Housing Trust Migration (including Interfacing) George Palios.

16
Housing Trust Migration (including Interfacing) George Palios

Transcript of Housing Trust Migration (including Interfacing) George Palios.

Page 1: Housing Trust Migration (including Interfacing) George Palios.

Housing TrustMigration

(including Interfacing)

George Palios

Page 2: Housing Trust Migration (including Interfacing) George Palios.

Contents

The government were encouraging Council’s to separate out their housing stock from Authority control and funded the creation of a number of Housing Trusts(HHT). Staff were automatically transferred over to the trust, but the new Trust had no computer systems, so these had to be purchased and then all existing data migrated across to the new machines.

Here are a few slides from the many presentations I held to explain how the Housing systems would be transferred to the new Housing Trust computers(fairly easy), and how the electronic interfaces would be migrated(more complex). My role was to Project Manage the migration (including designing the new systems architecture), over a 3-month period.

The diagrams are admittedly a little complex for the presentation, but were actual working documents.

Page 3: Housing Trust Migration (including Interfacing) George Palios.

• Investigation

Aims

• Change Process

• Change Requirement

• My Role

• Organisation

Page 4: Housing Trust Migration (including Interfacing) George Palios.

• Organisation

Page 5: Housing Trust Migration (including Interfacing) George Palios.

Change Requirement

• Tenants rights protected• Separate Company

• £329Million investment – 30 years

• Stock Transfer Project Teams

• Vote for Housing Trust

Page 6: Housing Trust Migration (including Interfacing) George Palios.

Original Configuration

Page 7: Housing Trust Migration (including Interfacing) George Palios.

Proposed Goal

Page 8: Housing Trust Migration (including Interfacing) George Palios.

Investigation

• Existing Software• Deadlines

• Resources

• Data Volumes/Frequencies

Relevant Information

Page 9: Housing Trust Migration (including Interfacing) George Palios.

Choices

• Option 2: Re-Model Interface Software

SWOT Analysis

Effectiveness• Selected Option 2

• Option 1: Manual Data Transfer

Page 10: Housing Trust Migration (including Interfacing) George Palios.

Proposed Solution

Page 11: Housing Trust Migration (including Interfacing) George Palios.

Change Process

• Meetings• Reports / Dataflow Diagrams

Milestones• Deadlines• Proof of Concept

Communication

• Activities / Resources / Timescales• Dependencies / Critical Path

Project Plan

Page 12: Housing Trust Migration (including Interfacing) George Palios.

Proof of Concept

Page 13: Housing Trust Migration (including Interfacing) George Palios.

Key Activities

• Testing

• Flexibility

• Skills Transfer

• Test Environment• Contingency

• Resources

Page 14: Housing Trust Migration (including Interfacing) George Palios.

Summary

• Implementation Plan• Future flexibility

• Information Exchange

• My Role

• Improved Housing Service

Page 15: Housing Trust Migration (including Interfacing) George Palios.

Lessons

Page 16: Housing Trust Migration (including Interfacing) George Palios.

Final Phase