Glenelg Aquatic Services Strategy Issues and Opportunities Report July 2013
Prepared by: SGL Consulting Group Australia Pty Ltd
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page i
T A B L E O F C O N T E N T S
1 INTRODUCTION ................................................................................................................................ 1
1.1 PROJECT AIMS ......................................................................................................................... 1
1.2 OBJECTIVES .............................................................................................................................. 1
1.3 PROJECT STUDY METHODOLOGY ........................................................................................... 1
2 PROJECT AREA ................................................................................................................................. 3
2.1 POPULATION ............................................................................................................................ 3
2.2 AGE STRUCTURE ....................................................................................................................... 4 2.2.1 Emerging groups ..................................................................................................................... 5
2.3 HEALTH AND WELLBEING PROFILE .......................................................................................... 5 2.3.1 Future Population .................................................................................................................... 6 2.3.2 Ageing Population.................................................................................................................. 6 2.3.3 Disadvantaged Populations and Places ........................................................................... 7 2.3.4 Cultural Diversity ...................................................................................................................... 7 2.3.5 Indigenous Population ........................................................................................................... 7 2.3.6 Summary of Key Issues and Implication for Aquatic Facilities ....................................... 7
3 TECHNICAL REVIEWS ....................................................................................................................... 9
3.1 BEST VALUE REVIEW OF AQUATIC BASED LEISURE FACILITIES MARCH 2004 ..................... 10
3.2 RLSSA AQUATIC FACILITY SAFETY ASSESSMENT AND SAFETY IMPROVEMENT PLANS MAY
2007 10
3.3 UNIVERSAL DESIGN (APPLICABLE TO ALL) ........................................................................... 11
3.4 ENVIRONMENTALLY SUSTAINABLE DESIGN (APPLICABLE TO ALL) ..................................... 12
3.5 RELEVANT REGULATORY STANDARDS .................................................................................. 13
4 SUMMARY OF MARKET RESEARCH AND CONSULTATION .......................................................... 14
4.1 PREVIOUS RESEARCH REVIEW ............................................................................................... 14
4.2 RESIDENT HOUSEHOLD SURVEY TRENDS ............................................................................... 15
4.3 COMMUNITY USER SURVEY ................................................................................................... 17 4.3.1 Portland Leisure and Aquatic Centre ............................................................................... 17 4.3.2 Outdoor Pools – Casterton, Merino and Heywood ........................................................ 19
4.4 SCHOOL SURVEY .................................................................................................................... 20 4.4.1 Most Popular Swimming Pools ............................................................................................ 20 4.4.2 Features Would Like to See Developed ........................................................................... 21
4.5 COMMUNITY FOCUS GROUPS AND KEY STAKEHOLDER INTERVIEWS ................................ 21 4.5.1 Facilities ................................................................................................................................... 21 4.5.2 Services and Programs ........................................................................................................ 22 4.5.3 Other ....................................................................................................................................... 22
4.6 COMBINED MARKET RESEARCH AND CONSULTATION FACILITY IMPROVEMENT
PRIORITIES ........................................................................................................................................ 22
4.7 BENCHMARKING OF FACILITIES IN SIMILAR SIZE MUNICIPALITIES ..................................... 23
4.8 LEISURE TRENDS ...................................................................................................................... 24 4.8.1 Specific Aquatic Facility Trends ......................................................................................... 25
5 OPERATIONAL AND STRATEGIC FACILITY OPTION REVIEWS ..................................................... 28
5.1 INTRODUCTION ...................................................................................................................... 28
5.2 PORTLAND LEISURE AND AQUATIC CENTRE (PLACE) .......................................................... 28 5.2.1 Facilities Review .................................................................................................................... 28 4.2.1.1 Dry Areas: ............................................................................................................................ 29
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page ii
4.2.1.2 Wet Areas: ........................................................................................................................... 29 5.2.2 Total Usage Review .............................................................................................................. 30 5.2.3 Usage Category Review ..................................................................................................... 30 5.2.4 Program and Service Delivery ............................................................................................ 31 4.2.7.1 Aquatic Programs .............................................................................................................. 32 4.2.7.2 Health and Fitness Programs ........................................................................................... 32 4.2.7.3 Children’s Programs: ......................................................................................................... 32 5.2.5 Technical Operations/Maintenance PLACE ................................................................... 33 5.2.6 Universal Design .................................................................................................................... 34 5.2.7 Environmental Performance ............................................................................................... 34
5.3 SUMMARY OF KEY FINDINGS ................................................................................................ 34
5.4 STRATEGIC OPTIONS .............................................................................................................. 35
5.5 CASTERTON SWIMMING POOL ............................................................................................. 38 5.5.1 Facilities Review .................................................................................................................... 38 4.3.1.1 Dry Areas ............................................................................................................................. 38 4.3.1.2 Wet Areas ............................................................................................................................ 38 5.5.2 Usage Review ........................................................................................................................ 39 5.5.3 Program and Service Delivery ............................................................................................ 40 5.5.4 Programs ................................................................................................................................. 40 5.5.5 Technical Operations/Maintenance Casterton ............................................................. 41 5.5.6 Environmental Performance ............................................................................................... 42
5.6 SUMMARY OF KEY FINDINGS ................................................................................................ 42
5.7 STRATEGIC OPTIONS .............................................................................................................. 43
5.8 HEYWOOD SWIMMING POOL ............................................................................................... 46 5.8.1 Facilities Review .................................................................................................................... 46 4.4.1.1 Dry Areas ............................................................................................................................. 46 4.4.1.2 Wet Areas ............................................................................................................................ 46 5.8.2 Usage Review ........................................................................................................................ 47 5.8.3 Program and Service Delivery ............................................................................................ 48 4.4.7.1 Programs ............................................................................................................................. 48 5.8.4 Universal Design .................................................................................................................... 50 5.8.5 Environmental Performance ............................................................................................... 50
5.9 SUMMARY OF KEY ISSUES ...................................................................................................... 50
5.10 STRATEGIC OPTIONS ............................................................................................................ 51
5.11 MERINO SWIMMING POOL ................................................................................................. 54 5.11.1 Facilities Review .................................................................................................................. 54 4.5.1.1 Dry Areas ............................................................................................................................. 54 4.5.1.2 Wet Areas ............................................................................................................................ 54 5.11.2 Usage Review ...................................................................................................................... 55 5.11.3 Program and Service Delivery .......................................................................................... 56 4.5.7.1 Programs ............................................................................................................................. 56 5.11.4 Technical Operations/Maintenance Merino ................................................................ 57 5.11.5 Environmental Performance ............................................................................................. 58 5.11.6 Summary of Key Issues and Options ............................................................................... 58
5.12 STRATEGIC OPTIONS ............................................................................................................ 58
6 CAPITAL FUNDING OPPORTUNITIES REVIEW ................................................................................ 60
6.1 REGIONAL GROWTH FUND .................................................................................................... 60
6.2 STATE GOVERNMENT FUNDING ............................................................................................ 61
6.3 COMMONWEALTH FUNDING ................................................................................................ 62 6.3.1 Health and Hospital Fund .................................................................................................... 62
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page iii
6.4 T –QUAL GRANTS ................................................................................................................... 63
6.5 COMMERCIAL FUNDRAISING ............................................................................................... 63
APPENDIX A - SUMMARY OF PREVIOUS RESEARCH AND STRATEGIES ........................................ 64
APPENDIX B – SUMMARY HOUSEHOLD TELEPHONE SURVEY ........................................................ 68
RESPONDENT PROFILE ..................................................................................................................... 69 Current Use of Swimming Pools ....................................................................................................... 69 Pool User Profile Comparisons ......................................................................................................... 70 Reasons for Non-Use of Swimming Pools ....................................................................................... 70 Most Popular Swimming Pools ......................................................................................................... 71 Rating of Council's Swimming Pools ............................................................................................... 72 Swimming Pool Usage Profiles ......................................................................................................... 73 Future Use of Swimming Pools ......................................................................................................... 74 Facilities and Features that Would Encourage Greater Future Use of Pools ......................... 74
APPENDIX C – SUMMARY OF SCHOOL SURVEY ........................................................................... 76 Use of Aquatic Centres..................................................................................................................... 77 Schools Aquatic Program Coordination ....................................................................................... 77 Frequency of Student Visitations in Learn to Swim Program ..................................................... 77 Most Popular Terms ............................................................................................................................ 77 Most Popular Swimming Pools ......................................................................................................... 77 Reasons for Choosing Most Used Swimming Pool ....................................................................... 78 Features Would Like to See Developed ........................................................................................ 78 School Based Aquatic Facilities ...................................................................................................... 78
APPENDIX D – SUMMARY OF USER SURVEY .................................................................................. 79 Portland Leisure and Aquatic Centre ............................................................................................ 80 Outdoor Pools – Casterton, Merino and Heywood..................................................................... 83
APPENDIX E – TOWNSHIP FOCUS GROUPS .................................................................................... 87
APPENDIX F – KEY STAKEHOLDER INTERVIEWS .............................................................................. 90
APPENDIX G – YMCA STAFF FOCUS GROUP ................................................................................. 93
APPENDIX H – INTERNAL GLENELG SHIRE COUNCIL STAFF SESSION ........................................... 96
APPENDIX I – LEISURE AND AQUATIC TRENDS THAT IMPACT ON LEISURE FACILITIES ................ 98 General Aquatic Facility Trends .................................................................................................... 100 Specific Aquatic Facility Trends .................................................................................................... 101 Potential Future Aquatic Facility Trends ...................................................................................... 104
APPENDIX J – ESD INITIATIVES ...................................................................................................... 106
APPENDIX K – BENCHMARKING OF LEISURE AND AQAUTIC FACILITIES IN SIMILAR
MUNICIPALITIES 110
D I R E C T O R Y O F T A B L E S
Table 1.1 Project Methodology ............................................................................................................ 2 Table 2.1 Age Structure – Five Year Age Groups ............................................................................... 4 Table 3.1 Technical Audits and Maintenance Report Summary ..................................................... 9 Table 3.2 Technical Audits and Maintenance Report Summary ................................................... 10 Table 3.2 RLSSA Safety Scores ............................................................................................................ 11 Table 4.1 Summary Facility Ratings ................................................................................................... 16 Table 4.2 Rating of Outdoor Swimming Pool Services and Facilities ............................................. 19 Table 5.1 Total Category PLACE Usage............................................................................................. 30 Table 5.2 Works Identified by Council for PLACE ............................................................................. 33 Table 5.3 PLACE Future Directions Options ....................................................................................... 36
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page iv
Table 5.4 Casterton Outdoor Pool Usage ......................................................................................... 39 Table 5.5 Works Identified by Council for Casterton ....................................................................... 41 Table 5.6 Casterton Future Directions Options ................................................................................. 44 Table 5.7 Heywood Outdoor Pool Usage ......................................................................................... 47 Table 5.8 Works Identified by Council for Heywood ....................................................................... 49 Table 5.9 Heywood Future Directions Options ................................................................................. 52 Table 5.10 Merino Outdoor Pool Usage ............................................................................................ 55 Table 5.11 Works Identified by Council for Merino .......................................................................... 57 Table 5.12 Merino Future Directions Options .................................................................................... 59 Table 7.9 Resident Telephone Survey Respondent Sample ........................................................... 69 Table 7.10 Usage of Swimming Pool Variances Against Sample Average .................................. 70 Table 7.11 Reasons for Non-Use of Swimming Pools ....................................................................... 71 Table 7.12 Most Popular and Used Swimming Pools/Leisure Centres ........................................... 72 Table 7.13 User Survey Respondent Sample .................................................................................... 80 Table 7.14 Centre Usage Times .......................................................................................................... 81 Table 7.15 Use of Portland Leisure and Aquatic Centre ................................................................. 81 Table 7.16 User Survey Respondent Sample .................................................................................... 84 Table 7.17 Centre Usage Times .......................................................................................................... 84 Table 7.18 Use of Outdoor Swimming Pools ..................................................................................... 85 Table 7.19 Rating of Outdoor Swimming Pool Services and Facilities ........................................... 85 Table 7.20 Summary of Key Issues – Township Focus Groups ........................................................ 88 Table 7.21 Summary of Key Stakeholders Interviews ...................................................................... 91
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 1
1 I N T R O D U C T I O N
Glenelg Shire Council wished to develop an Aquatic Services (infrastructure and non-
infrastructure) Strategy to provide the strategic direction for the Glenelg Shire to plan,
develop and operate its aquatic facilities in the future. The Strategy will seek to maximise the
usage and the relevance of the aquatic facilities to the community both now and into the
future, having regard for Council’s capacity to deliver the recommendations of the Strategy.
The Strategy will inform Council on the planning, provision, development, maintenance and
management of aquatic services in the Shire and provide recommendations, strategic
directions and policy outcomes to address the immediate and longer term needs of the
community.
1.1 PROJECT AIMS
The project aims detailed by Council for the Strategy are:
The Glenelg Shire Aquatic Services Strategy will establish justifiable strategic directions
for the planning, provision, development, preservation and management of the
aquatic services in the Shire.
The Aquatic Services Strategy will provide recommendations, strategic directions and
policy outcomes that address immediate and longer term community needs (over the
next 10 years)
As aquatic service provision has changed significantly since the construction of the
Shire municipal swimming facilities, this strategy should consider and explore longer
term visionary outcomes for aquatic services provision within the Shire – 10 – 50 year
objectives/targets.
1.2 OBJECTIVES
In addition to the above project aims the following project objectives have been identified
for consideration as part of the development of the Strategy.
Where are we now?
Where do we want to be?
What are out options?
How will be get there?
How are we going?
1.3 PROJECT STUDY METHODOLOGY
SGL Consulting Group Australia Pty Ltd (here after referred to as SGL Group) was appointed
to complete the project in September 2012. The project methodology was developed under
five interrelated stages.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 2
The associated tasks completed to undertake the study are summarised below:
Table 1.1
Project Methodology
Stage Task
Stage One – Background Analysis Project Clarification
Review Of Relevant Research
Operational Review
Review of Current Management Arrangements
Review of Technical Audits
Demographic Review – Glenelg Shire
Review of Competitor Facilities
Aquatic Industry Trends/Sector Analysis
Key Stakeholder Interviews
Stage Two – Gap Analysis Resident Survey
User Survey
Township Focus Groups
School Survey
Written Submissions
Issues and opportunities Report
Councillor Review Workshop
Community Review
Stage Three – Vision Development Development of future Aquatic Vision
Stage Four – Draft Strategy
Development
Development of Draft Aquatic Services Strategy
Stage Six – Monitor and Review Strategy Review
Stage Seven –Consultation Community and Council Consultation and Review
Process
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 3
2 P R O J E C T A R E A
The Glenelg Shire Council was established by an Order-in-Council under the Local
Government Act 1989, published in the Victorian Government Gazette S63 on 23 September
1994. Three councils were amalgamated, the City of Portland and the Shires of Glenelg and
Heywood, to form the new Glenelg Shire.
The Glenelg Shire Council is located in the south west corner of Victoria. The western
municipal border also forms the State border with South Australia. Glenelg Shire enjoys the
benefits offered by the abundant natural features including beaches, foreshore areas, rivers,
waterways, bush lands and rural areas. Glenelg Shire covers an area of 6,212 square
kilometres and has a population of 20,871.
Portland is the main population, commercial, service, industrial and residential centre.
Portland has developed around Portland Bay and Portland Harbour, one of the most
significant deep-water ports in Australia. The Shire also comprises a number of smaller towns
including:
Heywood
Casterton
Merino
Dartmoor
Narrawong
Digby
Tyrendarra
Sandford
Nelson
Figure: Shire of Glenelg
2.1 POPULATION
The current (2011) estimated population of the Shire is 19,578 people, which is expected to
grow to around 23,155 people by 2031, an increase of approximately 3,577 people Shire
wide.
Portland is the main population centre of the Shire, with an estimated current population of
10,124 people (i.e. Portland Central & South), which is expected to grow to 10,794 people by
2021, an increase of approximately 670 people over the next eleven years.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 4
Population growth of this magnitude (i.e. less than 1,000 people over the next 11 years) is not
expected to significantly contribute to greater demand for indoor leisure and aquatic
participation opportunities, over and above that which already exists.
2.2 AGE STRUCTURE
The Age Structure of the population is important when considering leisure and aquatic
services. For example previous market research and benchmarking indicates people under
40 years of age use swimming pools twice as much as people aged 40 years and over.
Age profiles are also an indicator of an area’s residential role and function and how it is likely
to change in the future. The age structure of a population is usually indicative of an area’s
era of settlement and provides key insights into the level of demand for services and facilities
(as most services and facilities are age-specific).
