Sheet1 Sheet1A B C D G H I J
1
2
Immediately, improvement Improvementnecessary Improvement hope No problem(A): Immediately, improvement (B): Improvementnecessary (C): Improvement hope (D): No problem
3LocationLocation
Audit Check Item Audit Check Item Document A B C D
4
1 One
If you govern parts andmaterial quality, it has not been done thatconfirmation of such inspection or data is beingcarried out, that there is validity to reason
ksp73 Non Inspection Part controlprocedure
It inspection siteenvironment is appropriate.
Inspection Area Environment
- It is nobrightness interfere with inspection
OK above 1000 lux at inspection area
Andmaterials, that there is no risk of deterioration
enclosed area store room, free fromrain
Presence or absence of dust, temperature,humidity, semiconductor anti-static, start-upinspection
enclosed area
Or work table isconnected to the earth, that the conductive materialis used (work clothes, shoes, etc.)
yes. Grounded
Inspectioncriteria are the latest version is maintenance
That there is atheory of the setting of inspection level
AQL,AOQL Example)AQL, I have determined the level of such AOQL.
Inspectionhas been carried out in accordance with testingstandards
refer to inspection standard sample(WI and Incoming Inspection report
And inspection that theitem is clear
And standards thathave been correctly determined
Examiner that you have devoted the appropriateperson in the certification, etc.
- Thatyou have to make sure that there is a capability thatcan be inspected
Before the test, inspectionpass-reject performs such as identification,contamination prevention is possible.
(That can bedistinguished from non-defective defective goodsyard)
1
7 Seven That can be newly engaged people of education
and training to the test
refer to training procedure KSP54
118 Eight That is of the
inspection records are storedyes
12
9 NineInspection instruments that inspection or calibrationis being performed
yes ( Calibration master List)
9
6 Six reject bin with red tape to indicatereject area (KQP 16)
8
5 Five training is necessarary before anyisnpection is carried out
7
4 Four
3 Three WI is updated accordingly when newversion is available. Procedure KQP16 Sampling plan WI-OQC-C0000-0200