H.B. 264 Significant Updates WebinarThis webinar has been approved for 1.0 HSW AIA CEUs
For those interested in AIA CEU credit:If you plan to watch this webinar in a group environment, and are interested in receiving AIA credit, please note the following.
In order to have backup documentation of webinar attendance for AIA, you will need to individually register and then individually login / logout for the webinar. GoToWebinar automatically tracks how long the person remains in the webinar. So, in actuality, it's much like signing the AIA roster page after a conference session to document your attendance.
Suggestion: login / logout from your personal computer—then join your group in the conference room.
After the webinar:Email Sue Meyer at [email protected] indicating your interest in receiving AIA credit along with your membership number. Your participation will be reported to AIA and you will receive a certificate of attendance via email.
![Page 2: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/2.jpg)
H.B. 264 School Energy Conservation
Finance Program
2012 Submittal Guide Requirements & Guidelines
![Page 3: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/3.jpg)
The 2012 Addition
• Changes in law– Governing Law: 133.06 (G)– 2011Changes: H.B. 153
• Emphasis on existing requirements• Refinement of requested information
![Page 4: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/4.jpg)
Learning Points
• Changes in law governing H.B. 264• Requirements for a H.B. 264 proposal• District responsibilities• Basic energy conservation strategies
and principles
![Page 5: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/5.jpg)
H.B. 264 Basic Requirements
• Proposed energy conservation measures (ECM) must have a reasonable energy component
• Proposed project cumulative payback including any finance cost must be fifteen years or less
• Must have a school board action
![Page 6: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/6.jpg)
Review/Approval Process
• Submit proposal• OSFC staff reviews and makes recommendation
concerning approval• Commission votes (approve/disapprove)• A formal letter is issues to the district• The project can begin the day of the approval
after the official Commission vote
![Page 7: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/7.jpg)
Review Philosophy
• Reasonableness– Engineering– Energy management– Cost
• School district – Ownership– Responsibility
![Page 8: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/8.jpg)
Review Team
• Mark Wantage, OSFC• Marlaina Hill, OSFC• Been Kuo, OSFC• Franklin Brown, OSFC• Other OSFC resources as needed• Tony Sutor, Ohio Department of Development• Scott Thrapp, Ohio Department of Development
![Page 9: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/9.jpg)
H.B. 264 Submittal Guide Introduction
• Helpful hints• OSFC contact information• New requirement:
– Goal: paperless process– Electronic submittals only
• Single searchable Adobe.pdf file• Two copies if mailed
![Page 10: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/10.jpg)
Section 1 - 3
These sections form the basis of the accountability and tracking of the project1.Transmittal letter2.Contact information3.Qualifications (of the individual/team developing the proposal)
![Page 11: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/11.jpg)
“Historical High”
![Page 12: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/12.jpg)
Section 4
• Executive Summary– Brief short to-the-point capsulation of the
proposed project and expected outcomes– Summary data must match data in document– Include:
• Total project cost with interest• Project payback years (three significant digits)• Any estimated grants, rebates, etc.
