GRIDFLEX The flexible slab formwork with safe accessible grid elements - PERI … · The flexible...

20
07044 GRIDFLEX The flexible slab formwork with safe accessible grid elements

Transcript of GRIDFLEX The flexible slab formwork with safe accessible grid elements - PERI … · The flexible...

07044

GRIDFLEXThe flexible slab formwork with safe accessible grid elements

PERI GmbHFormwork Scaffolding EngineeringP.O. Box 126489259 WeissenhornGermanyTel +49 (0)7309.950-0Fax +49 (0)[email protected]

Edition 04 | 2011

Important Notes:

Without exception, all current safety regulations must be observed in those countries where our products are used.

The photos shown in this brochure feature con-struction sites in progress. For this reason especially safety and anchor details cannot always be consid-ered as conclusive or final. These are subject to the risk assessment carried out by the contractor.

Safety instructions and load specifications are to be strictly observed at all times. Separate structural calculations are required for any deviations from the standard design data.

The information contained herein is subject to technical changes in the interests of progress. Errors and typographical mistakes reserved.

1

Content

GRIDFLEX 2 Increase efficiency and safety

4 PERI GRIDFLEX is fast

6 PERI GRIDFLEX is adaptable

8 PERI GRIDFLEX is safe

10 Components

2

Increase efficiency and safetySlab forming with PERI GRIDFLEX

Apart from achieving maximum cost-effectiveness, demands for high levels of working safety with system formwork is also increasingly coming to the fore.

With the development of the GRIDFLEX, PERI has created a new generation of slab formwork with which labour productivity clearly increases whilst, at the same time, working safety levels are also raised.

GRIDFLEX forms slabs up to 67 cm thick.

Only 2 system components required for placing the girder grid in a standard field

GRIDFLEX GFP Panel

Prophead GFH

3

Maximum utilizationVery simple assembly

Hook in GRIDFLEX element at one end ...

... align horizontally with the shuttering aid ...

... mount prop and position vertically.

The free choice of formlining allows slab soffits according to requirements of the customer.

After the complete assembly process has taken place from below, the closed element grid can be safely accessed for placing the plywood.

PERI GRIDFLEX is:

– fast– adaptable– safe

4

Using PERI GRIDFLEX is fastSystematic assembly sequence and few components

GRIDFLEX is safely formed from the slab below. Elements are safely hooked in from below and pushed upwards into position by means of the GF shuttering aid.

Setting up and measuring of props is no longer necessary which means mistakes during erection are avoided. Furthermore, untrained personnel can quickly learn how to handle the system.

With a surface area of 2 m², the stand-ard field requires only one prop and, due to the low prop loads, inexpensive PEP 10 and PEP 20 steel tube props can be used.

The standard field is formed using only two main components. This simplifies forming operations, planning and logistics.

The plywood sheets close the girder grid.

The regular unchanging assembly process results in considerable time savings along with a high level of safety for site personnel.

Regular assembly sequence: hook-in element, push into position with the shuttering aid, attach prop and position vertically.

Prophead GFH with prop Standard Element GFP Formlining

Few components

Systematic installation

5

With low individual component weights

All parts are moved by hand and there-fore have a particularly lightweight design. The GFP panel 200 x 100 cm only weighs 10 kg/m².

A minimum of time and effort:Mounting of the GFH Prophead on the prop.

Ergonomic assembly

Time-saving constructionThe spring mechanism secures the prophead to the prop. In so doing, the prophead is attached to the end plate of the prop without the need of pins or screws. This means props can be changed very quickly e.g. for different floor heights.

With practical details:

Storage and transportationWith the space-saving GF stacking device, GRIDFLEX elements can be stacked, stored and transported very compactly.

Stacking Pallet GFFor separate stacking of the 3 element types:GFP 200 x 100, GFC 200 x 100, GFL 150 x 100.

Tension Strap Rail GF 92For Standard Elements GFP 200 x 100 and Filler Elements GFL 150 x 100.Tension Strap Rail GF 125For Filler Element GFC 200 x 100.

For safe transportation and protection of the elements, the lashing is placed over the Tension Strap Rail GF.

