Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd....

40

Transcript of Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd....

Page 1: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 2: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 3: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 4: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 5: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 6: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 7: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 8: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 9: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 10: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 11: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 12: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 13: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 14: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 15: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 16: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 17: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 18: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 19: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 20: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 21: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 22: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 23: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 24: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 25: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 26: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w
Page 27: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

0

0

0

PROFILE (HORIZONTAL)

STATE STATE PROJECT REFERENCE NO.

STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION

NO.TOTALSHEETS

N.C.SHEET

GRAPHIC SCALES

PLANS

PROFILE (VERTICAL)

09/08/99

0

00

9/10/2012

R:\

Hy

draulics\

CA

DD\

PS

H\bd5111M

_ec_title sht.d

gn

erig

gs

TIP P

ROJE

CT:

LETTING DATE:

DIVISION OF HIGHWAYS2012 STANDARD SPECIFICATIONS

PROJECT ENGINEER

PROJECT DESIGN ENGINEER

FOR

Stephen E. Roberts, P.E.

50 25 50 100

50 25 50 100

10 5 10 20

1-888-521-4455 OR 919-878-9560

NC LICENSE NO. F-0112

RALEIGH, NORTH CAROLINA 27609

900 RIDGEFIELD DRIVE, SUITE 350

RUMMEL, KLEPPER & KAHL, LLP

EC-1

EROSION AND SEDIMENT CONTROL MEASURES

CONSTRUCTION.

GRUBBING PHASE OF

FOR CLEARING AND

EROSION CONTROL PLANS

THIS PROJECT CONTAINS

Temporary Silt Ditch

Temporary Silt Fence

Silt Basin Type B

TSD

Stilling Basin

TDTemporary Diversion

Temporary Rock Silt Check Type-B

Temporary Rock Silt Check Type-A

Temporary Rock Sediment Dam Type-ATemporary Rock Sediment Dam Type-B

Type A

Type B

Type C

A

B

C

Temporary Silt Fence

TSD

Std. # Description Symbol

Temporary Berms and Slope Drains

Rock Inlet Sediment Trap:

1630.031630.051605.01

1622.01

1633.01

1634.011634.021635.011635.021630.04

1632.01

1632.02

1632.03

Rock Pipe Inlet Sediment Trap Type-ARock Pipe Inlet Sediment Trap Type-B

1606.01 Special Sediment Control Fence

Skimmer Basin

Tiered Skimmer Basin

Infiltration Basin

Special Stilling Basin1630.06

Temporary Rock Silt Check Type-A withMatting and Polyacrylamide (PAM)

Wattle/Coir Fiber Wattle

Wattle/Coir Fiber Wattlewith Polyacrylamide (PAM)

DIVISION OF HIGHWAYS

STATE OF NORTH CAROLINA

PLAN FOR PROPOSEDHIGHWAY EROSION CONTROL

Temporary Silt Fence

Roadway Standard Drawings

The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design

revison thereto are applicable to this project and by reference hereby are considered a part of

these plans.

Temporary Rock Silt Check Type A1633.01

1605.01

1606.01 Special Sediment Control Fence

Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest

LEVEL IIIA CERTIFICATION NUMBER

PROJECT ENGINEERROADSIDE ENVIRONMENTAL

ROADWAY DESIGN ENGINEER

HYDRAULICS ENGINEER

Stephen E. Roberts, P.E.

EROSION CONTROL DESIGN ENGINEER

431

B. Keith Skinner, P.E.

Audrey B. Burnette, P.E.

Audrey B. Burnette, P.E.

BD-5111M

BD-511

1M

1632.03 Rock Inlet Sediment Trap Type C

BEGIN PROJECT BD-5111M

END PROJECT BD-5111M

-L- POC STA. 11+50.00

-L- POT STA. 15+00.000

SURRY COUNTY

BRIDGE NO. 89 ON SR 1618 OVER MOORES CREEK

NAD 83/ N

SRS

2007

1630.06 Special Stilling Basin

DIVISION OF WATER QUALITY.

