What is a HOT Lane? High Occupancy Toll Lane
Vehicles meeting occupancy requirements use for free, others pay toll
Toll varies based on congestion
Offers drivers a choice
Manages congestion
Source: MUMPO I-77 FAQs April 17, 2012
![Page 3: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/3.jpg)
How will the I-77 HOT lanes work?
Lanes monitored with electronic and video
Users with transponders have tolls deducted from pre-paid account (no toll booths)
Non-transponder users photographed and mailed bill
Source: MUMPO I-77 FAQs April 17, 2012
![Page 4: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/4.jpg)
The Problem
Phase 1: Single GP lane in both directions from I-485 to exit 28:
~$50M
Phase 2: Single GP lane in both directions from exit 28 to exit
36: ~$75M
Source: Meeting with Bill Coxe, Sept 20, 2012; “I-77 HOT Discussion with Cornelius Town Board”, email from Bill Coxe to Andrew Grant, Oct. 10, 2012
![Page 5: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/5.jpg)
The Initial Solution
Source: “I-77 Feasibility Study HOV-HOT Lanes Conversion”, Parsons- Brinkerhoff, May 6, 2010
![Page 6: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/6.jpg)
Current Funding
Now that $27M + $15M have materialized, what if…
Source: MUMPO 2012- 2018 TIP, Adopted
![Page 7: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/7.jpg)
We Used It For GP Lanes?
A $13M Gap Keeps Us From a General Purpose Lane, Phase 1
![Page 8: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/8.jpg)
The Initial Proposal – TIP 5405 HOT
Source: “I-77 Feasibility Study HOV-HOT Lanes Conversion”, Parsons- Brinkerhoff, May 6, 2010
But the initial proposal did not have enough toll paying miles in it, so…
Add HOT Lanes
Convert HOV to
HOT Lanes
![Page 9: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/9.jpg)
The Current Proposal
Source: “I-77 HOT Lanes Project Overview NCSITE Lunch N’ Learn”, August 21, 2012; “I-77 Widening Update”, MUMPO (Bill Coxe), Sept 19, 2012; “Billions invested in Roads”, Charlotte Observer, Jan 14, 2013
Let’s look at the projects in Mecklenburg…
5405 & 3311C
27.5 Miles of HOT Lanes
Cost: $550M
![Page 10: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/10.jpg)
5405
HOV–HOT Lane $7M
2nd HOT Lane $50M
Source: MUMPO 2012- 2018 TIP (Adopted); KRN Analysis
![Page 11: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/11.jpg)
3311C
Issue Cost
I-277 Connector $$$$M
Widen Lanes $16.5M
Environmental $$$
Source: I- 3311E; “I-77 Local Officials Meeting”, August 1, 2012
![Page 12: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/12.jpg)
The Current Proposal
?
![Page 13: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/13.jpg)
The Real Cost of HOT Lanes
HOT Lanes Require $300M+ Investment- 6X GP Lanes
Items in Red- No benefit to LKN
The HOT Lane
Financial Model
Requires Substantial Additional
Investments
Source: ibid, I-77 HOV- HOT Lane Conversion Fact Sheet, Mar 10, 2010
HOT Lanes GP Lanes
Construction 50.0$ 50.0$
HOV-HOT Conversion
7.0$ -$
Additional HOT Lane
50.0$ -$
Widen Lanes in Charlotte
16.5$ -$
I-277 Connector $$$$ -$
Downtown Cleanup
$$$
HOT Lane Operating Cost
100.0$ -$
P3 Profit 100.0$ -$
Center Dropdown Lanes
$$$ -$
Total: 323.5$ 50.0$
Phase 1: Widening I-77 from Exit 23 to Exit 28
![Page 14: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/14.jpg)
The Real Cost of HOT Lanes- 2
Paying for the whole pizza but getting only a slice
Construction
HOV-HOTConversionAdditional HOT Lane
Widen Lanes inCharlotteI-277 Connector
Downtown Cleanup
HOT Lane OperatingCostP3 Profit
![Page 15: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/15.jpg)
HOT Lanes GP Lanes
Construction 50.0$ 50.0$
HOV-HOT Conversion
7.0$ -$
Additional HOT Lane
50.0$ -$
Widen Lanes in Charlotte
16.5$ -$
I-277 Connector $$$$ -$
Downtown Cleanup
$$$
HOT Lane Operating Cost
100.0$ -$
P3 Profit 100.0$ -$
Center Dropdown Lanes
$$$ -$
Total: 323.5$ 50.0$
Phase 1: Widening I-77 from Exit 23 to Exit 28
About That $50M GP Lane…
$37M Public Funds +
$13M funding gap…
…that end up costing us over $300M!!
![Page 16: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/16.jpg)
HOT Lanes and Congestion
HOT lanes rely on congestion
More congestion = more profit
![Page 17: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/17.jpg)
Atlanta: I85 vs I77
Just How High Will Those Tolls Be?Sources: “First year of HOT lanes brings drivers…”, Atlanta Journal Constitution, Oct 12, 2012; GDOT; “Metro Atlanta’s toll lanes are not part of the solution…” Brian Gist, Dec 11, 2011; MUMPO 2010 Traffic Counts
I85 I77Number of GP Lanes 12 4Traffic Counts, GP Lanes (vpd) 271,500 96,000 Vehicles per GP Lane 22,625 24,000
HOT Lane Distance (Miles) 15.5 27Number of HOT Lanes 1 2HOV 3+ 3+Capital Cost ($M) 56 550
Operating Cost ($M) 3.90 2.0Operating Cost/Mile 0.25 0.07
Yr 1 Revenues (11mo) 3.05 ??
