Hillingdon Towpaths

Page 1 of 56

June 2014

Hillingdon Towpaths

Hillingdon Towpaths

Page 2 of 56

Canal amp River Trust July 2014

London Waterways

Bow Back Rivers

Grand Union Canal

Paddington Arm of the Grand Union Canal

Slough Arm of the Grand Union Canal

Hertford Union Canal

Limehouse Cut

London Docklands

Regentrsquos Canal

River Lee

River Stort

Contact

Canal amp River Trust

The Toll House

Delamere Terrace

Little Venice

London

W2 6TT

0303 040 4040

enquirieslondoncanalrivertrustorguk

Hillingdon Towpaths

Page 3 of 56

1 SUMMARY 4

2 BACKGROUND 5

21 Better Towpaths for Everyone 5

22 Hillingdon Waterspace Strategy 6

23 Hillingdon Canals 7

24 Improvements so far 7

25 Opportunities 9

3 TOWPATH SPECIFICATION 10

4 COST ASSUMPTIONS 11

5 METHOD 12

6 ASSESSMENT CRITERIA 13

61 Design Guidance amp Standards 13

62 Criteria used in this report 14

63 Prioritisation 14

7 RESULTS 15

71 High Priority Towpath Sections 15

72 Medium Priority Towpath Sections 15

73 Low Priority Towpath Sections 16

74 Map of Priority Towpath Sections 17

Appendix 1 - Towpath estimator tool 18

Appendix 2 - Towpath assessment criteria scores 19

Appendix 3 ndash Towpath Survey Section Reports 20

Hillingdon Towpaths

Page 4 of 56

1 SUMMARY

Canal amp River Trust has produced this report to inform future investment priorities for

Hillingdon canal towpaths

The report was produced at the request of members of the Hillingdon Canals Partnership

and serves as a reference document for its work to promote and improve the boroughrsquos

waterways

It contains information for Hillingdon canal towpaths surveyed in 2013 covering

the Grand Union Canal (divided into 35 sections)

the Paddington Arm (1 section)

and Slough Arm (1 section)

For each section the general towpath condition levels of use and its function in connecting

people and places are considered

The result is a prioritised overview of borough towpaths for improvement which will support

funding applications and decisions

Hillingdon Towpaths

Page 5 of 56

2 BACKGROUND

21 Better Towpaths for Everyone

Sir Brian Fender chair of London

Waterways Partnership launched

Better Towpaths for Everyone in

spring 2014

The report was endorsed by the

Mayorrsquos Cycling Commissioner

Andrew Gilligan and sets out

proposals for 3 strategic cross-

borough Quietways along the Grand

Union Canal Paddington Arm and

River Lee responding to the Mayorrsquos

Cycling Vision

Hillingdon sits across 2 of these Quietways

Hillingdon Towpaths

Page 6 of 56

22 Hillingdon Waterspace Strategy

Canal amp River Trust works with key stakeholders brought together under the Hillingdon

Canals Partnership

The partnership is chaired by David Brough (of Hayes Town Partnership) and includes

representatives from Hillingdon Council Hayes Town Partnership GlaxoSmithKline Inland

Waterways Association Groundwork Thames 21 West Drayton Town Centre Action

Group and John McDonnell MP (Hayes amp Harlington)

In 2008 British Waterways produced a draft scoping report for a Hillingdon Waterspace

Strategy Good progress has been made on some initiatives identified in the Strategy and

this report will assist decisions on further work

An update of the Waterspace Strategy is planned during 201415 subject to funding

Hillingdon Towpaths

Page 7 of 56

23 Hillingdon Canals

Canal amp River Trust cares for 2000 miles of historic inland waterways in England amp Wales

In the Capital Hillingdon has more towpaths than any other London Borough

London Borough km miles

1 Hillingdon 212 132 205

2 Ealing 156 97 151

3 Tower Hamlets 124 77 120

4 Enfield 90 56 87

5 Brent 83 52 81

6 Newham 78 49 76

7 Hackney 69 43 67

8 Westminster 55 34 54

9 Hounslow 36 23 35

10 Haringey 34 21 33

11 Camden 28 17 27

12 Islington 20 12 19

13 Kensington amp Chelsea 19 12 19

14 Hammersmith amp Fulham

17 10 16

15 Waltham Forest 13 08 13

Total 1034 642 100

Hillingdonrsquos 21km of traffic-free canal towpaths are split along the Grand Union Canal and

its Paddington and Slough Arms

Hillingdon Canals km miles

1 Grand Union Canal 175 109 829

2 Paddington Arm 29 18 132

3 Slough Arm 08 05 40

Total 212 132 100

Hillingdon towpaths are diverse in character condition and levels of use They connect the

town centres of Hayes West Drayton Uxbridge and Rickmansworth as well as bordering

the major employment site at Stockley Business Park

24 Improvements so far

In addition to the Canal amp River Trustrsquos programme of maintenance and improvement

works securing partner funding has been vital to delivering better access signs and

surfacing Towpaths have been improved in recent years with funding from Hillingdon

Council and Transport for London Other sections are now in more need of improvement

Some areas that have benefitted from investment such as to the west of and including

Hillingdon Towpaths

Page 8 of 56

Hayes Town Centre are areas where we have long term aspirations for further improvement

given their strategic importance and high footfall

Hillingdon towpaths will also receive new Legible London signage during summer 2014

New towpath surface near Cowley New access ramp Uxbridge

Example of Legible London sign River Lee

Hillingdon Towpaths

Page 9 of 56

25 Opportunities

There are some canal locations in Hillingdon that are not well used by local residents and

visitors or have large areas of redundant space often underneath road or rail bridges

Whilst these structures can create dark and sometimes intimidating spaces these locations

also present opportunities for improvement and increase in use

Hillingdon in partnership with Canal amp River Trust has submitted a funding application to

Transport for Londonrsquos Incubator Fund This includes installing the Sharkrsquos Canoe Club

underneath the Hayes By-pass and using the area under North Hyde Gardens as a

volunteer base and community space to promote activity and use of the canal We are in

discussions with the adjacent landowner about landscaping an upper towpath and installing

a Trim Trail (outdoor fitness trail) in the area

Hayes By-Pass (Section 1) and North Hyde Gardens (Section 2)

The by-pass is a large flyover with an access ramp from the A312 to the towpath There is a

large amount of redundant space underneath the road bridge As the bridge blocks out

light the space is dark and uninviting but could be used to install a climbing wall or outdoor

gym equipment

North Hyde Gardens has a vacant space at the base of the bridge on the towpath This

space has attracted antisocial behaviour in the past and has since been secured by the

local police and the landowners Legal and General

Shackles Dock Western View and Hayes Town Centre

These locations central to the town centre have suffered from littering and street-drinking

however Thames 21 and Sharkrsquos Canoe Club are in discussions with the landowners of

Shackles Dock about accessing the site for canoeing and there is also a wild flower

landscaping scheme proposed for Hayes Town Centre

Hillingdon Towpaths

Page 10 of 56

3 TOWPATH SPECIFICATION

The photograph below shows a typical towpath in the borough which has been recently

improved It shows the preferred towpath specification and was taken in July 2013 on the

Grand Union Canal Paddington Arm

We aim to achieve these minimum specifications

18m wide surfaced path tarmac with tar spray and chip finish with timber edging

boards

Verges maintained either side of the path with a minimum of 600mm on the

waterside and 500mm at the back where possible

Vegetation managed not to encroach and limit space for sharing the towpath but

still providing a habitat for nature and space for moored boats

The surface finish gives an audible crunch which lets others know yoursquore there

18 metres

surfaced width

Vegetation hedges

managed not to

encroach

Tarmac with edging boards

and tar spry and chip finish

Grass verge

retained and

grass seeded

Hillingdon Towpaths

Page 11 of 56

4 COST ASSUMPTIONS

The Trust uses its Towpath Estimator Tool to generate costs (see Appendix 1)

Estimated construction costs in this report are based on the Trustrsquos national term

contract rates for the 201314 financial year and are subject to inflationary uplift

Costs exclude design contingency and other project related costs such as legal or

land

The individual surveyed section reports (see Appendix 3) also include estimates for

additional measures to enhance the canal such as improvements to access points

bridges or signage

The total cost for towpath and additional improvements is estimated at just under

pound5million with pound13million in the high priority category (see Section 7 for complete

breakdown)

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 2: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 2 of 56

Canal amp River Trust July 2014

London Waterways

Bow Back Rivers

Grand Union Canal

Paddington Arm of the Grand Union Canal

Slough Arm of the Grand Union Canal

Hertford Union Canal

Limehouse Cut

London Docklands

Regentrsquos Canal

River Lee

River Stort

Contact

Canal amp River Trust

The Toll House

Delamere Terrace

Little Venice

London

W2 6TT

0303 040 4040

enquirieslondoncanalrivertrustorguk

Hillingdon Towpaths

Page 3 of 56

1 SUMMARY 4

2 BACKGROUND 5

21 Better Towpaths for Everyone 5

22 Hillingdon Waterspace Strategy 6

23 Hillingdon Canals 7

24 Improvements so far 7

25 Opportunities 9

3 TOWPATH SPECIFICATION 10

4 COST ASSUMPTIONS 11

5 METHOD 12

6 ASSESSMENT CRITERIA 13

61 Design Guidance amp Standards 13

62 Criteria used in this report 14

63 Prioritisation 14

7 RESULTS 15

71 High Priority Towpath Sections 15

72 Medium Priority Towpath Sections 15

73 Low Priority Towpath Sections 16

74 Map of Priority Towpath Sections 17

Appendix 1 - Towpath estimator tool 18

Appendix 2 - Towpath assessment criteria scores 19

Appendix 3 ndash Towpath Survey Section Reports 20

Hillingdon Towpaths

Page 4 of 56

1 SUMMARY

Canal amp River Trust has produced this report to inform future investment priorities for

Hillingdon canal towpaths

The report was produced at the request of members of the Hillingdon Canals Partnership

and serves as a reference document for its work to promote and improve the boroughrsquos

waterways

It contains information for Hillingdon canal towpaths surveyed in 2013 covering

the Grand Union Canal (divided into 35 sections)

the Paddington Arm (1 section)

and Slough Arm (1 section)

For each section the general towpath condition levels of use and its function in connecting

people and places are considered

The result is a prioritised overview of borough towpaths for improvement which will support

funding applications and decisions

Hillingdon Towpaths

Page 5 of 56

2 BACKGROUND

21 Better Towpaths for Everyone

Sir Brian Fender chair of London

Waterways Partnership launched

Better Towpaths for Everyone in

spring 2014

The report was endorsed by the

Mayorrsquos Cycling Commissioner

Andrew Gilligan and sets out

proposals for 3 strategic cross-

borough Quietways along the Grand

Union Canal Paddington Arm and

River Lee responding to the Mayorrsquos

Cycling Vision

Hillingdon sits across 2 of these Quietways

Hillingdon Towpaths

Page 6 of 56

22 Hillingdon Waterspace Strategy

Canal amp River Trust works with key stakeholders brought together under the Hillingdon

Canals Partnership

The partnership is chaired by David Brough (of Hayes Town Partnership) and includes

representatives from Hillingdon Council Hayes Town Partnership GlaxoSmithKline Inland

Waterways Association Groundwork Thames 21 West Drayton Town Centre Action

Group and John McDonnell MP (Hayes amp Harlington)