The age profile from the last 2011 census compared to the 2006 census is listed in the
following table:
Table 2.1
Age Structure – Five Year Age Groups
Glenelg Shire 2011 2006 Change
Five year age groups
(years)
Number % Regional
VIC
Number % Regional
VIC
2006 to
2011
0 to 4 1,068 5.5 6.3 1,121 5.7 6.0 -53
5 to 9 1,159 5.9 6.2 1,391 7.0 6.8 -232
10 to 14 1,413 7.2 6.7 1,536 7.8 7.5 -123
15 to 19 1,344 6.9 6.8 1,313 6.6 7.0 +31
20 to 24 788 4.0 5.5 863 4.4 5.5 -75
25 to 29 878 4.5 5.2 869 4.4 4.9 +9
30 to 34 961 4.9 5.2 1,147 5.8 5.8 -186
35 to 39 1,215 6.2 6.1 1,303 6.6 6.6 -88
40 to 44 1,332 6.8 6.7 1,566 7.9 7.1 -234
45 to 49 1,540 7.9 7.0 1,541 7.8 7.4 -1
50 to 54 1,513 7.7 7.1 1,526 7.7 7.1 -13
55 to 59 1,537 7.9 6.9 1,379 7.0 6.7 +158
60 to 64 1,384 7.1 6.6 1,031 5.2 5.4 +353
65 to 69 1,037 5.3 5.2 920 4.7 4.6 +117
70 to 74 867 4.4 4.1 716 3.6 3.8 +151
75 to 79 626 3.2 3.2 676 3.4 3.4 -50
80 to 84 503 2.6 2.6 463 2.3 2.5 +40
85 and over 413 2.1 2.3 397 2.0 2.0 +16
Total 19,578 100.0 100.0 19,758 100.0 100.0 -180
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 5
A review of the five-year age groups of Glenelg Shire in 2011 compared to Regional VIC
shows that there were a lower proportion of people in the younger age groups (under 15)
and a similar proportion of people in the older age groups (65+).
Overall, 18.6% of the population was aged between 0 and 15, and 17.6% were aged 65 years
and over, compared with 19.2% and 17.6% respectively for Regional VIC.
The major differences between the age structure of Glenelg Shire and Regional VIC were:
• A larger percentage of persons aged 55 to 59 (7.9% compared to 6.9%)
• A larger percentage of persons aged 45 to 49 (7.9% compared to 7.0%)
• A larger percentage of persons aged 50 to 54 (7.7% compared to 7.1%)
• A larger percentage of persons aged 10 to 14 (7.2% compared to 6.7%)
2.2.1 Emerging groups
From 2006 to 2011, Glenelg Shire's population decreased by 180 people (0.9%). This represents
an average annual population change of -0.18% per year over the period.
The largest changes in age structure in this area between 2006 and 2011 were in the age
groups:
• 60 to 64 (+353 persons)
• 40 to 44 (-234 persons)
• 5 to 9 (-232 persons)
2.3 HEALTH AND WELLBEING PROFILE
The 2009 – 2013 Glenelg Shire Municipal Health Plan1 indicates that the Glenelg Shire has a
broad mix of issues which influence the health of the community. The Shire has a significant
range of natural assets, including national parks, world heritage listed areas and an
internationally recognised GeoPark. It also has a rich source of renewable energy including
wind, geothermal and tidal.
The Australian Unity Wellbeing Index rated Glenelg Shire as having an average wellbeing of
80.74 (compared with an Australian average of 75). Glenelg is reported as having one of the
highest rates of wellbeing in Australia. This is reflected in in high rates of community
connectedness, perceptions of safety and self attested health.
However Glenelg also has one of the highest rates of socio economic disadvantage in the
State, with a SEIFA index ranking of 14 in the State. It also has low rates of Internet access,
lower levels of higher education and high rates of disengaged school leavers.
The Community Wellbeing Reports prepared by Community Indicators Victoria contain a
select number of community wellbeing indicators which are used to highlight important
trends and issues in the community. These reports provide a snapshot of the wellbeing of
individual municipalities with comparisons to regional and statewide results. The following
provides a summary of the key trends for the Glenelg Shire. Some of the key issues are as
follows:
1 Glenelg Shire Municipal Public Health Plan 2009 - 2013
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 6
Indicator Measure Comment
Subjective Wellbeing 79.5% Higher than state
average 76.4%
Community connection 79.5% Higher than state
average 70.7%
Housing affordability 11% Lower than state
average 17.7%
Participation in exercise,
recreation and sport
70% Lower than state
average 85.1%
Registered mental
health clients per 1000
population
21.7% Higher than state
average 11.6%
Drug and alcohol
clients
11.2% Higher than state
average 5.5%
Employment rate 59.6% Higher than state
average 60.9%
Level of educational
qualifications
38,6% Lower than state
average 50.7%
Transport limitations 21.1% Higher than state
average 20.3%
A report titled the Health and Wellbeing Profile 2009 for the Southern Grampians and Glenelg
Shires was developed by Department of Human Services Barwon South Western Region
Regional Planning Unit. The report identified the following key demographic characteristics.
2.3.1 Future Population
On current projections the SGG population is expected to increase from around 37,000 to
39,000 people in 2021. Most of the population growth is likely to be concentrated in main
centres of Hamilton and Portland.
Growth is also predicted for Southern Grampians (2.2%) and Glenelg Shires (5.6%). The
population of some of the more traditional farming or production areas and smaller towns
outside the periphery of regional centres is predicted to decline or remain stable.
2.3.2 Ageing Population
People aged 70 years and older will represent an increasing proportion of the SGG
population rising from 13% in 2006 to around 17% in 2021.
While the population is predicted to increase by only 4% overall in the catchment, there is
expected to be considerable growth in the older age groups (55+ age groups) with a
decrease in the size of all other age groups.
Southern Grampians and Glenelg residents on average, have shorter lives and higher death
rates than the Victorian average:
• In Glenelg, Life expectancy was even lower 75.8 years for males and 81.3 years for
females, well below the Victorian average of 79.8 years for males and 84.3 years for
females; and
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 7
• The age standardised mortality rate for the period 2003-2005 in the Catchment was
7.1 per 1,000 population; (Southern Grampians 6.5 per 1000, Glenelg 7.3 per 1000),
higher than the Victorian average of 6.1 per 1,000 population.
2.3.3 Disadvantaged Populations and Places
The SGG Catchment has significant groups of disadvantaged people, including Aboriginal
people, people on low incomes, and rural people, who suffer poorer health than the rest of
the population.
Based on the Index of Relative Socio-economic Disadvantage (IRSED), the most
disadvantaged pockets for the Catchment were in Portland, Heywood and Merino (Glenelg
Shire) and in Hamilton and Glenthompson (Southern Grampians Shire).
Glenelg LGA represents the area of highest disadvantage in the BSW region and is also
among the highest disadvantaged areas in Victoria (Vic rank = 14 of 80 LGAs in Victoria).
The socio-economic status of the SGG community has important implications for the health
care system. People who experience socio-economic disadvantage also experience higher
levels of chronic disease.
2.3.4 Cultural Diversity
While most residents of the Catchment are Australian born and speak English at home, a
large number of overseas born groups are represented by a small number of people. The top
countries of origin for residents of Southern Grampians and Glenelg in 2006 were the United
Kingdom, New Zealand, Netherlands, Germany, South Africa and the Philippines.
2.3.5 Indigenous Population
According to the 2006 Census, there were 480 indigenous persons residing in the Catchment
representing 1.3% of the total Catchment population. More than three quarters (77%) were
located in Glenelg Shire with main communities at Heywood (Winda-Mara) and Portland
(Dhauwurd-Wurrung).
Consistent with Victorian trends, the Catchments Indigenous population is young with a
higher representation in the lower age groups. More than half (59%) were aged less than 25
years and a third (30%) were aged less than 15 years. By comparison, 32% of the non-
Indigenous population were aged less than 25 years and 12% less than 15 years. Conversely,
persons aged 65 years or over in the Catchment comprised 7% of the Indigenous population
and 17% of the non-Indigenous population.
2.3.6 Summary of Key Issues and Implication for Aquatic Facilities
The following provides a summary of the key issues and the implication for aquatic facilities
and services:
The SGG Catchment has a mix of regional, coastal, rural and remote communities
with a dispersed population. Population growth is predicted over the planning period
to 2021, but the proportion of older people in the community will increase more
rapidly. This will result in the need to provide aquatic facilities and services that meet
the needs of this age group including access to warm water pools for therapeutic
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 8
based activities and ensuring all facilities are fully accessible including the inclusion of
ramps and accessible change room areas
The Catchment has pockets with a high level of socio-economic disadvantage.
Council will need to be mindful of the fees and charges established for the use of the
Centres to ensure that all residents are able to access the facilities.
The Catchment has high rates of preventable diseases that are causing significant
morbidity and mortality for individuals and are creating an unsustainable cost burden
for the community. Developing a promoting a range of programs and services at the
aquatic centres that encourage and support more people to be more active more
often should be a key priority of the centres in collaboration with the other health
providers.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 9
3 T E C H N I C A L R E V I E W S
Within the Shire of Glenelg there are the following four aquatic facilities:
Portland Leisure and Aquatic Centre – PLACE
Heywood Outdoor Swimming Pool
Merino Outdoor Swimming Pool
Casterton Outdoor Swimming Pool
Over the past 15 years Council has undertaken a range of technical and facility reviews at
the aquatic facilities. The purpose of these reviews has been to identify recurrent and capital
maintenance of the facilities and the likely life span of the components. The following
provides a summary of the key reports:
SWIMMING CENTRE AUDITS 1998 BY DAVID POWICK AND ASSOCIATES: In 1998 David Powick
completed a facility audit on the three outdoor pool facilities detailing the facility
components and the backlog works list required including estimated costs as well as
maintenance items and replacement items. Estimates were provided for over a 10-year
period.
AQUATIC CENTRE AUDIT/STRATEGY REPORT OCT 2001 BY PAUL LACEY AND DAVID POWICK: in
2001 a further report was commissioned by Council which provided the Council a detailed
description and analysis of the aquatic infrastructure and an action plan to ensure that the
facilities remained at a minimum standard for the following 10 years of operation. A table
was presented of items and costs for each centre including backlog works (urgent),
maintenance, replacement, new plant and minor capital works. These items were identified
for buildings, plant, outdoor pools and surrounds and indoor pools and surrounds.
COUNCIL REVIEW: In June 2012 Council Officers presented a report to Council identifying the
necessary priority works required at the four pools.
The following table provides a summary of the cost of works identified in technical and
maintenance reports completed by Council over the past 15 years.
Table 3.1
Technical Audits and Maintenance Report Summary
Pool David Powick
1998
Paul Lacey and David Powick
2001
Council
PLACE N/A $647,850 $8,500
Casterton $127,770 $157,350 & $110,000 additional
facilities
$74,000
Merino $96,620 $148,500 & $110,000 additional
facilities
$5,500
Heywood $117,350 $115,900 & $110,000 additional
facilities
$71,500
Total $341,740 $1,399,600 $159,500
A detailed review of these reports and discussions with Council Officers has indicated that
limited funding has been provided to undertake the identified works and as a result very few
actions from the technical audits and maintenance reports were carried out or completed.
Some minor maintenance has been undertaken. The following table details the Council
funding proviced to the four pools over the past five years.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 10
Table 3.2
Technical Audits and Maintenance Report Summary
Pool Year
2012/13 2011/12 2010/11 2009/10 2008/09
Pool 18001.36 78315.41 37771.82 26251.86 25866.18
Aquatic 6341.48 11661.93 21269.03 166058.93 2010.45
Total $24,342.84 $89,977.34 $59,040.85 $192,310.79 $27,876.63
3.1 BEST VALUE REVIEW OF AQUATIC BASED LEISURE FACILITIES MARCH 2004
In 2004 a survey-based review of the Aquatic Facilities was completed to determine if the
level of service was meeting the community expectations for each venue. The survey resulted
in a number of recommendations for Service Quality, Service Costs, Competitive Neutrality,
Accessibility, Website, Continuous Improvement and Community Consultation.
Surveys showed common themes across all facilities including positive responses to the
following areas:
Quality of staff
Location of facilities
Pool Safety
Fun and enjoyable facilities
Car parking
Common gaps in service provision and customer expectations identified across the facilities
included:
Cleanliness and hygiene
Quality of change room facilities
Perceived value for money
Operating hours (in particular outdoor pools)
Disability access
It should be noted that the issues identified in the 2004 Best Value Review are consistent with
the key consultation findings identified as part of this strategy.
3.2 RLSSA AQUATIC FACILITY SAFETY ASSESSMENT AND SAFETY IMPROVEMENT
PLANS MAY 2007
Life Saving Society of Australia (RLSSA) undertook an assessment at all Aquatic Centres in the
Shire. The assessment was carried out and measured against the safety standards and
operational guidelines listed in the RLSSA Guidelines for Safe Pool Operation. In addition a
Safety improvement Plan was detailed for each venue, with additional recommendations for
safety improvements at each site.
The Assessment reviewed a number of areas of operation of the facilities including
administration, first aid, technical operations, facility design, spa pools, water slides, general
supervision and learn to swim. Each facility received a Safety Score which is indicative of the
safety level of the venue.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 11
The purpose of the Safety Score is to provide a benchmark to the percentage of Life Saving
Victoria safety issues the venue has addressed. The Safety Score can be compared by the
centre year to year to show improvement and monitor the progress the Centre is making in
relation to the items assessed.
The following table shows the Safety Scores achieved at each centre:
Table 3.3
RLSSA Safety Scores
Centre Safety Score
PLACE 70.7
Casterton Outdoor Pool 64.8
Heywood Outdoor Pool 71.3
Merino Outdoor Pool 69.2
Based on the above scores there is a need for all centres to address the safety issues not
complied with as identified within the report
Feedback received from Council officers indicated that very few of the facility improvement
recommendations were implemented. It should also be noted that there was a change of
contract manager in 2008 and it is unclear if any of the management and operational
recommendations were implemented.
3.3 UNIVERSAL DESIGN (APPLICABLE TO ALL)
The concept of Universal Design is to simplify life for everyone by making the built environment
more usable to as many users as possible at little to no additional costs. Equal access for all
users is a fundamental requirement of current building design to meet the expectations of the
community. Whilst building codes and design standards determine the minimum
requirements, facilities such as Aquatic, Health and Recreation Centres demand a higher
concept for ‘ease of access’. This extends from the car park, to footpaths, drop off points,
entry ramps, main entries, reception/cafe/retail counters, passageways and doorways, and
change rooms.
‘Access’ and ‘accessibility’ has largely been seen as a process of fulfilling a set of measurable
requirements (i.e. technical notes and specifications) as generally set out in legislative
requirements such as the BCA and relevant standards. This has resulted in ‘accessible’
features being incorporated into a building which is otherwise designed by traditional
methods. These features in themselves consequently become a source of stigma and
segregation, as they are associated with particular users.
Universal Design separates itself from ‘accessibility’ as it is based on social inclusion and not
the measurement of accessible design features. Universal Design is applied holistically to a
building without alternatives for differing groups.
By applying a philosophy of Universal Design, especially where new buildings are designed
and constructed, many ‘access’ problems can be addressed successfully.
A large range of stakeholders inclusive of representative agencies for people with disabilities,
building associations and consumer groups, are engaged in the development of ‘universal’
standards.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 12
These standards provide a knowledge base and extensive principles, which may provide
guidance and inspiration for designers when generating Universal Design concepts. Relevant
guides and standards include:
Australian Standard AS1428 Parts 1-4, 2009
Disability (Access to Premises) Standards, 2010
Royal Lifesaving facility design guidelines
Sports and Recreation Victoria “Universal Design Factsheet”
Universal Design is an approach to achieve the goals of the design principles:
Body fit - accommodating a wide a range of body sizes and abilities;
Comfort - keeping demands within desirable limits of strength and stamina;
Awareness – insuring that critical information for use is easily perceived;
Understanding – making methods of operation and use intuitive, clear and
unambiguous;
Social integration – treating all groups with dignity and respect;
Personalization – incorporating opportunities for choice and the expression of
individual preferences; and
Cultural appropriateness – respecting and reinforcing positive cultural values.
Comment: It is recommended that Council integrate universal design aspects into any facility
development or re-development and that all proposed designs be independently audited by
Council prior to construction.
3.4 ENVIRONMENTALLY SUSTAINABLE DESIGN (APPLICABLE TO ALL)
The Council Environmental Sustainable Policy indicates that Council is committed to
delivering environmentally sustainable outcomes for energy, materials and water, for the
community and the organisation. Council is committed to leading by example, in particular
through environmentally sustainable practices in the work place and activities.
Council facilities play a central role in delivering the necessary reductions while also
demonstrating and extending current industry best practice. Particular emphasis is often
placed on water reduction, water reuse and energy efficiency, however, there is a full suite of
Environmentally Sustainable Design (ESD) disciplines that can be embedded into any design.
Many Councils have developed ESD Design Guidelines for buildings and urban design, which
act as a design tool when developing or re-developing facilities. These guidelines often
articulate specific performance targets that are to be met through the project to achieve
community aspirations for a low impact, environmentally sustainable and health promoting
pool and leisure facility.
ESD Design Briefs often include a prioritised list of initiatives that are to be incorporated into
the design process and categorised as mandatory, expected and optional. The decision
making process for enhanced ESD initiatives is often decided through a value management
exercise that gives consideration to maximum ecological benefit, budgetary constraints,
functional requirements, social value and lifecycle costs.
Some examples of ESD initiatives that can be incorporated into the development of new
aquatic and leisure facilities or the re-development of existing facilities include:
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 13
Energy and CO2 Emissions
Water
User Health and Education
Environmental Management
Transport
Materials
Environmental Pollution
See Appendix J for a detailed list of initiatives.
Comment: Pending the future development direction of the facilities, it is recommended that
an ESD audit of the facility or future development options be completed and an action plan
determined for staged implementation based on agreed Council priorities.
3.5 RELEVANT REGULATORY STANDARDS
The following provides a summary of the key relevant policies and statutory /regulatory
standards and requirements that must be complied with in the management and operation
of leisure and aquatic centres. This list provides a guide only to the required documents:
Pool operators are advised to consult all appropriate acts, regulations, codes of practice,
standards and guidelines, as well as industry publications.