6

PERI GRIDFLEX is adaptableElements telescoped right up to the walls

Changing the forming direction

A flexible formwork system must be able to be adapted to suit all floor plans. Through the change in the forming direction, filler areas can be reduced to a minimum and the largest possible area formed using standard elements. This saves elements and props.

Changing the forming direction.

Also when the direction has been changed, forming takes place as before from the ground.

For forming around columns, the same GRIDFLEX system components are used.

Efficent working conditions

GRIDFLEX elements are produced in different colours. Through this, forming and logistical operations are greatly simplified and mix-ups are a thing of the past.

7

Free choice of plywood

The type of formlining can be freely selected depending upon requirements. The individual plywood sheets are fixed directly with nails to the GRIDFLEX elements.

Flexible and simple filler areas

The telescoping of individual elements was basically adapted from the MULTIFLEX system. The new feature in the GRIDFLEX sys-tem is the two-dimensional adjustment with elements in both transverse and longitudinal directions. Compensations are quickly carried out and adjusting to the requirements of each building is an easy task.

GRIDFLEX offers a free choice of formlining and a safe accessible laying area.

GRIDFLEX elements are colour-coded to ensure easy handling.Red Transverse infillYellow Longitudinal infillWhite Standard

8

PERI GRIDFLEX is safeIntegrated solutions for safe forming operations

GRIDFLEX is safely formed from the level below.The girder grid elements are simply swivelled upwards into position by means of the Shuttering Aid. Subse-quently, the slab prop with prophead is hooked into the element and vertically positioned The pre-determined assembly sequence prevents any mistakes during forming.The small beam spacing of only 13 cm provides a safe working area for site personnel to install the plywood form-lining.

Safety at building edgesThe Guardrail GF 100 is pre-assembled on the ground and then, together with the element, pushed upwards.Bracing must be installed in order to ensure that the element can be safely pushed upwards into position and secured throughout forming operations.

Safety during formingThe system offers a high level of safety from the beginning onwards during shuttering. The special feature of the GRIDFLEX is the high degree of safety requirements. The system is securely fixed to the building in both longitudinal and transverse directions using the wall holder. This means that the system is securely held in position during the systematic shuttering procedure.

The GRIDFLEX Wall Holder fixes the formwork in both longitudinal and transverse directions.

9

Accessible area for installing the plywoodDue to the small main beam spacing of only 13 cm, as well as the direct connection of the head to the element, the system provides a safe working area for site personnel to install the formlining.

GRIDFLEX Grid Element Slab Formwork

10

Item no. Weight kg

110646 5,800 Filler Element Longitudinal GFL 183 x 20Aluminium, nailable yellow powder-coated.

1830

167

207

100

80

110486 15,000 Filler Element Longitudinal GFL 150 x 100Aluminium, nailable, yellow powder-coated.

980

1507

5x1

67

80 100

110040 22,100 Filler Element Cross GFC 200 x 100Aluminium, nailable, red powder-coated.

1041

5x1

67

1980

1850

80 100

110038 20,300 Standard Element GFP 200 x 100Aluminium, nailable, white powder-coated.

980

1994

5x1

67

80 100

GRIDFLEX Grid Element Slab Formwork

11

Item no. Weight kg

110044 2,370 Shuttering Aid GFAFor forming of GRIDFLEX.

Technical DataAdjustable in 7.5 cm increments.

2225min max 3925

110238 4,880 Wall Holder GFWFor horizontal anchoring of the formwork on the wall.

1500

100

8011

0

109910 0,845 Prophead GFH, galv.With spring retention. Supports GRIDFLEX elements.

137

120

58

GRIDFLEX Grid Element Slab Formwork

12

Item no. Weight kg

110595 0,411 Tension Sleeve GFOFor bracing cantilevered elements.

Technical DataPermissible force 3.0 kN.

63 80

71

110045 5,120 Traverse GFTWith securing wedge for fixing to the main beam of the element.

NoteFor assembly of length compensation, with props as centre support and support for cantilever ele-ments on the slab edge.

997

4260

57

110556 0,690 Clamp GFK, galv.For attaching filler panels to the standard elements.

113

5581

110326 7,150 Guardrail GF 100As guardrail for cantilevers. Guardrail height above top edge of plywood = 1.30 m.