ENVIRONMENT AND NATURAL RESOURCES

BY THE NORTH CAROLINA DEPARTMENT OF

PERMIT EFFECTIVE AUGUST 3, 2011 ISSUED

THE NCG-010000 GENERAL CONSTRUCTION

COMPLY WITH THE REGULATIONS SET FORTH BY

THESE EROSION AND SEDIMENT CONTROL PLANS

1635.02 Rock Pipe Inlet Sediment Trap Type B

AT-1

TYPE-III

AT-1

GRAU-350

AT-1

TYPE-III

TYPE-III

CURVESHOP

TYPE-III

BRIDGE #89

SR 1618 MAPLE GROVE CHURCH RD.

SR 1618 MAPLE GROVE CHURCH RD.

MOORES F

OR

K

MO

OR

ES F

OR

K

SOIL

SOIL

SOIL

TO N.C. 89

GR

GR

(RACE TRACK RD.)

TO SR 1620

Page 28: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

FLOW

A A

*T = 12" MIN., 18" MAX.

WIDTH

*T

PLAN

SECTION A-ASECTION B-B

B

B

2/3 CHANNEL

STRUCTURAL STONE

SEDIMENT CONTROL STONE

2’ MIN

2’ MIN

L=3xH

12"

H = 12" MIN

MATTING

EXCELSIOR

MATTING

EXCELSIOR

CLASS B STONE

PAM(3.5 OZ.)

INITIALLY APPLY 3.5 OUNCES OF POLYACRYLAMIDE (PAM)

INSET A

See Inset A

USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR

MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.

TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL

EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.

MATTING

EXCELSIORCLASS B STONE

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.

SHEET NO.PROJECT REFERENCE NO.

EC-2

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.

SHEET NO.PROJECT REFERENCE NO.

BD-5111M

NOT TO SCALE

TEMPORARY ROCK SILT CHECK TYPE ’A’ WITH

EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)

TO BE APPLIED TO EACH ROCK SILT CHECK.

MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT

A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE

PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN

NOTES

Page 29: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.

SHEET NO.PROJECT REFERENCE NO.

BD-5111M EC-2A

MATTING INSTALLATION DETAIL

A

B

A

B

A

NOTES:

THIS DETAIL APPLIES TO STRAW, EXCELSIOR, AND PERMANENT SOIL REINFORCEMENT MAT (PSRM) INSTALLATION.

STAPLES SHALL BE NO. 11 GAUGE STEEL WIRE FORMED INTO A "U" SHAPE WITH A MINIMUM THROAT WIDTH OF 1

INCH AND NOT LESS THAN 6 INCHES IN LENGTH.

MATTING IN DITCHES

MATTING ON SLOPES

BACKFILL

MATTING SHALL BE

PLACED IN TRENCH

AND BACKFILLED

18"

(MIN.)

6" MIN

STAPLES ON

1’ CENTERS

IN TRENCH

EXISTING

GROUND

6"

(MIN.)

SLOPE

4"

4"

10"

10"

10"

DIAGRAM B

DIAGRAM A

10"

6"

STAPLES ON

1’ CENTERS

IN TRENCH

NOT TO SCALE

30’

C

4"

4"

30’

C

STAPLE

CHECK

10"

4"

4"

StapleCheck

Staple

Staple Check Pattern

DIAGRAM c

1 1/

2’

6’

3’

3’

Staple

Page 30: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

SHEET NO.PROJECT REFERENCE NO.

BD-5111M EC-3

DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA

SOIL STABILIZATION SUMMARY SHEET

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

4

SUBTOTAL

MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER

TOTAL

SAY

SIDESTATION

TO

STATION

FROM LINE

SHEET NO.

CONSTESTIMATE (SY) STATION

TOSIDESTATION

FROM LINE

SHEET NO.

CONSTESTIMATE (SY)

MATTING FOR EROSION CONTROL MATTING FOR EROSION CONTROL

00

5,855

5,855

5,855

Page 31: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

SHEET NO.PROJECT REFERENCE NO.

DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

BD-5111M

SITE DESCRIPTION

SOIL STABILIZATION TIMEFRAMES

STABILIZATION TIME

7 DAYS

TIMEFRAME EXCEPTIONS

PERIMETER DIKES, SWALES, DITCHES AND SLOPES

HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE

SLOPES STEEPER THAN 3:1 7 DAYSIF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE

NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.

NONE

SLOPES 3:1 OR FLATTER 14 DAYS

14 DAYS

7 DAYS FOR SLOPES GREATER THAN 50’ IN

LENGTH.

ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.

EC-3A

Page 32: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

1110

1110

1110

1110

1110

1110

1110

1120

1120

1120

1120

1120

1120

1130

1140

1150

1160

EXIS

T.

EXIS

T.

.00.0

2

.02.0

211’

FD

PS

2’

TO EXIST.

60’ TAPER

TO EXIST.

65’ TAPER

TYP.

25’+90.0

0

TYP.

25’

8:1

8:1

8:1

11’

.01

.02

+31.25 LT

END SBG

+16.00 RT

END SBG

FD

PS

2’

PLANS PREPARED BY :

900 RIDGEFIELD DRIVE SUITE 350

RALEIGH, NORTH CAROLINA 27609-3960

RUMMEL, KLEPPER & KAHL, LLP

NC LICENSE NO. F-0112 (919) 878-9560

SHEET NO.PROJECT REFERENCE NO.

R/W SHEET NO.

9/10/2012

R:\

Hydraulics\

CA

DD\

PS

H\bd5111

M_ec_psh04_

C&

G.d

gn

eriggs

0

GRAPHIC SCALES

PLANS

NOTE:

PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B

DRAINAGE OUTLETS.

AND TEMPORARY ROCK SILT CHECKS TYPE - A AT

INSTALLED DURING CLEARING AND GRUBBING PHASE.

PERIMETER EROSION CONTROL MEASURES SHALL BE

NOTE:

CONSTRUCTION SHEET 4

EROSION CONTROL FOR

CLEARING AND GRUBBING

EROSION CONTROL DESIGN ENGINEER

10050 50

NAD 83/ N

SRS

2007

EC-4BD-5111M

DIRECTED BY THE ENGINEER.

ADDITIONAL EROSION CONTROL DEVICES MAY NEED TO BE INSTALLED AS

ANY DEVIATION FROM OPTIONS WILL REQUIRE PRIOR APPROVAL BY ENGINEER.

NOTES:

PROP. SBG END BRIDGE TO 14+16.00 RT

PROP. SBG END BRIDGE TO 14+31.25 LT

18" RCP

15" RCP 18" CMP

BRIDGE #89

WELL

SR 1618 MAPLE GROVE CHURCH RD.

SR 1618 MAPLE GROVE CHURCH RD.

MOORES F

OR

K

MO

OR

ES F

OR

K

EXISTING R/W

EXISTING R/W

EXISTING R/W

EXISTING R/W

TT

4SBW

48"WW

SOIL

SOIL

SOIL

ISFD

TO N.C. 89

WOODS

DAVID ALLAN HAYNES

DB 436 PG 1273RONNIE LEE POFF

DB 327 PG 638

LOFLIN HANDLE COMPANY, INC.

DB 551 PG 510

GATEM

TL

HTR

SAW AND KNIFE SERVICE, INC.

DB 788 PG 191

DB 666 PG 1083

NELDA GRAY HOLDER GOINGS

WB 00E PG 247DB 807 PG 239

60.0

0’

60.0

0’

GR

GR

1

54

3

2

(RACE TRACK RD.)

TO SR 1620

CF

CC

CFFF

F

FF

F

FF

F

C

FF

( Not to Scale)

DETAIL B

( Not to Scale)

DETAIL CRIP RAP BANK STABILIZATION

2’

Fabric

Filter

2’

Fabric

Filter

RIP RAP AT EMBANKMENT

10’(1.5:1 or Flatter)

Match Exist. Bank

(1.5:1 or Flatter)

Match Exist. Bank

FROM -L- STA. 13+33 TO STA. 13+62 RT

FROM -L- STA. 13+55 TO STA. 13+64 LT

FROM -L- STA. 13+41 TO STA. 13+63 RT

FROM -L- STA. 13+15 TO STA. 13+56 LT

FROM -L- STA. 13+09 TO STA. 13+21 RT

DETAIL D

( Not to Scale)

ROCK PLATING

3’-6"

AT THE FOLLOWING LOCATIONS:

USE ROCK PLATING DETAIL NO. 2

FROM STA. 13+91.94 – TO STA. 14+03.94 – RT.