Relevant acts, regulations and codes of practice include the following:
Health (Infectious Diseases) Regulations 2001
Guidelines for Safe Pool Operations RLSSA
Occupational Health and Safety Act 2004
Occupational Health and Safety Regulations 2007
Dangerous Goods Act 1985
Dangerous Goods (Storage and Handling) Regulations 2000
Chemical Notifiers Self Assessment Tool
Australian Standards
Codes of practice
Compliance codes.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 14
4 S U M M A R Y O F M A R K E T R E S E A R C H A N D
C O N S U L T A T I O N
An extensive market research and consultation process has been undertaken to assist with
determining the current and future community trends, needs and expectations for aquatic
facilities for the Glenelg Shire. The market research and consultation process included.
A review of previous research and strategies;
A 300 person resident household telephone survey;
An online survey open to all community members and users of the Glenelg pools;
An online survey to all schools in the Shire;
Key stakeholder interviews;
Township focus groups;
Benchmarking of other similar facilities in similar areas.
This section summarises the key findings from the Market Research and Consultation. The
detailed write up of the consultation is provided in Appendices A to H.
4.1 PREVIOUS RESEARCH REVIEW
As part of the review and market research process a range of Council and Community
documents and Plans were reviewed. The impact of relevant recommendations from these
documents have been summarised and are detailed in Appendix A. The documents
reviewed included:
Council Plan Embracing the Future 2013 – 2017
Advancing Country Towns Program - Economic Development Employment, Skills &
Training Aboriginal Outcomes
Municipal Health Plan
Recreation and Open Space
Early Years Plan
Recreation Facilities Policy
Indoor Recreation Facility Feasibility Study 2010
Portland Community Plan - 2008
Heywood and District Community Plan - 2008
Casterton and District Community Plan – 2008
The key documents that have an impact on the provision of leisure and aquatic facilities are:
The Council Plan – 2013 – 2017: that identifies Embracing community well-being and Building
Quality places as two of its four strategic objectives.
The Heywood and District Community Plan 2008; that identifies the opportunity to develop a
multi-purpose indoor centre which provides a range of different activities including
hydrotherapy (utilising geothermal energy), gymnasiums and a range of other activities.
The Casterton and District Community Plan 2008: that identifies the development of a
hydrotherapy facility as project that the community endeavoured to address.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 15
Municipal health Plan: that identifies 5 key goals including:
Healthy, safe and inclusive communities
Dynamic, resilient local economies
Sustainable, built and natural environments
Culturally rich and vibrant communalities
Democratic and engaged communities
In particular the plan identifies specific actions directly related to the future direction of the
aquatic centres including:
Increased participation by young people in recreation and leisure activities – as part
of the youth strategy.
Active ageing strategies
Healthy eating and physical activity strategies
Renewable energy strategies
Events and celebrations
Improve accessibility for people with a disability
4.2 RESIDENT HOUSEHOLD SURVEY TRENDS
Glenelg Shire Council area residents' telephone survey conducted in early December 2012.
The survey involved 300 residents (aged 15 years and older) who were randomly selected to
provide information on:
1. Current use or non-use of swimming pools
2. Future use or non-use of swimming pools
3. Swimming Pool issues and needs
4. Respondent profile
The respondent's profile was developed to reflect the population spread of people in the
Glenelg Shire Council area. All respondents were surveyed by telephone. The survey
questions were based on a range of SGL aquatic surveys standard questions and principally
sought information on peoples' use of public swimming pools which included Council, school,
private and commercial centres but not home pools.
The following provides a summary of the key survey results. A more detailed analysis of the
results is provided in Appendix B.
Based on the resident telephone usage percentages (53%) and current population estimates
(20,700) there are approximately 11,000 people in Glenelg Shire Council area currently using
swimming pools.
The Portland Aquatic and Leisure Centre (73% used) and the Casterton and Merino Outdoor
Swimming Pools (both 8% used) are most used facilities covering 89% of all use of swimming
pools. They Heywood Outdoor Pool is currently the least used facility.
Survey respondents that indicated they did not use a swimming pool (47%) identified the
main reason being:
• Not interested 31%
• Too busy 27%
• No suitable facilities close by 13%
• Go to the beach 11%
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 16
The main constraints to use of swimming pools can be categorised under a number of
common themes, being:
Personal Issues.: Not interested 31%, Too busy 27%, Too old/health
issues 15%, don’t like swimming 9%, work commitments 4%,
Product Issues: No suitable facilities close by 13%,
Placement Issues: Have and use own pool 3%.
No respondents identified issues around promotion i.e. Lack of Information/Do not know what
is available; which is often identified as a constraint to participation.
Residents rating of current facilities/services were relatively high being
Table 4.1
Summary Facility Ratings
Rating Facility Name
Portland Casterton Merino Heywood
Excellent 18% 35% 38% 38%
Good 52% 53% 31% 13%
Adequate 20% 12% 23% 25%
Poor 8% 0% 8% 25%
Very Poor 3% 0% 0% 0%
Current aquatic facilities are very family orientated with 58% of users visiting with family and
21% with friends resulting in a significant user market representing 79%.
Main activities people do at the four swimming pools are:
• Recreation/Leisure/Fun 55%
• Lap Swim/Fitness 35%
• Take child to Pool 24%
• Use health and Fitness Facilities 21%
The survey results indicated there is potential growth in swimming pool usage with 14% more
users indicating they would like to make greater use of Aquatic Leisure Facilities in the future.
• Yes 67% (+ 14%)
• No 33% (- 20%)
This would take users to nearly14,000 residents based on current population, an increase of
3,000 plus residents (above the estimated number currently of 11,000 users)
Respondents who indicated they would like to make greater future use of swimming pools
were asked to nominate up to three features that would encourage them to make more use
of the swimming pool. There were 31 facilities/features nominated with the most popular
responses being:
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 17
Longer opening hours 13%
Warm water pool 13%
Gym/weights facilities 11%
Cleaner more hygienic facilities 7%
More variety of activities/programs 6%
Membership packages/discount 4%
More health and fitness classes 4%
Outdoor grassed area 3%
More recreation/leisure pools 2%
Access to spa/sauna 2%
Indoor learn to swim 2%
These results indicate support for access to warm water pool, indoor health and fitness
programs as well as recreation swimming, fun features and facilities for family/friends with a
high wish for leisure pools, play equipment and modern service areas.
4.3 COMMUNITY USER SURVEY
Users of the four swimming pools were invited to complete an online or a hard copy user
survey to identify current and future issues and needs. A total of 70 surveys were received for
the outdoor pools users and 146 from users of the Portland Leisure and Aquatic Centre. The
following provides a summary of the key issues identified:
4.3.1 Portland Leisure and Aquatic Centre
(i) Use of PLACE
The most popular timeslots identified for use of the Centre was the 5.00pm- 8.00pm (39%),
followed by 9.00 am to midday (21%), 2.00pm to 5.00pm (17%), and after 8.00pm (11%).
Most survey respondents indicated they travel to the Centre from home 72%, followed by
work (17%) and school (10%).
The majority of respondents travel by car either on their own (89%) or with others (11%)
Most respondents spend 1 to 1.5 hours (55%) at the Centre followed by 0.5 to 1 hours (23%)
at each visit to the Centre.
The results indicate the majority of respondents are regular users of the Centre with daily,
4-6 times a week and 2-3 times a week accounting for 85.4% of usage.
The main activities undertaken at the Portland Leisure and Aquatic Centre as indicated
by survey respondents are listed as follows in order of frequency of response:
Use of gym and weights 29%
Group fitness and fitness classes 22%
Lap swim/fitness 19%
Spectator 18%
Recreation swimming and fun 16%
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 18
(ii) Reasons for Choosing to Use the Centre
Respondents provided a large range of reasons why they chose to use the Centre. The top
six reasons listed in order of frequency of response, were:
Close to home 16.1%
It has an indoor pool 16.1%
To attend a health and fitness program 12.7%
Range of gym equipment available 10.2%
Good facilities 8.5%
To attend learn to swim program 6.8%
The main reason the Portland Leisure and Aquatic Centre was the centre of choice was
because it is close to home (16%) followed by it has an indoor pool (16%) and to attend a
health and fitness program (12.7%).
(iii) Rating of the Facilities and Services/Programs
Survey respondents rated the current facilities services and programs at the Portland Leisure
and Aquatic Centre. The results indicate that approximately 29% of respondents considered
the facilities to be between excellent and good and 72% considered the facilities adequate,
poor or very poor.
The top issues people were unhappy with included:
Level of fees and charges 67%
Customer service/assistance 33%
Group fitness timetable 33%
Change rooms 23%
Indoor pool 20%
Centre too crowded 17%
Range of programs and services offered 17%
Leisure Pool 11%
Gym/Weight facilities 8.0%
Air quality in pool Hall 5.6%
(iv) Future Facility Features that Would Encourage Greater Use of Public Swimming Pools
Just under 9 out of 10 (87%) respondents indicated that they would like to make greater use
of the swimming pools and leisure centres in the future.
Respondents provided a large range of facility component priorities that would assist them in
greater use of pools. The top five features included:
Cleaner more hygienic facilities 19%
Warm water pool for therapy 13.8%
Larger indoor learn to swim pool 10.9%
Membership packages/discount offers 10.3%
Longer opening hours 6.9%
Improved gym/weights facilities 5.7%
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 19
4.3.2 Outdoor Pools – Casterton, Merino and Heywood
(i) Use of the Outdoor Swimming Pools
The most popular timeslots identified for use of the outdoor pools was the 2.00pm- 6.00pm
(45%), followed by 9.00 am to midday (22.7%)and midday to 2.00pm (13.6%).
Most survey respondents indicated they travel to the outdoor pools from home (72%),
followed by work (8%) and school (2.6%).
The majority of respondents travel by car either on their own (57%) or with others (39%)
Most respondents spend more than 2 hours (46%) at the outdoor pools followed by 1 to 1.5
hours (23%)at each visit to the pools.
The majority of respondents are regular users of the outdoor pools during the summer seasons
with daily, 4-6 times a week and 2-3 times a week and weekly accounting for 57% of usage.
(ii) Reasons for Choosing to Use the Outdoor Pools
Respondents provided a large range of reasons why they chose to use the outdoor pools.
The reasons listed in order of frequency of response, were:
Close to home 35%
To use outdoor pool 27%
To attend learn to swim program 12%
Close to work and school 8%
Good facilities 8%
To attend swimming club program 8%
Accessible facilities 4%
(iii) Rating of the Facilities and Services
Survey respondents rated the current facilities, services and programs at the outdoor
swimming pools.
Table 4.2
Rating of Outdoor Swimming Pool Services and Facilities
Rating Outdoor Pool
Casterton Heywood Merino
Excellent 26% 29 % 50%
Good 33% 35 % 10%
Adequate 33% 29% 30%
Poor 8% 6% 10%
Very poor 0% 0% 0%
The survey respondents who considered the facilities or services to be poor/very poor were
asked to indicate which services in particular they were unhappy with. The reasons listed in
order of frequency of response were:
Centre opening hours 45%
Level of fees and charges 22%
Range if programs and services offered 19%
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 20
(iv) Main Activities Undertaken at the outdoor pools
The top five main activities undertaken at the outdoor pools
Cool down from hot weather 29%
Recreation fun swimming 22%
Take child to the pool 19%
Competition activities 18%
Holiday programs 16%
(v) Future Facility Features that Would Encourage Greater Use of Public Swimming Pools
Seven out of 10 (70%) of respondents indicated that they would like to make greater use of
the swimming pools and leisure centres in the future.
Respondents provided a large range of facility component priorities that would assist them in
greater use of pools. The top five features included:
Longer opening hours
Cleaner more hygienic facilities
Additional family change rooms
More variety of activities and programs
Improved social and food areas
Improved outdoor grass areas/shade
Warm water pool
Improved learn to swim programs
4.4 SCHOOL SURVEY
All primary and secondary school located within the Portland Shire area were sent an
electronic link to a school survey in February 2013
A poor response was received from schools with only 4 schools completing the surveys.
School representatives were asked a range of questions about their schools use of Aquatic
Centres and aquatic/health and fitness based programs and services.
Of the 4 schools that completed the survey, all schools indicated that they had participated
in a Learn to Swim or School Sports Program.
Terms one, three and four were the most popular terms and that schools are more likely to
plan aquatic based programs during the warmer months which allows Aquatic Centre
operators to plan for peak school usage during these periods.
4.4.1 Most Popular Swimming Pools
The schools were requested to nominate the main swimming pool(s) used for the aquatic
programs. The following indicates the most popular swimming pools used:
Portland Indoor Pool 1 school
Casterton Outdoor Pool 1 school
Hamilton Indoor Pool 1 school
Heywood Outdoor Pool 1 school
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 21
4.4.2 Features Would Like to See Developed
The main features that would encourage schools to make greater use of swimming pools in
the future were:
Indoor warm water pools
Separate school change rooms
Cheaper entry fees
More shaded water
Access at different times than allocated
Diving facilities
4.5 COMMUNITY FOCUS GROUPS AND KEY STAKEHOLDER INTERVIEWS
A range of community focus groups and key stakeholder interviews were conducted to
identify current and future aquatic needs and expectations to assist with guiding the
recommended aquatic strategy for the Shire. The following provides a summary of the key
issues identified under key headings:
4.5.1 Facilities
The heating of the PLACE pools is inconsistent and is a major deterrent for a
number of people using the facilities. Often the water temperature is too cold.
The ambient air temperature is also too cool for some users.
The aquatic facilities across the Shire are not fully accessible for people with a
disability. This includes both the change room’s facilities and the swimming pools.
There is an opportunity to create a warm water pool at PLACE to support both the
learn to swim and rehabilitation/therapy markets.
There is a need to upgrade all four swimming pools to meet community
expectations and contemporary standards for the provisions of aquatic facilities.
Some of the key areas include;
(i) PLACE
Change room
Size of gym
Group fitness room
Improved reception and staff amenities
Improved indoor and outdoor leisure play area
Access to warm program pool
(ii) Casterton
The hospital considered the development of a hydrotherapy pool, however it
was not considered at this stage to be feasible. The opportunity to develop a
facility in partnership with Council should be investigated.
The swimming club and schools are proactive and would like to see greater
access to aquatic areas all year round.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 22
(iii) Merino
Facilities at Merino are tired and need updating – don’t require new facilities
There is limited shade at the pool which is a concern in extreme hot weather.
(iv) Heywood
The Heywood Community and District Plan outlines the priority for an indoor
multi purpose facility including a hydrotherapy pool and gym.
Facility needs to be maintained to a higher standard
Any future development of the swimming pools must consider environmentally
sensitive design initiatives.
There may be an opportunity to consider geothermal heating opportunities in
a wellness area of the facility.
4.5.2 Services and Programs
The opening hours of both PLACE and the Outdoor Pools do not meet the needs of
the community particularly on days of extreme hot weather. There is a need to review
the hours of operation.
Other allied health services would like to make greater use of the facility for their
clients. The provision of health suites would be supported by the Portland and District
Health.
There is a need to deliver more activities to meet the needs of the family market,
particularly over the summer months when there are more domestic tourists in the
area. The pool could provide and alternate activity if the right attractors were
available.
There is a need to provide a greater range of programs and activities to meet the
needs of young people. This could include more adventure type equipment such as
new waterslides.
4.5.3 Other
Over the past 15 to 20 years limited Council funding has been provided to upgrade
the pool.
4.6 COMBINED MARKET RESEARCH AND CONSULTATION FACILITY IMPROVEMENT
PRIORITIES
The following table highlights the top six future facility improvements from the 4 key
consultation and market research processes.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 23
Table 4.3
Most Popular Future Swimming Pool Improvements
Future Facility
Improvement
Priorities
Household Survey User Survey
School Survey Focus Groups Key Informants
1 • Longer opening
hours
Improved indoor
pool
Indoor warm
water pools
Gym needs
expansion
Improved quality
of the facilities
2 • Warm water pools Longer opening
hours
Separate school
change rooms
Warm water
/program pools
Access to warm
water pool.
3 • Access to more
gym/weights
facilities
Greater variety
of programs and
activities
Cheaper entry
fees
Improved leisure
features
Larger gym area
4 • Cleaner more
hygienic facilities
Cleaner more
hygienic facilities
More shaded
water
Improved change
rooms
More shade and
shelter outdoors
pools.
5 • More variety of
activities/programs
Access to indoor
pool for learn to
swim
Access at
different times
than allocated
More dry program
rooms
Better change
facilities at
outdoor pools
6 • Improved
membership
packages
More shade and
shelter at
outdoor pools.
Diving facilities Consistent water
temperature at
PLACE
Improved
accessibility for
people with
disabilities
4.7 BENCHMARKING OF FACILITIES IN SIMILAR SIZE MUNICIPALITIES
The provision of aquatic facilities within six Victorian Local Government Authorities was
benchmarked against Glenelg Shire Council with a similar population base of between
16,000 – 22,000 residents. The following municipalities were assessed:
Colac Otway Shire
Corangamite Shire
Golden Plains Shire
Horsham Rural City Council
Moyne Shire and
Southern Grampians Shire
Of the Councils assessed, the following could be found:
Three Councils provided an indoor aquatic and leisure centre (Colac Otway, Horsham
and Southern Grampians);
Three Councils provided outdoor swimming pools (Corangamite x 6, Moyne x 3 and
Southern Grampians x 6);
Two Councils had indoor community pools (Colac Otway in Apollo Bay and Moyne in
Port Fairy);
One Council had an indoor warm water pool in association with the local health
service (Corangamite in Cobden) and
One Council had no aquatic facilities at all (Golden Plains).