In 2008 British Waterways produced a draft scoping report for a Hillingdon Waterspace

Strategy Good progress has been made on some initiatives identified in the Strategy and

this report will assist decisions on further work

An update of the Waterspace Strategy is planned during 201415 subject to funding

Hillingdon Towpaths

Page 7 of 56

23 Hillingdon Canals

Canal amp River Trust cares for 2000 miles of historic inland waterways in England amp Wales

In the Capital Hillingdon has more towpaths than any other London Borough

London Borough km miles

1 Hillingdon 212 132 205

2 Ealing 156 97 151

3 Tower Hamlets 124 77 120

4 Enfield 90 56 87

5 Brent 83 52 81

6 Newham 78 49 76

7 Hackney 69 43 67

8 Westminster 55 34 54

9 Hounslow 36 23 35

10 Haringey 34 21 33

11 Camden 28 17 27

12 Islington 20 12 19

13 Kensington amp Chelsea 19 12 19

14 Hammersmith amp Fulham

17 10 16

15 Waltham Forest 13 08 13

Total 1034 642 100

Hillingdonrsquos 21km of traffic-free canal towpaths are split along the Grand Union Canal and

its Paddington and Slough Arms

Hillingdon Canals km miles

1 Grand Union Canal 175 109 829

2 Paddington Arm 29 18 132

3 Slough Arm 08 05 40

Total 212 132 100

Hillingdon towpaths are diverse in character condition and levels of use They connect the

town centres of Hayes West Drayton Uxbridge and Rickmansworth as well as bordering

the major employment site at Stockley Business Park

24 Improvements so far

In addition to the Canal amp River Trustrsquos programme of maintenance and improvement

works securing partner funding has been vital to delivering better access signs and

surfacing Towpaths have been improved in recent years with funding from Hillingdon

Council and Transport for London Other sections are now in more need of improvement

Some areas that have benefitted from investment such as to the west of and including

Hillingdon Towpaths

Page 8 of 56

Hayes Town Centre are areas where we have long term aspirations for further improvement

given their strategic importance and high footfall

Hillingdon towpaths will also receive new Legible London signage during summer 2014

New towpath surface near Cowley New access ramp Uxbridge

Example of Legible London sign River Lee

Hillingdon Towpaths

Page 9 of 56

25 Opportunities

There are some canal locations in Hillingdon that are not well used by local residents and

visitors or have large areas of redundant space often underneath road or rail bridges

Whilst these structures can create dark and sometimes intimidating spaces these locations

also present opportunities for improvement and increase in use

Hillingdon in partnership with Canal amp River Trust has submitted a funding application to

Transport for Londonrsquos Incubator Fund This includes installing the Sharkrsquos Canoe Club

underneath the Hayes By-pass and using the area under North Hyde Gardens as a

volunteer base and community space to promote activity and use of the canal We are in

discussions with the adjacent landowner about landscaping an upper towpath and installing

a Trim Trail (outdoor fitness trail) in the area

Hayes By-Pass (Section 1) and North Hyde Gardens (Section 2)

The by-pass is a large flyover with an access ramp from the A312 to the towpath There is a

large amount of redundant space underneath the road bridge As the bridge blocks out

light the space is dark and uninviting but could be used to install a climbing wall or outdoor

gym equipment

North Hyde Gardens has a vacant space at the base of the bridge on the towpath This

space has attracted antisocial behaviour in the past and has since been secured by the

local police and the landowners Legal and General

Shackles Dock Western View and Hayes Town Centre

These locations central to the town centre have suffered from littering and street-drinking

however Thames 21 and Sharkrsquos Canoe Club are in discussions with the landowners of

Shackles Dock about accessing the site for canoeing and there is also a wild flower

landscaping scheme proposed for Hayes Town Centre

Hillingdon Towpaths

Page 10 of 56

3 TOWPATH SPECIFICATION

The photograph below shows a typical towpath in the borough which has been recently

improved It shows the preferred towpath specification and was taken in July 2013 on the

Grand Union Canal Paddington Arm

We aim to achieve these minimum specifications

18m wide surfaced path tarmac with tar spray and chip finish with timber edging

boards

Verges maintained either side of the path with a minimum of 600mm on the

waterside and 500mm at the back where possible

Vegetation managed not to encroach and limit space for sharing the towpath but

still providing a habitat for nature and space for moored boats

The surface finish gives an audible crunch which lets others know yoursquore there

18 metres

surfaced width

Vegetation hedges

managed not to

encroach

Tarmac with edging boards

and tar spry and chip finish

Grass verge

retained and

grass seeded

Hillingdon Towpaths

Page 11 of 56

4 COST ASSUMPTIONS

The Trust uses its Towpath Estimator Tool to generate costs (see Appendix 1)

Estimated construction costs in this report are based on the Trustrsquos national term

contract rates for the 201314 financial year and are subject to inflationary uplift

Costs exclude design contingency and other project related costs such as legal or

land

The individual surveyed section reports (see Appendix 3) also include estimates for

additional measures to enhance the canal such as improvements to access points

bridges or signage

The total cost for towpath and additional improvements is estimated at just under

pound5million with pound13million in the high priority category (see Section 7 for complete

breakdown)

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 3: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 3 of 56

1 SUMMARY 4

2 BACKGROUND 5

21 Better Towpaths for Everyone 5

22 Hillingdon Waterspace Strategy 6

23 Hillingdon Canals 7

24 Improvements so far 7

25 Opportunities 9

3 TOWPATH SPECIFICATION 10

4 COST ASSUMPTIONS 11

5 METHOD 12

6 ASSESSMENT CRITERIA 13

61 Design Guidance amp Standards 13

62 Criteria used in this report 14

63 Prioritisation 14

7 RESULTS 15

71 High Priority Towpath Sections 15

72 Medium Priority Towpath Sections 15

73 Low Priority Towpath Sections 16

74 Map of Priority Towpath Sections 17

Appendix 1 - Towpath estimator tool 18

Appendix 2 - Towpath assessment criteria scores 19

Appendix 3 ndash Towpath Survey Section Reports 20

Hillingdon Towpaths

Page 4 of 56

1 SUMMARY

Canal amp River Trust has produced this report to inform future investment priorities for

Hillingdon canal towpaths

The report was produced at the request of members of the Hillingdon Canals Partnership

and serves as a reference document for its work to promote and improve the boroughrsquos

waterways

It contains information for Hillingdon canal towpaths surveyed in 2013 covering

the Grand Union Canal (divided into 35 sections)

the Paddington Arm (1 section)

and Slough Arm (1 section)

For each section the general towpath condition levels of use and its function in connecting

people and places are considered

The result is a prioritised overview of borough towpaths for improvement which will support

funding applications and decisions

Hillingdon Towpaths

Page 5 of 56

2 BACKGROUND

21 Better Towpaths for Everyone

Sir Brian Fender chair of London

Waterways Partnership launched

Better Towpaths for Everyone in

spring 2014

The report was endorsed by the

Mayorrsquos Cycling Commissioner

Andrew Gilligan and sets out

proposals for 3 strategic cross-

borough Quietways along the Grand

Union Canal Paddington Arm and

River Lee responding to the Mayorrsquos

Cycling Vision

Hillingdon sits across 2 of these Quietways

Hillingdon Towpaths

Page 6 of 56

22 Hillingdon Waterspace Strategy

Canal amp River Trust works with key stakeholders brought together under the Hillingdon

Canals Partnership

The partnership is chaired by David Brough (of Hayes Town Partnership) and includes

representatives from Hillingdon Council Hayes Town Partnership GlaxoSmithKline Inland

Waterways Association Groundwork Thames 21 West Drayton Town Centre Action

Group and John McDonnell MP (Hayes amp Harlington)

In 2008 British Waterways produced a draft scoping report for a Hillingdon Waterspace

Strategy Good progress has been made on some initiatives identified in the Strategy and

this report will assist decisions on further work

An update of the Waterspace Strategy is planned during 201415 subject to funding

Hillingdon Towpaths

Page 7 of 56

23 Hillingdon Canals

Canal amp River Trust cares for 2000 miles of historic inland waterways in England amp Wales

In the Capital Hillingdon has more towpaths than any other London Borough

London Borough km miles

1 Hillingdon 212 132 205

2 Ealing 156 97 151

3 Tower Hamlets 124 77 120

4 Enfield 90 56 87

5 Brent 83 52 81

6 Newham 78 49 76

7 Hackney 69 43 67

8 Westminster 55 34 54

9 Hounslow 36 23 35

10 Haringey 34 21 33

11 Camden 28 17 27

12 Islington 20 12 19

13 Kensington amp Chelsea 19 12 19

14 Hammersmith amp Fulham

17 10 16

15 Waltham Forest 13 08 13

Total 1034 642 100

Hillingdonrsquos 21km of traffic-free canal towpaths are split along the Grand Union Canal and

its Paddington and Slough Arms

Hillingdon Canals km miles

1 Grand Union Canal 175 109 829

2 Paddington Arm 29 18 132

3 Slough Arm 08 05 40

Total 212 132 100

Hillingdon towpaths are diverse in character condition and levels of use They connect the

town centres of Hayes West Drayton Uxbridge and Rickmansworth as well as bordering

the major employment site at Stockley Business Park

24 Improvements so far

In addition to the Canal amp River Trustrsquos programme of maintenance and improvement

works securing partner funding has been vital to delivering better access signs and

surfacing Towpaths have been improved in recent years with funding from Hillingdon

Council and Transport for London Other sections are now in more need of improvement

Some areas that have benefitted from investment such as to the west of and including

Hillingdon Towpaths

Page 8 of 56

Hayes Town Centre are areas where we have long term aspirations for further improvement

given their strategic importance and high footfall

Hillingdon towpaths will also receive new Legible London signage during summer 2014

New towpath surface near Cowley New access ramp Uxbridge

Example of Legible London sign River Lee

Hillingdon Towpaths

Page 9 of 56

25 Opportunities

There are some canal locations in Hillingdon that are not well used by local residents and

visitors or have large areas of redundant space often underneath road or rail bridges

Whilst these structures can create dark and sometimes intimidating spaces these locations

also present opportunities for improvement and increase in use

Hillingdon in partnership with Canal amp River Trust has submitted a funding application to

Transport for Londonrsquos Incubator Fund This includes installing the Sharkrsquos Canoe Club

underneath the Hayes By-pass and using the area under North Hyde Gardens as a

volunteer base and community space to promote activity and use of the canal We are in

discussions with the adjacent landowner about landscaping an upper towpath and installing

a Trim Trail (outdoor fitness trail) in the area

Hayes By-Pass (Section 1) and North Hyde Gardens (Section 2)

The by-pass is a large flyover with an access ramp from the A312 to the towpath There is a

large amount of redundant space underneath the road bridge As the bridge blocks out

light the space is dark and uninviting but could be used to install a climbing wall or outdoor

gym equipment

North Hyde Gardens has a vacant space at the base of the bridge on the towpath This

space has attracted antisocial behaviour in the past and has since been secured by the

local police and the landowners Legal and General

Shackles Dock Western View and Hayes Town Centre

These locations central to the town centre have suffered from littering and street-drinking

however Thames 21 and Sharkrsquos Canoe Club are in discussions with the landowners of