CONSTRUCTION LIMIT

SLOPE STAKE POINT

CLASS 1, 2 or B RIPRAP

2’ THICK

GROUND LINE

OVERLAP DETAIL

SEE FABRIC

FACE

GUARDRAIL

4’-6" MIN

1’ CLEARANCE MIN

BREAK POINT

SHOULDER OR BERM

IF NECESSARY

5’ OVERLAP MIN

FILTER FABRIC FOR ROCK PLATING

2’

18" CLASS IV SELECT MATERIAL

EMBANKMENTFLATTER FILL SLOPE

1.5:1 (H:V) OR

ROCK PLATING DETAIL NO. 2 - TYPICAL SECTION

OR FINISHED GRADE DETAILS

GUTTER, CURB AND GUTTER

SEE ROADWAY TYPICALS FOR

STEEL BEAM GUARDRAIL

See "Rip Rap Details" in Structures Plans for quantitiesType of Liner= CL II Rip-Rap w/ Filter Fabric

See "Rip Rap Details" in Structures Plans for quantitiesType of Liner= CL II Rip-Rap w/ Filter Fabric

Flatter4:

1 or

DFlatter

4:1 or

( Not to Scale)

SPECIAL CUT DITCH

FROM -L- STA. 14+33 TO STA. 14+65 RT

Min. D= 1.0 Ft.

DETAIL A

Slope

Ditch

Front

Ground

Natural

-L-

-L- STA. 11+80.00

BEGIN PROJECT BD-5111M

-L- STA. 15+00.00

END PROJECT BD-5111M

PT Sta. 12+25.62 POT Sta. 16+99.31

15+00

10+00

PC Sta. 10+00.00 PCC Sta. 11+19.82

AT-1

TYPE-III

AT-1

GRAU-350

AT-1

TYPE-III

TYPE-III

CURVESHOP

TYPE-III

SEE DETAIL ASPEC. CUT DITCH

2GI

2GI

401

402403

REMOVE

18"

DRAIN

GRADE TO

SEE DETAIL BRIP RAP AT EMBANKMENT

SEE DETAIL C

CLASS II RIP RAP

PROP. BANK STAB.

18"

404

10 SY FIL FABRIP RAP W\

3 TONS CL B

RCP-IV 15"

+03.9

4

+91.94

SEE DETAIL D

PLATING

WITH ROCK

1.5:1 SLOPES

405

2GI

BASIN

STILLING

SPECIAL

BASIN

STILLING

SPECIAL

D

D

B

Page 33: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

EXIS

T.

EXIS

T.

.00.0

2

.02.0

211’

FD

PS

2’

TO EXIST.

60’ TAPER

TO EXIST.

65’ TAPER

TYP.

25’+90.0

0

TYP.

25’

8:1

8:1

8:1

11’

.01

.02

+31.25 LT

END SBG

+16.00 RT

END SBG

FD

PS

2’

PLANS PREPARED BY :

900 RIDGEFIELD DRIVE SUITE 350

RALEIGH, NORTH CAROLINA 27609-3960

RUMMEL, KLEPPER & KAHL, LLP

NC LICENSE NO. F-0112 (919) 878-9560

SHEET NO.PROJECT REFERENCE NO.

R/W SHEET NO.

9/10/2012

R:\

Hydraulics\

CA

DD\

PS

H\bd5111

M_ec_psh05_final.d

gn

eriggs

0

GRAPHIC SCALES

PLANS

EROSION CONTROL DESIGN ENGINEER

10050 50

NAD 83/ N

SRS

2007

BD-5111M

on Slope as Work Allows.

