Greeningthedatacentre

5

Click here to load reader

Transcript of Greeningthedatacentre

Page 1: Greeningthedatacentre

Cool IT

Greening the Data CentreWorcester College of Technology

Page 2: Greeningthedatacentre

Cool IT

Page 3: Greeningthedatacentre

Where we want to go

Evaporative Cooling claims of up to 90% greater efficiency

The interesting bit…..

Photovoltaic Cells

Cool IT

Page 4: Greeningthedatacentre

The Process….

Cool IT

Page 5: Greeningthedatacentre

• Project Director– Clive Baker – Estates Manager

• Project Officer– Dave Kings – Deputy Communications and Systems Manager

• External Project Design and Supplier– Celsius Design Limited

http://projects.wortech.ac.uk/cool-it

The Team….

Cool IT