The following management arrangements are in place:
Of the 3 indoor aquatic and leisure facilities, 2 are managed in house (1 externally
contracts the gymnasium and dry component of the facility) and 1 is managed by an
external management provider;
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 24
Of the 3 Councils that provide outdoor facilities, 1 is managed by an external provider
and 2 are managed in house by Council;
Both indoor community pools are managed by community committees of
management; and
1 pool is managed by a District Health Service and contracted to an external
management provider.
The following recent aquatic facility developments have taken place:
An indoor warm water pool and 2 spa pools were developed in Cobden (2011) for
approximately $1million on Cobden and District Community Health land. This was
developed through significant community support and fundraising.
A 4 lane, 25m pool and dry facilities were developed in Port Fairy (2006) as a
community project with funds being raised by the community. This is managed by a
committee of management with financial assistance from Council. The capital cost of
the facility is thought to be in the area of $1.2 – $1.5million.
The Hamilton Indoor Leisure and Aquatic Centre (2006) was constructed by Council at
a cost of $9.7million.
The following new aquatic facility developments have yet to take place:
Colac Otway Shire received $10million to upgrade the Blue Water Fitness Centre to
include a warm water exercise pool, leisure water area and other dry facility
components.
4.8 LEISURE TRENDS
The following summary of general leisure trends impacting on people and their demand for
recreation, sport and leisure activities and in particular aquatic facilities has been developed
using a range of aquatic facility feasibility documents.
General Leisure trends impacting on aquatic leisure facilities design, facility components and
user attraction include:
A gradual ageing of the population. As life expectancy increases, birth rates stay low and
the “baby boomers” of the 1950s and 1960s grow older. This is placing a new demand on
providing programmed hotter water areas as well as pools suitable for therapy and older
adult exercises. It also means it is essential to have a range of pools with different water
depths and temperatures.
Flexibility in the times when people recreate. As demands on people’s time increases
and work practices change people are seeking to take their recreation at different times,
over a broad spread of hours and at facilities that offer a lot of activities under the one
roof. Indoor pools and health and fitness facilities are particularly attractive and getting
easier to use as many are open 12 to 16 hours, 7 days a week
Increased variety in recreation and leisure options. People’s leisure and recreation
options are changing towards newer more varied activities offered over a greater range
of timeframes compared to previous decades where limited variety in activities and
scheduling occurred. This has supported the trend to more multi-use facilities to attract a
broader range of users as well as multiple water areas to meet different needs at the one
centre.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 25
Constraints to recreation and leisure participation. Lack of time, lack of facilities close by,
family and work constraints, health problems and cost of service or use of facilities are the
main constraints to many people’s recreation and leisure participation. The development
of targeted markets of users, programs and services at aquatic and health and fitness
centres has assisted in reducing some of these participation constraints
Changing employment structures, trading and work hours. These trends often makes
participation in traditional sports difficult and therefore people are looking for facilities
that are open longer hours and have a lot of activity options at the one site. This makes
opportunities such as indoor pools attractive as their long opening hours and days open
means usage can be made in a wide range of social, training, competition, educational
settings.
Different people want different activities. The broadening different cultural, age, gender
of the population sees the need for facilities to offer potential users a much more varied
range of programs and services than previously offered. All year round indoor aquatic
facilities also provide the greatest diversity of activities throughout the different seasons
impacted by an areas local weather.
Provision of high standards and quality of facilities and services. People are looking for
high standard, high quality facilities and services to meet their recreation and leisure
needs. This has also seen the trend for indoor facilities becoming very popular as they
allow activity in safe and secure spaces in all weather and environmental conditions. This
leads to indicating that building low standard, low cost facilities will not attract the
maximum user market.
Desire for activities to be affordable. The development of multi-purpose aquatic leisure
centres has enabled the high operating cost activity of aquatics (in many cases) to be
cross subsidised by more profitable activity areas such as health and fitness, food and
beverage and entertainment areas. This has enabled many facilities to keep general
entry fees low to encourage use whilst seeking users who want special services to
contribute at a greater level to the cost of such activities.
Recognition of strong links between physical activity and health. Preventative health
care and active lifestyles are very important to many people’s aquatic and health and
fitness activities are becoming a large part of people’s activity choices.
Expectations of equity and access. Today’s society expects people with special needs to
be catered for in public aquatic and leisure facilities. This has seen improved design
features to increase accessibility to and within such facilities. Added to this is the growing
array of programs and activities offered to people of all different abilities, physical
condition and skill levels.
4.8.1 Specific Aquatic Facility Trends
Specific Aquatic Facility Trends that are impacting on people in the 21st Century include:
(i) Aquatic Facility Trends and Main User Markets
Traditionally many local authority aquatic leisure facilities were built for specialist or limited
market users (i.e. competitive swimmers or high level sport participants). Detailed planning
and comprehensive feasibility studies now are able to show more targeted user profiles.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 26
Such studies usually identify the demographic profile of residents in the project area, their
current aquatic and leisure participation patterns and use of surrounding aquatic facilities
that provide a sound base for more user friendly facilities that cater for the following key
markets.
Recreation and Leisure Market - usually made up of families, people coming with
friends and groups for fun, relaxation, social activity and low level
competition/participation.
Competitive/Training/Fitness Market - usually made up of people predominantly
attending facilities alone for structured fitness or competition activities.
Education Market - usually made up of children and adults wishing to increase
water safety and survival skills. Includes Learn to swim classes, school and club use
and individuals improving their skills and techniques. They require hot water pools
and water depths with some straight edges and easy water access etc.
Health and Therapy Market - usually made up of children, adults and older adults
wanting to relax or exercise in hot water. This market also includes specialist health
condition groups such as arthritis, asthma suffers, etc. They require hot water pools
and associated health relaxation areas, i.e. Spa/saunas, etc.
Research indicates that the recreation and leisure market will be the largest as it contains
people of all ages, ability, types, interest and gender. The competitive/ training/fitness
market is a more specialist market as it usually contains younger, fitter and more active
people who have made time to train and compete.
Previous research conducted by SGL Leisure Planning Team indicates that in many cases 60%
to 70% of facility users come from the recreation/leisure sector with 20% to 30% coming from
the competitive/training/fitness markets. The health and therapy and education markets can
range from 10% to 20% of the market subject to the age and health profile of the community
in which the facility is located.
(ii) Health and Fitness Activity Areas
Industry trends indicate that users of aquatic facilities are also significant users of health and
fitness facilities. Location of each of these activity components at the one site improves
financial viability.
Health and fitness has the capacity to record high expense recovery returns, with many
centres returning 125% to 180% of expenditure. Locating these facilities at aquatic centres
increases the potential of cross-selling and spin-off use. It also improves the
membership/program user and casual user ratio.
There is also an increase in personal trainers both as private businesses and within community
aquatic centres. These programs provide one on one or small group intensive training
programs that are tailored to meet the individual needs of the participants.
(iii) Leisure Play Equipment
Changing static shallow water areas into water play and fun zones is one of the most popular
renovations. This can be done by adding simple play equipment, water sprays and
interactive equipment to existing pools. Added to this is the option to introduce inflatable
play equipment to allow the area to be changeable.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 27
(iv) Major Attraction Leisure Features
Water slides and similar challenge and adventure type activities have remained popular as
long as the venue has a range of slides/rides to keep peoples interest. Single ride facilities
struggle to keep interest due to the lack of variety. Multi ride areas allow users to try different
length and configuration rides.
There are also a range of new water rides that have a slide component leading to another
ride experience such as dropping into a bowl and then water, or onto a ramp and then into
a splash pool.
A key design trend is to link all slides to a common entry platform to ensure one staff person
can supervise the area. A common splash down zone also allows one lifeguard to control a
range of ride water entry points.
(v) Rural Aquatic Facilities
Many regional Council’s are currently trying to determine the appropriate level of aquatic
service provision as a result of ageing infrastructure and escalating operating subsidies
required to support often multiple pools across the Council area. Many of the pools are
starting to reach the end of their useful life and in some cases have declining participation.
The cost to upgrade the facilities is often financially prohibitive resulting in limited funds being
available to improve the facilities to meet community need and expectations. In some cases
Councils have determined to rationalise some of the outdoor pools and provide one
centralised facility to current contemporary standards.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 28
5 O P E R A T I O N A L A N D S T R A T E G I C F A C I L I T Y O P T I O N
R E V I E W S
5.1 INTRODUCTION
This section provides an operational review of each of the four Glenelg aquatic facilities and
identifies options for the future direction of each facility. The review of each facility identifies:
Facilities review
Usage review
Technical / Maintenance
Universal design
Environmental performance
Program and service delivery
Summary of key market research and consultation findings
Strategic options
5.2 PORTLAND LEISURE AND AQUATIC CENTRE (PLACE)
5.2.1 Facilities Review
Council’s first heated outdoor swimming pool complex consisting of a 50m main pool, 25m
learners pool and toddlers pool was constructed in 1976 on a portion of the Henty Park
Reserve in Portland.
The heated pool complex was converted to heating by geothermal energy in 1983, and a
spa pool was added to the outdoor facilities in 1984. The geothermal energy is currently not
in use.
During 1992/93 $1.2 million was spent on providing indoor heated pool facilities, a gymnasium
and multi-purpose area, culminating in the Portland Leisure and Aquatic Centre being
launched as “The PLACE” and opening to the public on 2 June 1993.
An extension to the Gymnasium at the PLACE was completed in 1996. The purpose of this
extension was to make room for the transfer of gymnasium facilities from Portland Aluminium
to the PLACE.
A Sauna was added to the complex in 1998 and in 2012 an outdoor spa was added to the
facility.
A significant upgrade to the water filtration plant at the PLACE was completed during 2007.
The filtration plant is now operated on modern vacuum media filtration to minimise water
wastage from backwashing and to extend filter wash cycles.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 29
“The PLACE” provides wet and dry activity areas comprising:
4.2.1.1 Dry Areas:
Gymnasium;
Group Fitness/relaxation program room suitable for up to 50 participants as a multi-
purpose activity room;
Class 2 Child Care Centre for up to 21 children;
Kiosk catering for up to 20 people at any time;
Male and female change room facilities, supplemented by dedicated change rooms
for people with a disability.
4.2.1.2 Wet Areas:
25 metre rectangular indoor pool (6 lanes)
Indoor free form learners pool;
Indoor free form toddlers pool;
Sauna;
Outdoor spa bath accommodating up to 6 people;
Outdoor 50 metre heated pool (8 lanes);
Outdoor 25m learners pool;
Outdoor water slide feature;
Outdoor toddlers pool;
First Aid Room/Lifeguard Station.
The PLACE uses a gas chlorine water treatment system utilising Wallace & Tiernan chlorine
injectors with dosing for both chlorine and pH controlled by an electronic Ezitrol unit. All pools
run off a common filtration plant except the spa.
The entrance and indoor components have a feeling of being relevant at a local level with
modest facilities and almost domestic feel in some areas. The outdoor 50m pool, water slide
pool and expansive outdoor area seem grand in comparison to the indoor facilities. The
facility is showing signs of age and wear and tear.
Figure 1 Portland Leisure and Aquatic Centre
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 30
5.2.2 Total Usage Review
A review of usage of PLACE over the last four years 2008/2009 to 2011/12 has been
completed and is summarised in the graph below.
Figure 2: Portland Leisure and Aquatic Centre
A review of usage over the past four years indicates
Usage of the Centre has continued to increase from a low of 78,145 visits in 2008/2009 to a
high of 130,806 visits in 2011/2012.
This continual growth represents an increase of 17,748 visits over the 3-year period (year 1
not included due to 9 months of data) This figure represents an increase in attendances of
15% over the past 3 years.
Based on a current catchment of approximately 10,000 people this represents a high
average visitation rate of approximately 13 visits per person per year.
5.2.3 Usage Category Review
A usage category breakdown is provided in the following table:
Table 5.1
Total Category PLACE Usage
Attendance 2008/2009*
2009/2010 2010/2011 2011/2012
Member Group Fitness 13027 16267 16172 16936
Member Health Club 12254 21357 24769 27070
Member Recreational Swimming 8112 13903 16920 19531
Casual Group Fitness 2459 2762 2633 2495
Casual Health Club 2320 2889 2393 2772
Casual Aqua Safe 5352 11192 11529 12402
Casual Recreational Swimming 18692 26458 23052 24179
Schools 10364 8441 10582 11541
Casual Personal Training 533 795 865 947
Creche 5032 8904 9771 12933
Total 78,145
9 mths operation
112,968 118,686 130,806
78,145
112,968 118,686
130,806
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
2008/2009 2009/2010 2010/2011 2011/2012
Total Attendance
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 31
A review of usage by category over the past four years indicates:
Usage by category has experienced a steady increase in all areas.
2009/2010 saw slightly higher attendances in the categories of Member Group Fitness,
Casual Group Fitness, Casual Health Club and Casual Rec Swimming compared to other
years.
Total Creche attendances have increased over the three-year period from a low of 8,904
in 2009/2010 to a high of 12,933 in 2011/2012. This represents an increase in 4,029 people
(45%).
Total Member Recreation Swimming attendances have increased over the three year
period from a low of 13,903 in 2009/2010 to a high of 19,531 in 2011/2012. This represents
an increase in 5,628 people (40%).
Total School attendances have increased over the three year period from a low of 8,441
in 2009/2010 to a high of 11,541 in 2011/2012. This represents an increase in 3,100 people
(36%).
5.2.4 Program and Service Delivery
PLACE is currently operating within the following hours:
Monday to Friday 6.00 am to 8.00 pm
Saturday 8.00 am to 6.00 pm
Sundays and Public Holidays 10.00 am to 6.00 pm
Previously Portland’s outdoor pools had less operational hours causing some complaints; this
has since been adjusted to reflect the indoor facilities hours over the summer season.
0
5000
10000
15000
20000
25000
30000
2008/2009
2009/2010
2010/2011
2011/2012
Usage Category Breakdown
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 32
PLACE has access to the YMCA “stable” of programs. Due to the regional location and
potential staffing limitations the ability to provide the full range of programs may be difficult
without structured staff training, development and retention strategies in place.
4.2.7.1 Aquatic Programs
The following programs currently operate at PLACE:
Aquatic Education (YMCA Aqua Safe - Swimming lessons)
Aqua Aerobics
Birthday Parties
These programs reflect a basic level of service provision.
Opportunities exist to expand aquatic programs to include the following:
Swimming Squads
Additional Aqua Aerobics classes (currently 4 per week)
AAA (Disability) Programs
Theme/Fun Days
Inflatable sessions
4.2.7.2 Health and Fitness Programs
The following programs currently operate at PLACE:
Group Fitness (approx. 30 classes per week)
Pilates
Over 50’s, Pryme Movers
Zumba Tomics (kids Zumba)
Bounce Back with Bubs (Mums and bubs fitness group)
Personal Training
Teen Gym (13 to 16 years)
Climbing wall (portable)
These programs represent a fair level of service provision.
Opportunities exist to expand health and fitness opportunities to include the following YMCA
programs:
Eat Smart (nutrition program)
Challenge Fit Camp
Youth Gym (from 10 years)
AAA (Disability) Programs
Healthy Bodies Healthy Minds (Mental Illness)
Corporate Programs
4.2.7.3 Children’s Programs:
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 33
Crèche
OSHC (School Holiday Program)
Birthday Parties
These programs represent a good level of service provision.
Whilst opportunities exist to expand Childcare (day care) opportunities this should not be a
major focus at PLACE. Given likely limited resources, greater efficiencies can be maintained
by focusing on children’s programs to supplement and support the core aquatic and fitness
business elements, this can be achieved by the children’s programs currently in place.
Based on the information provided there are a number of additional program opportunities
available with a potential to provide a wider range of services and reach a broader cross
section of residents.
The YMCA has successfully developed various programs for specific population groups in
other regions, including programs to engage indigenous populations. The YMCA of Perth
introduced “Swim for Life” a successful indigenous youth training and recruitment program in
remote areas. Potential exists to develop similar programs to benefit the Glenelg Shire
community.
Comment: The YMCA currently provide a fair provision of programs at PLACE, there is room for
program growth in Aquatic and Health and Fitness areas. Online program information and
marketing is currently poor and could be significantly improved.
Comment: The current spread of hours is fair and comparable to similar facilities. Feedback
has been received expressing the desire for longer operating hours (in particular the outdoor
facilities), it is unlikely extended hours would result in sufficient attendances to make this
feasible.
Comment: Feedback has been received regarding pool crowding at peak times, potential to
extend the outdoor season to operate at peak times only may be considered to alleviate this.
5.2.5 Technical Operations/Maintenance PLACE
Council has identified a number of projects from previous reports and inspections as being
the most significant in the short term. The following table outlines works identified for the
PLACE by Council:
Table 5.2
Works Identified by Council for PLACE
Item Description Estimated Cost YR
A Provide three access handrails to the Toddler/Baby
pool.
$2,000 11/12 carry
forward to 12/13
B Improve warning signage around the perimeter of
the toddler/baby pool.
$2,500 12/13
C Improve perimeter seating around toddler pool. $3,000 Future
D Improve signage at the toddler pool to comply with
RLSSA operational guidelines.