Place Matting for Erosion Control

CONSTRUCTION SHEET 4

CONTROL FOR

FINAL EROSION

DIRECTED BY THE ENGINEER.

ADDITIONAL EROSION CONTROL DEVICES MAY NEED TO BE INSTALLED AS

ANY DEVIATION FROM OPTIONS WILL REQUIRE PRIOR APPROVAL BY ENGINEER.

NOTES:

EC-5/SHT. 4

PROP. SBG END BRIDGE TO 14+16.00 RT

PROP. SBG END BRIDGE TO 14+31.25 LT

18" RCP

15" RCP 18" CMP

BRIDGE #89

WELL

SR 1618 MAPLE GROVE CHURCH RD.

SR 1618 MAPLE GROVE CHURCH RD.

MOORES F

OR

K

MO

OR

ES F

OR

K

EXISTING R/W

EXISTING R/W

EXISTING R/W

EXISTING R/W

TT

4SBW

48"WW

SOIL

SOIL

SOIL

ISFD

TO N.C. 89

WOODS

DAVID ALLAN HAYNES

DB 436 PG 1273RONNIE LEE POFF

DB 327 PG 638

LOFLIN HANDLE COMPANY, INC.

DB 551 PG 510

GATEM

TL

HTR

SAW AND KNIFE SERVICE, INC.

DB 788 PG 191

DB 666 PG 1083

NELDA GRAY HOLDER GOINGS

WB 00E PG 247DB 807 PG 239

60.0

0’

60.0

0’

GR

GR

1

54

3

2

(RACE TRACK RD.)

TO SR 1620

CF

CC

CFFF

F

FF

F

FF

F

C

FF

( Not to Scale)

DETAIL B

( Not to Scale)

DETAIL CRIP RAP BANK STABILIZATION

2’

Fabric

Filter

2’

Fabric

Filter

RIP RAP AT EMBANKMENT

10’(1.5:1 or Flatter)

Match Exist. Bank

(1.5:1 or Flatter)

Match Exist. Bank

FROM -L- STA. 13+33 TO STA. 13+62 RT

FROM -L- STA. 13+55 TO STA. 13+64 LT

FROM -L- STA. 13+41 TO STA. 13+63 RT

FROM -L- STA. 13+15 TO STA. 13+56 LT

FROM -L- STA. 13+09 TO STA. 13+21 RT

DETAIL D

( Not to Scale)

ROCK PLATING

3’-6"

AT THE FOLLOWING LOCATIONS:

USE ROCK PLATING DETAIL NO. 2

FROM STA. 13+91.94 – TO STA. 14+03.94 – RT.

CONSTRUCTION LIMIT

SLOPE STAKE POINT

CLASS 1, 2 or B RIPRAP

2’ THICK

GROUND LINE

OVERLAP DETAIL

SEE FABRIC

FACE

GUARDRAIL

4’-6" MIN

1’ CLEARANCE MIN

BREAK POINT

SHOULDER OR BERM

IF NECESSARY

5’ OVERLAP MIN

FILTER FABRIC FOR ROCK PLATING

2’

18" CLASS IV SELECT MATERIAL

EMBANKMENTFLATTER FILL SLOPE

1.5:1 (H:V) OR

ROCK PLATING DETAIL NO. 2 - TYPICAL SECTION

OR FINISHED GRADE DETAILS

GUTTER, CURB AND GUTTER

SEE ROADWAY TYPICALS FOR

STEEL BEAM GUARDRAIL

See "Rip Rap Details" in Structures Plans for quantitiesType of Liner= CL II Rip-Rap w/ Filter Fabric

See "Rip Rap Details" in Structures Plans for quantitiesType of Liner= CL II Rip-Rap w/ Filter Fabric

Flatter4:

1 or

DFlatter

4:1 or

( Not to Scale)

SPECIAL CUT DITCH

FROM -L- STA. 14+33 TO STA. 14+65 RT

Min. D= 1.0 Ft.