Shackles Dock about accessing the site for canoeing and there is also a wild flower

landscaping scheme proposed for Hayes Town Centre

Hillingdon Towpaths

Page 10 of 56

3 TOWPATH SPECIFICATION

The photograph below shows a typical towpath in the borough which has been recently

improved It shows the preferred towpath specification and was taken in July 2013 on the

Grand Union Canal Paddington Arm

We aim to achieve these minimum specifications

18m wide surfaced path tarmac with tar spray and chip finish with timber edging

boards

Verges maintained either side of the path with a minimum of 600mm on the

waterside and 500mm at the back where possible

Vegetation managed not to encroach and limit space for sharing the towpath but

still providing a habitat for nature and space for moored boats

The surface finish gives an audible crunch which lets others know yoursquore there

18 metres

surfaced width

Vegetation hedges

managed not to

encroach

Tarmac with edging boards

and tar spry and chip finish

Grass verge

retained and

grass seeded

Hillingdon Towpaths

Page 11 of 56

4 COST ASSUMPTIONS

The Trust uses its Towpath Estimator Tool to generate costs (see Appendix 1)

Estimated construction costs in this report are based on the Trustrsquos national term

contract rates for the 201314 financial year and are subject to inflationary uplift

Costs exclude design contingency and other project related costs such as legal or

land

The individual surveyed section reports (see Appendix 3) also include estimates for

additional measures to enhance the canal such as improvements to access points

bridges or signage

The total cost for towpath and additional improvements is estimated at just under

pound5million with pound13million in the high priority category (see Section 7 for complete

breakdown)

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 4: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 4 of 56

1 SUMMARY

Canal amp River Trust has produced this report to inform future investment priorities for

Hillingdon canal towpaths

The report was produced at the request of members of the Hillingdon Canals Partnership

and serves as a reference document for its work to promote and improve the boroughrsquos

waterways

It contains information for Hillingdon canal towpaths surveyed in 2013 covering

the Grand Union Canal (divided into 35 sections)

the Paddington Arm (1 section)

and Slough Arm (1 section)

For each section the general towpath condition levels of use and its function in connecting

people and places are considered

The result is a prioritised overview of borough towpaths for improvement which will support

funding applications and decisions

Hillingdon Towpaths

Page 5 of 56

2 BACKGROUND

21 Better Towpaths for Everyone

Sir Brian Fender chair of London

Waterways Partnership launched

Better Towpaths for Everyone in

spring 2014

The report was endorsed by the

Mayorrsquos Cycling Commissioner

Andrew Gilligan and sets out

proposals for 3 strategic cross-

borough Quietways along the Grand

Union Canal Paddington Arm and

River Lee responding to the Mayorrsquos

Cycling Vision

Hillingdon sits across 2 of these Quietways

Hillingdon Towpaths

Page 6 of 56

22 Hillingdon Waterspace Strategy

Canal amp River Trust works with key stakeholders brought together under the Hillingdon

Canals Partnership

The partnership is chaired by David Brough (of Hayes Town Partnership) and includes

representatives from Hillingdon Council Hayes Town Partnership GlaxoSmithKline Inland

Waterways Association Groundwork Thames 21 West Drayton Town Centre Action

Group and John McDonnell MP (Hayes amp Harlington)

In 2008 British Waterways produced a draft scoping report for a Hillingdon Waterspace

Strategy Good progress has been made on some initiatives identified in the Strategy and

this report will assist decisions on further work

An update of the Waterspace Strategy is planned during 201415 subject to funding

Hillingdon Towpaths

Page 7 of 56

23 Hillingdon Canals

Canal amp River Trust cares for 2000 miles of historic inland waterways in England amp Wales

In the Capital Hillingdon has more towpaths than any other London Borough

London Borough km miles

1 Hillingdon 212 132 205

2 Ealing 156 97 151

3 Tower Hamlets 124 77 120

4 Enfield 90 56 87

5 Brent 83 52 81

6 Newham 78 49 76

7 Hackney 69 43 67

8 Westminster 55 34 54

9 Hounslow 36 23 35

10 Haringey 34 21 33

11 Camden 28 17 27

12 Islington 20 12 19

13 Kensington amp Chelsea 19 12 19

14 Hammersmith amp Fulham

17 10 16

15 Waltham Forest 13 08 13

Total 1034 642 100

Hillingdonrsquos 21km of traffic-free canal towpaths are split along the Grand Union Canal and

its Paddington and Slough Arms

Hillingdon Canals km miles

1 Grand Union Canal 175 109 829

2 Paddington Arm 29 18 132

3 Slough Arm 08 05 40

Total 212 132 100

Hillingdon towpaths are diverse in character condition and levels of use They connect the

town centres of Hayes West Drayton Uxbridge and Rickmansworth as well as bordering

the major employment site at Stockley Business Park

24 Improvements so far

In addition to the Canal amp River Trustrsquos programme of maintenance and improvement

works securing partner funding has been vital to delivering better access signs and

surfacing Towpaths have been improved in recent years with funding from Hillingdon

Council and Transport for London Other sections are now in more need of improvement

Some areas that have benefitted from investment such as to the west of and including

Hillingdon Towpaths

Page 8 of 56

Hayes Town Centre are areas where we have long term aspirations for further improvement

given their strategic importance and high footfall

Hillingdon towpaths will also receive new Legible London signage during summer 2014

New towpath surface near Cowley New access ramp Uxbridge

Example of Legible London sign River Lee

Hillingdon Towpaths

Page 9 of 56

25 Opportunities

There are some canal locations in Hillingdon that are not well used by local residents and

visitors or have large areas of redundant space often underneath road or rail bridges

Whilst these structures can create dark and sometimes intimidating spaces these locations

also present opportunities for improvement and increase in use

Hillingdon in partnership with Canal amp River Trust has submitted a funding application to

Transport for Londonrsquos Incubator Fund This includes installing the Sharkrsquos Canoe Club

underneath the Hayes By-pass and using the area under North Hyde Gardens as a

volunteer base and community space to promote activity and use of the canal We are in

discussions with the adjacent landowner about landscaping an upper towpath and installing

a Trim Trail (outdoor fitness trail) in the area

Hayes By-Pass (Section 1) and North Hyde Gardens (Section 2)

The by-pass is a large flyover with an access ramp from the A312 to the towpath There is a

large amount of redundant space underneath the road bridge As the bridge blocks out

light the space is dark and uninviting but could be used to install a climbing wall or outdoor

gym equipment

North Hyde Gardens has a vacant space at the base of the bridge on the towpath This

space has attracted antisocial behaviour in the past and has since been secured by the

local police and the landowners Legal and General

Shackles Dock Western View and Hayes Town Centre

These locations central to the town centre have suffered from littering and street-drinking

however Thames 21 and Sharkrsquos Canoe Club are in discussions with the landowners of

Shackles Dock about accessing the site for canoeing and there is also a wild flower

landscaping scheme proposed for Hayes Town Centre

Hillingdon Towpaths

Page 10 of 56

3 TOWPATH SPECIFICATION

The photograph below shows a typical towpath in the borough which has been recently

improved It shows the preferred towpath specification and was taken in July 2013 on the

Grand Union Canal Paddington Arm

We aim to achieve these minimum specifications

18m wide surfaced path tarmac with tar spray and chip finish with timber edging

boards

Verges maintained either side of the path with a minimum of 600mm on the

waterside and 500mm at the back where possible

Vegetation managed not to encroach and limit space for sharing the towpath but

still providing a habitat for nature and space for moored boats

The surface finish gives an audible crunch which lets others know yoursquore there

18 metres

surfaced width

Vegetation hedges

managed not to

encroach

Tarmac with edging boards

and tar spry and chip finish

Grass verge

retained and

grass seeded

Hillingdon Towpaths

Page 11 of 56

4 COST ASSUMPTIONS

The Trust uses its Towpath Estimator Tool to generate costs (see Appendix 1)

Estimated construction costs in this report are based on the Trustrsquos national term

contract rates for the 201314 financial year and are subject to inflationary uplift

Costs exclude design contingency and other project related costs such as legal or

land

The individual surveyed section reports (see Appendix 3) also include estimates for

additional measures to enhance the canal such as improvements to access points

bridges or signage

The total cost for towpath and additional improvements is estimated at just under

pound5million with pound13million in the high priority category (see Section 7 for complete

breakdown)

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 5: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 5 of 56

2 BACKGROUND

21 Better Towpaths for Everyone

Sir Brian Fender chair of London

Waterways Partnership launched

Better Towpaths for Everyone in

spring 2014

The report was endorsed by the

Mayorrsquos Cycling Commissioner

Andrew Gilligan and sets out

proposals for 3 strategic cross-

borough Quietways along the Grand

Union Canal Paddington Arm and

River Lee responding to the Mayorrsquos

Cycling Vision

Hillingdon sits across 2 of these Quietways

Hillingdon Towpaths

Page 6 of 56

22 Hillingdon Waterspace Strategy

Canal amp River Trust works with key stakeholders brought together under the Hillingdon

Canals Partnership

The partnership is chaired by David Brough (of Hayes Town Partnership) and includes

representatives from Hillingdon Council Hayes Town Partnership GlaxoSmithKline Inland

Waterways Association Groundwork Thames 21 West Drayton Town Centre Action

Group and John McDonnell MP (Hayes amp Harlington)

In 2008 British Waterways produced a draft scoping report for a Hillingdon Waterspace

Strategy Good progress has been made on some initiatives identified in the Strategy and

this report will assist decisions on further work

An update of the Waterspace Strategy is planned during 201415 subject to funding

Hillingdon Towpaths

Page 7 of 56

23 Hillingdon Canals

Canal amp River Trust cares for 2000 miles of historic inland waterways in England amp Wales

In the Capital Hillingdon has more towpaths than any other London Borough

London Borough km miles

1 Hillingdon 212 132 205

2 Ealing 156 97 151

3 Tower Hamlets 124 77 120

4 Enfield 90 56 87

5 Brent 83 52 81

6 Newham 78 49 76

7 Hackney 69 43 67

8 Westminster 55 34 54

9 Hounslow 36 23 35

10 Haringey 34 21 33

11 Camden 28 17 27

12 Islington 20 12 19

13 Kensington amp Chelsea 19 12 19

14 Hammersmith amp Fulham

17 10 16

15 Waltham Forest 13 08 13

Total 1034 642 100

Hillingdonrsquos 21km of traffic-free canal towpaths are split along the Grand Union Canal and

its Paddington and Slough Arms

Hillingdon Canals km miles

1 Grand Union Canal 175 109 829

2 Paddington Arm 29 18 132

3 Slough Arm 08 05 40

Total 212 132 100

Hillingdon towpaths are diverse in character condition and levels of use They connect the

town centres of Hayes West Drayton Uxbridge and Rickmansworth as well as bordering

the major employment site at Stockley Business Park

24 Improvements so far

In addition to the Canal amp River Trustrsquos programme of maintenance and improvement

works securing partner funding has been vital to delivering better access signs and

surfacing Towpaths have been improved in recent years with funding from Hillingdon

Council and Transport for London Other sections are now in more need of improvement

Some areas that have benefitted from investment such as to the west of and including

Hillingdon Towpaths

Page 8 of 56

Hayes Town Centre are areas where we have long term aspirations for further improvement

given their strategic importance and high footfall

Hillingdon towpaths will also receive new Legible London signage during summer 2014

