HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and...

17
Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey Honeywell Federal Manufacturing & Technologies, LLC The Department of Energy’s National Security Campus is operated and managed by Honeywell Federal Manufacturing & Technologies, LLC under contract number DE-NA00002839. www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida

Transcript of HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and...

Page 1: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

HASS Rapid Change Out Process

Derik Clayton & Julie Stuckey

Honeywell Federal Manufacturing & Technologies, LLC

The Department of Energy’s National Security Campus is operated and managed by Honeywell Federal Manufacturing & Technologies, LLC under contract number DE-NA00002839.

www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida

Page 2: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

Overview

www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 2

Common Solution for all Products

• Significant Increase in HASS Testing Requirements

• Chamber Capacity Constraints

• Floor Space Constraints

• Needed Common Solution for Diverse Products

• Areas of Opportunityo Tester

o Fixturing

o Change-Over

o Mistake Proofing

o Ergonomics

o Storage

Page 3: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

Current State

www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 3

Current Practices Will Not Support Future Demand

• One part currently undergoes HASS testingo Dedicated Chamber and 3 Bay Tester

o 4 products tested at once

o Fixtures “permanently” installed in chamber parts loaded into fixtures

o Multiple electrical connections made in the fixture

o Complex product – extensive test times to allow for electrical coverage during HASS testing

o Significant Floor Space required to support a single product.

Page 4: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

Problem Statement

www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 4

How do we optimize throughput while minimizing capital expenditure and assuring quality?

• 5 distinctly shaped products require testing• What are the common elements we can leverage?• What will change-over look like?• What is the maximum number of products

that can he tested at one time?• Smallest footprint possible with easy

product flow• What do the operators think?

Page 5: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

Common Tester for all ProductsCustomized with Adapters

Tester Challenges

5

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 5

Page 6: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

• Fixtures/product orientation

• Ducting configuration differences

• Cable organization and change out

• Unnecessary related weight on the chamber

• Operator tooling access

• Storage

• Common procedures

Chamber Challenges

6

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 6

Page 7: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

• Reducing variations and eliminating wasteo Reducing change out time

o Universal designs and setups

o 5S standards

• Concept design development and selectiono Modified Pugh

• Implementation and Controlo Sustain the gain.

Six Sigma – Problem Solving Tools

7

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 7

Page 8: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

• Develop goals and define weighted factor of importance.

• Analyzed concepts against established goals

• Recognize strengths and weaknesses in each proposed design or concept.

• Converge on a hybrid design to maximize strengths

8

Six Sigma – Modified Pugh

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 8

Page 9: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

• Minimize the process step variationsoGeneric procedures written as base templates for all products to

be tested

oProduct specific steps highlighted to more easily identify procedure differences

• Assembly outside of chamberoModified current process to assembly as much of the product,

fixture, and cabling as possible outside the chamber

oMistake Proofing

Common Processes / Procedures

9

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 9

Page 10: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

•Repeatable and consistent UUT placement inside the chamber

o Labeling on the product fixture

o Modify the standoffs

o Color Coding

o Resistor IDs

10

Modified Standoffs

Keyed

Rapid Change Over - Fixturing

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 10

Page 11: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

Rapid Change Over - Ducting

• Redirecting air by means of plenumso Customized plenums for use across

numerous productso Optimizing product placement

• Quick connect pinso Allows for quick removalo Collet on end of ducts

• Universal connection pointso Six Sigma design – standardizeo Unique designed plenums

11

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 11

Page 12: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

Rapid Change Over - Cabling

• Cable fixturingo Mistake proofing built into the fixture

• Cable tray in chambero Keeps cables organized and out of the wayo Isolated from vibrationo No added weight on the vibration table

• Break out boxo Product specifico Universal Connectors

12

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 12

Page 13: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

• Design Engineeringo Separate design facility with dedicated chambers for running HALT testing

• Production Facility o Separate production facility with dedicated chambers for running HASS

• Collaborationo Early development design fixturing and cabling input

Collaborating with HALT

13

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 13

Page 14: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

• Implementing a “5S” workplace organizational and housekeeping methodology for lean manufacturing processo Sort, set in order, shine, standardize, sustain

• Why is it important?o Space, time, money, energy saving

o Enhances productivity

o Reduces waste

Storage

14

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 14

Page 15: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

• Reduced each change over time by 1.2 hrso From current process: 121 total steps, 110 during “change over”

o To current process: 89 total steps, 38 during “change over”

• Design Engineering and Production Engineering collaborationo Reduced duplicated efforts and rework

o Production Engineering leading the fixture design efforts and decisions

• Improved Ergonomics

• Reduced risk of making mistake

• Adaptable to future products

The Impact

15

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 15

Page 16: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

•Reducing HASS change-over times allows greater utilization of capital equipment

•Areas to considero Common Test Equipment

o Flexible Fixturing

o Mistake-Proofing

o Ergonomics

o Storage

Summary

16

Rapid Change-Over is Key for Increased Production Output

• www.ieee-astr.org September 28- 30 2016, Pensacola Beach, Florida 16

Page 17: HASS Rapid Change Out Process - ieee-astr.org Rapid Change Out... · Accelerated Stress Testing and Reliability Conference HASS Rapid Change Out Process Derik Clayton & Julie Stuckey

Accelerated Stress Testing and Reliability Conference

• References–G. Hobbs, “HALT and HASS: Accelerated Reliability Engineering”:

Westminster, CO: Hobbs Engineering Corporation, 2005–H. McLean, “HALT, HASS & HASA Explained: Accelerated

Reliability Techniques”: Milwaukee, WI; ASQ Quality Press, 2000 –T. Pyzdek and P. Keller, “Six Sigma Handbook: A Complete Guide

for Green Belts, Black Belts, and Managers at All Levels”, New York, NY: McGraw-Hill Education, 2014

–S. Pugh, “Total Design: Integrated Methods for Successful Product Engineering” First Printed 1990. Reprinted 1991.. ed. Wokingham, England ; Reading, Mass.: Addison-Wesley Pub., 1991

–D. Mc Dermott, “Decision Making Confidence: How to use the Pugh Matrix” [http://www.decision-making-confidence.com/pugh-matrix.html]

– Institute of Environmental Sciences and Technology, “IEST-RP-PR003.1 HALT and HASS”: Arlington Heights, IL, September 2012

–M. Imai, “Gemba Kaizen: a Commonsense, Low-Cost Approach to Management”, New York, NY: McGraw-Hill 1997

17

17