$1,000 Future
The list of projects in Table 5.2 have been identified by Council as potential risks. Incidents
have been reported at Portland of people slipping whilst entering the toddler pool, and
chairs breaking when being sat on.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 34
Council has identified that as a minimum, the above interim actions need to be undertaken
to “make safe the pool surrounds” with additional works to be undertaken at a future date to
improve the amenity of the pools. Actions such as repainting the pools are required to be
undertaken on a regular basis, and funds need to be allocated annually to ensure that the
pools are maintained to a minimum standard.
Comment: PLACE has difficulty maintaining pool water quality within Health Regulations
(including chemical levels and microbiological levels). The 2001 Powick Report
recommended additional water treatment plant ($275,000) which should most likely improve
performance in this area. Further investigation and assessment of plant, staff training and
procedures may be necessary to develop an action plan to address this.
5.2.6 Universal Design
The concept of Universal Design is to simplify life for everyone by making the built environment
more usable to as many users as possible at little to no additional costs. The following issues
were noted in regards to universal design principles at PLACE:
The 25 meter indoor pool has ramp access but the ramp is too steep. The gradient is 1:10.5
and should be no steeper than 1:14;
There is a raised pediment around all of the outdoor pools;
The outdoor spa has a raised timer surround with no disability access to it. The spa itself is
raised and even the most able bodied person could have trouble getting in and out of
the spa; and
There is a disabled toilet off the foyer area.
Water temperature is not consistent
Signage is poor
5.2.7 Environmental Performance
At the time of construction of the Portland Outdoor Pool and the later addition of the indoor
facilities, Environmentally Sustainable Design (ESD) principles were also not a high priority in
design and construction of the facility. No other ESD features were noted at the time of visual
inspection.
Comment: Pending the future development direction of the facility, an ESD audit of the
facility should be completed and an action plan determined for staged implementation. The
ongoing and increasing high cost associated with operating aquatic centres and the high
use of water, energy and chemicals indicates that this is a critical issues that needs to be
improved.
5.3 SUMMARY OF KEY FINDINGS
The key findings in relation to the Portland Leisure and Aquatic Centre is summarised as
follows:
Usage of the Centre has continued to increase from a low of 78,145 visits in 2008/2009 to a
high of 130,806 visits in 2011/2012.
This continual growth represents an increase of 17,748 visits over the 3-year period (15%).
Usage by program category has experienced a steady increase across all program
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 35
areas. During peak usage times (early mornings and after school hours) the facility is at
capacity.
Council provides a financial subsidy to operate the facility. This subsidy has increased
over the last five years as part of contractual arrangements..
• Technical reviews completed in 2001 identified approximately $600,000 of works required
at the pool. Discussions with council officers indicated that since that time little works
have been completed.
• The community consultation process identified that residents believe the facility is in need
of refurbishment. The key areas of concern identified were:
• Water heating consistency
• Quality of the change rooms
• Accessibility
• Lack of “fun” leisure activities
72% of respondents to the telephone survey considered the facilities adequate, poor or
very poor. The top issues people unhappy with were:
Level of fees and charges 67%
Customer service/assistance 33%
Group fitness timetable 33%
Change rooms 23.4%
Indoor pool 20%
Centre too crowded 17%
Range of programs and services offered 17%
Leisure Pool 11%
Gym/Weight facilities 8.4%
Air quality in pool Hall 5.6%
5.4 STRATEGIC OPTIONS
The consultation processes has identified the opportunity to upgrade PLACE to create a
sporting, leisure and aquatic precinct that caters for a range of diverse indoor and outdoor
activities and opportunities using both the adjacent sporting fields and the aquatic facilities.
Based on the community consultation and market research undertaken the following tables
provides future direction options for PLACE for consideration and the likely economic, social
and environmental impact.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 36
Table 5.3
PLACE Future Directions Options
Option Description Indicative
Capital Cost
Capacity to
Attract
External
Funding
Potential
Impacts
Status Quo –
with
improvements
to OH&S and
compliance
issues
Undertake an update of facility
technical audit to determine
current OH&S
Carry out the recommendations
of the audit.
No additional facilities proposed
or change to existing facilities.
$65K -$85K Potential to
attract some
funding from
DPCD -
The option will see the following:
OH&S and risk issues associated with plant and buildings as identified in the audit addressed.
Compliance with Environmentally Sustainable Design principles, which may improve
operational efficiencies.
Additional funding required implementing the recommendations of the reports.
Potential reduced operating cost as a result of greater operating efficiencies
The project will not address the following:
Community expectations for the provision of new or upgraded facilities including warm
water program pool, expanded gymnasium and facilities for young people/families or older
adults.
No additional increase in usage or revenue as a result of no new or additional facilities or
services provided.
Refurbish
existing
facilities and
provide new
and or
additional
facilities.
Refurbished facilities include
following additions:
Upgraded interactive leisure
water – indoor and outdoor.
Replacement of outdoor water
slide.
Replace outdoor spa.
Expansion of gym and group
fitness room.
Construction of warm water
program pool.
Provision of accessible/family
change room and school
change rooms.
Redevelop staff
administration/reception/merch
andise areas.
$6M - $10M Potential to
attract some
funding from
DTPLI– Better
Pools Funding
and
Department of
Health
This option will see the following:
Facility upgraded to current standards in terms of O, H and S, DDA and Universal design.
Interactive leisure water will address identified needs of family/youth and social markets
Updated water slide will provide improved leisure opportunities for the young people/family
markets and provide major attractor for the facility.
Expansion of gym and group fitness rooms will reduce over crowding, increase access and
participation and provide higher yield service that will assist in improving the financial
viability of the centre.
Warm water program pool addresses the identified need for access to warm water for
rehabilitation, therapy and lower level learn to swim
Upgraded administration/reception and merchandise areas will improve operational
efficiencies and increase secondary spend opportunities.
Upgraded and new change facilities will improve customer comfort and amenity.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 37
Option Description Indicative
Capital Cost
Capacity to
Attract
External
Funding
Potential
Impacts
Major
refurbishment
with Day Spa
Option
This options includes the features
detailed in option two with the
addition of a wellness centre
$7M - $11M Potential to
attract some
funding from
DPCD – Better
Pools Funding.
This project will address the items identified in options two with the addition of:
A wellness centre including a range of high quality allied health activities such as massage,
relaxation etc. These services provide a substantially higher yield per visit than community
aquatic and leisure facilities.
The centre would provide a point of difference for the region as a major attractor for the
local, interstate and international tourist markets.
The facility may be able to make use of geo thermal water opportunities within the area
(similar to recently opened Moree Artisan Pools, NSW.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 38
5.5 CASTERTON SWIMMING POOL
5.5.1 Facilities Review
The Casterton Memorial Swimming Pool, built in 1965, is located on Carmichael Drive,
Casterton.
The pool is seasonal facility that operates seven days a week from 10 am with weather
dependant closing times. The facility operates from 1 December to 31 March each year.
Casterton Swimming Pool is an outdoor aquatic facility comprising of the following areas:
4.3.1.1 Dry Areas
Male and female change rooms
Kiosk
First aid room
Office
Car parking
4.3.1.2 Wet Areas
50m solar heated outdoor pool
Toddlers pool
Figure 1 Casterton Swimming Pool
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 39
5.5.2 Usage Review
A review of usage of Casterton Outdoor Pool over the past five years 2008/2009 to 2012/2013
has been completed and is summarised on the following page.
Table 5.4
Casterton Outdoor Pool Usage
Attendance 2008/2009 2009/2010 2010/2011 2011/2012 2012/2013
Adult 427 320 199 377 421
Child 1,534 1,265 556 864 689
Family 70 77 66 103 75
Schools 0 0 0 2,360 1,632
Membership 3,454 5,125 4607 5,477 5,430
Total 5,485 6,787 5,428 9,181 8,247
5,485
6,787
5,428
9,181
8,247
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
2008/2009 2009/2010 2010/2011 2011/2012 2012/2013
Total Attendance
0
1000
2000
3000
4000
5000
6000
Adult Child Family Schools Membership
2008/2009
2009/2010
2010/2011
2011/2012
2012/2013
Usage Category Breakdown
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 40
A review of usage over the past five years indicates
Usage of the Centre has increased from 5,485 visits in 2008/2009 to 8,247 visits in 2012/2013.
This represents an increase of 2,762 visits over the 5-year period (50%).
It should be noted that industry trends indicate that weather conditions can have an
impact on attendances during a season of up to 30%.
5.5.3 Program and Service Delivery
The Casterton Swimming Pool currently operates within the following opening hours:
Open 10.00 am
Close based on Temperature at 1pm:
Below 20C - the pool closes at 6.30pm
Between 20C - 25C - the pool closes at 7.30pm
Between 25and 30C - the pool closes at 8:00pm
Above 30C - the pool closes at 9:00pm
Outdoor pool hours have been a source of many complains across all facilities. Previously the
facilities had opened at 10.00 am but changed to 10 am in December 2009 following
Councils analysis of the previous year’s attendance data.
Comment: Consideration should be given to simplifying the operating hours to achieve a
better public awareness.
Comment: Flexibility to close entirely on unseasonal cold days may also be considered as
significant attendances are unlikely and impact on resources may be lessened.
Comment: Based on community feedback Council may wish to revisit the potential for earlier
opening times, in particular the better patronised pools in Casterton and Merino. Operating
hours of similar facilities vary; however a 1.00 pm is one to three hours later than the majority.
5.5.4 Programs
There is little evidence of programming at the outdoor pools.
Due to weather factors and relatively small catchment populations it may be difficult to
sustain regular program opportunities. Some examples of potential programs which could be
developed without a major impact on resources include:
Vicswim learn to swim programs (or YMCA intensive programs)
Theme/Fun days
Inflatable sessions
Lap swimming sessions
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 41
Informal children activities (e.g. ball games, races)
Comment: Little evidence exists of outdoor pool programs, and common customer feedback
identifies the need for “more fun activities”. This could be addressed in part through some
simple, low cost programs.
5.5.5 Technical Operations/Maintenance Casterton
Casterton Outdoor Pool operates with concrete sand pressure filters and chlorine gas. Solar
heating was installed in 1986.
Comment: Consideration may be given to converting to Sodium Hypochlorite (liquid chlorine)
for safety reasons, however chlorine gas in still commonly used in remote facilities and
generally delivers good water quality results.
The Swimming Centre Audits 1998 By David Powick and Associates recommended the
following works for Casterton Outdoor Pool:
Various minor safety compliance items
Change room works
Chlorine Detection Unit installation
Backwash valve replacement
Circulation pump repairs
New chemical dosing pumps
Backwash holding tanks
Pool painting
Tile repairs
Dive board removal
Hand rail installation
Improved safety signage
Council has identified a number of projects from previous reports and inspections as being
the most significant in the short term. The following table outlines works identified for the
Casterton Swimming Pool:
Table 5.5
Works Identified by Council for Casterton
Item Description Estimated Cost YR
A Re level existing concrete pool deck through
grinding concrete joints and other minor remedial
tasks.
$6,000 11/12
B Replace existing concrete pool surrounds. $40,000 Future
C Improve signage at the toddler pool to comply with
RLSSA operational guidelines
$500 12/13
D Repaint Pools (required every 5 years) $27,500 Future
The list of projects in Table 5.5 have been identified by Council as potential risks. An incident
has been reported at Casterton of a child slipping and sustaining an injury.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 42
Comment: Evidence shows consistent water quality problems including low chemical levels
and poor water clarity. Further investigation and assessment of plant, staff training and
procedures may be necessary to develop an action plan to address this.
5.5.6 Environmental Performance
At the time of construction of the Casterton Outdoor Pool, Environmentally Sustainable Design
(ESD) principles were also not a high priority in design and construction of the facility.
However, solar heating of the outdoor pool has since been installed to increase water
temperatures. No other ESD features were noted at the time of visual inspection.
Comment: Pending the future development direction of the facility, an ESD audit of the
facility should be completed and an action plan determined for staged implementation.
5.6 SUMMARY OF KEY FINDINGS
The key findings in relation to the Casterton Swimming Pool is summarised as follows:
The Casterton Outdoor Pool attracts the highest number of visits of the three
outdoor pools with approximately 8,200 visits during the 2012/2013-summer season.
The facility however is also in need of upgrade to meet the needs of the local
Casterton and surrounding areas residents.
Discussions with key stakeholders indicated that the facility is highly valued by
residents as a summer social/ leisure facility and by the local swimming club and
schools.
Discussions with the Swimming Club indicate they currently bus club members to
the Hamilton Indoor Swimming Pools, as they are unable to access the Casterton
Pool for pre season training, putting members of the club at a competitive
disadvantage.
The 50-metre outdoor pool at the Casterton facility however is advantageous to
the training programs of the club members.
A number of families are required to travel to Hamilton to access learn to swim
programs as the only classes available at Casterton are the intensive program
during January each year.
The local schools also use the pool for swimming sports, learn to swim programs
and squad swimming programs twice a week. The schools see the pool as vital to
their physical education curriculum.
Discussion with a representative from the Casterton Hospital indicated that the
Hospital had recently undertaken a study into the feasibility of constructing a
hydrotherapy pool onsite. The study found that the facility at this stage was not
feasible.
The respondents to the telephone survey rated the Casterton Pool facilities as
follows:
Excellent 35%
Good 53%
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 43
Adequate 12%
Poor 0%
Very poor 0%
Community representatives identified the need to upgrade the following key
issues:
Change rooms
Toddlers pools
Concourse
Improved shade around the pool
5.7 STRATEGIC OPTIONS
Based on the community consultation and market research undertaken the following tables
provides future direction options for Casterton for consideration and the likely economic,
social and environmental impact.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 44
Table 5.6
Casterton Future Directions Options
Option Description Indicati
ve
Capital
Cost
Capacity to
Attract
External
Funding
Potential
Impacts
Status Quo -
with
improvement
s to OH&S
and
compliance
issues.
Undertake an update of facility
technical audit to determine
current OH&S requirements.
Carry out the recommendations
of the audit.
No additional facilities proposed
or change to existing facilities.
$55K -
$75K
Potential to
attract some
funding from
DPCD -
The option will see the following:
OH&S and risk issues associated with plant and buildings as identified in the audit addressed.
Compliance with Environmentally Sustainable Design principles, which may improve operational
efficiencies.
Additional funding required implementing the recommendations of the reports.
Potential reduced operating cost as a result of greater operating efficiencies
The project will not address the following:
No new facility or program opportunities will be provided therefore no significant increase in
revenue is expected.
The community needs for access to an all year round facilities with the closest facilities being 50
minutes away.
Upgrade
facility to
improve
access,
amenity and
user comfort.
Refurbished facilities include
following additions:
Upgrade reception/entry area.
Upgrade the change rooms.
Improve shade and shelter.
Repaint the pool shell.
Provide wet deck around pool
Upgrade the pool concourse.
Upgrade the toddler’s pool to
provide interactive leisure water.
Provide new seating, tables and
drinking fountains.
Upgrade front “look” of building.
$200K -
$300K
Potential to
attract some
funding from
DPCD -
The option will address the following:
OH&S and risk issues associated with plant and buildings as identified in the audit.
Compliance with Universal Design principles, which will increase access and participation at the
Centre
Improve the user experience and may attract some additional visitation due to improved amenity
and comfort.
The project will not address the following:
No new facility or program opportunities will be provided therefore no significant increase in
revenue is expected.
The community needs for access to an all year round facilities with the closest facilities being 50
minutes away.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 45
Option Description Indicati
ve
Capital
Cost
Capacity to
Attract
External
Funding
Potential
Impacts
Develop a
small indoor
program
pool
This option includes the features
detailed in option two with the
addition of an indoor warm water/
program pool.
$5M -
$6M
Potential to
attract some
external
funding from
DPCD – Better
Pools Funding
program,
Hospital Fund.
This option will address the items identified in options two with the addition of:
Community and local school access to an all year round indoor heated pool for, health and
wellness, rehabilitation; lower level learn to swim, and aquatic fitness programs.
Highly engaged community would support option.
Higher level of capital funding from Council, however, increased revenue is expected due to high
yield components.
Opportunity to seek external funding from local organisations (ie hospital) and state government.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 46
5.8 HEYWOOD SWIMMING POOL
5.8.1 Facilities Review
Built in 1964 he Heywood Outdoor Swimming Pool is located at the corner of Fitzroy Street and
Hunter Street Heywood.
The pool is seasonal facility that operates seven days a week from 1.00 pm with weather
dependant closing times. The facility operates from 1 December to 31 March each year.
Heywood Swimming Pool is an outdoor aquatic facility comprising of the following areas:
4.4.1.1 Dry Areas
Male and female change rooms
Kiosk
First aid room
Office
Car parking
4.4.1.2 Wet Areas
50m solar heated outdoor pool
Toddlers pool
Figure 3: Heywood Outdoor Pool
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 47
5.8.2 Usage Review
A review of usage of Heywood Pool over the last five years 2008/2009 to 2012/2013 has been
completed and is summarised below.
Table 5.7
Heywood Outdoor Pool Usage
Attendance 2008/2009 2009/2010 2010/2011 2011/2012 2012/2013
Adult 210 284 66 170 151
Child 929 1012 450 858 1,058
Family 39 59 28 25 47
Schools 0 0 0 13 70
Membership 450 293 273 507 538
Total 1,628 1,648 817 1,573 1,864
1,628 1,648
817
1,573
1864
0
500
1,000
1,500
2,000
2008/09 2009/10 2010/11 2011/12 2012/13
Total Heywood Pool Attendances 2008/2009 - 2012/2013
Attendances
0
200
400
600
800
1000
1200
Adult Child Family Schools Membership
2008/2009
2009/2010
2010/2011
2011/2012
2012/2013
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 48
A review of usage over the past five years indicates
Usage of the Centre has continued to increase from a low of 817 visits in 2010/2011 to a
high of 1,864 visits in 2012/2013.