New towpath surface near Cowley New access ramp Uxbridge

Example of Legible London sign River Lee

Hillingdon Towpaths

Page 9 of 56

25 Opportunities

There are some canal locations in Hillingdon that are not well used by local residents and

visitors or have large areas of redundant space often underneath road or rail bridges

Whilst these structures can create dark and sometimes intimidating spaces these locations

also present opportunities for improvement and increase in use

Hillingdon in partnership with Canal amp River Trust has submitted a funding application to

Transport for Londonrsquos Incubator Fund This includes installing the Sharkrsquos Canoe Club

underneath the Hayes By-pass and using the area under North Hyde Gardens as a

volunteer base and community space to promote activity and use of the canal We are in

discussions with the adjacent landowner about landscaping an upper towpath and installing

a Trim Trail (outdoor fitness trail) in the area

Hayes By-Pass (Section 1) and North Hyde Gardens (Section 2)

The by-pass is a large flyover with an access ramp from the A312 to the towpath There is a

large amount of redundant space underneath the road bridge As the bridge blocks out

light the space is dark and uninviting but could be used to install a climbing wall or outdoor

gym equipment

North Hyde Gardens has a vacant space at the base of the bridge on the towpath This

space has attracted antisocial behaviour in the past and has since been secured by the

local police and the landowners Legal and General

Shackles Dock Western View and Hayes Town Centre

These locations central to the town centre have suffered from littering and street-drinking

however Thames 21 and Sharkrsquos Canoe Club are in discussions with the landowners of

Shackles Dock about accessing the site for canoeing and there is also a wild flower

landscaping scheme proposed for Hayes Town Centre

Hillingdon Towpaths

Page 10 of 56

3 TOWPATH SPECIFICATION

The photograph below shows a typical towpath in the borough which has been recently

improved It shows the preferred towpath specification and was taken in July 2013 on the

Grand Union Canal Paddington Arm

We aim to achieve these minimum specifications

18m wide surfaced path tarmac with tar spray and chip finish with timber edging

boards

Verges maintained either side of the path with a minimum of 600mm on the

waterside and 500mm at the back where possible

Vegetation managed not to encroach and limit space for sharing the towpath but

still providing a habitat for nature and space for moored boats

The surface finish gives an audible crunch which lets others know yoursquore there

18 metres

surfaced width

Vegetation hedges

managed not to

encroach

Tarmac with edging boards

and tar spry and chip finish

Grass verge

retained and

grass seeded

Hillingdon Towpaths

Page 11 of 56

4 COST ASSUMPTIONS

The Trust uses its Towpath Estimator Tool to generate costs (see Appendix 1)

Estimated construction costs in this report are based on the Trustrsquos national term

contract rates for the 201314 financial year and are subject to inflationary uplift

Costs exclude design contingency and other project related costs such as legal or

land

The individual surveyed section reports (see Appendix 3) also include estimates for

additional measures to enhance the canal such as improvements to access points

bridges or signage

The total cost for towpath and additional improvements is estimated at just under

pound5million with pound13million in the high priority category (see Section 7 for complete

breakdown)

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 6: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 6 of 56

22 Hillingdon Waterspace Strategy

Canal amp River Trust works with key stakeholders brought together under the Hillingdon

Canals Partnership

The partnership is chaired by David Brough (of Hayes Town Partnership) and includes

representatives from Hillingdon Council Hayes Town Partnership GlaxoSmithKline Inland

Waterways Association Groundwork Thames 21 West Drayton Town Centre Action

Group and John McDonnell MP (Hayes amp Harlington)

In 2008 British Waterways produced a draft scoping report for a Hillingdon Waterspace

Strategy Good progress has been made on some initiatives identified in the Strategy and

this report will assist decisions on further work

An update of the Waterspace Strategy is planned during 201415 subject to funding

Hillingdon Towpaths

Page 7 of 56

23 Hillingdon Canals

Canal amp River Trust cares for 2000 miles of historic inland waterways in England amp Wales

In the Capital Hillingdon has more towpaths than any other London Borough

London Borough km miles

1 Hillingdon 212 132 205

2 Ealing 156 97 151

3 Tower Hamlets 124 77 120

4 Enfield 90 56 87

5 Brent 83 52 81

6 Newham 78 49 76

7 Hackney 69 43 67

8 Westminster 55 34 54

9 Hounslow 36 23 35

10 Haringey 34 21 33

11 Camden 28 17 27

12 Islington 20 12 19

13 Kensington amp Chelsea 19 12 19

14 Hammersmith amp Fulham

17 10 16

15 Waltham Forest 13 08 13

Total 1034 642 100

Hillingdonrsquos 21km of traffic-free canal towpaths are split along the Grand Union Canal and

its Paddington and Slough Arms

Hillingdon Canals km miles

1 Grand Union Canal 175 109 829

2 Paddington Arm 29 18 132

3 Slough Arm 08 05 40

Total 212 132 100

Hillingdon towpaths are diverse in character condition and levels of use They connect the

town centres of Hayes West Drayton Uxbridge and Rickmansworth as well as bordering

the major employment site at Stockley Business Park

24 Improvements so far

In addition to the Canal amp River Trustrsquos programme of maintenance and improvement

works securing partner funding has been vital to delivering better access signs and

surfacing Towpaths have been improved in recent years with funding from Hillingdon

Council and Transport for London Other sections are now in more need of improvement

Some areas that have benefitted from investment such as to the west of and including

Hillingdon Towpaths

Page 8 of 56

Hayes Town Centre are areas where we have long term aspirations for further improvement

given their strategic importance and high footfall

Hillingdon towpaths will also receive new Legible London signage during summer 2014

New towpath surface near Cowley New access ramp Uxbridge

Example of Legible London sign River Lee

Hillingdon Towpaths

Page 9 of 56

25 Opportunities

There are some canal locations in Hillingdon that are not well used by local residents and

visitors or have large areas of redundant space often underneath road or rail bridges

Whilst these structures can create dark and sometimes intimidating spaces these locations

also present opportunities for improvement and increase in use

Hillingdon in partnership with Canal amp River Trust has submitted a funding application to

Transport for Londonrsquos Incubator Fund This includes installing the Sharkrsquos Canoe Club

underneath the Hayes By-pass and using the area under North Hyde Gardens as a

volunteer base and community space to promote activity and use of the canal We are in

discussions with the adjacent landowner about landscaping an upper towpath and installing

a Trim Trail (outdoor fitness trail) in the area

Hayes By-Pass (Section 1) and North Hyde Gardens (Section 2)

The by-pass is a large flyover with an access ramp from the A312 to the towpath There is a

large amount of redundant space underneath the road bridge As the bridge blocks out

light the space is dark and uninviting but could be used to install a climbing wall or outdoor

gym equipment

North Hyde Gardens has a vacant space at the base of the bridge on the towpath This

space has attracted antisocial behaviour in the past and has since been secured by the

local police and the landowners Legal and General

Shackles Dock Western View and Hayes Town Centre

These locations central to the town centre have suffered from littering and street-drinking

however Thames 21 and Sharkrsquos Canoe Club are in discussions with the landowners of

Shackles Dock about accessing the site for canoeing and there is also a wild flower

landscaping scheme proposed for Hayes Town Centre

Hillingdon Towpaths

Page 10 of 56

3 TOWPATH SPECIFICATION

The photograph below shows a typical towpath in the borough which has been recently

improved It shows the preferred towpath specification and was taken in July 2013 on the

Grand Union Canal Paddington Arm

We aim to achieve these minimum specifications

18m wide surfaced path tarmac with tar spray and chip finish with timber edging

boards

Verges maintained either side of the path with a minimum of 600mm on the

waterside and 500mm at the back where possible

Vegetation managed not to encroach and limit space for sharing the towpath but

still providing a habitat for nature and space for moored boats

The surface finish gives an audible crunch which lets others know yoursquore there

18 metres

surfaced width

Vegetation hedges

managed not to

encroach

Tarmac with edging boards

and tar spry and chip finish

Grass verge

retained and

grass seeded

Hillingdon Towpaths

Page 11 of 56

4 COST ASSUMPTIONS

The Trust uses its Towpath Estimator Tool to generate costs (see Appendix 1)

Estimated construction costs in this report are based on the Trustrsquos national term

contract rates for the 201314 financial year and are subject to inflationary uplift

Costs exclude design contingency and other project related costs such as legal or

land

The individual surveyed section reports (see Appendix 3) also include estimates for

additional measures to enhance the canal such as improvements to access points

bridges or signage

The total cost for towpath and additional improvements is estimated at just under

pound5million with pound13million in the high priority category (see Section 7 for complete

breakdown)

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 7: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 7 of 56

23 Hillingdon Canals

Canal amp River Trust cares for 2000 miles of historic inland waterways in England amp Wales

In the Capital Hillingdon has more towpaths than any other London Borough

London Borough km miles

1 Hillingdon 212 132 205

2 Ealing 156 97 151

3 Tower Hamlets 124 77 120

4 Enfield 90 56 87

5 Brent 83 52 81

6 Newham 78 49 76

7 Hackney 69 43 67

8 Westminster 55 34 54

9 Hounslow 36 23 35

10 Haringey 34 21 33

11 Camden 28 17 27

12 Islington 20 12 19

13 Kensington amp Chelsea 19 12 19

14 Hammersmith amp Fulham

17 10 16

15 Waltham Forest 13 08 13

Total 1034 642 100

Hillingdonrsquos 21km of traffic-free canal towpaths are split along the Grand Union Canal and

its Paddington and Slough Arms

Hillingdon Canals km miles

1 Grand Union Canal 175 109 829

2 Paddington Arm 29 18 132

3 Slough Arm 08 05 40

Total 212 132 100

Hillingdon towpaths are diverse in character condition and levels of use They connect the

town centres of Hayes West Drayton Uxbridge and Rickmansworth as well as bordering

the major employment site at Stockley Business Park

24 Improvements so far

In addition to the Canal amp River Trustrsquos programme of maintenance and improvement

works securing partner funding has been vital to delivering better access signs and

surfacing Towpaths have been improved in recent years with funding from Hillingdon

Council and Transport for London Other sections are now in more need of improvement

Some areas that have benefitted from investment such as to the west of and including

Hillingdon Towpaths

Page 8 of 56

Hayes Town Centre are areas where we have long term aspirations for further improvement

given their strategic importance and high footfall

Hillingdon towpaths will also receive new Legible London signage during summer 2014

New towpath surface near Cowley New access ramp Uxbridge

Example of Legible London sign River Lee

Hillingdon Towpaths

Page 9 of 56

25 Opportunities

There are some canal locations in Hillingdon that are not well used by local residents and

visitors or have large areas of redundant space often underneath road or rail bridges

Whilst these structures can create dark and sometimes intimidating spaces these locations

also present opportunities for improvement and increase in use

Hillingdon in partnership with Canal amp River Trust has submitted a funding application to

Transport for Londonrsquos Incubator Fund This includes installing the Sharkrsquos Canoe Club

underneath the Hayes By-pass and using the area under North Hyde Gardens as a

volunteer base and community space to promote activity and use of the canal We are in

discussions with the adjacent landowner about landscaping an upper towpath and installing

a Trim Trail (outdoor fitness trail) in the area

Hayes By-Pass (Section 1) and North Hyde Gardens (Section 2)