![Page 13: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/13.jpg)
Section 5
• School Board Resolution– Board action is required before
Commission approval– Project total cost (including financing)– Identify any estimated grant, rebate, non-
district dollars– Statement acknowledging the requirement
for annual performance report
![Page 14: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/14.jpg)
Section 5 (continued)
• School Board Resolution– Intention to maintain facility staff Building
Operators Certification (BOC)– Any actions relative to OSFC funded programs
Waver of Competitive Bidding if desired by the district Requires 2/3 vote majority of the board
membership
![Page 15: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/15.jpg)
Section 6
• OSFC Eligibility– Memorializes discussions, understandings
and intent of the district with regards to both programs
– Intent is to maximize the opportunities of both programs for the district
– Use more than bulleted answers
![Page 16: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/16.jpg)
OSFC Statistic
First Building Completed November 2000
Huntington Local (Ross) Renovation /Addition Project
![Page 17: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/17.jpg)
Section 6
• OSFC Eligibility– Completed OSFC funded facilities must
have OSFC project team concurrence– Reconcile Maintenance Plan and district
034 Maintenance Fund – Laws and policies governing the OSFC
take precedence
![Page 18: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/18.jpg)
Section 7
• Previous H.B. 264 Projects– Must identify (list located on OSFC
website: http://osfc.ohio.gov/Programs/EnergyConservationProgramHB264.aspx
– Active projects must be clearly tracked for the respective annual performance reports
– Proposed project must clearly define the separation of performance from past active projects
![Page 19: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/19.jpg)
Section 8 (ref Section 17)
• Claim of Estimated O&M Savings– Up to 30% of estimated savings may come
from estimated savings from O&M – Five year baseline– Five year limit on estimated claimed savings– Requires district treasurer to certify
estimates of savings
![Page 20: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/20.jpg)
Section 8 (continued)
• Claim of Estimated O&M Savings– Estimated O&M savings over 10% requires
more detail• Individual ECM O&M summary detail• Changes to operations service requirements
– District treasurer to certify
![Page 21: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/21.jpg)
Existing Building Issue
![Page 22: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/22.jpg)
Section 8 (continued)
• Expectation– All operational tasks and needs for the
proposed project are identified– All district responsibilities and tasks are
presented and understood
![Page 23: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/23.jpg)
Mechanical Room
![Page 24: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/24.jpg)
Section 9
• Energy Performance, Tracking & Reporting– Energy Star Portfolio Manager
• Include the district IRN at the beginning of building name (example: 54321- Sue High School)
– Commissioning and re-commissioning– Annual performance verification reporting– Use energy management professional with
experience
![Page 25: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/25.jpg)
O&M at Work
![Page 26: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/26.jpg)
Section 9 (continued)
• Energy Performance, Tracking & Reporting– Strategy:
• Track Energy Star rating• Monitor utility bills• Monitor O&M performance• Re-commission every five years
– Drop in rating: shorter interval– Maintain rating: longer interval
• Monitor indoor environmental quality (IEQ)
![Page 27: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/27.jpg)
Sections 10 & 11
• Details of the ECMs– Estimated kBtu/sqft performance– Residual value
• Residual value = Original cost x Remaining useful lifeOriginal useful life
– Most recent five consecutive years of utility data for baseline
– ECMs with no claimed savings
![Page 28: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/28.jpg)
Section 12
• Financial Analysis– Show analysis for the payback period– Estimated data
• Total project cost• Grants/ rebates, non-district dollars• Finance rate• Finance amount• Project costs and savings categories
![Page 29: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/29.jpg)
Section 13
• Energy Savings Calculations– Individual payback period must be
reasonable– Estimated replacement cost must be
included if the equipment life cycle is less then the payback (ECM and project)
![Page 30: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/30.jpg)
Section 13 (continued)
• Energy Savings Calculations– Energy Modeling
• eQUEST• Other
– OSDM Compliant– 30% above ASHRAE
![Page 31: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/31.jpg)
Common ECM?
![Page 32: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/32.jpg)
Section 14
• Building Automation Systems– Summary of the designed intent– Summary of changes– Points list– Requires service agreement– Re-commissioning required at least every
5 years
![Page 33: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/33.jpg)
Opportunity for Improvement?
