GOES-R Calibration Working Group (CWG) June 16, 2010

18
1 GOES-R Calibration Working Group (CWG) June 16, 2010 Presented By: Changyong Cao 1 NOAA/NESDIS/STAR CWG Progress Update

description

GOES-R Calibration Working Group (CWG) June 16, 2010. CWG Progress Update. Presented By: Changyong Cao 1 NOAA/NESDIS/STAR. Outline. Cal/Val Plans and CWG collaborations NIST progress Cal/Val data management Discrepancy resolution Cal/ val interfaces Aircraft flight campaigns - PowerPoint PPT Presentation

Transcript of GOES-R Calibration Working Group (CWG) June 16, 2010

Page 1: GOES-R Calibration Working Group (CWG) June 16, 2010

1

GOES-R Calibration Working Group (CWG)June 16, 2010

Presented By: Changyong Cao1 NOAA/NESDIS/STAR

CWG Progress Update

Page 2: GOES-R Calibration Working Group (CWG) June 16, 2010

2

Outline

· Cal/Val Plans and CWG collaborations· NIST progress· Cal/Val data management· Discrepancy resolution· Cal/val interfaces· Aircraft flight campaigns· Tool development· Summary

Page 3: GOES-R Calibration Working Group (CWG) June 16, 2010

5D-3

GOES-R Program Cal/Val Documents

Roles a

nd re

spon

sibilit

ies

Tech

nical

Details

Baselined on Feb 7, 2011

Page 4: GOES-R Calibration Working Group (CWG) June 16, 2010

GOES-R Cal/Val Collaborators

5D-4

• Instrument and Ground Segments Vendors

All instruments• Flight Project

All instruments• Ground Project

All instruments• NOAA/NESDIS/STAR

All instruments

• MIT Lincoln Laboratory All instruments

• NIST Optical Technology Division

ABI Electron & Optical Physics Division

(SUVI, EXIS)

• Marshall Space Flight Center/UAH GLM SUVI

NGDC/SWPC (Space weather instruments)

Field Campaign (NASA, NOAA, JPL, etc.) ABI, GLM, SUVI

Page 5: GOES-R Calibration Working Group (CWG) June 16, 2010

5

Calibration Coordination Team (CCT) Formed Under New PSE Leadership

AWG

PSE & Program Science

Flight

GSPInstr. Vendor

GS Vendor

MOST

DOST

GOES-R Calibration

Coordination Team

Scope – A coordinating body to ensure efficient implementation of calibration activities throughout the GOES-R Program during all mission phases.

GOES-R Calibration Coordination Team membership diagram

CCT members - Representatives of any group with responsibility to ensure L1b Product integrity, e.g.,• PSE & Program Science

(Cal/Val Working Group Reps) • Flight (Deputy Project Manager,

Instrument Managers) • Ground (Deputy Project

Manager)• Vendors (Instrument and

Ground)• AWG• MOST (MOM)• DOST (DOM)

Thanks to Mr. Ed Grigsby

Page 6: GOES-R Calibration Working Group (CWG) June 16, 2010

Pre-Launch Resources - NIST

5D-6

NIST is a resource leveraged by PSE/Program Science (CWG) in order to provide:

• Review of vendor calibration plans and test setups• Links to primary SI standards• Development of plans for SI-traceable calibrations

NIST is currently involved in the following activities:• Deployment of the Traveling SIRCUS to the ABI Vendor testing

facility• Blackbody characterization using TXR• Characterization of ABI vendor’s integration sp• Validation of the ABI vendor’s FEL lamps• Determining the SRF of ABI filters• End-to-end calibrations of EXIS at SURF-III/Beamline 2• Review of the SUVI vendor

NIST SURF-III Facility

Tunable Laser

Wavemeter

IntegratingSphere

Exit Port

Spectrum Analyser

Optical fiber

Radiometerunder Test

Computer

ReferenceRadiometer

IntensityStabilizer

Monitor Detector (output to stabilizer)

Chopperor

Shutter

Speckle-removalSystem

Line

ar E

ncod

er

Tunable LaserTunable Laser

Wavemeter

IntegratingSphere

Exit Port

Spectrum Analyser

Optical fiber

Radiometerunder Test

Computer

ReferenceRadiometer

IntensityStabilizer

Monitor Detector (output to stabilizer)

