supply to operate sw/breaker.   Nos.

    iv)  11 kV Line :- Installation of communicable/non communicable FPIs (

    O/C,E/F)   Nos.

    v)  11 kV Line : Installation of switchable breakers alongwith aux power

    supply to operate sw/breaker Nos.

  • 8/18/2019 HPSEBL Shimla Contacts

    25/52

    vi) Installati on of re mote operable switches for breaker/switches

    operation for Distribution Transformer alongwith aux power supply to

    operate sw/breaker Nos.

    vii)  Installati on of re mote operable switches for breaker/switches

    operation for cap bank alongwith aux power supply to operate

    sw/breaker .   Nos.

    Sub Total 0 0 0

    V Others

    Sub Total 0 0 0

    Grand Total 191.704

    Note: Unit price and Total Cost are inclusive of all taxes and duties

  • 8/18/2019 HPSEBL Shimla Contacts

    26/52

    POWER FINANCE CORPORATION LTD. Annexure-1

    Detail Project Report

    Project Benefits:

    a. Reduction in AT&C loss

    Base Year: AT&C Loss for FY 2012-13   % 9.53%

    FY 15-16   % 20.00%

    FY 16-17   % 17.00%

    FY 17-18   % 15.00%

    FY 18-19   % 13.00%

    FY 19-20   % 11.50%

    FY 20-21   % 10.50%

    FY 21-22   % 10.00%

    b. Other intangible benefit shall be as follows:

    Better voltage profile: With strenthening of network & improvement in PF, tail end voltage will be

    imroved & reactive current will be reduced resulting improvement of quality of power & better

    consumer satisfaction..

    Decrease in the DT failure: With addition of DT & enhancement of DT capacity the load on DT will be

    reduced, resulting decrease in DT failure & improvement in reliability.

    Curbing the theft/ pilferage/ and unaccounted usage: With ABC, HVDS, meter pillar boxes & proper

    consumer metering, theft / piferage & unaccounted usages will be minimised.

    . Reduction of Losses to meet AT&C loss reduction trajectory.

    . Providing elctricity access to all urban house hold.

    . Improvement in network planning

    . Improvement in quality of supply like voltage level, PF etc.

    . Prompt and effective solution to the consumer queries / grievances.

    Line loss reduction: With strengthening of network, conductor resistance will be reduced, resulting

    reduction in cu loss.

    Implementation of the project will facilitate to achieve Utility level AT&C Loss reduction trajectory asper Annexure-III of IPDS Guidelines is shown below:

    . Accurate & reliable energy aacounting on sustainable basis.

    . Better accountability at all level.

    . Improve the reliability of the power supply.

    . 24x7 power supply for consumers in urban area.

    Ensuring better accounting: With metering of all nodal points, the energy accounting & auditing will

    be improved, resulting better administrative action:

  • 8/18/2019 HPSEBL Shimla Contacts

    27/52

    POWER FINANCE CORPORATION LTD.

    Detail Project Report

    Project area asset detail

    Rating (MVA) Nos. Capacity (MVA)31.5 1 31.5 30.8

    10.5 3 31.5 31.6

    2 Totu 66/11KV 6.3 3 18.9 18

    3 Gumma 66/22KV 2x6.3+1x10 1 22.6 22.4

    4 Hully 66/22KV 10 2 20 18.4

    5 Sainj 66/22KV 6.3 1 6.3 5.81

    Rating (MVA) Nos. Capacity (MVA) MVA MVAR

    1 Bharari 33/11KV 10 2 20 20 -

    2 Khallini 33/11KV 10 2 20 20 -

    3 Maliana 33/11KV 10 2 20 18.8 -

    4 Shoghi 33/11KV 3.15 1 3.15 2.44 -

    5 Ghandal 33/11KV 2.5 1 2.5 2 -

    6  Ashwni Khud 33/11KV 2.5+4 1 6.5 5.8 -

    7 Panthaghatti 33/11KV 3.15 2 6.3 5.22 -

    8 Mashobra 15/22KV 2.5 3 7.5 7.6 -

    9 Summer Hill 15/11KV 4 2 8 7.4 -

    *Note:- 33/11 kV SS's Statutory Towns of the Project area alongwith rural areas.

    SN

    Annexure-2

    EHV Transformer Details

    Details of EHV Sub-stations feeding project area

    Maximum Demand (MVA)

    Details of 33/11 Sub-stations feeding project area

    Maximum Demand

    Voltage RatioSN Name of EHV

    Substation

    Voltage RatioHV Transformer Details Name of

    Substation*

    132/33KVJutogh1

  • 8/18/2019 HPSEBL Shimla Contacts

    28/52

    SNFrom EHV

    SubstationTo 33/11 S/S

    Name of 33KV

    feeder

    Length of

    feeder

    Type of

    conductor

    Average

    Demand

    (MVA)

    Peak

    Demand

    (MVA)

    Bharari Bharari 7.00 ACSR 15 21

    Khallini Khallini 19.00 ACSR 14 21

    Maliana Maliana 4.60 ACSR 12 18

    Shoghi Shoghi 0.00 ACSR 1.5 2.9

    Ghandal Ghandal 16.00 ACSR 1.2 2

    Ashwni Khud Ashwni Khud 21.40 ACSR 4 5.8

    Panthaghatti Panthaghatti 6.00 ACSR 4 5.95

    Sl.