The by-pass is a large flyover with an access ramp from the A312 to the towpath There is a

large amount of redundant space underneath the road bridge As the bridge blocks out

light the space is dark and uninviting but could be used to install a climbing wall or outdoor

gym equipment

North Hyde Gardens has a vacant space at the base of the bridge on the towpath This

space has attracted antisocial behaviour in the past and has since been secured by the

local police and the landowners Legal and General

Shackles Dock Western View and Hayes Town Centre

These locations central to the town centre have suffered from littering and street-drinking

however Thames 21 and Sharkrsquos Canoe Club are in discussions with the landowners of

Shackles Dock about accessing the site for canoeing and there is also a wild flower

landscaping scheme proposed for Hayes Town Centre

Hillingdon Towpaths

Page 10 of 56

3 TOWPATH SPECIFICATION

The photograph below shows a typical towpath in the borough which has been recently

improved It shows the preferred towpath specification and was taken in July 2013 on the

Grand Union Canal Paddington Arm

We aim to achieve these minimum specifications

18m wide surfaced path tarmac with tar spray and chip finish with timber edging

boards

Verges maintained either side of the path with a minimum of 600mm on the

waterside and 500mm at the back where possible

Vegetation managed not to encroach and limit space for sharing the towpath but

still providing a habitat for nature and space for moored boats

The surface finish gives an audible crunch which lets others know yoursquore there

18 metres

surfaced width

Vegetation hedges

managed not to

encroach

Tarmac with edging boards

and tar spry and chip finish

Grass verge

retained and

grass seeded

Hillingdon Towpaths

Page 11 of 56

4 COST ASSUMPTIONS

The Trust uses its Towpath Estimator Tool to generate costs (see Appendix 1)

Estimated construction costs in this report are based on the Trustrsquos national term

contract rates for the 201314 financial year and are subject to inflationary uplift

Costs exclude design contingency and other project related costs such as legal or

land

The individual surveyed section reports (see Appendix 3) also include estimates for

additional measures to enhance the canal such as improvements to access points

bridges or signage

The total cost for towpath and additional improvements is estimated at just under

pound5million with pound13million in the high priority category (see Section 7 for complete

breakdown)

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 8: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 8 of 56

Hayes Town Centre are areas where we have long term aspirations for further improvement

given their strategic importance and high footfall

Hillingdon towpaths will also receive new Legible London signage during summer 2014

New towpath surface near Cowley New access ramp Uxbridge

Example of Legible London sign River Lee

Hillingdon Towpaths

Page 9 of 56

25 Opportunities

There are some canal locations in Hillingdon that are not well used by local residents and

visitors or have large areas of redundant space often underneath road or rail bridges

Whilst these structures can create dark and sometimes intimidating spaces these locations

also present opportunities for improvement and increase in use

Hillingdon in partnership with Canal amp River Trust has submitted a funding application to

Transport for Londonrsquos Incubator Fund This includes installing the Sharkrsquos Canoe Club

underneath the Hayes By-pass and using the area under North Hyde Gardens as a

volunteer base and community space to promote activity and use of the canal We are in

discussions with the adjacent landowner about landscaping an upper towpath and installing

a Trim Trail (outdoor fitness trail) in the area

Hayes By-Pass (Section 1) and North Hyde Gardens (Section 2)

The by-pass is a large flyover with an access ramp from the A312 to the towpath There is a

large amount of redundant space underneath the road bridge As the bridge blocks out

light the space is dark and uninviting but could be used to install a climbing wall or outdoor

gym equipment

North Hyde Gardens has a vacant space at the base of the bridge on the towpath This

space has attracted antisocial behaviour in the past and has since been secured by the

local police and the landowners Legal and General

Shackles Dock Western View and Hayes Town Centre

These locations central to the town centre have suffered from littering and street-drinking

however Thames 21 and Sharkrsquos Canoe Club are in discussions with the landowners of

Shackles Dock about accessing the site for canoeing and there is also a wild flower

landscaping scheme proposed for Hayes Town Centre

Hillingdon Towpaths

Page 10 of 56

3 TOWPATH SPECIFICATION

The photograph below shows a typical towpath in the borough which has been recently

improved It shows the preferred towpath specification and was taken in July 2013 on the

Grand Union Canal Paddington Arm

We aim to achieve these minimum specifications

18m wide surfaced path tarmac with tar spray and chip finish with timber edging

boards

Verges maintained either side of the path with a minimum of 600mm on the

waterside and 500mm at the back where possible

Vegetation managed not to encroach and limit space for sharing the towpath but

still providing a habitat for nature and space for moored boats

The surface finish gives an audible crunch which lets others know yoursquore there

18 metres

surfaced width

Vegetation hedges

managed not to

encroach

Tarmac with edging boards

and tar spry and chip finish

Grass verge

retained and

grass seeded

Hillingdon Towpaths

Page 11 of 56

4 COST ASSUMPTIONS

The Trust uses its Towpath Estimator Tool to generate costs (see Appendix 1)

Estimated construction costs in this report are based on the Trustrsquos national term

contract rates for the 201314 financial year and are subject to inflationary uplift

Costs exclude design contingency and other project related costs such as legal or

land

The individual surveyed section reports (see Appendix 3) also include estimates for

additional measures to enhance the canal such as improvements to access points

bridges or signage

The total cost for towpath and additional improvements is estimated at just under

pound5million with pound13million in the high priority category (see Section 7 for complete

breakdown)

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 9: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 9 of 56

25 Opportunities

There are some canal locations in Hillingdon that are not well used by local residents and

visitors or have large areas of redundant space often underneath road or rail bridges

Whilst these structures can create dark and sometimes intimidating spaces these locations

also present opportunities for improvement and increase in use

Hillingdon in partnership with Canal amp River Trust has submitted a funding application to

Transport for Londonrsquos Incubator Fund This includes installing the Sharkrsquos Canoe Club

underneath the Hayes By-pass and using the area under North Hyde Gardens as a

volunteer base and community space to promote activity and use of the canal We are in

discussions with the adjacent landowner about landscaping an upper towpath and installing

a Trim Trail (outdoor fitness trail) in the area

Hayes By-Pass (Section 1) and North Hyde Gardens (Section 2)

The by-pass is a large flyover with an access ramp from the A312 to the towpath There is a

large amount of redundant space underneath the road bridge As the bridge blocks out

light the space is dark and uninviting but could be used to install a climbing wall or outdoor

gym equipment

North Hyde Gardens has a vacant space at the base of the bridge on the towpath This

space has attracted antisocial behaviour in the past and has since been secured by the

local police and the landowners Legal and General

Shackles Dock Western View and Hayes Town Centre

These locations central to the town centre have suffered from littering and street-drinking

however Thames 21 and Sharkrsquos Canoe Club are in discussions with the landowners of

Shackles Dock about accessing the site for canoeing and there is also a wild flower

landscaping scheme proposed for Hayes Town Centre

Hillingdon Towpaths

Page 10 of 56

3 TOWPATH SPECIFICATION

The photograph below shows a typical towpath in the borough which has been recently

improved It shows the preferred towpath specification and was taken in July 2013 on the

Grand Union Canal Paddington Arm

We aim to achieve these minimum specifications

18m wide surfaced path tarmac with tar spray and chip finish with timber edging

boards

Verges maintained either side of the path with a minimum of 600mm on the

waterside and 500mm at the back where possible

Vegetation managed not to encroach and limit space for sharing the towpath but

still providing a habitat for nature and space for moored boats

The surface finish gives an audible crunch which lets others know yoursquore there

18 metres

surfaced width

Vegetation hedges

managed not to

encroach

Tarmac with edging boards

and tar spry and chip finish

Grass verge

retained and

grass seeded

Hillingdon Towpaths

Page 11 of 56

4 COST ASSUMPTIONS

The Trust uses its Towpath Estimator Tool to generate costs (see Appendix 1)

Estimated construction costs in this report are based on the Trustrsquos national term

contract rates for the 201314 financial year and are subject to inflationary uplift

Costs exclude design contingency and other project related costs such as legal or

land

The individual surveyed section reports (see Appendix 3) also include estimates for

additional measures to enhance the canal such as improvements to access points

bridges or signage

The total cost for towpath and additional improvements is estimated at just under

pound5million with pound13million in the high priority category (see Section 7 for complete

breakdown)

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 10: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 10 of 56

3 TOWPATH SPECIFICATION

The photograph below shows a typical towpath in the borough which has been recently

improved It shows the preferred towpath specification and was taken in July 2013 on the

Grand Union Canal Paddington Arm

We aim to achieve these minimum specifications

18m wide surfaced path tarmac with tar spray and chip finish with timber edging

boards

Verges maintained either side of the path with a minimum of 600mm on the

waterside and 500mm at the back where possible

Vegetation managed not to encroach and limit space for sharing the towpath but

still providing a habitat for nature and space for moored boats

The surface finish gives an audible crunch which lets others know yoursquore there

18 metres

surfaced width

Vegetation hedges

managed not to

encroach

Tarmac with edging boards

and tar spry and chip finish

Grass verge

retained and

grass seeded

Hillingdon Towpaths

Page 11 of 56

4 COST ASSUMPTIONS

The Trust uses its Towpath Estimator Tool to generate costs (see Appendix 1)

Estimated construction costs in this report are based on the Trustrsquos national term

contract rates for the 201314 financial year and are subject to inflationary uplift

Costs exclude design contingency and other project related costs such as legal or

land

The individual surveyed section reports (see Appendix 3) also include estimates for

additional measures to enhance the canal such as improvements to access points

bridges or signage

The total cost for towpath and additional improvements is estimated at just under

pound5million with pound13million in the high priority category (see Section 7 for complete

breakdown)

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 11: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 11 of 56

4 COST ASSUMPTIONS

The Trust uses its Towpath Estimator Tool to generate costs (see Appendix 1)

Estimated construction costs in this report are based on the Trustrsquos national term

contract rates for the 201314 financial year and are subject to inflationary uplift

Costs exclude design contingency and other project related costs such as legal or

land

The individual surveyed section reports (see Appendix 3) also include estimates for

additional measures to enhance the canal such as improvements to access points

bridges or signage

The total cost for towpath and additional improvements is estimated at just under

pound5million with pound13million in the high priority category (see Section 7 for complete

breakdown)

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 12: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 12 of 56

5 METHOD

The boroughrsquos canal towpaths were considered as 37 discrete sections

The 35 sections of the Grand Union Canal have been surveyed and presented in

order from the Bulls Bridge canal junction (between Southall and Hayes) as far as

Rickmansworth divided where bridges cross the towpath or at locks

The Paddington Arm was not surveyed in detail for this report It has had recent

enhancement works however a small section of towpath requires resurfacing This

has been earmarked for improvement as part of the Southall Gasworks

Development

The Slough Arm is subject to wider discussions with other local authorities and is

considered high priority

Section No

Location Distance (m)

Section No

Location Distance (m)