Highest Toll ($) 5.95 ??
![Page 18: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/18.jpg)
HOT Lane Options
HOT Lane Restriction
Highest Throughput
Best for P3
Lower Cost
Lowest Throughput
HOT Lane
Capacity
Low: 2 PPV High: 3 PPV
Low: 1 Lane
High: 2 Lanes
“HOV 2+ require substantial subsidies from the state”
Source: “I-77 Feasibility Study HOV-HOT Lanes Conversion”, Parsons- Brinkerhoff, May 6, 2010
![Page 19: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/19.jpg)
HOT Lanes & Congestion
HOT lanes are expected to have “minimal impact to the travel speed in the existing general purpose lanes.”- “Comments on Environmental Documents for TIP
Projects I-3311 C and I-4750 HOT”, MUMPO memo dated October 4, 2012
HOT Lanes Will Ensure Congestion, Not Relieve It
![Page 20: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/20.jpg)
HOT Lanes & the Future
Unplanned Revenue Impacting Facility
Compensation Event
Source: “I-77 HOT Lane Project Discussion with Cornelius Town Board”, email from Bill Coxe to Andrew Grant, October 15, 2012
![Page 21: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/21.jpg)
HOT Lanes and Our Future Q: “Will there ever be an opportunity to
construct GP lanes along I-77 under the P3 scenario?”
A: “The answer is technically “yes” but it would almost certainly cost the public much more than the cost of construction and… it would be an ongoing cost through the remaining life of the contract.”
Source: “I-77 HOT Lane Project Discussion with Cornelius Town Board”, email from Bill Coxe to Andrew Grant, October 15, 2012
HOT Lanes Put Us in a Contractual Straightjacket
![Page 22: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/22.jpg)
Some Existing HOT LanesCA 91 ORANGE COUNTY
I 15 SAN DIEGO
I85 ATLANTA
US 290 HOUSTON
![Page 23: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/23.jpg)
I-77 HOT Lanes
Mooresville
Davidson
Cornelius
Huntersville
Combined Population:
~150,000
Source: US Census Bureau, 2010
![Page 24: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/24.jpg)
A Quick Comparison
CityHOT Lane
Length (Mi)
Served Population
(000)
Public or Private
Tolls Pay for Construction?
Orange County SR 91 10 3,055 Public NoHouston US 290 13 1,500 Public NoAtlanta I-85 16 1,317 Public NoSan Diego I-15 20 1,500 Public NoLKN I-77 28 150 Private Yes
Source: “A Guide for HOT Lane Development,” FHA, 2003
![Page 25: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/25.jpg)
Economic Burden
Population Supporting One Mile of HOT Lane
People
(Thou
sand
s)
LKN Citizens Bear >15x the Burden of Other HOT LanesSource: “A Guide for HOT Lane Development,” FHA, 2003
306
11585 75
50
50
100
150
200
250
300
350
SR 91 US 290 I-85 I-15 I-77
![Page 26: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/26.jpg)
Additional Economic Burden: I77 vs I85
$107
$0.10
$0.20
$0.30
$0.40
$0.50
I85I77
$0.003
Annual Liability, Per Person
I77 I85Capital $550M $0Term 50YrsCapital/Yr $11M $0
Op Cost $3M $4MProfit $2M $0
Total Annual Cost $16M $4M
![Page 27: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/27.jpg)
What’s Going On?
Expect tremendous future congestion
Future taxpayer subsidy
Significant public money put into project
![Page 28: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/28.jpg)
SC vs NC: Tax Comparison
Rock Hill (SC)Lake Norman
(NC)Corporate Income Tax 5.00% 6.90%Gas Tax (c/gal) 16.8 39.2Gas Tax + State Excise Tax 35.2 57.8Gas Tax Rank 47 6Sales Tax 7.00% 8.75%Interstate 8 GP Lanes Toll Lane
Source: NC Fast Facts 2013, John Locke Foundation; tax-rates.org; sctax.org; taxfoundation.org
![Page 29: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/29.jpg)
6 Lanes
8 Lanes
HOT Lane
6 Lanes
Location
8 Lanes
6 Lanes
The Bedroom Community is located…
![Page 30: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/30.jpg)
![Page 31: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/31.jpg)
HOT Lanes on I-77:HOT Lanes on I-77:
1. Cost more- much more- than GP lanes2. Require additional improvements with
no benefits to LKN commuters3. Ensure congestion instead of relieving it4. Limit our ability to make future
improvement5. Lock us into an agreement with a
private company for 50years6. Negatively impact our economy
An Expensive, Non-Solution That Limits Future Improvements and Negatively Impacts Our Economy
![Page 32: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/32.jpg)
![Page 33: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/33.jpg)
What Should Our Leaders Do?
Convene an ad hoc task force to develop general purpose lane alternatives
Convince the NCDOT to postpone awarding the contract until all alternatives have been vetted
![Page 34: HOT Lanes on I-77](https://reader033.fdocuments.us/reader033/viewer/2022042822/568154ee550346895dc2e3d7/html5/thumbnails/34.jpg)
What Can I Do?
Contact your town/county commissioners and request they establish the task force
Attend wideni77.org working session
Spread the word!