    No.From 33/11 S/S To 33/11 KV S/S

    Name of 33KV

    feeder

    Length of

    feeder

    Type of

    conductor

    Average

    Demand

    MVA

    Peak

    Demand

    MVA

    -----Not Applicable------

    Jutogh1

    Details of interconnection of 33/11 KV Sub-stations feeding project area

    Details of connection from EHV to 33/11 Sub-stations feeding project area

  • 8/18/2019 HPSEBL Shimla Contacts

    29/52

    Rating (KVA) Nos.Capacity

    KVA630 8 5040

    500 2 1000

    400 3 1200

    250 10 2500100 2 200

    Belvedere ACSR   2   630 1 630

    630 15 9450

    250 13 3250

    630 1 630

    250 2 500

    100 16 1600

    63 5 315

    25 8 200

    1000 3 3000

    630 12 7560

    500 1 500

    400 1 400

    250 1 250

    400 1 400

    250 1 250

    25 2 50

    1000 8 8000

    630 6 3780

    250 6 1500

    133/11 kV SS

    Bharari

    0.29

    Walker  ACSR   5.46

    Peak Demand

    (MVA)

    ACSR   4.37

    Doomi ACSR   1.69

    Telegraph

    Idgah

    Barmu ACSR

    Sl. No Name of 22 / 11

    KV feeder 

    From 33/11 of

    66/11 KV S/S

    Distribution Transformer Details*Type of

    conductor 

    ACSR   2.56

    ACSR   5.11

     Name & Capacity of

    Power Transformer 

    2x10MVA 33/11 KV

    Bharari

    Bharari

    Details of 22/11 KV feeders emanating from 33/11 or 66/11 KV Sub-stations feeding project area