1 North Hyde Gardens to Bullrsquos Bridge

351 20 Bridge 184 to Bridge 185 232

2 North Hyde Gardens to Railway Bridge

277 21 Bridge 183a to Bridge 184 887

3 Railway Bridge to Shackles Dock 185 22 Bridge 183 to Bridge 183a 105

4 Shackles Dock to Station Road 203 23 Denham Lock to Bridge 183 489

5 Station Road to Printing House Lane

510 24 Bridge 182 to Denham Lock 455

6 Printing House Lane to Dawley Road

496 25 Bridge 181 to Bridge 182 872

7 Dawley Road to Rigby Lane 292 26 Bridge 180 to Bridge 181 1161

8 Rigby Lane to Stockley Road 896 27 Bridge 179 to Bridge 180 682

9 Stockley Rd to Iron Bridge Road 245 28 Bridge 178 to Bridge 179 1136

10 Iron Bridge Road to Horton Bridge Road

796 29 Bridge 177a to Bridge 178 512

11 Horton Bridge Road to West Drayton High Street

622 30 Bridge 177 to Bridge 177a 393

12 West Drayton High Street to Trout Rd

372 31 Riverside Cottages to Bridge 177

370

13 Trout Rd to Roving Bridge 496 32 Bridge 176d to Riverside Cottages

718

14 Roving Bridge to Linden Doors Lock

352 33 Bridge 176 to Bridge 176d 725

15 Linden Doors Lock to Benbow Bridge

586 34 Hillingdon border to Bridge 176

512

16 Benbow Bridge to Iver Lane 518 35 Bridge 175 to Hillingdon border

617

17 Iver Lane to Cowley Mill Road 933 36 Paddington Arm 1000

18 Cowley Mill Road to Culvert Lane 221 37 Slough Arm 834

19 Culvert Lane to Rockingham Road 322

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 13: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 13 of 56

6 ASSESSMENT CRITERIA

61 Design Guidance amp Standards

Towpaths are multi-functional spaces shared by

everyone whether for boating angling walking or

cycling They provide an attractive traffic-free

experience particularly appealing to enjoyment of

leisure time and can attract new and novice cyclists

The Trust has its own Towpath Design Guide which

sets out the approach needed for waterways

Following national consultation on sharing Towpaths

in early 2014 the Trust will publish a new Towpath

Policy setting out its expectations and approach to

managing and improving towpaths for shared use

Elsewhere new London Cycling Design Standards

(LCDS) were released for consultation in June 2014

The LCDS includes a Cycling Level of Service (CLoS)

which enables assessment of the suitability of a route

for cycling The design standards provide guidance to

ensure cycle routes are delivered to the following

good design outcomes

1 Safe

2 Direct

3 Comfortable

4 Coherent

5 Attractive

6 Adaptable

The LCDS refers to shared space although mainly

between motorised vehicles cyclists and pedestrians

The design standards do not adequately analyse the

needs of pedestrians and cyclists in off-highway

environments such as parks and canal towpaths

Similarly the National Cycle Network - Guidance and

Practical Details document produced by Sustrans

doesnrsquot fully consider constraints limitations and

character of towpaths The minimum width of 2m is

not always achievable for example under bridges

However 18m is often sufficient width for towpaths in

areas with medium to low flows

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 14: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 14 of 56

62 Criteria used in this report

The criteria used for this report consider physical condition levels of use and connectivity to

people and places as follows

1 Width

2 Surface

3 Levels for drainage

4 Vegetation

5 Access

6 Signage

7 Traffic

8 Links to places and people

9 Antisocial behaviour

10 Community interest

The scoring for each of the 10 criteria is explained in more detail in Appendix 2

63 Prioritisation

Survey results for the 37 towpath sections have been grouped as high medium or low

priority as follows

High Priority red scores 1 to 5

Medium Priority yellow scores 6 to 10

Low Priority green scores 11 to 20

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 15: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 15 of 56

7 RESULTS

Full details for each surveyed section are at Appendix 3 of this report

71 High Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

5 Bridge 200 to Bridge 199 510 pound119719 pound2300 11 to 2 2

6 Bridge 199 to Bridge 198 496 pound116440 pound2190 12 ndash 15 5

7 Bridge 198 to Bridge 196 292 pound68561 pound1500 12 ndash 15 4

8 Bridge 196 to Stockley Rd 896 pound210337 pound3400 1 to 12 1

23 Denham Lock to Bridge 183 489 pound114781 pound52162 12 to 3 4

31 Riverside Cottages to Bridge 177

370 pound86855 pound1880 15 to 16 4

32 Bridge 176d to Riverside Cottages

718 pound168529 pound7710 15 to 16 4

35 Bridge 175 to Hillingdon border

617 pound144852 pound2470 1 to 16 5

37 Slough Arm 834 pound166800 NA 12 to 14 5

Sub total pound1196874 pound7361200 pound1270486

72 Medium Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

1 Bulls bridge to Bridge 200c 351 pound82403 pound3310 15 to 18 9

2 Bridge 200c to Bridge 200b 277 pound65040 pound1620 2 9

3 Bridge 200b to Bridge 200a 185 pound43427 pound1450 15 7

4 Bridge 200a to Bridge 200 203 pound47637 pound1475 15 7

9 Stockley Rd to Bridge 194a 245 pound57512 pound1570 15 ndash 18 6

10 Bridge 194a to Bridge 193 796 pound186863 pound3000 1 to 15 7

11 Bridge 193 to Bridge 192 622 pound146026 pound18000 12 ndash 15 8

12 Bridge 192 to Bridge 191 372 pound87340 pound2000 12 to 18 7

13 Bridge 191 to Bridge 190b 496 pound116440 pound2950 15 ndash 18 9

14 Bridge 190b to Bridge 190a 352 pound82645 pound1810 12 to 18 9

15 Bridge 190a to Bridge 189 586 pound137567 pound2380 15 to 18 9

17 Bridge 188 to Bridge 187 933 pound218999 pound3140 12 to 15 10

18 Bridge 187 to Culvert Ln 221 pound51886 pound1530 15 to 18 10

19 Culvert Ln to Bridge 186 322 pound75603 pound1780 12 to 18 6

20 Bridge 184 to Bridge 185 232 pound54476 pound1550 12 to 15 7

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 16: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 16 of 56

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

21 Bridge 183a to Bridge 184 887 pound208233 pound3110 12 to 15 7

22 Bridge 183 to Bridge 183a 105 pound24648 pound1250 12 to 15 6

24 Bridge 182 to Denham Lock 455 pound106808 pound2100 12 to 15 7

25 Bridge 181 to Bridge 182 872 pound204711 pound103075 1 to 15 7

26 Bridge 180 to Bridge 181 1161 pound272544 pound3760 1 to 15 7

27 Bridge 179 to Bridge 180 682 pound160110 pound2620 15 to 2 8

28 Bridge 178 to Bridge 179 1136 pound266675 pound3700 15 to 2 9

29 Bridge 177a to Bridge 178 512 pound120204 pound2220 15 to 2 10

30 Bridge 177 to Bridge 177a 393 pound92238 pound1940 15 to 16 10

34 Hillingdon border to Bridge 176

512 pound120204 pound2220 12 to 16 9

Sub total pound3030239 pound173560 pound3203799

73 Low Priority Towpath Sections

Map Section

No

Location Distance (m)

Estimated towpath

cost

Estimated additional works cost

Width (m)

Priority Score

16 Bridge 189 to Bridge 188 518 pound121581 pound2200 15 to 2 11

33 Bridge 176 to Bridge 176d 725 pound170188 pound7725 15 to 16 12

36 Paddington Arm 1000 pound183020 NA Min 18 14

Sub total pound474789 pound992500 pound484714

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 17: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 17 of 56

74 Map of Priority Towpath Sections

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 18: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 18 of 56

Appendix 1 - Towpath estimator tool

Project Name

overall length of towpath (m) 000 input 000

width of towpath (m) 000 input 000

area of any brick sheeting (m2) 000 input 000

Terram and 75mm type 1 base construction Yes

Granular surfacing (limestone granitebrick dust etc) No

SBM DBM or Breedon gravel surfacing No

Bitumen emulsion spray amp chip finish No specification and estimating rate to be confirmed currently pro visio nal assumed contract specification

timber edgings to path No

Excavated material disposed off site No

Is general site clearance required No

Are the works being delivered in Scotland No

Are the works being delivered in London amp SE No

Description Quantity Unit Rate pound p Quantity Unit Rate pound p

PERMANENT WORKS

Insert significant items as appropriate - PC SUM 0 0

Additions to costs calculated above for works carried out due to

difficultwaterborne access

to value of Class E earthworks included above 000 14500 0 000 10000 0

to value of Class O timber included above 000 14500 0 000 10000 0

to value of Class RP and Q towpath amp piling 000 14500 0 000 10000 0

to value of Class U brickwork blockwork and masonry included

above

000 11000 0 000 10000 0

to value of Class X miscellaneous work included above 000 11000 0 000 10000 0

pound 0 pound 0

Addition to cover minor items not specifically identified above

Add to value of Permanent Works as calculated including additions

for working from water

000 015 000 000 015 000

pound pound

bf pound 0 bf pound 0

GENERAL ITEMS

General Items applicable to all projects

Contractor Set-up Site Management Supervision etc including

general plant instruments personnel transport out of hours

security general labour site compound and hard standing general

testing etc 6500

Of Total

Perman

ent

Works 0 6500

Of Total

Permanent

Works 0

Site Specific General Items (ie access tracks specific temp works

etc)

pound 0 pound 0

PRICE ADJUSTMENTS

Add Regional Adjustment 0 0

0 0

pound 0 pound 0

pound 0 0

Add Inflation adjustment

pound pound

RISK

Add Risk monies for Construction Phase

Insert items sums and probability of

their occurrence as appropriate

land agent and owner fee sum 0 sum 0

sum sum

sum sum

0 0

0 0

0 0

excludes contingency or other proejct related costs such as legal etc these to be added by Regeneration project manager as appropriate

excludes external design assumed schemes developed on BW standard details Contractor preparing BoQ etc

Note until estimator is developed further default answer Yes

Towpath Budget Estimator - DRAFT - Revision 1

Probability

age

Full cost Probabili

ty age

For all associated works (access improvements bank protection piling

etc) either include a PC sum below or include specific measures in bill

build up found click Measured WorksA1

Grand Total - BUDGET ESTIMATE

Project and contract management from British Waterways 115

Total of Estimate (inclusive of Contractors staff) pound

Waterborne andor difficult access Non-waterborneeasy towpath access circa 500m

Full cost

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 19: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 19 of 56

Appendix 2 - Towpath assessment criteria scores

1 Width

0 - Width less than 12 in places

1 - No serious issues but not optimised

2 - Optimised 16m ndash 18m minimum except at bridges structures

2 Surface

0 - Likely to prevent access when wet cause punctures or encourage fast cycling

1 - No serious issues but not optimised

2 - Optimised Constant hard wearing with a low speed surface

3 Levels

0 - Change in level which causes drainage issue

1 - No serious issues but not optimised

2 - Optimised Good drainage and level throughout

4 Vegetation

0 - Encroaching and diminishing usable width

1 - No serious issues but not optimised

2 - Optimised Well-kept and easy to manage whilst maintaining habitat value

5 Access

0 - A lack of access points or the towpath is hard to access

1 - No serious issues but not optimised

2 - Optimised Access points provide easy access

6 Signage

0 - No consistent way-finding system in need of advisory signs to guide visitors or there is damage to signs

1 - No serious issues but not optimised

2 - Optimised good visitors way finding information

7 Traffic

0 - High

1 - Med

2 - Low

8 Links to trip generators (such as population centres or employment sites)

0 - Part of population centre

1 - Near to population centre

2 - Far from population centre (Rural or connective route only)

9 Anti-Social Behaviour

0 - Regular graffiti crime or rough sleeping hot spot

1 - Occasional evidence of anti-social behaviour

2 - No apparent evidence of anti-social behaviour

10 Community Support

0 - Is too far away or unattractive to community groups

1 - There is good potential of community involvement

2 - There is an active adoption or friends group in the area

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 20: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 20 of 56