![Page 34: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/34.jpg)
Section 15
• Lighting Project Information– Cannot claim labor savings– Summary of designed intent– Lighting map– Basic data
• Foot-candle and Lumen output and profile• Color and temperature• Degradation over time
![Page 35: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/35.jpg)
Posibilities
![Page 36: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/36.jpg)
Section 16
• Wind and Solar Project information– Ohio Department of Development/ Office of
Energy Efficiency (ODOD/OERD) based process
– Stand alone document useful for anyone considering energy generation and a service provider
![Page 37: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/37.jpg)
Section 17 (ref. Section 8)
• Operations and Maintenance Information– Summarize manufactures O&M
requirements– Recommend input into CMMS– District guidance
• Identify task for and requirements of the district• Update OSFC maintenance plan
– Back up information for claimed savings
![Page 38: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/38.jpg)
Section 18
• Measures with no claim of cost savings– Required annual reporting (Must include
into project cost)– 3RD party commissioning
• Project development• Post project retro-commissioning
– Facility staff training (including BOC)
![Page 39: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/39.jpg)
Section 18 (continued)
• Measures with No Claim of Cost Savings– Energy performance related tasks
• Energystar label• Dashboards• Sub metering• Performance Monitoring
– New service contract tied to ECMs– IAQ or EQ projects or programs
![Page 40: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/40.jpg)
Section 19
• All Other Work– Any current of future work outside of the
project scope as proposed– Provide clarity– Avoids confusion
![Page 41: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/41.jpg)
Section 20
• Equipment Cut Sheets
![Page 42: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/42.jpg)
Section 20
• AppendixA. Opportunities Assessment Certification
StatementB. Wind/Solar Project Technical Worksheet
![Page 43: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/43.jpg)
Project Payback Period
• OSFC Look Back Program• Required district annual performance report• OSFC responsibilities
![Page 44: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/44.jpg)
Recommendations
• Professional with at least three years of recent direct relevant experience
• Certified Energy Manager or equivalent• References
– Projects posted on OSFC website– OSFC project reports
• 3RD Party Independent
![Page 45: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/45.jpg)
Self performance
• A district may develop and/or self perform a H.B. 264 project– Proposal must meet same standards– Must show ability to insure success
• Staff expertise• District commitment• A plan
– Cannot include labor savings
![Page 46: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/46.jpg)
Future
• Continue the OSFC Look Back Project– 2002 and 2003 completed– 2004 in progress– All districts with active projects (payback
period)• Web based process
![Page 47: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/47.jpg)
Your Caption Here
![Page 48: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/48.jpg)
House Bill 264 Projects
• Look Back Information
Ohio Energy Resources Division
![Page 49: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/49.jpg)
OSFC H.B. 264 Look Back
• Two years of data following the year the project was approved– Approved in 2005: require data for 06 & 07
• All active payback years will be reviewed
![Page 50: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/50.jpg)
OSFC Look Back Process
1. Letters will be sent out to school districts2. Letters will be sent out to vendors3. A deadline will be given and all data must be
submitted prior to the date4. You may submit by mail or email5. MUST BE RECEIVED BY THE DEADLINE!6. After the data has been reviewed school
onsite visits will be scheduled.
![Page 51: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/51.jpg)
OSFC Look Back Process
7. The vendor, school, OSFC, & OERD will attend
8. Not all schools will be visited9. OSFC/OERD will look at ECM’s, feedback, &
take pictures10.All information will be reported to the
Commission
![Page 52: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/52.jpg)
OSFC H.B. 264 Look Back
• The minimum data required will need– Usage & cost total for each building for each
year• kWh• MCF• CCF• Sqft per building
– Do not only send savings or adjusted saving
![Page 53: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/53.jpg)
Report Analysis
• KBtu's/ Sqft• Costs / Sqft• kWh, MCF, CCF, MMBTU, costs
– Baseline vs. proposal – Proposal vs. actual – Baseline vs. actual
![Page 54: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/54.jpg)
Report Analysis
• Variance between the comparisons• Reports will be in terms of real figures
(savings & use) and percentages• Reports will be compared to other schools• Performance by vendor will be compared• Results are public record & posted online
![Page 55: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/55.jpg)
Look Back Payback Period
• Look at the proposal– Actual performance– Actual performance with O&M– Actual performance with O&M and
adjustments to the savings• The rate (baseline) will be multiplied by energy
savings and then added to the actual performance with O&M
![Page 56: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/56.jpg)
Look Back Template (example)
![Page 57: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/57.jpg)
Look Back Payback Period
Further investigation or action will be taken if the project has not shown a payback period of 15 years or less
![Page 58: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/58.jpg)
Thank you
Questions?
![Page 59: HB264 significant changes](https://reader033.fdocuments.us/reader033/viewer/2022051412/54979754ac7959292e8b53a5/html5/thumbnails/59.jpg)
Questions After the [email protected]
OSFC Webinar SeriesJanuary 18, 2:00 pm - Safe Routes to SchoolRegister: https://www3.gotomeeting.com/register/478496902
February 8, 2:00 pm – H.B. 264 Wind & SolarFebruary 22, 10:00 am - Corrective Action Program