GRID MODERNIZATION INITIATIVE PEER REVIEW - …...2005/01/03 · Distributed Energy Resources in...
Transcript of GRID MODERNIZATION INITIATIVE PEER REVIEW - …...2005/01/03 · Distributed Energy Resources in...
GRID MODERNIZATION INITIATIVEPEER REVIEW
GMLC 1.3.5 – DER Siting and Optimization tool for California
JOHN GROSH & GONÇALO CARDOSO
4/4/17 1
April 18-20, 2017Sheraton Pentagon City – Arlington, VA
Planning and Design Tools
4/4/17Planning and Design Tools 2
ProjectDescriptionPrototypeframeworkforintegrateddistributedresourceplanning andoptimizationtoolabletoidentifyDERadoption patterns,microgrid sites,andevaluateDERimpacts onthedistributionandtransmissiongrid.
ValueProposition
ü IntegrateprivateDERinvestmentanddispatchdecisionsingridplanning
ü Capturedistributionandtransmissiongirdinteractions
ü UniquemethodologyenablesholisticviewongridimpactsofDER
ProjectObjectivesü DERpenetrationpatternsandoperationalstrategiesü identifysiteswitheconomicpotentialformicrogrid and
DERü addresspolicyincentivesandvalueofDERasgridassetsü considernetworkconstraintsintheDERlocationproblemü evaluateimpactsofDERonthebulkelectricgridsystemü Californiaasstartingpointforwiderapplication(e.g NY)
DER Siting and Optimization tool for CaliforniaHigh Level Summary
4/4/17Planning and Design Tools 3
PROJECTFUNDING
Lab FY16$ FY17$ FY18$LBNL 114,107 315,893 -SLAC 45,000 215,000 -LLNL 65,000 170,000 -NREL 73,333 56,667 -BNL 53,333 76,667 -ANL 24,333 90,667 -
ProjectParticipantsandRolesJohnGrosh,LiangMin- LLNL (Currentlead)– T&Dpowerflowco-simulationLead,feederdataconversion,Demonstration,Dissemination
MichaelStadler*,GonçaloCardoso- LBNL (Originallead,PlusOne)– Behind-the-meterDERmodeling,ModelIntegration,ModelAutomation,Demonstration,Dissemination,Coordination
Sila Kiliccote - SLAC (PlusOne)– MappingandResultsVisualizationLead,Demonstration,Dissemination
AnthonyFlorita - NREL – LoaddisaggregationLead,feederdataconversion,Demonstration
RobertLofaro - BNL – SupportonT&Dpowerflow,Datacollection,Loaddisaggregation,Demonstration
Jianhui Wang- ANL – SupportonT&Dpowerflow,Mapping,Demonstration
CPUC,PGE,SCE+ExternalAdvisoryCommittee
DER Siting and Optimization tool for CaliforniaProject Team
Totalfunding: $1.3MDuration: 18(16)monthsDue: EndofSep2017
4/4/17Planning and Design Tools 4
5.1.2– Developmethodsforintegratingdistributionintosystem-wideplanning,(…)includingdistributedgeneration,demandresponse,electricvehicles,andenergystorage
5.1.8– Developmethodologiesandtoolstoproducesimple-to-usedesktopcomputermodelsfromHPC-generatedsimulationsandeconomicanalysis
5.2.2– Scalemodelingframeworktotheregionallevel.Developassociatedmodelsforload,distributedgeneration,energystorage,andcontrolstoenablethedesignandevaluationoffutureEMS/DMS/BMSarchitecturesandnovelwide-areasensor-controlnetworks
2.2.10– Establishandtestmethodologiesforenablingoptimaldispatchofenergystoragetoservemultiplegridservices
DER Siting and Optimization tool for CaliforniaRelationship to Grid Modernization MYPPMYPPVision:Thefuturegridwillsolvethechallengesofseamlesslyintegratingconventionalandrenewablesources,storage,andcentralanddistributedgeneration (…)
Directrelationship toMPYYvisionbydeliveringatooltoestimateDERimpactsontheelectricgrid(Behind-the-metermodeling+T&Dco-simulation+Visualization)
DesignandPlanningTools
MYPPActivity5ScalingToolsforComprehensive
Economicassessment
MYPPTask5.1.2 MYPPTask5.1.8 MYPPTask5.2.2
DevicesandIntegratedSystem
Testing
MYPPActivity2StandardsandTest
Procedures