  • 8/18/2019 HPSEBL Shimla Contacts

    30/52

    1000 2 2000

    800 1 800

    630 4 2520

    250 2 500

    1000 2 2000

    630 7 4410

    500 1 500400 1 400

    250 7 1750

    630 6 3780

    500 1 500

    250 1 250

    1000 1 1000

    630 4 2520

    250 8 2000

    630 4 2520

    250 7 1750

    630 4 2520

    250 5 1250630 6 3780

    400 3 1200

    250 8 2000

    100 2 200

    1000 1 1000

    630 12 7560

    250 8 2000

    100 2 200

    33/11KV

    Khallini2

    0.1

    New Sml ACSR 5.36

    Kanlog ACSR   4.89

    0.11

    Palika Bhwn. ACSR 1.34

    Forest Col. ACSR

    2.8

    4.54

    Bamloe 2.15

     Alu Park ACSR2x10MVA 33/11KV

    Khallini

    Benmore ACSR

    Baragaon ACSR

     ACSR

  • 8/18/2019 HPSEBL Shimla Contacts

    31/52

    630 3 1890

    250 4 1000

    25 1 25

    1000 2 2000

    630 15 9450

    400 1 400

    250 2 500

    100 1 100

    1000 2 2000

    630 2 1260

    250 11 2750

    100 1 100

    630 1 630

    400 4 1600

    250 8 2000

    100 4 400

    25 1 25

    630 3 1890

    250 5 1250

    100 3 300

    63 1 63

    25 1 25

    630 5 3150

    250 9 2250

    100 5 500

    25 2 50

    400 2 800

    25 1 25

    33/11KV

    Maliana3

    Jagroti ACSR

    3.03

    Flowerdale ACSR 2.21

    Nav Bahar ACSR 2.39

    Cemetry ACSR

    5.61

    Kasumpti ACSR 4.43

    1

    2x10MVA 33/11KV

    Maliana

    PC Kasumpti ACSR 0.58

    Strawbery ACSR

  • 8/18/2019 HPSEBL Shimla Contacts

    32/52

    630 1 630

    250 1 250

    25 1 25

    1000 2 2000

    400 1 400

    250 2 500

    100 6 600

    63 13 819

    25 2 50

    250 1 250

    100 2 200

    25 1 25

    250 5 1250

    100 1 100

    63 4 252

    25 6 150

    630 1 630

    250 2 500

    100 3 300

    63 2 126

    25 2 50

    Mehli ACSR   1   1000 0

    250 3 750

    63 1 63

    25 1 25

    630 3 1890

    250 1 250

    250 3 750

    33/11KV

    Panthaghatti5

    33/11KV Shoghi4

     ACSR 1.34

    Tikaksha

    0.54

     ACSR 0.84

     ACSR 1.44

    Koti ACSR

    0.3

    Vikasnagar 

    Beolia

    1x3.15MVA

    33/11KV Shoghi

    Supermax ACSR 0.29

    Shoghi ACSR 1.14

    2x3.15MVA

    33/11KV

    Panthaghatti

    Paoghat ACSR

  • 8/18/2019 HPSEBL Shimla Contacts

    33/52

    100 2 200

    63 10 630

    25 16 400

    250 1 250

    100 4 400

    63 2 126

    25 15 37563 4 252

    25 8 200

    250 3 750

    100 3 300

    63 5 315

    25 10 250

    LWSS ACSR 0.5   1000 0

    Kawalag ACSR 1   100 1 100

    630 4 2520

    400 3 1200

    250 11 2750

    100 4 400

    63 1 63

    25 2 50

    250 5 1250

    100 3 300

    63 9 567

    25 16 400

    250 2 500

    33/11KV

    Ghandal

    6

    33/11KV

    Ashwani Khud7

    0.68

     ACSR 0.19

     ACSRGhanahati

    0.25

    3

    2.5MVA 33/11KV

    Ghandal

    Dhami ACSR 0.62

    Kohbag ACSR

    1x2.5+1x4MVA

    33/11KV Ashwni

    Khud

    Kasumpti ACSR 2

    Junga ACSR

    Shakrah

  • 8/18/2019 HPSEBL Shimla Contacts

    34/52

    100 11 1100

    63 7 441

    25 28 700

    630 2 1260

    250 2 500

    100 3 300

    63 1 63

    25 1 252000 3 6000

    630 1 630

    100 1 100

    Gumma-III ACSR 3   100 1 100

    63 1 63

    25 1 25

    630 4 2520

    500 1 500

    400 1 400

    250 3 750

    100 3 300

    63 40 252025 86 2150

    630 4 2520

    400 4 1600

    250 12 3000

    100 49 4900

    63 56 3528

    25 89 2225

    100 3 300

    63 5 315

    66/22KV

    Gumma8

    Mashobra

    Theog ACSR   6.2

     ACSR

     ACSR

    Kadharghat ACSR

     ACSR

    1

    0.1

    9.2

    Juggo (Koti) 3

    0.7

    Gumma-ii ACSR 4

    Gar Guma

    2x6.3+1x10MVA

    66/22KV Gumma

    Chair ACSR

  • 8/18/2019 HPSEBL Shimla Contacts

    35/52

    25 53 1325

    Drabla-! ACSR 0   1000 0

    Drabla-II ACSR 4 25 1 25

     AIR ACSR 0 630 1 630

    250 10 2500

    100 10 1000

    63 30 1890

    25 104 2600Chaba ACSR -4   1000 0

    Sunni ACSR 0

     AiR ACSR 0

    250 3 750

    100 4 400

    63 4 252

    25 5 125

    Retreat ACSR 1   630 2 1260

    250 3 750

    100 5 500

    63 6 378800 1 800

    630 10 6300

    500 1 500

    250 8 2000

    100 3 300

    630 1 630

    250 10 2500

    100 17 1700Taradevi ACSR 3

    Sunni ACSR 4

    Chakkar ACSR 5

    3

    Dhalli ACSR 3.6

    9 15/22KV  3x2.5MVA

    Mashobra

    Theog-II ACSR

  • 8/18/2019 HPSEBL Shimla Contacts

    36/52

    63 8 504

    25 2 50

    630 3 1890

    400 1 400

    250 11 2750

    100 10 1000

    63 9 56725 18 450

    400 2 800

    250 6 1500

    100 3 300

    63 15 945

    25 15 375

    250 1 250

    100 2 200

    63 2 126

    25 1 25

    630 1 630

    250 1 250

    100 1 100

    Dhami ACSR 1   250 1 250

    1000 1 1000

    630 1 630

    400 2 800

    200 1 200

    66/11KV Totu10

    2

    Sceince Block PILC U/G 0.5

     ACSR 1

    STP Gadog ACSR

    MES ACSR 2

    Banuti ACSR 4

    Chilling Plant

    3x6.3MVA 66/11KV

    Totu

     AIR PILC U/G 0.5

  • 8/18/2019 HPSEBL Shimla Contacts

    37/52

    630 5 3150

    250 6 1500

    Doordarshan ACSR 0.2   1000 0

    630 5 3150

    250 1 250

    100 1 100

    630 4 2520250 2 500

    Kenedy House PILC U/G 0.8   1000 2 2000

    250 10 2500

    100 8 800

    63 19 1197

    25 60 1500

    250 11 2750

    100 12 1200

    63 50 3150

    25 98 2450

    Rating (KVA) Nos.Capacity

    KVA

    -----Not Applicable------

    66/22KV Sainj13

    15/11KV

    SummerHill11

    66/22KV Hully12

    Kumar house PILC U/G 1.8

    Teacher house PILC U/G 1.8

    Boys Hostel XLPE U/G 1.4

    Peak Demand

    (MVA)

     Name & Capacity of

    Power Transformer 

    From EHV

    Substation

    Distribution Transformer Details Name of 11 KV

    feeder 

    Details of 11 KV feeders emanating from EHV Sub-stations feeding project area

    Sl.

     No.

    Type of

    conductor 

    2x4MVA 15/11KV

    SummerHill

    1x6.3MVA 66/22KV

    Sainj

    Sainj, Deha,

    Pulbahal,

    Dhareach.

    ACSR   5.81

    2x10 MVA 66/22KV

    Hully

    Hully Chhailla

    TheogACSR   18.4

    *Note:- Out of 1679 Nos. DTRs 954 Nos. DTRs feeds Statutory Towns (i.e. Shimla, Sunni & Theog) of theProject area.

  • 8/18/2019 HPSEBL Shimla Contacts

    38/52

    Annex-HT_23

    Sr.