DETAIL A

Slope

Ditch

Front

Ground

Natural

-L-

-L- STA. 11+80.00

BEGIN PROJECT BD-5111M

-L- STA. 15+00.00

END PROJECT BD-5111M

PT Sta. 12+25.62 POT Sta. 16+99.31

15+00

10+00

PC Sta. 10+00.00 PCC Sta. 11+19.82

AT-1

TYPE-III

AT-1

GRAU-350

AT-1

TYPE-III

TYPE-III

CURVESHOP

TYPE-III

SEE DETAIL ASPEC. CUT DITCH

2GI

2GI

401

402403

REMOVE

18"

DRAIN

GRADE TO

SEE DETAIL BRIP RAP AT EMBANKMENT

SEE DETAIL C

CLASS II RIP RAP

PROP. BANK STAB.

18"

404

10 SY FIL FABRIP RAP W\

3 TONS CL B

RCP-IV 15"

+03.9

4

+91.94

SEE DETAIL D

PLATING

WITH ROCK

1.5:1 SLOPES

405

2GI

C

CB

Page 34: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

NAD 83/ N

SRS 2

007

VICINITY MAP

NOT TO SCALE

Begin Project

End Project

0

0

0

PROFILE (HORIZONTAL)

STATE STATE PROJECT REFERENCE NO.

STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION

NO.TOTALSHEETS

N.C.SHEET

DESIGN DATAGRAPHIC SCALES

PLANS

PROFILE (VERTICAL)

0

00

CO

NT

RA

CT:

TIP P

ROJE

CT:

50 10050

50 10050

10 2010

-L-

SURRY COUNTY

SR 1618 OVER MOORE FORK

MO

ORE

FORK

-L- STA. 11+50.00BEGIN PROJECT BD-5111M

-L- STA. 15+00.00END PROJECT BD-5111M

RACETRACK RD.CHURCH RD.

MAPLE GROVE

CREEK

STEWARTS

HO

RT

ON R

D.

(89

PINE RIDGE

MA

PLE H

OLL

OW R

D.

MOORE FORK

ADT = 1,500 (2009)

DESIGN SPEED = 55 mph

BD-511

1M

-L- STA. 14+05.00END BRIDGE

-L- STA. 12+80.00BEGIN BRIDGE

DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA

TYPE OF WORK: UTILITIES BY OTHERS

LOCATION:

INDEX OF SHEETS

SHEET NO. DESCRIPTION

PLAN SHEETS

UTILITIES BY OTHERS

TITLE SHEET

UTILITY OWERS ON PROJECT

UO-2

UO-1

1-888-521-4455 OR 919-878-9560

NC LICENSE NO. F-0112

RALEIGH, NORTH CAROLINA 27609

900 RIDGEFIELD DRIVE, SUITE 350

RUMMEL, KLEPPER & KAHL, LLP

PLANS PREPARED BY:

2

(3) CITY OF MT. AIRY - WATER

(2) CENTURYLINK TELEPHONE - TELEPHONE

(1) SURRY-YADKIN EMC - POWER

BD-5111M UO-1

UO-2

AT-1

TYPE-III

AT-1

AT-1

GRAU-350SHOP CURVETYPE-III

IIITYPE

SHOP CURVETYPE-III

AT-1

TYPE-III

AT-1

AT-1

GRAU-350SHOP CURVETYPE-III

IIITYPE

SHOP CURVETYPE-III

Page 35: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

EL*3

008

18" RCP

15" RCP 18" CMP

WELL

25

SR 1618 MAPLE GROVE CHURCH RD.

SR 1618 MAPLE GROVE CHURCH RD.

MOORES F

OR

K

MO

OR

ES F

OR

K

EXISTING R/W

EXISTING R/W

EXISTING R/W

EXISTING R/W

TT E

IPEIP

EIP

4SBW

48"WW

SOIL

SOIL

SOIL

ISFD

TO N.C. 89

WOODS

DAVID ALLAN HAYNES

DB 436 PG 1273

RONNIE LEE POFF

DB 327 PG 638

LOFLIN HANDLE COMPANY, INC.

DB 551 PG 510

GATEM

TL

HTR

SAW AND KNIFE SERVICE, INC.