Appendix 3 ndash Towpath Survey Section Reports

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 21: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 21 of 56

Towpath Section 1

North Hyde Gardens Road to

(Bridge 200c Nestles to

Bulls Bridge junction)

Priority 9

Length of Towpath 351m

Current Towpath Surface Some evidence of

the existing towpath construction potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

There is no public access

Estimated Costs

Towpath surfacing with timber Edgings pound69882

Towpath surfacing with concrete Edgings pound82403

Additional works

New Bridge PlatesSigns including road names

pound1000 (approx)

General site clearance and de-veg over full towpath

length pound810

Permanent fencing or parapet over back pound1500

Total pound3310

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 22: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 22 of 56

Towpath Section 2

North Hyde Gardens Bridge to Railway

Bridge

(Bridge 200c Nestles Bridge to 200b)

Priority 9

Length of Towpath 277m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Timber edgings

Width of Towpath 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There

are no public access points to the towpath along this

stretch

Estimated Costs

Towpath surfacing with timber Edgings pound55159

Towpath surfacing with concrete Edgings pound65440

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound620

Total pound1620

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 23: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 23 of 56

Towpath Section 3

Railway Bridge to Shackles Dock

(Bridge 200b to 200a Exchair Dock)

Priority 7

Length of Towpath 185m

Current Towpath Surface Some

evidence of the existing towpath

construction potholed and bad

drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m

Services in towpath Fibre optic

cable inspection chambers are

present

Access Issues Waterborne access

would be needed to carry out this

work There is no public access point along

this stretch

Estimated Cost

Towpath surfacing with timber Edgings

pound36828

Towpath surfacing with concrete Edgings

pound43427

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath

length pound450

Total pound1450

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 24: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 24 of 56

Towpath Section 4

200a Exchair Dock to 200)

Priority 7

Length of

Towpath 203m

Current Towpath

Surface There is

evidence of the

existing towpath

construction and generally in good condition Towpath

surfacing with timber edgings present

Current Width of Towpath 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to

carry out this work There is a public access point just after

bridge 200 this a set of steps with metal railings (see picture

below)

Estimated Cost

Towpath surfacing with timber edgings pound40395

Towpath surfacing with concrete edgings pound47637

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound475

Total pound1475

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 25: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 25 of 56

Towpath Section 5

Station Rd to Printing House Lane (Bridge 200 to 199)

Priority 2

Length of Towpath 510m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy potholed

and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 12m to 2m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work There is a

public access point adjacent to bridge 199 set of

brick steps with metal railings

Estimated Costs

Towpath surfacing with timber edgings pound101526

Towpath surfacing with concrete edgings

pound119719

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1300

Total pound2300

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 26: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 26 of 56

Towpath Section 6

Printing House Lane to Dawley Road

(Bridge 199 to 198)

Priority 5

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m ndash 15m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access points at bridge 198 a set of concrete and

timber steps with timber a channel for bicycles

wheels

Concept Estimated Cost

Towpath surfacing with timber edgings pound98747

Towpath surfacing with concrete edgings pound116440

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length pound1190

Total pound2190

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 27: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 27 of 56

Towpath Section 7

Dawley Road to Rigby Lane

(Bridge 198 to 196)

Priority 4

Length of Towpath 292m

Current Towpath Surface Some

evidence of the existing towpath

construction generally muddy

potholed and bad drainage

Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m

to 15m

Services in towpath Fibre optic

cable inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access on to the towpath from the end of Rigby

Lane

Estimated Costs

Towpath surfacing with timber edgings pound58145

Towpath surfacing with concrete edgings pound68561

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus possible removal of metal work to public

access pound1000

Total pound2000

Access from Rigby Lane

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 28: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 28 of 56

Towpath Section 8

Rigby Lane to Stockley Road

(Bridge 196 to 195a)

Priority 1

Length of Towpath 896m

Current Towpath Surface Muddy

potholed surface tree roots narrow

and bad drainage Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 1m to

12m

Access Issues The only way down to this section of

towpath is via a set of long sloping steps from an

office car park on the Stockley Business Park These

steps are not ideal for transport of construction

materials Waterborne access would be needed to

carry out this work

Services in towpath Fibre optic cable inspection

chambers are present

Estimated costs

Towpath surfacing with timber edgings

pound175566

Towpath surfacing with concrete edgings

pound210337

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full towpath

length plus tidy up of stepped access pound2400

Total pound3400

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 29: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 29 of 56

Towpath Section 9

Stockley Road to Iron Bridge Road

(Bridge 195a to 194a)

Priority 6

Length of Towpath 245m

Current Towpath Surface There is evidence

of the existing towpath constructionsurfacing

generally in good condition Towpath surfacing

with timber edgings present in parts

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a

public access points at Iron Bridge Rd This

access has a long low gradient

surfaced slope down to the towpath

(see picture below)

Concept Estimated Cost

Towpath surfacing with timber edgings

pound48772

Towpath surfacing with concrete

edgings pound57512

Additional works

New Bridge PlatesSigns including road names

pound1000

General site clearance and de-veg over full

towpath length pound570

Total pound1570

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 30: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 30 of 56

Towpath Section 10

Iron Bridge Road to Horton Bridge Road

(Bridge 194a to 193)

Priority 7

Length of

Towpath 796m

Current Towpath

Surface Some

evidence of the

existing towpath

construction

generally muddy

potholed and bad

drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 1m to 15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There are no

public access point on this stretch

Estimated Costs

Timber Edgings pound158469

Concrete Edgings pound186863

Additional works

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full

towpath length pound2000

Total pound3000

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 31: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 31 of 56

Towpath Section 11

Horton Bridge Road to

West Drayton High Street

(Bridge 193 to 192)

Priority 8

Length of Towpath 622m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There are 2 public access points both adjacent to the

bridges The access adjacent to the High Street is a

tarmacked slope which is generally used for car parking by

locals this could be used for materials and plant if

necessary There is also an old cobbled traffic management

system laid in the towpath just after the access point The

access adjacent to Horton Road Bridge is a set of ad-hoc

unmaintained timberconcrete steps unsuitable for works

access

Estimated Cost

Timber Edgings pound123838

Concrete Edgings pound146026

Additional works

New Bridge PlatesSigns including

road names pound1000

General site clearance and de-veg

over full towpath length pound2000

Newupdated access at Horton Road

Bridge pound10000 - pound15000

Total pound13000-pound18000

Access from West Drayton High Street

StreStreetStreet

Access from Horton Road Bridge

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 32: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 32 of 56

Towpath Section 12

West Drayton High Street Bridge to

Trout Rd

(Bridge 192 to 191)

Priority 7

Length of Towpath 372m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy potholed

and bad drainage Towpath surfacing with timber edgings

present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would

be needed to carry out this work There is

a public access on to the towpath from

StStephens Road the access has very

narrow ramps and a tight gate system this

access is for abled-body people only

Estimated Costs

Timber Edgings pound74071

Concrete Edgings pound87340

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length plus

possible removal of metal work to public access pound1000

Total pound2000

Access from St Stephenrsquos Road

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 33: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 33 of 56

Towpath Section 13

Trout Rd Bridge to Roving Bridge

(Bridge 191 to 190b)

Priority 9

Length of Towpath 496m

Current Towpath Surface There is evidence of the existing

towpath constructionsurfacing generally in good condition

Towpath surfacing with timber edgings present in parts

Extensive towpath works done outside the new Tesco

supermarket creating seating areas and public access

Current Width of Towpath 15m ndash 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work Towpath assessment needs to be carried

out to allow any plant on this section of towpath There are

public access points from the Tesco supermarket car park and adjacent to Trout Road bridge this access has

a traffic management gated system in place

Towpath surfacing with timber edgings

pound98747

Towpath surfacing with concrete edgings

pound116440

Additional works New Bridge PlatesSigns

including road names pound1000 General site

clearance and de-veg over full towpath

length pound1200

Removal of traffic calming system pound750

Total pound2950

Trout Road Access

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 34: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 34 of 56

Towpath Section 14

Slough Arm junction Roving Bridge to

Linden Doors Lock

(Bridge 190b to 190a)

Priority 9 Length of Towpath 352m

Current Towpath Surface Some evidence of

the existing towpath construction generally

muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access would be

needed to carry out this work There is a public

access point adjacent to Roving Bridge this is a

well maintained set of steps two large concrete

steps at the top then shallow cobbled set steps

the rest of the way

Concept Estimated Cost

Timber Edgings pound70089

Concrete Edgings pound82645

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound810

Total pound1810

Access at Roving Bridge

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 35: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 35 of 56

Towpath Section 15

Linden Doors Dock (Packet Boat Lane) to

Benbow Bridge

Bridge 190a to 189

Priority 9

Length of Towpath 586m

Current Towpath Surface Some evidence of the

existing towpath construction generally muddy

potholed and bad drainage Towpath surfacing with

timber edgings present in parts

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath

There are public access points at bridge 189 and

midway through the towpath length the access at

bridge 189 is wide and of towpath construction The

access midway through the length is constructed of concrete steps and a steel hand rails Both are in good

condition

Estimated Cost

Timber Edgings pound116664

Concrete Edgings pound137567

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound1380

Total pound2380

Access off public footpath

Access from Benbow Bridge

Access adjacent to bridge

189

Acce

Access adjacent to bridge

189

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 36: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 36 of 56

Towpath Section 16

Benbow Bridge to Iver Lane (Cowley Shovel

Bridge)

(Bridge 189 to 188)

Priority 11

Length of Towpath 518m

Current Towpath Surface A section of this

towpath is tarmac from bridge 188 to the Lock

There is evidence of the existing towpath

construction generally in good condition Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection

chambers are present

Access Issues Waterborne access would be

needed to carry out this work as the towpath is un-

assessed Towpath assessment needs to be

carried out to allow any plant on this section of

towpath There are public access points at bridge

188 and bridge 189 At bridge 188 there is a large

gated tarmac access area in front of a pub and cafeacute leading down

to the lock but there is a traffic calming system at the end of this

area At bridge 189 there is a narrow sloped stepped access down

to the towpath generally in good condition but would need opening

up

Estimated Cost

Timber Edgingspound103103

Concrete Edgingspound121581

Additional works New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full

towpath length pound1200

Total pound2200

Iver Lane Access

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 37: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 37 of 56

Towpath Section 17

Iver Lane (Cowley Shovel Bridge) to

Cowley Mill Rd (Gas Works Bridge)

Bridge 188 to 187

Priority 10

Length of Towpath 933m

Current Towpath Surface There is

evidence of the existing towpath

constructionsurfacing generally in good

condition Towpath surfacing with timber

edgings present in parts

Current Width of Towpath 12m to

15m

Services in towpath Fibre optic cable

inspection chambers are present

Access Issues Waterborne access

would be needed to carry out this work

as the towpath is un-assessed Towpath

assessment needs to be carried out to

allow any plant on this section of towpath There is a public access

point at Cowley Mill Rd Bridge this is a block paved ramp with one

half cobbled steps There is a public access points at Iver Lane

bridge this access is a large vehicular concrete ramp with gated

access at the bottom

Concept Estimated Cost

Timber Edgingspound185717

Concrete Edgingspound218999

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2140

Total pound2140

Access at Cowley Mill Road

Access at Iver Lane

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 38: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 38 of 56