    No.Description Qty. Rate Unit Amount

    Ref: DS CD

    2014-15

    2 ST Pole 9 Mtr. Long W/L 200 kg 12 9547 No 114564   P-12

    3 RCC Muff of 2000 mm length 12 963 No 11556   P-12

    4 C.I. X-Arm (1800X100X50) mm Tangent Structure 8 900 Set 7200   P-12

    5 A. I. Knee Bracing Set 2X(850X50X50) mm 8 400 No 3200   P-12

    6 C.I. X.-Arm (1500X100X50)mm Dead End Structure 4 752 No 3008   P-12

    7 C.I. X.-Arm (3000X100X50)mm Dead End Structure 4 1500 No 6000   P-12

    8 A. I. Bracing Set (1500X50X50+2700X50X50)mm 2 1977 Set 3954   P-12

    2 No. Each

    9 22 kV Pin Insulator with Pin Helically formed fitting 36 236 No 8496   P-12

    10 Disc insulator set (Cleaves and Tong) 24 1454 Set 34896   P-12

    Helically formed fitting

    11 Stay Set complete including Guy Assembly 13 728 Set 9464   P-12

    Helically fitting

    12 Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set) 78 58 Kg 4524   P-12

    13 Coil Earthing for PCC / Steel Pole 3 552 No 1656   P-12

    14 GI Wire 8 SWG for Guarding across the Road 26 62 Kg 1612   P-12

    15 Danger Plate(250X200X1.6 mm) 12 110 No 1320   P-12

    16 Earth Wire 8SWG GI Wire for PCC/ Steel Pole 105 62 Kg 6510   P-12

    17 M.S. Nuts and Bolts (Off Sizes) 25 81 Kg 2025   P-12

    18 Top Clamp for Pole (M.S. Flat 50X6 mm) 8 65 No 520   P-12

    19 Barbed Wire 30 65 Kg 1950   P-12

    20 Aluminium Paint 12 141 Ltr 1692   P-12

    21 Back Clamp ( M.S. Flat 50X6 mm ) 16 56 No 896   P-12

    22 ACSR Cond. 6/1/4.09mm2 3.090 49932 Km 154290   P-66

    23 G.O. Switch 400 A 1 7237 No 7237   P-33

    24 D,O Fuse Unit 1 3524 No 3524   P-33

    Total: 390094

    22   Add 3% Contingencies   11703

    23   Add 3% Storage charges   11703

    24   Add Erection charges 1.000 96525 km 96525 P-54

    25   Add Transportation charges 1.000   26145   km 26145 P-10

    26   Add Electrical Inspection Fees.   1.000   200   km 200

    TOTAL :- Material + Charges 704008

    Central Taxes@ 14% 98561

    GranD Total 802570

    Say Rs. In Lac 8.026

    ** Abstract of Cost for 22 kV H.T.Line with ACSR 6/1/4.09 mm Conductor **

  • 8/18/2019 HPSEBL Shimla Contacts

    39/52

    Annex-HT_24

    Sr.

    No.

    Description Qty. Rate Unit Amount

    Ref. Page No.