Chopperor

Shutter

Speckle-removalSystem

Line

ar E

ncod

er

NIST SIRCUS

COMPLETED

COMPLETEDCOMPLETED

COMPLETED

COMPLETED

Page 7: GOES-R Calibration Working Group (CWG) June 16, 2010

Major GOES-R Cal/Val-related Activities in Each Mission Phase

5D-7

• Pre-Launch Schedule determined by

Flight and Vendors Instrument and Test Design

and Review Instrument Testing and Test

Verification L1b Algorithm Development,

Implementation and Review

• Post-Launch Testing (PLT) Schedule determined by

MOST and DOST Science Test Design and

Review Science Tests Analysis and

Verification Cal Parameter Verification Long-Term Monitoring

Initialization Performance

Analysis/Anomaly Resolution L1b Product Validation

• Mission Operational Lifetime

Schedule determined by Ops

Long-Term Monitoring Vicarious Calibration Cal Parameter Update L1b Product Validation Anomaly Resolution

Page 8: GOES-R Calibration Working Group (CWG) June 16, 2010

Pre-Launch Design & Development Review

Instrument/GS Vendor

Flight Instrument ManagerGOES-R Portal

Flight / Instrument Vendor Interface

Flight/CWGReview

Development Plans, Procedures, Reports, Draft CDRLs, RFA Responses, Requested Items

CDRLs, Reports

Reviews, TIMs, and

TRRsReports, Presentations

Feedback, Comments, RFAsC

DR

Ls, R

epor

ts

RFA Responses, Requested Items

RFAs

Feedback, Comments, Direction, RFAs

Feedback, Comments, RFAs

Participation

Page 9: GOES-R Calibration Working Group (CWG) June 16, 2010

Pre-Launch Calibration Data Management

Addresses RFA #6

Instrument VendorCal Testing

Cal Analysis

Flight/Instrument Manager

GOES-R Portal

Flight / Instrument Vendor Interface

Flight/CWGValidation

Selected Cal Reports & Data for CDRLs

Cal Test Data, Results & ReportsVendor Archive

2030 expirationAll Instrument Test Data

Cal Test Data Requests,Test Anomaly Notification

Cal Test Data Requests,Test Anomaly Notification

Cal Test Data,Test Anomaly Resolution

Cal Test Data, Documentation, Results

Cal Test Validation Reports

Cal/Val Long-term Stewardship

Page 10: GOES-R Calibration Working Group (CWG) June 16, 2010

CWG Discrepancy Reporting Process

5D-10

Instrument Data

CWGData analysis/

Document Review

Discrepancy Identification

Internal Review

PSE/Flight/Ground

Discrepancy Process

Discrepancy Report

Discrepancy Found

Revision Requests(if applicable)

Validation Record

(No Discrepancy/Resolved)

Currently 8 discrepancies identified and some are being addressed through flight

Page 11: GOES-R Calibration Working Group (CWG) June 16, 2010

5D-11

Postlaunch Instrument Calibration Data Flow

NOAA Satellite Operations Facility (NSOF)

L1b Data, GRB

CLASS

GAS

MM, PG, PD and

DE

CWG

Instrument Radiometric and Spectral Calibration Data Quality Assurance

for GOES-series R• Post Launch Verification• Long-term Monitoring• Vicarious Calibration• Deep-Dive Calibration Analysis

Wallops Command and Data Acquisition System (WCDAS)

Fairmount, WV (RBU)

Instrument Calibration Data• All Calibration Parameters and Algorithms

used in L0→L1b processing• Satellite Telemetry• Instrument Housekeeping & Engineering data• Instrument Calibration Data

Instrument Calibration DataVia

Terrestrial Data Link

L0Data

L1Data, GRB

Product Generation Operational Environment

L0 & Input Data

Ground Processing Algorithm

L1b CalibratedData

Product Generation Development Environment

L0 & Input Data

Experimental Ground

Processing Algorithm

ExperimentalL1b CalibratedData CLASS

Updated Calibration

Parameter Tables

Cal L0 and Processing Data

L1b, L2+ Products

MLS and 2-Day Store

Page 12: GOES-R Calibration Working Group (CWG) June 16, 2010

Anomaly Resolution

Anomaly Resolution

L1b Product Performance Monitoring and Anomaly Resolution

5D-12

Instr. Telemetry

5-Day RDR CLASS

Mission Mgmt: Instr. Temps, etc.H & S Monitor

WCDAS/ NSOF

NSOFWCDAS-

WCDAS Cal Terminals

CALVAL WorkstationGov’t Tools

MLS2-day

MLS2-day

GAS

NSOF Cal Terminals

CLASS

STARAnomaly Resolution

STAR LS

STAR WorkstationsAutomated Cal Data Acquisition

GOES-R Integrated Cal/ValInstrument Performance Web Displays

CALVAL WorkstationGov’t Tools

STAR GOES-R Remote Access

Firewall

L0

GRB (L1b) TDL (CAL)