This continual growth represents an increase of 236 visits over the 5 year period (14.5%).
Heywood is the least utilised of all the aquatic facilities with attendance levels much lower
than expected for a facility of this type with a catchment population of over 1,800.
There is no longer an active swimming club at Heywood Swimming Pool.
5.8.3 Program and Service Delivery
The Heywood Swimming Pool currently operates within the following opening hours:
Open 1.00pm
Close based on Temperature at 1pm:
Below 20C - the pool closes at 6.30pm
Between 20C - 25C - the pool closes at 7.30pm
Between 25and 30C - the pool closes at 8:00pm
Above 30C - the pool closes at 9:00pm
Outdoor pool hours have been a source of many complaints across all facilities. Previously
the facilities had opened at 10.00 am but changed to 1.00pm in December 2009 following
Councils analysis of the previous year’s attendance data.
Comment: Consideration may wish to be given to simplifying the operating hours to achieve
a better public awareness.
Comment: Flexibility to close entirely on unseasonal cold days may also be considered as
significant attendances are unlikely and impact on resources may be lessened.
Comment: Based on community feedback Council may wish to revisit the potential for earlier
opening times. Operating hours of similar facilities vary; however a 1.00 pm is one to three
hours later than the majority.
4.4.7.1 Programs
There is little evidence of programming at the outdoor pools.
Due to weather factors and relatively small catchment populations it may be difficult to
sustain regular program opportunities. Some examples of potential programs which could be
developed without a major impact on resources include:
Vicswim learn to swim programs (or YMCA intensive programs)
Theme/Fun days
Inflatable sessions
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 49
Lap swimming sessions
Informal children activities (e.g. ball games, races)
Comment: Little evidence exists of outdoor pool programs, and common customer feedback
identifies the need for “more fun activities”. This may be addressed in part through some
simple, low cost programs such as additional inflatables and programs during the holiday
period were structured activities such as pool volley ball could be
Heywood Outdoor Pool operates with concrete, sand, austral pressure filters installed in 1997
and chlorine gas. Solar heating is fitted.
Comment: Consideration may be given to converting to Sodium Hypochlorite (liquid chlorine)
for safety reasons, however chlorine gas in still commonly used in remote facilities and
generally delivers good water quality results.
The Swimming Centre Audits 1998 By David Powick and Associates recommended the
following works for Heywood Outdoor Pool:
Various minor safety compliance items
Change room works
New dump shower
Pool painting
Tile repairs
Hand rail installation
Improved safety signage
Council has identified a number of projects from previous reports and inspections as being
the most significant in the short term. The following table outlines works identified for the
Heywood Swimming Pool:
Table 5.8
Works Identified by Council for Heywood
Item Description Estimated Cost YR
A Repaint Pools (Required every 5 Years) $20,000 11/12
B Re level existing concrete pool deck through
grinding concrete joints
$4,000 11/12
C Improve signage at the toddler pool to comply with
RLSSA operational guidelines
$500 12/13
D Replace In ground infrastructure from pool
chlorination system to pool
$12,000 Future
E Replace existing concrete pool surrounds $35,000 Future
The list of projects in Table 5.8 have been identified by Council as potential risks.
Comment: Evidence shows a history of water quality problems including low chemical levels
and poor water clarity, often failing to meet Health Regulations. Further investigation and
assessment of plant, staff training and procedures may be necessary to develop an action
plan to address this.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 50
5.8.4 Universal Design
At the time of construction of the Heywood Outdoor Pool, universal design principles were not
at the fore of design and construction resulting in limited universal design features being
incorporated into the facility.
Change rooms have not been provided with accessibility in mind and all pools have raised
pediments. Little work has been done on the facilities since they were built, therefore, the
retrospective inclusion of universal design features such as accessible amenities, ramp entry
into pools, improved signage, the construction of wet decks around pools, beach entries,
accessible BBQ and furniture etc. have not been provided.
Comment: Pending the future development direction of the facility, a universal design audit
of the facility should be completed and an action plan determined for staged
implementation.
5.8.5 Environmental Performance
At the time of construction of the Heywood Outdoor Pool, Environmentally Sustainable Design
(ESD) principles were also not a high priority in design and construction of the facility.
However, solar heating of the outdoor pool has since been installed to increase water
temperatures. No other ESD features were noted at the time of visual inspection.
Comment: Pending the future development direction of the facility, an ESD audit of the
facility should be completed and an action plan determined for staged implementation.
5.9 SUMMARY OF KEY ISSUES
The key findings in relation to the Heywood Swimming Pool is summarised as follows:
The review of the Heywood Outdoor Pool indicates that it is the least used of the three
outdoor facilities, with just under 1,900 visits in the 2012/2013 season.
The consultation process has identified that the facility is “tired” and in need of
significant works to encourage greater utilisation. The pool is primarily used as a place
to “cool off” during summer months with little use of the 50-metre pool for lap
swimming or training. The Swimming Club that was located at the facility disbanded
approximately two years ago due to lack of interest.
Families wishing to participate in learn to swim programs travel to Portland to access
the indoor heated pools.
The development of a multi purpose indoor facility including a warm water pool and
a gym was identified as a priority in the 2008 Heywood and District Community Plan.
Discussion with some of the key stakeholders from the township indicated that this was
still a priority.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 51
The respondents to the telephone survey rated the Heywood Pool facilities as follows:
Excellent 38%
Good 13%
Adequate 25%
Poor 25%
Very poor 0%
Community representatives identified the following key issues:
Lack of transport to access the facilities at Portland
Toddlers pools needs upgrading
Concourse needs upgrading
Need for improved change rooms
Poor maintenance/cleaning
Operating hours do not meet community need
Need for greater community involvement
Improved leisure water
5.10 STRATEGIC OPTIONS
Based on the community consultation and market research undertaken the following tables
provides future direction options for Heywood swimming pool for consideration and the likely
economic, social and environmental impact.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 52
Table 5.9
Heywood Future Directions Options
Option Description Indicative
Capital Cost
Capacity to
Attract External
Funding
Potential
Impacts
Status Quo -
with
improvements
to OH&S and
compliance
issues.
Undertake an update of facility
technical audit to determine current
OH&S requirements.
Carry out the recommendations of
the audit.
No additional facilities proposed or
change to existing facilities.
$25K - $35K Potential to attract
some funding from
DPCD -
The option will see the following:
OH&S and risk issues associated with plant and buildings as identified in the audit
addressed.
Compliance with Environmentally Sustainable Design principles, which may
improve operational efficiencies.
Additional funding required implementing the recommendations of the reports.
Potential reduced operating cost as a result of greater operating efficiencies
The project will not address the following:
No new facility or program opportunities will be provided therefore no significant
increase in revenue is expected.
The community needs for access to an all year round multipurpose program
room.
Upgrade
facility to
improve
access,
amenity and
user comfort.
Refurbished facilities include following
additions Upgrade to the reception/entry
area.
Upgrade the change rooms.
Improve shade and shelter.
Repaint the pool shell.
Upgrade the pool concourse.
Upgrade the toddler’s pool to
provide interactive leisure water.
Provide new seating, tables and
drinking fountains.
$200K - $300K Potential to attract
some funding from
DPCD -
The option will address the following:
OH&S and risk issues associated with plant and buildings as identified in the audit.
Compliance with Universal Design principles, which will increase access and
participation at the Centre
Improve the user experience and may attract some additional visitation due to
improved amenity and comfort.
The project will not address the following:
No new facility or program opportunities will be provided therefore no significant
increase in revenue is expected.
The community need for all year round community facilities and fun elements.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 53
Option Description Indicative
Capital Cost
Capacity to
Attract External
Funding
Potential
Impacts
Develop an
outdoor
interactive
water play
area and an
indoor multi
purpose space
for community
programs.
This option includes a total refurbishment
of the facility to provide an outdoor aqua
play area and community multi purpose
space and includes:
Substantial interactive outdoor
aqua play/leisure water that links
to the success of the skate park.
Potential to retrofit existing to
construct a smaller outdoor pool.
Indoor multi purpose program
room.
Upgraded change and
amenities
Upgraded reception area.
$1.5M to $2M Potential to attract
some funding from
DPCD -
The option will address the following:
Community access to a smaller (20m) outdoor pool for fun and fitness operational
during the summer period only. Providing reduced operating costs.
Access to an interactive water play space during the summer months that can
be used as a dry play space during the winter months. This provides for increased
opportunities for participation by new markets such as families/children and
young people not currently well catered for.
Provides the township with a unique water playground and point of difference.
Provides access to indoor multipurpose space that can be used all year round for
fitness classes, community meetings, youth space and community activities.
This option would require a higher level of capital funding from Council,
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 54
5.11 MERINO SWIMMING POOL
5.11.1 Facilities Review
The Merino Outdoor Swimming Pool built in 1961 is located on Mocamboro Road, Merino.
The pool is seasonal facility that operates seven days a week from 1.00pm with weather
dependant closing times. The facility operates from 1 December to 31 March each year.
Merino Swimming Pool is an outdoor aquatic facility comprising of the following areas:
4.5.1.1 Dry Areas
Male and female change rooms
Kiosk
First aid room
Office
Car parking
4.5.1.2 Wet Areas
25m solar heated outdoor pool
Toddlers pool
Figure 4: Merino Outdoor Swimming Pool
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 55
5.11.2 Usage Review
A review of usage of Merino Outdoor Swimming Pool over the last four years 2008/2009 to
2011/12 has been completed and is summarised below.
Table 5.10
Merino Outdoor Pool Usage
Attendance 2008/2009
2009/2010 2010/2011 2011/2012 2012/2013
Adult 103 107 27 66 556
Child 271 250 132 159 104
Family 33 17 11 14 76
Schools 0 0 0 445 0
Membership 2276 1975 1836 1471 2075
Total 2683 2349 2006 2155 2311
A review of usage over the past five years indicates
Usage of the Centre has decreased from 2,683 visits in 2008/2009 to 2,311 visits in
2012/2013.
2,683 2,349
2,006 2,155 2311
0
500
1,000
1,500
2,000
2,500
3,000
2008/09 2009/10 2010/11 2011/12 2012/13
Attendances
0
500
1000
1500
2000
2500
2008/2009
2009/2010
2010/2011
2011/2012
2012/2013
Usage Category Breakdown
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 56
This represents a decline of 372 visits over the 5 year period (14%).
5.11.3 Program and Service Delivery
The Merino Swimming Pool currently operates within the following opening hours:
Open 1.00pm
Close based on Temperature at 1pm:
Below 20C - the pool closes at 6.30pm
Between 20C - 25C - the pool closes at 7.30pm
Between 25and 30C - the pool closes at 8:00pm
Above 30C - the pool closes at 9:00pm
Outdoor pool hours have been a source of many complains across all facilities. Previously the
facilities had opened at 10.00 am but changed to 1.00pm in December 2009 following
Councils analysis of the previous year’s attendance data.
Comment: Consideration may wish to be given to simplifying the operating hours to achieve
a better public awareness.
Comment: Flexibility to close entirely on unseasonal cold days may also be considered as
significant attendances are unlikely and impact on resources may be lessened.
Comment: Based on community feedback Council may wish to revisit the potential for earlier
opening times, in particular the better patronised pools in Casterton and Merino. Operating
hours of similar facilities vary; however a 1.00 pm is one to three hours later than the majority.
4.5.7.1 Programs
There is little evidence of programming at the outdoor pools.
Due to weather factors and relatively small catchment populations it may be difficult to
sustain regular program opportunities. Some examples of potential programs which could be
developed without a major impact on resources include:
Vicswim learn to swim programs (or YMCA intensive programs)
Theme/Fun days
Inflatable sessions
Lap swimming sessions
Informal children activities (e.g. ball games, races)
Comment: Little evidence exists of outdoor pool programs, and common customer feedback
identifies the need for “more fun activities”. This may be addressed in part through some
simple, low cost programs.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 57
5.11.4 Technical Operations/Maintenance Merino
The Merino Outdoor Pool operates with the original open bed suction sand filters and chlorine
gas. No solar heating is fitted.
Comment: Consideration may be given to converting to Sodium Hypochlorite (liquid chlorine)
for safety reasons, however chlorine gas in still commonly used in remote facilities and
generally delivers good water quality results.
Comment: Consideration should be given to solar heating at Merino if adequate roof space
is available. The facility is already well supported by the local community however increase
water temperatures would see an increase in attendance and increase program
opportunities.
The Swimming Centre Audits 1998 By David Powick and Associates recommended the
following works for Merino Outdoor Pool:
Various minor safety compliance items Change room works New dump shower Circulation pump repairs New filtration system pH dosing pump Compliant backwash discharge Pool painting Hand rail removal Improved safety signage
Council has identified a number of projects from previous reports and inspections as being
the most significant in the short term. The following table outlines works identified for the
Merino Swimming Pool:
Table 5.11
Works Identified by Council for Merino
Item Description Estimated Cost YR
A Re level existing concrete pool deck through
grinding concrete joints
$2,000 11/12
B Improve maintenance access to pool chlorination
system through moving the recirculation pump
$3,000 11/12
C Improve signage at the toddler pool to comply with
RLSSA operational guidelines
$500 12/13
The list of projects in Table 5.11 have been identified by Council as potential risks.
Comment: Available evidence suggests Merino is the best performing of the outdoor pool in
terms of plant and water quality; however the 1998 audit indicated filtration was inadequate
for a facility of this size.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 58
5.11.5 Environmental Performance
At the time of construction of the Merino Outdoor Pool, Environmentally Sustainable Design
(ESD) principles were also not a high priority in design and construction of the facility.
However, solar heating of the outdoor pool has since been installed to increase water
temperatures. No other ESD features were noted at the time of visual inspection.
Comment: Pending the future development direction of the facility, an ESD audit of the
facility should be completed and an action plan determined for staged implementation.
5.11.6 Summary of Key Issues and Options
The Merino Pool is well used by the local farming community, schools and the swimming club.
The facility is located in an “idyllic” rural setting. The pool is viewed as the “poor cousin” to
the Casterton Pool and therefore often gets the old equipment i.e. pool blankets.
The pool is ageing and in need of upgrade to meet the needs and expectations of the
Merino and surrounding Districts residents.
The key issues identified through the consultation process include:
Quality of the change rooms
Ageing plant and equipment
Lack of maintenance
Lack of shade
The respondents to the telephone survey rated the Merino Pool facilities as follows:
Excellent 38%
Good 31%
Adequate 23%
Poor 8%
Very poor 0%
5.12 STRATEGIC OPTIONS
Based on the community consultation and market research undertaken the following tables
provides future direction options for Merino Swimming Pool for consideration and the likely
economic, social and environmental impact.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 59
Table 5.12
Merino Future Directions Options
Option Description Indicative
Capital Cost
Capacity to
Attract
External
Funding
Potential
Impacts
Status Quo -
with
improvements
to OH&S and
compliance
issues.
Undertake an update of facility
technical audit to determine current
OH&S requirements.
Carry out the recommendations of
the audit.
No additional facilities proposed or
change to existing facilities.
$25K -$35K Potential to
attract some
funding from
DPCD -
The option will see the following:
OH&S and risk issues associated with plant and buildings as identified in the
audit addressed.
Compliance with Environmentally Sustainable Design principles, which may
improve operational efficiencies.
Additional funding required implementing the recommendations of the reports.
Potential reduced operating cost as a result of greater operating efficiencies
The project will not address the following:
No new facility or program opportunities will be provided therefore no significant
increase in revenue is expected.
Upgrade
facility to
improve
access,
amenity and
user comfort.
Refurbished facilities include following
additions:
Upgrade to the reception/entry area.
Upgrade the change rooms.
Improve shade and shelter.
Repaint the pool shell.
Provide wet deck around pool
Upgrade the pool concourse.
Upgrade the toddler’s pool to provide
interactive leisure water.
Provide new seating, tables and
drinking fountains.
$200K - $300K Potential to
attract some
funding from
DPCD -
The option will address the following:
OH&S and risk issues associated with plant and buildings as identified in the
audit.
Compliance with Universal Design principles, which will increase access and
participation at the Centre
Improve the user experience and may attract some additional visitation due to
improved amenity and comfort.
Continued access to a swimming pool for the local community to “cool off”
during summer months, participate in the local swimming club and access learn
to swim programs.
The project will not address the following:
No new facility or program opportunities will be provided therefore no significant
increase in revenue is expected.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 60
6 C A P I T A L F U N D I N G O P P O R T U N I T I E S R E V I E W
One of the key requirements Glenelg Aquatic Strategy was the consideration of Councils
financial capacity to fund the recommendations of the Strategy. A key aim of the Strategy is
to enable capital funding to be shared between Council funding and State and Federal
Government Grants.
This high capital cost of recommended facility improvements and developments will
therefore see the need for a number of funding support grants as Council does not have the
financial capacity to totally fund such major developments.
The Leisure and Aquatic Facility Development Industry has a history of only very limited
funding sources that may assist Council in financing the capital cost of new or re developed
Aquatic Facilities.