    as per Cost-

    Data for 2014-15

    1

    Prov. Steel Tubular pole 9mtr long with steel cap /

    base plate. 4 9547 Each   38188   P-12

    2   Prov. RCC muff . 4 963 Each   3852   P-12

    3

    Prov. ACSR Conductor 6/1/4.09mm i/c 3%

    cutting,wastage & sagging.   3.090 49,932 km 154290   P-66

    4

    Prov. C.I.X-arm for double pole str size 3000 x 100

    x 50mm for GO.Switch , D.O.Fuses & Disc

    Insulators.   2 1,500 Each 3000   P-12

    5

    Prov. C.I.X-arm for double pole str size 1800 x 100

    x 50mm.   2 900 Each 1800   P-12

    6

    Prov. C.I.X-arm size 1800 x 100 x 50mm for Single

    Pole.   2 900 Each 1800   P-12

    7Prov. MSAI-X-Arm 50x50x6x2800mm for earth/Gaurding.   1 659   Each   659   P-30

    8

    Prov. A.I.X-Bracing set for double pole str

    (1500x100x 50mm) + (2700x50X50mm) each ( 2

    nos per set ) complete with Full clamps,cutting &

    wastage etc.   1 1,977 Set 1977   P-8

    9

    Prov. A.I.Knee-bracing set 2(750 x 50 x 50 x 6

    mm. ) for single pole   2 353 Each 706   P-8

    10

    Prov. M.S. Flat 50 x 8mm for top clamp for single

    pole   2 65 Each 130   P-8

    11

    Prov. M.S. Flat 50 x 8mm for back clamp for X-

    arm.   2 63 Each 126   P-30

    12   Prov. M.S. Flat 50 x 8mm for Staple   6 63 Each 378   P-8

    13   Prov. M.S. Nuts & Bolts off size = 25 kg / Km line.   15.000 81 kg 1215   P-8

    14   Prov. Barbed wire.   4 65 kg 260   P-8

    15   Prov. M.S. Eye hook with nut.   4 30 Each 120 P-15

    16

    Prov. 22 kv Disc Insulator complete set with ball

    clevis / eye -socket,dead end clamp , Bend

    Stapple & P.G.clamps etc.   6 1,454 Set 8724   P-12

    17  Prov. Dead end clamp for AAAC Conductor

    6/1/4.09 mm  12 500 Set 6000

      Stock Issue

    rates

    18

    Prov. 22 kv Pin Insulatorwitn Pin Hellically formed

    fitting.   6   236 Each   1416   P-12

    19

    Prov. H.T. stay set complete i/c Guy

    assembly/Stay Wire   4 1,106 Set 4424   P-12

    20   Prov. Coil earthing complete set.   1 552 Set 552   P-12

    21   Prov. 22 KV Danger plate   3 110 Each 330   P-1222   Prov. Alluminum Paint.   4 141 Ltr 564   P-12

    23

     Add Sundreies & misc itmes i.s. Primer

    ,Alluminium Paint & other items to complete the

     job = Rs 1000-00 / Km line.   L.S. 1000

    Sub-Total :-- Material 231511

    CHARGES :--25 Add Contingency @ 3% on Rs. 6945

    ** Abstract of Cost of Re-Conductoring of Existing 22/11/15 kV H .T. Line from ACSR 6/1/2.59

    mm to ACSR 6/1/4.09 mm Conductor / km line

  • 8/18/2019 HPSEBL Shimla Contacts

    40/52

    26 Erection chargesa   Add Erection charges for Single pole str.   3 3,174 Each 9522   P-48

    b   Add Erection charges for Double pole str.   1 6,245 Each 6245   P-48-49

    c   Add Erection charges for fixing of Jumpering.   4 318 Set 1272   P-49

    d   Add Erection charges for Earthing   1 639 Each 639   P-49

    e   Add Erection charges for Stay Set   4 1,184 Each 4736   P-49

     Add Erection charges for laying of ACSR 6/1/4.09

    mm Conuctor = ( 19720 x 3 wire ) for new and

    re-conductoring of 11 kv H.T.Line.

    1.000 59160 km 59160  33KV Cost

    Data P- 68

    27 Transportation charges

    a  Add Transportation charges for re-conductoring of

    11 kv H.T.Line @ 50% on Rs. 26145.00  1.000 13073 km 13073 P-10

    28 Add Electrical Inspection Fees.   1.000 200 km 200

      TOTAL :- Material + Charges 3333030

    Total 333303Less cost of dismantled material ( As per Ann-

    HT 24 a  24040

    Grand-Total 309263

    Say Rs. 3.093

    Ann-HT_24(a)

    Sr.

    No.Description Qty. Rate Unit Amount

    Ref. Page No.

    as per Cost-

    Data for 2014-

    151

    (a) ACSR Conductor 6/1/2.59mm ( 30MM^2) /

     AAAC 7/2.50mm (30mm2) 1.000 33162 P/km 33162 P- 44

    (b)Dead end clamp for ACSR 6/1/2.11/6/1/2.59

    mm Cond. on Stock Issue Rates = Rs. 500 x @

    55% = 110.00   15   275 Each   4125   P- 42

     TOTAL :- 1 372872

    (a) ACSR Conductor 6/1/2.59mm ( 30MM^2) /

     AAAC 7/2.50mm 1.000 13041 P/km 13041  P-53

    (b)Dead end clamp for all type cond. @ 5%

    on Rs. 4125 206

      TOTAL :- 2 1324724040Net Cost to be credit = Item No. 1 - 2

    Dismentaling charges for ACSR Condutor /G.I. Wire. ( 11kv Line / km)

    Less the credit of ACSR Condutor / G.I.Wire ( Per Km line )

  • 8/18/2019 HPSEBL Shimla Contacts

    41/52

    Annex-HTAB_11

    Sr.

    No.Description Qty. Rate Unit Amount

    Ref: DS CD-

    2014-15

    1   Prov. Steel Tubular Pole 9 mtr long.   15   9547   Each 143205 P-12

    2   RCC Muff    15   963   Each 14445 P-123

      Prov. H.T. stay set complete i/c Guy

    assembl /Sta Wire  4 1,076 Set 4304 P-11

    4   Prov. Barbed wire. 14 65 kg 910 P-11

    5   Prov. 11 KV Danger plate 10 110 Each 1100 P-11

    6   Prov. Alluminum Paint for Steel items   3 141 Ltr     423 P-11

    7 Prov. Anchoring Assembly .   4 285   Each   1140 P-11

    8 Prov. Suspension Assembly.   21 227   Each   4767 P-11

    9 Façade Hooks 15 75   Each   1125 P-11

    10   Aerial Bunched Cable - 95 mm2 1.030 504545 km 519681 P-11

    12 Sub-Total :-- Material 69110013 CHARGES :--

    14 Add 3% Contingencies   20733

    15 Add 3% Storage charges   20733

    16   Add Erection charges 1.000 43505 km 43505 P-11

    17   Add Transportation charges 1.000   19029   km 19029 P-11

    18   Add Electrical Inspection Fees. 1.000   200   km 200

    TOTAL :- Material + Charges 795300

    Central taxes @ 14 % 111342

    Grand Total 906642

    Say Rs. In Lac 9.066

    ** Abstract of Cost for New 22kV /11kV H.T Line with AB Cable -95 mm2  on Single Pole Structure

    **

  • 8/18/2019 HPSEBL Shimla Contacts

    42/52

    Sr.