1448

970

GRIDFLEX Grid Element Slab Formwork

13

Item no. Weight kg

111291 4,690 Head Spindle GTR 38-70/50For using GRIDFLEX in combination with PERI UP shoring.

708

38

80120

Ø14

124777 0,210 Anchor Bolt PERI 14/20 x 130For temporary fixation to reinforced concrete structures.

NoteSee PERI data sheet!Drilling Ø 14 mm.

130

SW 24Ø14

028100 1,830 Base Plate for RSFor assembly of RS push-pull props.

Complete with1 pc. 018050 Pin Ø 16 x 65/86, galv.1 pc. 018060 Cotter Pin 4/1, galv.

150 90 1085

Ø21

Ø13

065073 1,370 Anchor Chain 3.0 kN, l = 2.5 m Technical DataPermissible tension force 3.0 kN.

2500

15

065074 0,450 Turnbuckle 3.0 kN, M12 Technical DataPermissible tension force 3.0 kN.

min 220 max 300

16

GRIDFLEX Grid Element Slab Formwork

14

Item no. Weight kg

115385 4,230 Tension Strap Rail GF 125As transport protection for GRIDFLEX Elements GFC 200 x 100. Red powder-coated.

1258 4316

1

115427 2,090 Tension Strap Rail GF 92As transport protection for GRIDFLEX Elements GFP 200 x 100 and GFL 150 x 100. Yellow powder-coated.

933 3313

0

111392 2,970 Extension GF 10

835

Ø48,3

110939 21,700 Stacking Device GF, galv.For stacking 10 Standard Elements GFP 200 x 100, Filler Elements Cross GFC 200 x 100 or Filler Elements Longitudinal GFL 150 x 100 respectively. Suitable for crane and fork-lift transport. 2 pieces per stack.

Complete with2 pc. 111392 Extension GF 10Technical DataPermissible load-bearing capacity = 175 kg per device= 350 kg per stacking

1085 190

468

491

959

115427 115385

2,090 4,230

AccessoriesTension Strap Rail GF 92Tension Strap Rail GF 125

GRIDFLEX Grid Element Slab Formwork

15

Item no. Weight kg

111738 63,900 Pallet GF 85 x 210, galv.For stacking and transportation of GRIDFLEX Filler Panel GFL 183 x 20.

NoteFollow Instructions for Use!Technical DataPermissible load-bearing capacity 750 kg.

2190

925

1095

1020

111396 28,100 Pallet RP 80 x 110, galv.For stacking GF 100 guardrails.

Complete with4 pc. 111392 Extension GF 10NoteFollow Instructions for Use!Technical DataPermissible load-bearing capacity 750 kg.

953 6937501010

1140 880

385

493

878

230

GRIDFLEX Grid Element Slab Formwork

16

Item no. Weight kg

111379 265,000 Corner Platform GCP, completePlatform with 21 mm thick decking and insertable guardrail. Delivered as individual components.

Complete with1 pc. 111378 Corner Platform GCP2 pc. 111332 Handrail GCP 130, galv.1 pc. 111340 Handrail GCP 160, galv.1 pc. 111324 Internal Angle GCPTechnical DataPermissible live load 150 kg/m2.

2600

1479

2360

881

1300

111566 106,000 Platform GIP 200, completePlatform with 12 mm thick decking and insertable guardrail. Delivered as individual components.

Complete with1 pc. 111703 Platform Frame GIP 2001 pc. 111700 Platform Handrail GIP 2002 pc. 111702 Main Beam GIP 2001 pc. 111701 Cross Beam GIP 200Technical DataPermissible load 150 kg/m2.

2130

1610

2035

17

The optimal System for every Project and every Requirement

PERI GmbHFormwork Scaffolding EngineeringRudolf-Diesel-Strasse 1989264 WeissenhornGermanyTel. +49 (0)7309.950-0Fax +49 (0)[email protected]

System-Independent Accessories

Wall Formwork Column Formwork

Slab Formwork Climbing Systems Tunnel Formwork Bridge Formwork

Shoring Systems Facade ScaffoldConstruction Scaffold Industrial Scaffold

Access Protection Scaffold Services

DE

en 0

2 | 2

015

5eb

792

138

© P

ER

I Gm

bH