Traditionally, Aquatic Facility funding sources usually involve:
Council Funding
Other Government Grants
Commercial Investment
Commercial Fundraising
Community Fundraising and User Group/Contributions
Traditionally, a combination of Council funding with Government Grants and some limited
community fundraising has occurred for most aquatic facilities in Australia.
In larger areas with greater commercial opportunities we are now starting to see some
commercial investment in return for rights to manage/operate facilities ($1M to $2M
investment in return for longer-term management agreements).
In the last couple of years there also has been a number of Councils look at Commercial
fundraising. This appears to have been more successful in New Zealand than Australia.
The following information provides an overview of funding opportunities that may wish to be
pursued in greater detail once facility development options are identified.
6.1 REGIONAL GROWTH FUND
The Government’s new Regional Growth Fund (RGF) is designed to assist regional
communities and businesses adapt to current community changes.
The framework for the RGF is based on two long-term goals:
Developing a prosperous and thriving regional Victoria with more opportunities for
regional Victorians; and
Improving the quality of life for regional Victorians.
The RGF will support regional cities and country communities to create new prosperity, more
opportunities and a better quality of life.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 61
The RGF will:
Provide better infrastructure, facilities and services;
Strengthen the economic, social and environmental base of communities;
Create new jobs and improve career opportunities;
Support the planning and development of projects; and
Leverage increased investment.
The RGF seeks to strengthen the capacity of regional and rural Victoria to develop within the
environment of growth and change. It aims to ensure a competitive environment in which
regional businesses can operate successfully, and to strengthen the resilience of regional
industry in the face of social and environmental change.
It incorporates a grass roots approach to identifying and developing community-led projects,
while ensuring that wherever country Victorians lives they have access to opportunities,
quality infrastructure and services.
The Regional Growth Fund has two main components:
Strategic Initiatives
Local Initiatives
6.2 STATE GOVERNMENT FUNDING
Over the past eight years State Government, through Sport and Recreation Victoria have
administered the Better Pool Funding Program.
It is anticipated that a funding allowance of approximately $3 million may be achieved from
State Government through the Better Pools funding program.
Funding applications are more likely to be successful if the project aligns with the key findings
and priority recommendations identified in State Sporting Government Planning Strategies.
The current priorities of the funding program are projects that:
Demonstrate how the project will increase or maintain participation.
Improves facilities to encourage greater female participation.
Encourages development of multi-use facilities.
Collaborates between local government authorities, schools and community
groups.
Demonstrates a partnership between local government and State Sporting
Associations or other relevant peak bodies.
Improved environmental sustainability.
Includes Universal Design principles
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 62
6.3 COMMONWEALTH FUNDING
Commonwealth Government funding has been restricted for sport and recreation
developments since the early 1990s when the Community Sports and Cultural Centres
Improvement Scheme was discontinued.
Although there has been no formal funding scheme, there have been a number of leisure
facility projects that were able to generate significant political pressure to receive funding
(election promises and stimulus packages).
In 2009/2010 the down turn in the economy provided a number of Local Government
Authorities with funding through the Federal Government stimulus package.
In March 2011 the Federal Government announced the Regional Development Australia
Fund (RDAF), which is a national program to support Australia’s regions and enhance
economic development and liveability of communities. The program is administered by the
Department of Regional Australia, Regional Development and the Department of Local
Government.
The program guidelines indicate that the aim of the funding program is to support localism,
and to leverage and better coordinate state, commonwealth, local government and private
(including not for profit) investments for the long-term benefit of communities.
Funding of between $500,000 and $25 million per project is available from this funding
program. The fifth round of the program has recently closed. Projects that addressed the
identified priorities of Regional Development Australia committees and have a strong regional
impact have been funded in the first 5 rounds.
The essential requirements for RDAF submissions include:
Submissions must;
Apply for funding between $500k and $25M
Include funding from other sources
Provide dollar for dollar contributions for projects over $5M
Have written endorsement from the RDA
Be “Investment ready”
Come from a local government authority or an incorporated not for profit entity
Submissions must show how they align with the Regional Plan and be endorsed in
writing by the RDA
There may be opportunities to seek funds under this scheme if the redevelopment includes an
integrated health, tourism and community precinct components.
6.3.1 Health and Hospital Fund
The benching of other similar area facility developments has identified potential funding
opportunity from the Health and Hospital Fund
Colac Ottway Shire Council received $2.83M for the construction of a warm water exercise
pool at the Blue Water Fitness Centre through the 2012/13 Health and Hospital Fund. This
initiative was Council driven with support from the Colac area health service.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 63
6.4 T –QUAL GRANTS
T-QUAL Grants is a competitive merit-based grants program aimed at stimulating sustainable
economic growth in the Australian tourism industry.
By providing matched funding to large and small-scale tourism projects, the program aims to
increase Australia's supply of quality tourism products and experiences.
If the redevelopment of PLACE included a “wellness” centre making use of the available geo
thermal water there may be an opportunity to seek funds under this scheme.
By providing matched funding to large and small-scale tourism projects, the program aims to
increase Australia's supply of quality tourism products and experiences.
The program actively encourages private sector investment in the development of Australia's
tourism industry products, services and experiences. It is underpinned by the National Long-
Term Tourism Strategy and Tourism 2020. All projects funded under the program must align
with Tourism 2020 priorities.
T-QUAL Grants are administered by the Department of Resources, Energy and Tourism and
are offered in two separate programs:
Strategic Tourism Investment Grants—funding for up to $1 million to support a small
number of larger scale projects to support Indigenous tourism, economic
development and tourism employment.
T-QUAL Grants—Tourism Quality Projects—funding of between $15,000 and $100,000
for smaller-scale projects to support collaborative tourism industry development
projects, particularly those which stimulate private sector investment.
6.5 COMMERCIAL FUNDRAISING
Traditionally, commercial fundraisers have been used on some recreation and sporting
projects to raise some funds. The results indicate they usually have some success but the
funds raised are regarded as low contribution levels compared to the high capital cost to
build such facilities. Such companies traditionally charge up to 30% of funds raised for their
services.
This funding option is not likely given the size of the population base.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 64
APPENDIX A - SUMMARY OF PREVIOUS RESEARCH AND STRATEGIES
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 65
Summary of Previous Research and Strategies
Report Name Author and Date Key Points/Recommendations Relevant to the Current Project
Council Plan Embracing
the Future 2009 – 2013
Glenelg Shire Council has identified four strategic objectives to
drive the achievement of our Statement of Intent. These
strategic objectives are supported by a series of Council
commitments that underpin the strategic objectives.
Performance indicators have been developed for each of the
strategic objectives. Monitoring and reporting of these
performance indicators through the Glenelg Shire Annual Report
will assist Council and the community to measure progress
against these strategic objectives and associated commitments
of the 2009-2013 Council Plan.
The key strategic objectives:
Responsible and responsive governance and decision
making
Enhancing community well being
Strengthening a vibrant economy
Building quality places
Advancing Country Towns
Program
Heywood, Lake Condah &
Surrounding Towns
Economic Development
Employment, Skills &
Training
Aboriginal Outcomes
Damien Bell 2011 Advancing Country Towns focuses on improving cross-
government investment by working at a strategic level to
identify local needs to improve the quality of life. The plan
identified the following:
There are opportunities for tourism and other economic
development particularly in the timber industry with the Glenelg
Shire identifying a Portland to Heywood economic corridor.
There is also a significant Aboriginal cultural heritage site which
provides opportunities for tourism.
The determined priority areas for the Advancing Country Towns
project for Heywood, Lake Condah and surrounding towns are:
Economic development
Employment, skills and training with a focus indigenous
outcomes
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 66
Report Name Author and Date Key Points/Recommendations Relevant to the Current Project
Casterton and District
Community Plan 2008
By understanding the interwoven links that contribute to a well
functioning community ensures that the community can move
forward in developing its own future
Consequently the aims of the Casterton Community Plan
was:
To ensure that any development is balanced and
contributes to the unique culture of the Casterton
community.
That the economic, social, cultural and environmental
goals are all considered when developing Casterton as
a well functioning community.
To take advantage of any opportunities which exist
through the timber industry being centred (in part) in the
Casterton district.
A hydrotherapy facility was a project that the community
endeavoured to address. The hydrotherapy proposal would
provide long term benefit for people with special needs in this
area and is considered important adjunct for the infrastructure
for the Casterton community.
Heywood and District
Community Plan 2008
The Heywood community completed its first community plan in
2007 and commenced an extensive planning process to
develop a long term future for the Heywood community. This
plan was extended and reaffirmed at the review session held in
June 2008.
The development of a multi-purpose indoor centre which
provides a range of different activities including hydrotherapy
(utilising geothermal energy), gymnasiums and a range of other
activities was considered to be an important part of the health
and social development of Heywood. By developing an indoor
centre that involved the schools, the hospital and all sporting
clubs would encourage broad community use, and is a way in
which the community can ensure that such a project would
provide genuine benefit and attract investment.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 67
Report Name Author and Date Key Points/Recommendations Relevant to the Current Project
Portland Community Plan
2008
The aim of the Portland Community Plan is for residents to feel
empowered to contribute to programs and projects that
provide social, economic, environmental and cultural
sustainability. The Vision for the Plan was
Strong communities
Social services, facilities and networks sufficient to sustain quality
of life, equity and wellbeing for all residents
Cultural diversity and expression
Developing and renewing cultural diversity and cultural
expression, to build shared values and enduring relationships.
A clean, green city
Managing land, ecosystems, energy, air and water in a way that
protects their use for future generations and encourages new
forms of eco living.
A diverse and vibrant economy
A resilient economic structure, ongoing business growth and
access to local employment for residents.
In relation to sport, recreation and leisure facilities the plan
identified:
Encourage all sporting clubs to participate in good sports
programs
Develop a multipurpose facility (including synthetic
surfaces for appropriate sports)
Develop capacity and structures to encourage
recreational fishing both for Portland and as a potential
visitor attraction for Portland
Continue to support the drag racing asset and motor
sport infrastructure at Portland
Continue to lobby for a facility and / or location for
motor sports in the Portland region
Continue to develop the plans for Yarraman Park
Undertake a balance of sport, leisure and arts in order to
provide broader accessibility for all residents of Portland
Encourage outdoor activities which include bush
walking, park trials and the like to encourage local
residents health and fitness and to attract visitor to the
area Ensure that basic infrastructure projects are
undertaken to support existing facilities, such as, sealing
the access road to the swimming pool facility
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 68
APPENDIX B – SUMMARY HOUSEHOLD TELEPHONE SURVEY
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 69
RESPONDENT PROFILE
The following table summarises the Resident Telephone Survey respondent sample:
Table 6.1
Resident Telephone Survey Respondent Sample
CATEGORY SUB-GROUP NUMBER %
Gender Male 145 48
Female 155 52
Age Range 15 - 19 years 38 13
20 - 29 years 16 5
30 – 39 years 35 12
40 - 49 years 62 21
50 - 59 years 60 21
60 ears plus 88 29
Township Bolwarra 8 3
Cape Bridgewater 3 1
Casterton 24 8
Dartmoor 7 2
Digby 5 2
Drumborg 3 1
Heathmere 5 2
Heywood 32 11
Merino 20 7
Narrawong 6 2
Nelson 4 1
Portland 168 56
Tyrendarra 1 0.25
Identified as Having
a Disability
Yes 31 10
No 269 90
Country of Birth Australia 281 94
England 6 2
New Zealand 4 1
Other 9 3
A review of the survey sample indicates all responses are within 2 to 5 per cent of existing the
Shire ages profile, area population and gender distribution indicating a reasonably balanced
and similar sample profile.
Current Use of Swimming Pools
Survey respondents were questioned on their use of public swimming pools in the past 12
months. Public swimming pools included Council, school and commercial centres, but not
home pools.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 70
Glenelg residents make slightly below average use of swimming pools identified through the
survey responses. A total of fifty three per cent (53%) of people had used or visited a pool in
the past 12 months. A total forty seven per cent (47%) had not used or visited a pool in the
past 12 months.
Based on current population estimates (20,871 – ABS 2011) there are approximately 11,000
people in Glenelg Shire Council area currently using swimming pools/leisure centres.
Pool User Profile Comparisons
Usage of swimming pools does change by gender, age profile and area people live, as the
following results indicate:
Table 6.2
Usage of Swimming Pool Variances Against Sample Average
CATEGORY SUB-GROUP
% USED
POOLS
VARIANCE AGAINST
USED AVERAGE
(58%)
Gender Male 71 +18
Female 89 +36
Age Range 15-29 years 41 -12
30-49 years 70 +17
50-69 years 49 -4
70 years + 28 -25
The pool usage results indicate:
More females (89%) than males (71%) use pools. This trend is similar to other
aquatic participation surveys across rural Victoria.
People in their most active years (30 to 49 years old) make the highest use of pools:
Area Average 53%
15 to 29 years 70%
Young people aged 15 – 29 years use make lower than average (41%) use of pools
which is inconsistent with current aquatic usage trends.
Pool usage participation rates drop as people age
Area Average 53%
50 -69 years 49%
70 years plus 28%
Reasons for Non-Use of Swimming Pools
Slightly less than five out of ten respondents (47%) had not used a swimming pool in the past
12 months. The main reasons respondents gave for non-use were:
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 71
Table 6.3
Reasons for Non-Use of Swimming Pools
REASONS FOR NON-USE OF SWIMMING
POOLS
% OF
TOTAL RESPONSE
GENDER
Male
%
Female
%
Not interested 31 31 30
Too busy 27 27 23
No suitable facilities 11 11 12
Go to the beach 11 11 12
Don’t like swimming 9 9 9
Too old 8 8 9
Health problems 7 7 5
Work commitments 4 4 5
Have and use own pool 3 3 4
Cannot afford it 3 3 1
No indoor pool pools close by 2 2 3
The constraints that affect people’s use of pools do change depending upon their gender
and age. The main constraints to use of swimming pools can be categorised under a number
of common themes, being:
Personal Issues.: Not interested 31%, Too busy 27%, Too old/health
issues 15%, don’t like swimming 9%, work commitments 4%,
Product Issues : No suitable facilities close by 13%,
Placement Issues : Have and use own pool 3%.
No respondents identified issues around promotion i.e. Lack of Information/Do not know what
is available; which is often identified as a constraint to participation.
Most Popular Swimming Pools
The usage rates of people using swimming pools are spread around a number of different
facilities in the Shire and in neighbouring Shires. Respondents who had used a swimming pool
in the past 12 months listed 6 different facilities.
A summary of the most pools/leisure centres used, compared to the pool people nominated
as the one they use the most is as follows:
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 72
Table 6.4
Most Popular and Used Swimming Pools/Leisure Centres
SWIMMING POOL
SWIMMING POOLS/ LEISURE
CENTRES USED IN PAST 12
MONTHS (MULTIPLE
ANSWERS)
%
MOST USED SWIMMING
POOL/LEISURE CENTRES IN PAST
12 MONTHS(ONE CENTRE ONLY)
%
Portland Aquatic and Leisure
Centre
79 73
Casterton Outdoor Pool 11 8
Merino Outdoor Pool 8 8
Hamilton Indoor Pool 6 3
Heywood Outdoor Pool 5 3
Other 7 6
The pool usage data clearly indicates Council's pools receive high use, however, use is also
made of the Hamilton Indoor Pool located across the border in the Shire of Southern
Grampians.
Rating of Council's Swimming Pools
Survey respondents who had used swimming pools were asked to rate each of the four
Glenelg Shire Councils swimming pools under a five point rating system. The respondents
rated the facilities as follows:
(i) Portland Aquatic and Leisure Centre
Excellent 18%
Good 52%
Adequate 20%
Poor 8%
Very poor 3%
The key issues the respondents identified for improvement were:
Water temperature 30%
Indoor pool 25%
Leisure pool 25%
Change rooms 8%
Outdoor 50 metre pool 8%
Gym 8%
Feeling of safety 8%
Group fitness facilities 8%
(ii) Casterton Outdoor Pool
Excellent 35%
Good 53%
Adequate 12%
Poor 0%
Very poor 0%
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 73
The key issues the respondents identified for improvement were:
Outdoor pool 30%
Change rooms 20%
(iii) Merino Outdoor Pool
Excellent 38%
Good 31%
Adequate 23%
Poor 8%
Very poor 0%
The key issues the respondents identified for improvement were:
Outdoor pool 28%
Change rooms 21%
(iv) Heywood Outdoor Pool
Excellent 38%
Good 13%
Adequate 25%
Poor 25%
Very poor 0%
The key issues the respondents identified for improvement were:
Outdoor pool 30%
Change rooms 20%
Feeling of security 50%
Swimming Pool Usage Profiles
The following sections provide data on the top five most used pools in relation to frequency of
use, reason for choosing pool and who usually go with:
1) Frequency of use of most used pool?
Daily 2%
4-6 times a week 9%
2-3 times/week 14%
Weekly 20%
Fortnightly 8%
Monthly 9%
Less than monthly 29%
Summer only 9%
2) Reasons choose most used pool?
Close to home 60%
Only pool aware of 23%
Good facilities 12%
To take part in a fitness activities 7%
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 74
Family/friends use 6%
Warm water 6%
Range of pools available 5%
Social reasons 5%
3) How do they travel to the most used pool?
Car 83%
Cycle 1%
Public transport 1%
Walk 15%
4) Main activities usually do at most used pool?
Recreation/swimming 55%
Lap swimming 35%
Take child to pool 24%
Use Gymnasium 21%
Fitness activities 13%
Other recreation activities 9%
To take part in aquatic program 6%
Family activities 4%
Cool down from hot weather 5%
4) Who do you usually go to the pool with?