    No.Description Qty. Rate Unit Amount

    Ref: DS

    CD 2014-

    15

    A MATERIAL :-

    1 Prov. Steel Tubular Pole 8 mtr long. 15 7,224 Each 108360 P-11

    2 RCC Muff 15 729 Each 10935 P-11

    3 LT AB Cable 3x120+95mm2 LT AB Cable   1.030 297,291 P/Km 306210 P-70

    3 Suspension and dead end clamp 15 389.00 Each 5835 As per

     Award

    Una Town

    4 Distribution box 15 1820.00 Each 27300 As per

     Award

    Una Town

    5 L.T. Stay-Set complete in all respect. 1 978 Set 978 P-23

    6  Add Sundreies & misc itmes i.e. Primer

    & other items to complete the job.  1 500 500

    Sub-Total - Material 460118

    B CHARGES :--

    1 Add Contingency @ 3% on Rs. 13804

    2 Add Storage @ 3% on Rs. 13804

    3  Add Erection Charges @ 50% of Rs.

    88465.00 (Cost. 3-Phase L.T.Line )  Km 1.000 44233 44233 P-18

    4  Add Transportation charges @ 50% of

    Rs. 22998-00 (Cost. 3-Phase L.T.Line )Km 1.000 11499 11499 P-28

    543457

    Central taxes @ 14 %   76084

    Grand Total 619541

    6.195

    Annex-LTAB_11

    New 3 Phase L.T. Line with AB Cable 120 mm2 on 8 Mtr long Steel Tublar Pole for

    different Distribution SS:/ Km

      TOTAL :- Material + Charges

    Say Rs. In Lac

  • 8/18/2019 HPSEBL Shimla Contacts

    43/52

    Annex-LTAB_12

    Sr.

    No.Description Qty. Rate Unit Amount

    Ref: DS CD-

    2014-15

    A MATERIAL :-1 Prov. Steel Tubular Pole 8 mtr long. 5 7,224 Each 36120 P-112 RCC Muff 5 729 Each 3645 P-11

    3 LT AB Cable 3x120+70 +16mm2 LT AB Cable   1.030 297,291 P/Km 306210 P-70

    3 Suspension and dead end clamp 12 389.00 Each 4668  As per Award

    Una Town

    4 Distribution box 15 1820.00 Each 27300  As per Award

    Una Town

    5 L.T. Stay-Set complete in all respect. 1 978 Set 978 P-23

    6  Add Sundreies & misc itmes i.e. Primer & other items to

    com lete the ob.  1 500 500

    Sub-Total - Material 379421B CHARGES :--1 Add Contingency @ 3% on Rs. 78612 Add Storage @ 3% on Rs. 7861

    3

      Add Erection Charges @ 50% of Rs. 88465.00(Cost. 3-

    Phase L.T.Line Km 1.000 44233 44233 P-18

    4  Add Transportation charges @ 50% of Rs. 22998-00(Cost. 3-

    Phase L.T.LineKm 1.000 11499 11499 P-28

      TOTAL :- Material + Charges 450875Less the Cost if Dismentaled Material as per Annex- LTAB_12(a) -33915

    Sub-Total 416960

    Central taxes @ 14 %   58374

    Grand Total 475334Say Rs. In Lac 4.753

    Annex-LTAB_12(a)

    Sr.No.

    Description Qty. Rate Unit Amount Ref: DS CD-2014-15

    1

    a)

     ACSR Conductor 6/1/2.11mm ( 25MM^2)/ AAAC

    7/2.00MM/AAC 7/2.21 mm (20mm2) [7512x4=30048] 1.000 30048 P/km 30048 P-44

    b)

     ACSR Conductor 6/1/2.59mm ( 30MM^2) / AAAC 7/2.50mm

    (30mm2) 1.000 44216 P/km 44216 P-44

    c)

     ACSR Conductor 6/1/3.35mm ( 50MM^2).)/ AAAC 7/3.15 mm

    (50mm2) 1.000 73924 P/km 73924 P- 44  TOTAL :- 1 148188

    2

    a)  ACSR Conductor 6/1/2.11mm ( 25MM^2)/ AAAC

    7/2.00MM/AAC 7/2.21 mm 20mm2 2917*4=11668  1.000 11668 P/km 11668 P-53

    b)  ACSR Conductor 6/1/2.59mm ( 30MM^2) / AAAC 7/2.50mm

    4347*4=17388  1.000 17388 P/km 17388 P-53

    c)   ACSR Conductor 6/1/3.35mm ( 50MM^2)./AAAC 7/3.15mm[4347*4=17388]

      1.000 17388 P/km 17388 P-53

      TOTAL :- 2 464443 Net Cost = Item No. 1 - 2 101744

    33915

    Less the credit of ACSR Condutor / G.I.Wire ( Per Km line )

    Dismentaling charges for ACSR Condutor /G.I. Wire. ( 11kv Line / km)

    Average cost of Dismentled Material to be credited

    Augmentation/ Re-Cond of 3 Phase L.T. Line with AB Cable 120 mm2 on 8 Mtr long Steel Tublar Pole for different

    Distribution SS:/km

    ** Abstract of Cost for Dismentalled Material. **

  • 8/18/2019 HPSEBL Shimla Contacts

    44/52

    Annex-DT_11

    Sr DESCRIPTION QTY UNIT RATE

    No Rs. 25 KVA 63 KVA 100 KVA 250 KVA 400 KVA 630 KVA

    1 2 3 4 5 6 7 8 9 10 11

    1 11/0.4 kV Distribution Transformer (Ordinary)

    I) 25 kVA 1 No 47413.00 47413.00 P-30

    II) 63 kVA 1 No 83317.00 83317.00 P-30

    III) 100 kVA 1 No 110636.00 110636.00 P-30

    IV) 250 kVA 1 No 184742.00 184742.00 P-30

    V) 400 KVA 1 No 459397.00

    As per Chief

    Engineer

    (MM) P.O.-

    2014

    VI) 630 KVA 1 No 640146.00

    As per Chief

    Engineer

    (MM) P.O.-

    2014

    2 S/T Pole 9Mtr. W/L200 kg 2 No 9547.00 19094.00 19094.00 19094.00 19094.00 19094.00 19094.00 P-30

    3 R CC Mu ff o f 2 00 0 mm l eng th 2 N o 96 3. 00 1 92 6. 00 1 92 6. 00 19 26. 00 1 92 6. 00 19 26. 00 1 92 6. 00 P-30

    4 C. I. X -A rm (2 80 0X1 00 X50 mm) f or T ra ns fo rmer ba se 4 N o 1 40 3. 00 5 61 2. 00 5 61 2. 00 56 12. 00 5 61 2. 00 56 12. 00 5 61 2. 00 P-30