MYPPTask2.2.10
DER Siting and Optimization tool for CaliforniaApproach
Task 1 – Integrated T&D Modeling• Develop CA-representative integrated T&D power-flow model• Collect, convert, test, and validate datasets required to enable T&D co-simulation
Task 2 – Mapping Platform• Develop mapping and visualization capabilities• Integrate all three main model components: behind-the-meter models, T&D model, visualization
Task 3 – Model Automation for DER Adoption Patterns• Collect new DER-CAM datasets / update existing ones• Enable automated DER-CAM model creation, parallel optimizations, automated data exchange
Task 4 – Characterization of Feeder Loads• Identify and collect distribution datasets required to build representative CA T&D model• Develop and apply load disaggregation methods
Task 5 – Demonstration and DER Market Concepts• Select and conduct a demonstration case focusing on how this project complements and/or exceeds current DRP process• Develop high-level DER market concepts focusing on revenue streams of DER-based solutions and DER potential as grid asset
Task 6 – Dissemination and Training• Prepare project specific documentation and scientific publications• Develop interactive training material, tutorial videos, and organize training sessions
Uniqueness:Integratedmodelingtoolbringstogethercustomer-orientedbehind-the-metermodeling withT&Dco-simulation andcustomvisualization capabilities.
4/4/17Planning and Design Tools 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18- - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Milestones MS MS GNG1 IntegratedT&DModeling
2 MappingPlatform
3 ModelAutomationforDERAdoptionPaterns
4 CharacterizationofFeederLoads
5 DemonstrationandDERMarketConcepts
6 DisseminationandTrainingApr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept
FY16 FY17
Task TaskDescription
4/4/17 6
Milestone (FY16-FY18) Status DueDate
Milestone#1– QuarterlyProgressMeasure:CompletedinitialtestingofPG&Edistributiondata(1.1);InitiatedIOUGISsurvey(2.1);CollectedresidentialloaddataforDER-CAMandcreatedresidentialloaddatabase(3.1and3.2);EngagedwithIOUstocollectfeederdata(4.1);
Completed 6/30/2016
Milestone#2– QuarterlyProgressMeasure:CompletedPG&Edistributiondatacollection,conversionandvalidation(1.1);CompletedinitialtestingofSCEdistributiondata(1.2);CompletedIOUGISsurveyandidentifieddataexchangeneedsfortheco-simulationplatform(2.1);CompleteddatacollectionanddatabaseupgradesforDER-CAM(3.1and3.2);Completedfeederdatacollectionandloaddatadisaggregation(4.1and4.2)– EndofTask4.
Completed 9/30/2016
AnnualMilestone#1:CompletedSCEdistributiondatacollection,conversionandvalidation(1.2);CompletedT&Dmodelingandco-simulationintegration(1.3)– EndOfTask1;Completedmappingplatformdevelopmentandmodelintegration(2.1and2.2);CompletedDER-CAMmodificationsandmodelautomation(3.3and3.4)– EndofTask3.
Completed 12/31/2016
AnnualMilestone#2:BytheendofSeptember2017thisprojectwillbecompleted,deliveringaplatformtomodelsystem-wideimpactsofDERpenetrationandtosuggestoptimalDERandmicrogridlocations,aswellasahighlevelframeworktoestablishDERmarkets.
OnTime 9/30/2017
Planning and Design Tools
DER Siting and Optimization tool for CaliforniaKey Project Milestones
4/4/17Planning and Design Tools 7
Keyachievement:Developmentofend-to-endsoftwareframeworkprototype
DER Siting and Optimization tool for CaliforniaAccomplishments to Date
GridLab-D
Loads
Disaggregation
Filtering
APICall DER-CAMDERAdoption
DERDispatch
Aggregation
GridLab-D
QueueMngmt.