L1b, L2+, CAL

Remote Access

Product Generation: Product Performance

Monitor

Mission Management: GRB Monitor

Product Generation:GRB to L2+

Product Generation: Create

L0, L0 to L1b processing and

GRB generation.

L0

Page 13: GOES-R Calibration Working Group (CWG) June 16, 2010

GOES-R ABI Post-Launch Test - leveraging operational experience from heritage instruments

Post-Launch Testing and Product Evaluation

Cal/Val Mission PDR Aug 2011

GEO-LEO

GEO-GEO

KPP Product Quality Evaluation Working with the Imagery Team

Page 14: GOES-R Calibration Working Group (CWG) June 16, 2010

Post-launch Cal/Val using Lunar Observations

for MTF, band to band registration, RVS, and stability evaluation

Heritage

B3

Mission Lifetime Calibration Stray light Analysis and VNIR Lunar

Observations

B2

B4

B1

B5 B6

Stray Light Effect Analysis-Leveraging operational experience from heritage instruments

Simulated ABI Lunar Images using Hyperion Hyperspectral Observations

3.9 mm

GOES-R ABI will scan around the exclusion zone: a sophisticated KOZExclusion zone does not eliminate all of the stray light contamination.

Page 15: GOES-R Calibration Working Group (CWG) June 16, 2010

Long-term Performance Monitoring

Heritage Activity

Sonoran Desert and White Sands Site Characterization

Heritage test site for GOES ImagersCharacterization of BRDF to remove

seasonal signal variation for vicarious calibration.

Mission Lifetime Calibration V&V Support and Instrument Performance

Monitoring

5D-15Cal/Val Mission PDR Aug 2011

Completed two flights: White Sands on May 23, and Sonoran Desert on June 10, 2011

Page 16: GOES-R Calibration Working Group (CWG) June 16, 2010

GOES-R Instrument and L1b Product Analysis Tool

Development

Online/L0 Tools for All GOES-R Instruments Radiometric Calibration Tools

Instrument Noise Monitoring/Trending VNIR Lunar and Stellar Irradiance Trending/Analysis ABI

Instrument Telemetry Monitoring/Trending

GEO-GEO and GEO-LEO Inter-Comparison Trending/Analysis

ABI, SUVI, EXIS

Calibration Coefficients Monitoring/Trending

Vicarious Calibration Target Radiance Trending/Analysis – (DCC, Desert Site, Instrumented Sites, Rayleigh

Scattering, Sunglint) ABI, GLM

Raw Data Readers NWP Bias Monitoring ABI, GLM

L0 and L1b Product Assessment Aircraft Radiometer Underflights ABI

Spectral Calibration Tools Spatial Calibration ToolsSRF

Correction ABI, SUVI, EXIS Band-to-Band Registration ABI

SRF Analysis ABI, SUVI, EXIS MTF Analysis SUVI, ABI, GLM

Underflight ABI, EXIS LSF Analysis ABI

• CWG developing tools for: Long-term instrument performance monitoringL1b product radiometric, spatial and spectral calibration monitoring Instrument and L1b product anomaly resolution

• Tools to be deployed during GOES-R post-launch tests and mission operational life.

Page 17: GOES-R Calibration Working Group (CWG) June 16, 2010

Field Campaigns

· Hardware Procurement for Cal/Val»Spectraoradiometer

– ASD 0.4-2.5um with 10nm resolution»Sunphotometer» Infrared camera

· Proposals

· Thanks to Dr. Steve Goodman17

Page 18: GOES-R Calibration Working Group (CWG) June 16, 2010

Summary

· Developed a comprehensive GOES-R Cal/Val program to ensure product qualityCal/Val StrategyCal/Val PlanImplementation and execution

· GOES-R leveraging diverse complementary technical capabilities

· Provide life cycle support for a successful GOES-R program

· Realigned with the new PSE