Towpath Section 18

Cowley Mill Bridge (Gas Works Bridge) to

Culvert Lane

Bridge 187 to 186

Priority 10

Length of Towpath 221m

Current Towpath Surface Some evidence of the existing towpath

construction generally in good condition some potholes and

bad drainage Towpath surfacing with timber edgings present

Current Width of Towpath 15m to 18m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to

carry out this work There are no public access points along

this stretch

Estimated Cost

Timber Edgings pound44003

Concrete Edgings pound51886

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound530

Total pound1530

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 39: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 39 of 56

Towpath Section 19

Culvert Lane to Rockingham Road (Dolphin

Bridge)

(Bridge 186 to 185)

Priority 6

Length of Towpath 322m

Current Towpath Surface Some evidence of the existing towpath

construction generally muddy potholed and bad drainage Towpath

surfacing with timber edgings present in parts

Current Width of Towpath 12m to 18m

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment needs

to be carried out to allow any plant on this section of towpath There

is a public access points at the end of Culvert Lane There is a hard

standing area that would be good for storage of materials

Estimated Cost

Timber Edgings pound64117

Concrete Edgings pound75605

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound780

Total pound1780

Access at Culvert Lane

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 40: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 40 of 56

Towpath Section 20

Uxbridge Lock Bridge to Uxbridge Bridge (Oxford Rd)

Bridge184 (Turnover) to Bridge 185

Priority 7

Length of Towpath 887m

Current Towpath Surface Worn patchy tarmac Timber

edgings

Current Width of Towpath 12m to 15m

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry out this work as

there is no suitable access to this section of towpath There are two public access

points along this stretch both are from the Swan and Bottle pub carparks

Estimated Cost

Timber Edgings pound46201

Concrete Edgings pound54476

Additional Suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound550

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 41: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 41 of 56

Towpath Section 21

Bridge 183a (A40) to Bridge 184 (Turnover)

Priority 7

Length of Towpath 887m

Current Towpath Surface Dusty rocky levels vary turning into worn

patchy tarmac Timber edgings

Current Width of Towpath 12m to 15m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work as there is no suitable access to this section of towpath

Concept Estimated Cost

Timber Edgings pound176592

Concrete Edgings pound208233

Suggested Additional works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound2110

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 42: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 42 of 56

Towpath Section 22

Bridge 183 (White Bridge) to Bridge 183a (A40)

Priority 6

Length of Towpath 105m

Current Width of Towpath 12m to 15m

Current Towpath Surface Muddy rocky

levels vary potholes poor drainage No Timber

edgings

Public access points

Construction Notes There are services in

towpath in this section Fibre optic cable

inspection chambers are present Waterborne

access would be needed to carry out this work

as there is no suitable access to this section of

towpath

Estimated costs

With Timber Edgings pound20902

With Concrete Edgings pound24648

Additional works

Signage (Bridge plates road names) pound1000

Vegetation management pound250

Above Site plan Below Satellite View

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 43: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 43 of 56

Towpath Section 23

Denham Lock to Bridge 183 White Bridge

Priority 4

Length of Towpath 489m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 12m to 3m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is a public access point which leads to and from

Colne Valley Park visitors centre

Estimated Cost

Timber Edgings pound97338

Concrete Edgings pound114781

Additional Towpath works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound1162

Works to bridge 183 ndash re-grading of exit ramp Partial reconstruction of parapet wall pound50000

Access from Colne Valley Park visitors centre

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 44: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 44 of 56

Towpath Section 24

Bridge 182 (turnover) to Denham Lock

Priority 7

Length of Towpath 455m

Current Towpath Surface Gravel rocky levels vary Timber edgings in

parts

Current Width of Towpath 12m to 15m

Public access points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried

out to allow any plant on this section of towpath There is no public access

point along this stretch

Estimated Cost

With Timber Edgings pound90577

With Concrete Endings pound106808

Non-Towpath works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound1100

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 45: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 45 of 56

Towpath Section 25

Bridge 181 (railway) to Bridge 182

(turnover)

Priority7

Length of Towpath 872m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any

plant on this section of towpath There is no public access point along this stretch

Estimated Cost

With Timber Edgings pound173606

With Concrete Edgings pound204711

Additional suggested works (these costs to be added to the concept estimate

cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound2075

Works to bridge 182 ndash Option 1 (resurface bridge painting of metal work) pound50000

Works to bridge 182 ndash Option 2 (redesign of lead-in ramps) pound100000

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 46: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 46 of 56

Towpath Section 26

Bridge 180 (Wide Water bridge) to Bridge

181 (Railway Bridge)

Priority 7

Length of Towpath 1161m

Current Towpath Surface Gravel rocky levels vary Timber

edgings in parts There is no public access point along this stretch

Current Width of Towpath 1m to 15m

Public Access Points

Construction Notes

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath

Estimated Costs

With Timber Edgings pound231130

With Concrete Edgings pound272544

Additional works

New Bridge PlatesSigns including road names pound1000

General site clearance and de-veg over full towpath length pound2760

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 47: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 47 of 56

Towpath Section 27

Bridge 179 to Bridge 180 Wide Water Bridge

Priority 8

Length of Towpath 682m

Current Towpath Surface Muddy rocky potholes and bad drainage

Timber edgings in parts Towpath level is low in places falling under wall

level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work

as the towpath is un-assessed Towpath assessment needs to be carried out

to allow any plant on this section of towpath There is a public access point

adjacent to Bridge 180 this is a long slope with bollards to stop vehicular access

Concept Estimated Cost

With Timber Edgings pound135783

With Concrete Edgings pound160110

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1620

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 48: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 48 of 56

Towpath Section 28

Bridge 178 Black Jacks to Bridge 179

Priority 9

Length of Towpath 1136m

Current Towpath Surface Muddy rocky potholes and bad

drainage Timber edgings in parts Towpath level is low in places

falling under wall level

Current Width of Towpath 15m to 2m

Public access points

Services in towpath Fibre optic cable inspection chambers are

present

Access Issues Waterborne access would be needed to carry out

this work as the towpath is un-assessed Towpath assessment

needs to be carried out to allow any plant on this section of

towpath There is no public access point along this stretch

Estimated Costs

With Timber Edgings pound226153

With Concrete Edgings pound266675

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting

for a firm cost)

General site clearance and de-veg over full towpath length pound2700

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 49: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 49 of 56

Towpath Section 29

Bridge 177a over Troy arm to Bridge

178 Black Jacks

Priority 10

Length of Towpath 512m

Current Towpath Surface Breedon type surface generally in

good condition Timber edgings

Current Width of Towpath 15m to 2m

Services in towpath Fibre optic cable inspection chambers

are present

Public access points

Access Issues Waterborne access would be needed to carry

out this work as the towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at Bridge 178

which leads to the Lock

Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Additional suggested works (these costs to be added to the

concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still

waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 50: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 50 of 56

Towpath Section 30

Bridge 177 Copper Mill Lane to Bridge 177a over Troy

arm

Priority 10

Length of Towpath 393m

Current Towpath Surface Dusty Rocky surface tree routes Large

potholes due to vehicular use in part Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Public access points

Construction Notes

Fibre optic cable inspection chambers are present Access Issues

Towpath assessment needs to be carried out to allow any plant on this

section of towpath There is a large vehicular access point at Bridge

177 which could be used for plant access

Estimated Costs

With Timber Edgings pound78219

With Concrete Edgings pound92238

Additional suggested works

Signage pound1000

Vegetation management pound940

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 51: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 51 of 56

Towpath Section 31

Riverside Cottages to Bridge 177 Copper Mill Lane

Priority 4

Length of Towpath 370m

Current Towpath Surface Dusty Rocky Large potholes due to vehicular use

Timber edgings visible in parts

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as

the towpath is un-assessed Towpath assessment needs to be carried out to

allow any plant on this section of towpath

Concept Estimated Cost

Timber Edgings pound73656

Concrete Edgings pound86855

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a

firm cost)

General site clearance and de-veg over full towpath length pound880

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 52: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 52 of 56

Towpath Section 32

Bridge 176D Stinkhole bridge to Riverside

Cottages

Priority 4

Length of Towpath 718m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this work as the

towpath is un-assessed Towpath assessment needs to be carried out to allow any plant

on this section of towpath

Estimated Cost

With Timber Edgings pound142917

With Concrete Edgings pound168529

Non-Towpath works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1710

Surface over Bridge 176DD pound5000 (investigate ownership of bridge)

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 53: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 53 of 56

Towpath Section 33

Bridge 176 Springwell Ln to Bridge 176D Stinkhole Bridge

Priority 12

Length of Towpath 725m

Current Towpath Surface Breedon gravel type surface Timber edgings

Current Width of Towpath 15m to 16m

Services in towpath Fibre optic cable inspection chambers are present

Access Issues Waterborne access would be needed to carry out this

work There is a public access point just after bridge 176 this is gives

access to the towpath from Springwell Lane and is the public access point

for a nearby carpark

Estimated Cost

Timber Edgings pound144327

Concrete Edgingspound170188

Additional Suggested works (these costs to be added to the concept

estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm

cost)

General site clearance and de-veg over full towpath length pound1725

Create a wheel channel over Bridge 176D pound5000

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 54: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 54 of 56

Towpath Section 34

Hillingdon area boundary to Bridge 176 Springwell Lane

Priority 9

Length of Towpath 512m

Current Towpath Surface Dusty

rocky potholed narrow in places and

bad drainage Timber edgings are

present in parts

Current Width of Towpath 12m to

16m

Public access points

Services in towpath Fibre optic cable inspection chambers

are present

Access Issues Waterborne access would be needed to carry

out this work as 335m of towpath is un-assessed Towpath

assessment needs to be carried out to allow any plant on this

section of towpath There is a public access point at bridge

176 this is gives access to the towpath from Springwell Lane

and is the public access point for a nearby carpark

Concept Estimated Cost

With Timber Edgings pound101941

With Concrete Edgings pound120204

Suggested additional works (these costs to be added to the concept estimate cost)

New Bridge PlatesSigns including road names pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1220

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56

Page 55: Hillingdon Towpaths - Canal & River TrustHammersmith & Fulham 1.7 1.0 1.6 15 Waltham Forest 1.3 0.8 1.3 Total 103.4 64.2 100 ... The by-pass is a large flyover with an access ramp

Hillingdon Towpaths

Page 55 of 56

Towpath Section 35

Bridge 175 Stockers Farm to Hillingdon boundary

Priority 5

Length of Towpath 617m

Current Towpath Surface Dusty rocky

potholed narrow in places and bad drainage

Timber edgings are present in parts

Current Width of Towpath 1m to 16m

Public Access Points

Access Issues Waterborne access would be needed to carry out this work as the towpath is un-assessed

Towpath assessment needs to be carried out to allow any plant on this section of towpath There is a public

access point at bridge 175 this is a set of concrete

steps Boaters have well established gardens along

this stretch which may create conflict when trying to

achieve the 18m desired width

Estimated Costs

With Timber Edgings pound122843

With Concrete Edgings pound144852

Additional Suggested works (these costs to be

added to the concept estimate cost)

New Bridge PlatesSigns including road names

pound1000 (still waiting for a firm cost)

General site clearance and de-veg over full towpath length pound1470

Hillingdon Towpaths

Page 56 of 56