Hall D Cryogenic requirements
Now thru ?T. Whitlatch
Solenoid System Diagram as Installed in Hall D4 Superconducting
coilsBathed in Liquid
HeliumNominal Operation
1500A40 year old magnet
Coil 4 (of 4)
Solenoid Coil Test Set Up
Page 4
Cold box 3 refrigerator to be used in test lab and Hall D
Cryo Can due in May/June 1
All hardware ready by Mid June
Racks complete (and tested) by June
Power supply in place
Rails/Supports in place
AnacondaCryo Can
Power Supply
Rails
Coil 1End Plate
Racks
Test at Full Current and equivalent loads
Solenoid Magnet Installed in Hall D Dec 2011
Hall: D
Additional Heat Loads, as needed: Hall D solenoid
Technical Details, if known:
During cooldown of complete magnet in Hall D
Pinlet dP Tinlet Treturn Flow (g/s) Liquifaction Load***Load
atm atm K K g/s g/s W4K 3 1.8 4.5 300/10 5* 0.2 300K 3 1.8 300 300 5N2 5 90 20
* 2g/s augmented with helium supply dewar
Steady state
Pinlet dP Tinlet Treturn Flow (g/s) Liquifaction Load***Load
atm atm K K g/s g/s W4K 3 1.8 4.5 4.5 2 0.2 100N2 5 90 7
*** at inlet temperature
Solenoid coil test in Test Lab summer 2010-2011
Hall: D
Additional Heat Loads, as needed: Hall D solenoid
Technical Details, if known:
During cooldown of single coil in Test Lab
Pinlet dP Tinlet Treturn Flow (g/s) Liquifaction Load***Load
atm atm K K g/s g/s W4K 3 1.8 4.5 300/10 5* 0.2 300K 3 1.8 300 300 5N2 5 90 20
* 2g/s augmented with helium supply dewar
Steady state
Pinlet dP Tinlet Treturn Flow (g/s) Liquifaction Load***Load
atm atm K K g/s g/s W4K 3 1.8 4.5 4.5 1 0.2 50N2 5 90 7
*** at inlet temperature
Hall D Cryo TargetLiquid Hydrogen – 4 x 40 cm
< 1 g/s required
Use stand alone refrig?