GridDyn
Behind-the-Meter
T&DCo-Simulation(ParGrid)
ModelIntegration
GISMapping Heatmaps
Nodalresults
Timeline
DERMix
DERDispatch
Mapping&Visualization
DER-CAMServerModelIntegration
4/4/17Planning and Design Tools 8
End-to-endsoftwareprototype:• T&DmodelforCA• DER-CAMenhancements&data• ModelintegrationandAPIs• Visualization
Participationinworkshops,meetings,andotherstakeholderengagement:• CPUCandinvolvementwithDRP
• AttendedDRPWGmeetingsonbothICA&LNBA(8+6)• LedscopingofvalidationofICAmethodsforlong-termrefinements,includingone-on-one
discussionswithPG&E,CPUCOfficeofRatepayerAdvocates,SolarCity,andIREC• PresentedvalidationapproachtotheDRPWG• BriefedDRPWGontheGMLCProject
• TechnicaladvisorycommitteeincludingCPUCandindustryrepresentatives
DER Siting and Optimization tool for CaliforniaAccomplishments to Date
4/4/17Planning and Design Tools 9
DER Siting and Optimization tool for CaliforniaResponse to December 2016 Program Review
Recommendation Response
IntegrateofresultswiththeValuationwork(1.2.4)
Engagedwiththe1.2.4project;Identifiedimplementationstrategy(DemonstrationCase)
DetermineconnectionswiththeRegionalPartnershipinVermont
Engagedwiththe1.3.10project;Discussedcomplementaritiesandanalysis methodsfordifferentusecases;strategyforcoordination
DiscussimplicationofthenewDRP DRPfocusesonshort-termapplications;Integrationof1.3.5targets“long-termlong-term”refinements(CPUC)
LetDOEwhenAnnualMilestone#1iscomplete Annualmilestoneprogresspresentedviawebinar;Submittedsupportingdocumentation
Whenwillthistoolbepostedonline? July 2017(alignedwithDemonstrationCase)
4/4/17Planning and Design Tools 10
(SUNSHOT) CyDER – A Cyber Physical Co-Simulation Platform for Distributed Energy Resources in Smart Grids
CyDER: interconnection and short-term operations using real-time data (PGE)1.3.5: long-term planning for all of California, behind-the-meter DER dispatch, and policy applications
Ø Data sharing; Complementary in scale (space and time), and granularity
1.3.22 - Technical Support to NY REV1.3.5 will provide access to DER-CAM and all other project developmentsBNL is leading 1.3.22 and also participating in 1.3.5
Ø Demonstration Case; Technology Transfer
1.4.15 Development of Integrated Transmission, Distribution and Communication Models
LLNL is participating in both 1.3.5 and 1.4.15Ø Technology Transfer
1.2.4 Grid Services and Technologies Valuation FrameworkLBNL, NREL, ANL are participating in both 1.3.5 and 1.2.4
Ø Integrate Valuation Framework in Demonstration Case
Communications:Active participation in ICA and LNBA WG meetings (14 total)Presentation to CPUC / DRP WG
DER Siting and Optimization tool for CaliforniaProject Integration and Collaboration
1.3.5DERPlanninginCA
(SUNSHOT)CyDER
1.3.22NYREV
1.4.15TD&CModels
1.2.4ValuationFramework
4/4/17Planning and Design Tools 11
DER Siting and Optimization tool for CaliforniaNext Steps and Future Plans
Nextsteps:Task5- ProjectdemonstrationDERMarketConcepts[Apr– Sep]
• DemonstrationCase(earlystart)• ApplicationinPolicyscenarios• MarketConceptDevelopment
Task6- DisseminationandTraining[Jun– Aug]• Documentation&Training
Possibleadditionsorexpansions:• IntegrationofAMIdata• Integrationwithgridexpansionmodels(LNBA)• Applicationindifferentterritories
4/4/17Planning and Design Tools 12
DISCUSSION
DER Siting and Optimization tool for California