DB 788 PG 191

DB 666 PG 1083

NELDA GRAY HOLDER GOINGS

WB 00E PG 247DB 807 PG 239

N 41°07’12"

E

157.3

0’

S 73

°46’58

" E112.40

S 37°3

6’15

" W

201.7

8’

3.16

’S 37°4

2’2

2" W

200.5

6’

60.0

0’

60.0

0’

GR

GR

1

1

5432

S 49°41’08" E 160.00’

S 54°3

4’0

7"

W

207.2

1’

1.05’

EIP

TO

R/

W

(RACE TRACK RD.)

TO SR 1620

BM#1

BD5111M-2

DATUM DESCRIPTION

THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT

IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY

NCDOT FOR MONUMENT "BD5111M-2"

WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF

NORTHING: 1,008,876.1749(ft) EASTING: 1,498,562.4478(ft)

ELEVATION: 1,117.8696(ft)

THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT

(GROUND TO GRID) IS: 1.0000657452

THE N.C. LAMBERT GRID BEARING AND

LOCALIZED HORIZONTAL GROUND DISTANCE FROM

"BD5111M-2" TO -L- STATION 10+00.00 IS

N45î��36’24.86"W 395.85

ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES

VERT. DATUM USED IS BASED ON MONUMENT "BD5111M-2" (NAVD 88)

PI Sta 10+60.04

D

L = 119.82’

T = 60.04’

R = 750.00’

PI Sta 11+72.74

D

L = 105.80’

T = 52.92’

R = 1,500.00’

-L-

-L-

15+00

10+00

15" RCP-III

15"

DRAIN

GRADE TO

TO

B

TO

B

TOB

TO

B

TOB

TO

B

PLANS PREPARED BY :

900 RIDGEFIELD DRIVE SUITE 350

RALEIGH, NORTH CAROLINA 27609-3960

RUMMEL, KLEPPER & KAHL, LLP

NC LICENSE NO. F-0112 (919) 878-9560

SHEET NO.PROJECT REFERENCE NO.

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

BD-5111M

R/W SHEET NO.

0

GRAPHIC SCALES

PLANS

10050 50

NAD 83/ N

SRS 2

007

ADT = 1,500 (2009)

DESIGN SPEED = 55 mph

UO-2

THIS SHEET WILL BE DONE BY OTHERS.

ALL PROPOSED UTILITY WORK SHOWN ON

NOTE:

UTILITIES BY OTHERS

UTILITY OWNERS ON PROJECT

CITY of MT AIRY - WATERCENTURYLINK TELEPHONE - TELEPHONESURRY-YADKIN EMC - POWER

INSTALLATION.3.CONTACT CITY of MT AIRY BEFORE GUARDRAIL

CONSTRUCTION RE-HANG THE CABLES. CABLES AWAY FROM CONSTRUCTION, AFTER 2.CENTURYLINK TELEPHONE WILL TEMPORARILY LOCATE

NEW CONSTRUCTION1.SURRY-YADKIN EMC IS NOT IN CONFLICT WITH

NOTES:

CONSTRUCTION

AERIAL CABLES FROM POLES DURING

CENTURYLINK TELEPHONE WILL REMOVE

PRIOR TO GUARDRAIL INSTALLATION

CONTACT CITY of MT AIRY

EDGE OF EXISTING BRIDGE.

POWER IS APPROXIMATLY ~21’ FROM

TO REMAIN DURING CONSTRUCTION.