    Main Channel

    5C.I (460X100X50 mm) for supporting Main Channel of 

    2 No 230.00 230.00 230.00 230.00 230.00 230.00 230.00 P-30

    Transformer 

    6 Transformer Belting

    I) A.I (2800X50X50 mm) 2 No 659.00 1318.00 1318.00 1318.00 1318.00   - - P-30

    II) A.I (460X35X35 mm) 2 No 96.00 192.00 192.00 192.00 192.00   - - P-30

    7 Transformer Bed ( 1.2X1.5X1.5 M) i/c fencing 1 L/S - - - - 20000.00 20000.00 20000.00 P-30

    8 C .I . f or F us e Un it /A B Swi tc h ( 28 00 X7 5X 40 mm) 4 N o 1 04 6. 00 4 18 4. 00 4 18 4. 00 41 84. 00 4 18 4. 00 41 84. 00 4 18 4. 00 P-30

    9 A .I X Ar m f or Li ght ni ng A rr es tor ( 280 0X5 0X5 0 mm) 1 N o 65 9. 00 6 59 .00 65 9. 00 6 59 .00 65 9. 00 6 59 .00 65 9. 00 P-30

    1 0 G .O. Swi tc h 1 Se t. 4 79 6. 00 47 96. 00 4 79 6. 00 47 96. 00 4 79 6. 00 47 96. 00 4 79 6. 00 P-30

    11 D.O.Fuse 1 Set. 1797.00 1797.00 1797.00 1797.00 1797.00 1797.00 1797.00 P-301 2 L igh tn ing Ar re st or s 3 N o 51 6. 00 1 54 8. 00 1 54 8. 00 15 48. 00 1 54 8. 00 15 48. 00 1 54 8. 00 P-30

    1 3 D is c I ns ul at or F it ti ng 3 Se t. 1 16 8. 00 3 50 4. 00 3 50 4. 00 35 04. 00 3 50 4. 00 35 04. 00 3 50 4. 00 P-30

    1 4 S ta y Se t c omp le te 2 Se t. 72 8. 00 1 45 6. 00 1 45 6. 00 14 56. 00 1 45 6. 00 14 56. 00 1 45 6. 00 P-30

    15 Stay W ire 7/3.15 mm ( @ 6.0 kg Per Stay Set) 12 Kg. 63.00 756.00 756.00 756.00 756.00 756.00 756.00 P-30

    1 6 P ip e Ea rt hi ng 3 Se t. 2 80 3. 00 8 40 9. 00 8 40 9. 00 84 09. 00 8 40 9. 00 84 09. 00 8 40 9. 00 P-30

    17 LT Distribution Panel Box with MCCB

    I) 25 kVA 1 Set. 9940.00 9940.00 P-30

    II) 63 kVA 1 Set. 10561.00 10561.00 P-30

    III) 100 kVA 1 Set. 9944.00 9944.00 P-30

    IV) 250 kVA 1.00 Set. 30871.00 30871.00 P-30

    V) 400 KVA 179370.00Stock Issue

    Rate

    VI) 630 KVA 179370.00Stock Issue

    Rate

    18 Half Clamp (M.S. Flat 50X6 mm) 15 No. 63.00 945.00 945.00 945.00 945.00 945.00 945.00 P-30

    19 M.S. Nuts and Bolts (Off Sizes) 10.00 Kg. 81.00 810.00 810.00 810.00 810.00 810.00 810.00 P-30

    20 G.I. Thimble 16 No 34.00 544.00 544.00 544.00 544.00 544.00 544.00 P-30

    21 Lead-Tin Solder (60:40) 1 Kg. 899.00 674.25 674.25 674.25 674.25 674.25 674.25 P-30

    22 Solder Flux 1.00 Tin 108.00 108.00 108.00 108.00 108.00 108.00 108.00 P-30

    23 Danger Plate 1.00 No 110.00 110.00 110.00 110.00 110.00 110.00 110.00 P-3124 Barbed Wire 15.00 Kg. 65.00 975.00 975.00 975.00 975.00 975.00 975.00 P-31

    24 LT Cable (3.5 Core)

    i) 25 mm2 10 Mtr 57.00 570.00 P-31

    ii) 50 mm2 10 Mtr 98.00 980.00 P-31

    iii) 95 mm2 10 Mtr 176.00 1760.00 P-31

    iv) 185 mm2 10 Mtr 194.00 1940.00 P-31

     v) XLPE 300 mm2 10 Mtr 1085.00 10850.00 P-69

    v)XLPE 400 mm2 10 Mtr 1317.00 13170.00 P-69

    25 Energy Meter (3-Phase, 4-Wire)

    i) 50 A CT Type 1.00 No 13645.00   - P-31

    ii) 100 A CT Type 1.00 No 14105.00   - P-31

    iii) 200 A CT Type 1.00 No 12746.00   - P-31

    iv) 400 A CT Type 1.00 No 13280.00   - P-31

    v) 1000 A CT Type 1.00 No 20000.00 - -

    As per Chief

    Engineer

    (MM) P.O.-

    201426 Aluminium Paint. 4.00 Ltr 141.00 564.00 564.00 564.00 564.00 564.00 564.00 P-31

    S ub -Total 1 18 13 4.25 1 55 06 9.25 1 82 55 1.25 2 97 76 4.25 7 28 31 8.25 9 11 38 7.25

    27 Erection Charges as per Sub-Head-C (P-50) 57473.00 57473.00 57473.00 57473.00 57473.00 57473.00 P-31

    2 8 T ran sp or ta ti on C ha rg es a s p er S ta te me nt -VI ( P-5 9) 17 09 0. 00 1 81 52 .0 0 19 74 4. 00 2 13 36 .0 0 21 33 6. 00 2 13 36 .0 0 P-31

    29 Other Charges

    I) Contingency Charges @3% 3544.03 4652.08 5476.54 8932.93 21849.55 27341.62

    ii) Storage Charges @3% 3544.03 4652.08 5476.54 8932.93 21849.55 27341.62

    199785.31 239998. 41 270721. 33 394439. 11 850826. 35 1044879.49

    27969.94 33599.78 37900.99 55221.47 119115.69 146283.13

    227755.25 273598. 18 308622. 31 449660. 58 969942. 03 1191162.61

    2.278 2.736 3.086 4.497 9.699 11.912Say Rs.

    COST DATA FOR 11/0.4 kV DISTRIBUTION SUB - STATION (Rs)ORDINARY

    Ref. of Cost

    Data 2014-15

    Sub-Total

    Central taxes @14%

    Grand Total

  • 8/18/2019 HPSEBL Shimla Contacts

    45/52

    Annex-DT_21

    25 KVA 63 KVA 100 KVA 250 KVA 400 KVA

    1 2 3 4 5 6 7 8 9

    1 22/0.4 kV Distribution Transformer (Ordinary)

    I) 25 kVA 1 No 94412 94412 P-33

    II) 63 kVA 1 No 156513 156513 P-33

    III) 100 kVA 1 No 199588 199588 P-33

    IV) 250 kVA 1 No 388990 388990P-33

    V) 400 KVA 1 No 618521 618521

    2 S/T Pole 9Mtr. W/L200 kg 2 No 9547.00 19094.00 19094.00 19094.00 19094.00 19094.00 P-30

    3 RCC Muff of 20 00 mm len gth 2 No 96 3.00 19 26 .00 19 26 .00 19 26 .00 19 26.00 1926 .00 P-30

    4 C.I. X-Arm (2800X100X50 mm) for Transformer base 4 No 1403.00 5612 5612 5612 5612 5612 P-30

    Main Channel

    5C.I (460X100X50 mm) for supporting Main Channel of 

    2 No 230.00 460 460 460 460 460 P-30

    Transformer 

    6 Transformer Belting

    I) A.I (2800X50X50 mm) 2 No 659.00 1318 1318.00 1318.00 - - P-30

    II) A.I (460X35X35 mm) 2 No 96.00 192 192.00 192.00 - - P-30

    7 Transformer Bed ( 1.2X1.5X1.5 M) 1 L/S - - - - 20000.00 20000.00 P-30

    8 C.I. for Fuse Unit/AB Switch (2800X75X40 mm) 4 No 1046.00 4184 4184 4184 4184 4184 P-30

    9 A.I X Arm for Lightning Arrestor (2800X50X50 mm) 1 No 659.00 659 659 659 659 659 P-30

    10 G.O.Switch 1 Set. 7237.00 7237 7237 7237 7237 7237 P-33

    11 D.O.Fuse 1 Set. 3524.00 3524 3524 3524 3524 3524 P-33

    12 Lightning Arrestors 3 No 880.00 2640 2640 2640 2640 2640 P-33

    13 Disc Insulator Fitting 3 Set. 1454.00 4362 4362 4362 4362 4362 P-33

    14 Stay Set complete 2 Set. 728.00 1456 1456 1456 1456 1456 P-3015 Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set) 12 Kg. 63.00 756 756 756 756 756 P-30

    16 Pipe Earthing 3 Set. 2803.00 8409 8409 8409 8409 8409 P-30

    17 LT Distribution Panel Box with MCCB

    I) 25 kVA 1 Set. 9940.00 9940 P-30

    II) 63 kVA 1 Set. 10561.00 10561.00 P-30

    III) 100 kVA 1 Set. 9944.00 9944.00 P-30

    IV) 250 kVA 1 Set. 30871.00 30871.00 P-30

    V)400 KVA 1 Set. 30871.00 30871.00 "

    18 Half Clamp (M.S. Flat 50X6 mm) 15 No. 63.00 945 945 945 945 945 P-30

    19 M.S. Nuts and Bolts (Off Sizes) 10.00 Kg. 81.00 810 810 810 810 810 P-30

    20 G.I. Thimble 16 No 34.00 544 544 544 544 544 P-30

    21 Lead-Tin Solder (60:40) 1 Kg. 899.00 674 674 674 674 674 P-30

    22 Solder Flux 1.00 Tin 108.00 108 108 108 108 108 P-30

    23 Danger Plate 1.00 No 110.00 110 110 110 110 110 P-31

    24 Barbed Wire 15.00 Kg. 65.00 975 975 975 975 975 P-31

    24 LT Cable (3.5 Core)