EXISTING SINGLE PHASE POWER

Page 36: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

1119.89

1119.72

00

00

55

55

1010

1010

1515

1515

2020

2020

2525

2525

3030

3030

3535

3535

4040

4040

4545

4545

5050

5050

5555

5555

6060

6060

6565

6565

7070

7070

7575

75759/10/2012

R:\

Road

way\

Xsc\

BD-5111

M_xpl_

L.d

gn

Fkeys

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

1115 1115

1120 1120

1125 1125

1130 1130

1135 1135

1140 1140

1145 1145

1150 1150

1155 1155

1160 1160

1110 111011+50.00

X-1BD-5111M

-L-

2.5 5

1115

1120

1125

1130

1135

1140

1145

1150

1110

75

1115

1120

1125

1130

1135

1140

1145

1150

1110

Page 37: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

1119.61

0.020 0.0042:1 2:1

1119.530.020 0.0142:1 2:1

00

00

55

55

1010

1010

1515

1515

2020

2020

2525

2525

3030

3030

3535

3535

4040

4040

4545

4545

5050

5050

5555

5555

6060

6060

6565

6565

7070

7070

7575

75759/10/2012

R:\

Road

way\

Xsc\

BD-5111

M_xpl_

L.d

gn

Fkeys

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

1115 1115

1120 1120

1125 1125

1130 1130

1135 1135

1140 1140

1145 1145

1150 1150

1155 1155

1110 1110

12+00.00

1115 1115

1120 1120

1125 1125

1130 1130

1135 1135

1140 1140

1145 1145

1150 1150

1110 1110

12+25.00

X-2BD-5111M

-L-

2.5 5

Page 38: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

1119.450.020 0.0202:1 2:1

1119.360.020

2:10.020

1113.73

0.020 0.020

1104.67

0.020 0.020

00

00

55

55

1010

1010

1515

1515

2020

2020

2525

2525

3030

3030

3535

3535

4040

4040

4545

4545

5050

5050

5555

5555

6060

6060

6565

6565

7070

7070

7575

75759/10/2012

R:\

Road

way\

Xsc\

BD-5111

M_xpl_

L.d

gn

Fkeys

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

1110 1110

1115 1115

1120 1120

1125 1125

1130 1130

12+50.00

1105 1105

1110 1110

1115 1115

1120 1120

1100 1100

12+75.00

1105 1105

1110 1110

1115 1115

1120 1120

1100 1100

13+00.00

1105 1105

1110 1110

1115 1115

1120 1120

1100 110013+25.00

X-3BD-5111M

-L-

2.5 5

Page 39: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

1106.55

0.020 0.020

1112.30

0.020 0.020

1118.70

0.020 0.0201.5:1

1118.64

0.020 0.0202:1

2:1

00

00

55

55

1010

1010

1515

1515

2020

2020

2525

2525

3030

3030

3535

3535

4040

4040

4545

4545

5050

5050

5555

5555

6060

6060

6565

6565

7070

7070

7575

75759/10/2012

R:\

Road

way\

Xsc\

BD-5111

M_xpl_

L.d

gn

Fkeys

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

1105 1105

1110 1110

1115 1115

1120 1120

13+50.00

1105 1105

1110 1110

1115 1115

1120 1120

1100 1100

13+75.00

1105 1105

1110 1110

1115 1115

1120 1120

1100 1100

14+00.00

1105 1105

1110 1110

1115 1115

1120 1120

1125 1125

1100 1100

14+25.00

X-4BD-5111M

-L-

2.5 5

Page 40: Home | Connect NCDOT 11... · 18"rcp 15"rcp 18" cmp bridge #89 well sr 1618 maple grove churc h rd. sr 1618 maple grove chu rd. m o o r e s f o r k m o o r e s f o r k exist ing r/w

1118.61

0.020 0.0202:1

1116.97

4:14:1

1118.58

0.020 0.0202:1

1118.59

0.010 0.0232:1 2:1

1118.62

00

00

55

55

1010

1010

1515

1515

2020

2020

2525

2525

3030

3030

3535

3535

4040

4040

4545

4545

5050

5050

5555

5555

6060

6060

6565

6565

7070

7070

7575

75759/10/2012

R:\

Road

way\

Xsc\

BD-5111

M_xpl_

L.d

gn

Fkeys

8/23/99

PROJ. REFERENCE NO. SHEET NO.0

1110 1110

1115 1115

1120 1120

1125 1125

1105 1105

14+50.00

1115 1115

1120 1120

1125 1125

1110 111014+75.00

1115 1115

1120 1120

1125 1125

1110 1110

15+00.00

1115 1115

1120 1120

1125 1125

1130 1130

1110 1110

15+25.00

X-5BD-5111M

-L-

2.5 5