Family members 58%
On own 28%
Friends 21%
School group 3%
Club members 1%
Future Use of Swimming Pools
To assist in identifying the level of demand for future use of swimming pools, respondents were
asked if they would like to make greater use of pools in the future.
Sixty seven per cent (67%) of people indicated they would like to use pools in the future.
The highest future demand for use of pools will come:
From Females (65%) compared to males (44%).
People in their most active years aged 30 to 49 years (84%), followed by 15 to 29 years
(78%) 30 to 49 years and 50+ (64%).
Facilities and Features that Would Encourage Greater Future Use of Pools
Respondents who indicated they would like to make greater future use of swimming pools
were asked to nominate up to three features that would encourage them to make more use
of the swimming pool. There were 31 facilities/features nominated with the most popular
responses being:
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 75
Longer opening hours 13%
Warm water pool 13%
Gym/weights facilities 11%
Cleaner more hygienic facilities 7%
More variety of activities/programs 6%
Membership packages/discount 4%
More health and fitness classes 4%
Outdoor grassed area 3%
More recreation/leisure pools 2%
Access to spa/sauna 2%
Indoor learn to swim 2%
These results indicate support for access to warm water pool and indoor health and fitness
programs as well as recreation swimming and fun features and facilities for family/friends with
a high wish for leisure pools, play equipment and modern service areas.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 76
APPENDIX C – SUMMARY OF SCHOOL SURVEY
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 77
All primary and secondary school located within the Portland Shire area were sent an
electronic link to a school survey in February 2013
A total of 4 schools completed and returned the surveys.
Appendix Three of this report provides details of the individual school comments.
Use of Aquatic Centres
School representatives were asked a range of questions about their schools use of Aquatic
Centres and aquatic/health and fitness based programs and services.
The questions were aimed at identifying aquatic participation and facility usage trends and
key reasons why activities and facilities were selected.
Of the 4 schools that completed the survey, all schools indicated that they had participated
in a Learn to Swim or School Sports Program.
Schools Aquatic Program Coordination
Of the 4 schools who participated in Learn to Swim or School Sports Programs, 3 of the
programs were co-ordinated by pool staff and the fourth school coordinated their own
program.
Frequency of Student Visitations in Learn to Swim Program
Of the schools who participate in aquatic-based programs, the average number of student
visits is detailed below:
4 Visits 2 schools
More than 10 visits 2 schools
Most Popular Terms
To gain an understanding, of when schools use swimming pools, they were asked to nominate
which school term they typically use pools. The results are detailed below:
Term One 2 Schools
Term Two 1 Schools
Term Three 1 School
Term Four 2 Schools
The results indicate that terms one, three and four were the most popular terms and that
schools are more likely to plan aquatic based programs during the warmer months which
allows Aquatic Centre operators to plan for peak school usage during these periods.
Most Popular Swimming Pools
The schools were requested to nominate the main swimming pool(s) used for the aquatic
programs.
The following indicates the most popular swimming pools used:
Portland Indoor Pool 1 school
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 78
Casterton Outdoor Pool 1 school
Hamilton Indoor Pool 1 school
Heywood Outdoor Pool 1 school
Reasons for Choosing Most Used Swimming Pool
The main reasons schools gave for choosing their most used swimming pools were:
Affordable price 1 school
Heated swimming facilities; Indoor facilities;
Good facilities; 50 metre pool; Quality of programs 1 school
Close to school; 50 metre pool 1 school
Close to school; Range of pools;
Heated swimming facilities 1 school
Features Would Like to See Developed
The main features that would encourage schools to make greater use of swimming pools in
the future were:
Indoor warm water pools
Other (please specify below)
Access at different times than allocated; Diving facilities; More shaded water
areas
Separate school change room; Cheaper entry fees
Indoor warm water pools 1 school
Separate school change rooms 1 school
Cheaper entry fees 1 school
More shaded water 1 school
Access at different times than allocated 1 school
Diving facilities 1 school
School Based Aquatic Facilities
No Schools within the area surveyed had a school-based facilities
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 79
APPENDIX D – SUMMARY OF USER SURVEY
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 80
Users of all the four Council swimming pools were invited to complete a user survey either
online or as a hard copy survey. The surveys were completed during the months of February
and March 2013. A summary of the key finding is detailed as follows:
Portland Leisure and Aquatic Centre
Respondent Profile
The following table summarises the user survey respondent sample for the Portland Leisure
and Aquatic Centre.
Table 6.5
User Survey Respondent Sample
CATEGORY SUB-GROUP NUMBER %
Gender Male 17 25
Female 52 75
Age Range 15-19 years 2 3
20-29 years 12 18
30-39 years 22 31
40-49 years 19 27
50-59 years 8 12
60-69 years 5 8
70 years plus 1 1
CATEGORY SUB-GROUP NUMBER %
Suburb Portland 57 81.4
Narrawong 3 4.3
Bolwarra 2 2.9
Cape Bridgewater 1 1.4
Casterton 1 1.4
Heathmere 1 1.4
Other 5 7.1
A review of the survey sample indicates that:
Fewer males (25%) responded to the survey than females (75%).
The highest percentage age profile that responded to the survey were aged 30- 39 years
31%, followed by 40 - 49 years 27% and 20-29 years 18%. These age groups represent
people in their most active years.
The predominant area were respondents lived was Portland 81%, followed by Narrawong
at 4.3%.
(ii) Times the Centre Was Most Used
The main times people used the Portland Leisure and Aquatic Centre are detailed in the
table below.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 81
Table 6.6
Centre Usage Times
Time Slot Numbers %
Before 9.00am 15 10
9.00am-12 midday 30 21
Midday- 2.00pm 3 2
2.00pm- 5.00pm 25 17
5.00pm-8.00pm 57 39
After 8.00pm 16 11
TOTAL 146 100
The most popular timeslots identified for use of the Centre was the 5.00pm- 8.00pm (39%),
followed by 9.00 am to midday (21%), 2.00pm to 5.00pm (17%), and after 8.00pm (11%).
Most survey respondents indicated they travel to the Centre from home 72%, followed by
work (17%) and school (10%).
The majority of respondents travel by car either on their own (89%) or with others (11%)
Most respondents spend 1 to 1.5 hours (55%) at the Centre followed by 0.5 to 1 hours (23%) .
at each visit to the Centre.
(iii) Visits to the Portland Leisure and Aquatic Centre
The following table summarises the frequency of use of the Portland Leisure and Aquatic
Centre.
Table 6.7
Use of Portland Leisure and Aquatic Centre
Daily 2 to3 times 4 to 6 times Weekly Once a
Fortnight
Once a Month Less than once
a month
10% 34.8% 40.6% 7.2% 2.9% 0% 1.4%
The results indicate the majority of respondents are regular users of the Centre with daily, 4-6
times a week and 2-3 times a week accounting for 85.4% of usage.
(vi) Reasons for Choosing to Use the Centre
Respondents provided a large range of reasons why they chose to use the Centre. The
reasons listed in order of frequency of response, were:
Close to home 16.1%
It has an indoor pool 16.1%
To attend a health and fitness program 12.7%
Range of gym equipment available 10.2%
Good facilities 8.5%
To attend learn to swim program 6.8%
To attend a specific program 6.8%
To use outdoor pool 5.9%
Friends and family use it 4.2%
The main reason the Portland Leisure and Aquatic Centre was the centre of choice was
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 82
because it is close to home (16%) followed by it has an indoor pool (16%) and to attend a
health and fitness program (12.7%).
(v) Rating of the Facilities
Survey respondents rated the current services and programs at the Portland Leisure and
Aquatic Centre as:
Excellent 10%
Good 19%
Adequate 37%
Poor 29%
Very poor 6%
The results indicate that approximately 29% of respondents considered the facilities to be
between excellent and good and 72% considered the facilities adequate, poor or very poor.
The survey respondents who considered the facilities to be poor/very poor were asked to
indicate which facilities and/or services in particular they were unhappy with. The reasons
listed in order of frequency of response were:
Change rooms 23.4%
Indoor pool 20%
Leisure Pool 11.2%
Gym/Weight facilities 8.4%
Air quality in pool Hall 5.6%
Outdoor Pool 5.6%
Kiosk and food facilities 4.7%
Group fitness rooms 3.7%
Water slides 2.0%
(vi) Rating of the Service and Programs
Survey respondents rated the current services at the Portland Leisure and Aquatic Centre as:
Excellent 12%
Good 35%
Adequate 35%
Poor 14.7%
Very Poor 2.9%
The results indicate that approximately 47% of respondents considered the services to be
between excellent and good while 52.6% considered the services adequate, poor or very
poor.
The survey respondents who considered the services to be poor/very poor were asked to
indicate which services in particular they were unhappy with. The reasons listed in order of
frequency of response were:
Level of fees and charges 67%
Customer service/assistance 33%
Group fitness timetable 33%
Centre too crowded 17%
Range if programs and services offered 17%
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 83
(vii) Main Activities Undertaken at the Portland Leisure and Aquatic Centre
The main activities undertaken at the Portland Leisure and Aquatic Centre as indicated by
survey respondents are listed as follows in order of frequency of response:
Use of gym and weights 29%
Group fitness and fitness classes 22%
Lap swim/fitness 19%
Spectator 18%
Recreation swimming and fun 16%
Take child to pool 15%
Take part in an aquatic program 12%
Personal training 7%
(ix) Future Facility Features that Would Encourage Greater Use of Public Swimming Pools
Just under 9 out of 10 (87%) of respondents indicated that they would like to make greater
use of the swimming pools and leisure centres in the future.
Respondents provided a large range of facility component priorities that would assist them in
greater use of pools. The top five features included:
Cleaner more hygienic facilities 19%
Warm water pool for therapy 13.8%
Larger indoor learn to swim pool 10.9%
Membership packages/discount offers 10.3%
Longer opening hours 6.9%
Improved gym/weights facilities 5.7%
Outdoor Pools – Casterton, Merino and Heywood
(i) Respondent Profile
The following table summarises the user survey respondent sample for the Portland Leisure
and Aquatic Centre.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 84
Table 6.8
User Survey Respondent Sample
CATEGORY SUB-GROUP NUMBER %
Gender Male 17 33
Female 52 67
Age Range 15-19 years 4 3.6
20-29 years 14 13
30-39 years 34 31
40-49 years 24 29
50-59 years 13 11.80
60-69 years 9 8.18
70 years plus 2 1.8
A review of the survey sample indicates that:
Fewer males (33%) responded to the survey than females (67%).
The highest percentage age profile that responded to the survey were aged 30- 39 years
31%, followed by 40 - 49 years 29% and 20-29 years 13%. These age groups represent
people in their most active years.
(ii) Times the Centre Was Most Used
The main times people used the outdoor pools are detailed in the table below.
Table 6.9
Centre Usage Times
Time Slot Numbers %
Before 9.00am 20 19
9.00am-12 midday 25 22.7
Midday- 2.00pm 15 13.6
2.00pm- 6.00pm 50 45
TOTAL 110 100
The most popular timeslots identified for use of the outdoor pools was the 2.00pm- 6.00pm
(45%), followed by 9.00 am to midday (22.7%)and midday to 2.00pm (13.6%).
Most survey respondents indicated they travel to the outdoor pools from home (72%),
followed by work (8%) and school (2.6%).
The majority of respondents travel by car either on their own (57%) or with others (39%)
Most respondents spend more than 2 hours (46%) at the outdoor pools followed by 1 to 1.5
hours (23%)at each visit to the pools.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 85
(iii) Visits to the Outdoor Swimming Pools
The following table summarises the frequency of use of the Outdoor Swimming Pools.
Table 6.10
Use of Outdoor Swimming Pools
Daily 2 to3 times 4 to 6 times Weekly Once a
Fortnight
Once a Month Less than once
a month
19% 7% 42% 15% 6% 0% 3%
The results indicate the majority of respondents are regular users of the outdoor pools during
the summer seasons with daily, 4-6 times a week and 2-3 times a week and weekly
accounting for 57% of usage.
(vi) Reasons for Choosing to Use the Outdoor Pools
Respondents provided a large range of reasons why they chose to use the outdoor pools.
The reasons listed in order of frequency of response, were:
Accessible facilities 3.85%
Close to home 35%
To use outdoor pool 27%
To attend learn to swim program 12%
Close to work and school 8%
Good facilities 8%
To attend swimming club program 8%
(v) Rating of the Facilities and Services
Survey respondents rated the current facilities, services and programs at the outdoor
swimming pools.
Table 6.11
Rating of Outdoor Swimming Pool Services and Facilities
Rating Outdoor Pool
Casterton Heywood Merino
Excellent 26% 29 % 50%
Good 33% 35 % 10%
Adequate 33% 29% 30%
Poor 8% 6% 10%
Very poor 0% 0% 0%
The survey respondents who considered the facilities or services to be poor/very poor were
asked to indicate which services in particular they were unhappy with. The reasons listed in
order of frequency of response were:
Centre opening hours 45%
Level of fees and charges 22%
Range if programs and services offered 19%
(vii) Main Activities Undertaken at the Portland Leisure and Aquatic Centre
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 86
The main activities undertaken at the Portland Leisure and Aquatic Centre as indicated by
survey respondents are listed as follows in order of frequency of response:
Cool down from hot weather 29%
Recreation fun swimming 22%
Take child to the pool 19%
Competition activities 18%
Holiday programs 16%
Lap swimming /fitness 15%
Aquaerobics 2%
(ix) Future Facility Features that Would Encourage Greater Use of Public Swimming Pools
Seven out of 10 (70%) of respondents indicated that they would like to make greater use of
the swimming pools and leisure centres in the future.
Respondents provided a large range of facility component priorities that would assist them in
greater use of pools. The top five features included:
Longer opening hours
Cleaner more hygienic facilities
Additional family change rooms
More variety of activities and programs
Improved social and food areas
Improved outdoor grass areas/shade
Warm water pool
Improved learn to swim programs
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 87
APPENDIX E – TOWNSHIP FOCUS GROUPS
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 88
A range of focus group sessions (day and evening) were held Portland, Heywood and
Casterton township to identify local community issues and need.
The following table provides a summary of the key issues identified.
Table 6.12
Summary of Key Issues – Township Focus Groups
Stakeholder Group Issues Raised
Portland Focus
Water temperature at PLACE is an issue. Often cold.
Use of chlorine gas a concern in a residential area.
The infrastructure is old.
Casterton/Merino Focus
Group
Hospital undertook feasibility of developing a hydrotherapy pool – not
considered feasible at this stage.
Hospital interested in discussing possible options with council to develop a
warm water pool collaboratively.
Schools make high use of pool for school sports, learn to swim and squad
training.
Some parents going to Hamilton and Mt Gambia to access learn to swim
programs. Intensive program only program available.
Facility in need of upgrade – no money been spent on the facility for some
years.
Current facility not accessible for people with disabilities
Merino pool considered the “poor cousin”.
Swimming Club successful, but need to bus participants to Hamilton from
preseason training as pool opening too late.
There is no hot day policy to enable pool to remain open on days of extreme
heat. This doesn’t suit farmers who finish work at 5.30pm and pool is closed
by 6 pm.
Heywood Focus
Heywood Community Health
Advised that the Heywood Community Plan outlines a priority for the
development of a multipurpose indoor centre including a hydrotherapy pool
and gymnasium.
Provided consultation completed in March 2011 by the Bendigo Bank
regarding priorities. Pool heating and a general revamp of the pool including
the provision of a roof over the pool, the undertaking of general
maintenance and the provision of disability access were considered priorities
by the community.
Currently run a rehabilitation program on Monday and Wednesdays for
strength and balance. Indoor dry program run from the Heywood Rural
Health (old hospital) with a small gymnasium. Don’t use the pool for
programs.
Heywood residents do travel to Portland to use facilities however good
transport links are required. There is a V-line bus service as well as smaller bus
services run by the YMCA, Heywood Community Health and the Glenelg
Shire.
Casterton/Merino User
Group Session
• Casterton Swimming Club
• Merino Swimming Club
• YMCA staff members at both
Casterton and Merino.
Swim Clubs at both Casterton and Merino Swimming Pools.
Lack of maintenance funding spent on the facilities.
Don’t want longer operating hours.
Coleraine hospital rehabilitation pool is no longer operational.
No disability access into the pools.
Swimming clubs have raised money for solar hot water for the showers.
Clubs have purchased lane ropes and reels.
Commissioning takes place too late prior to season opening.
Solar blankets falling apart at both pools.
Offer 4 weeks of Learn to Swim through the schools.
Don’t want any great improvements just want the existing facilities
maintained.
Volunteerism not encouraged.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 89
Stakeholder Group Issues Raised
Open later if the weather is warm.
Heywood/Dartmoor User
Group Session
Lack of maintenance means people will use private pools.
Hours of operation are too short.
Contract management not good.
Poor water quality.
Poor security.
Poor cleaning and maintenance.
Younger ones go to Portland for swimming lessons as its too cold.
Solar heating not used enough.
There was a swimming club in the past but no longer.
There used to be lap swimming but no longer.
Needs greater community involvement i.e. a community committee of
management or advisory group.
Potential for increased programs such as boot camp.
More programs and equipment is needed such as inflatables.
Change facilities old and tired with no hot water.
Need leisure water.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 90
APPENDIX F – KEY STAKEHOLDER INTERVIEWS
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 91
Discussions were held with a range of key informants to discuss current and future aquatic
and leisure facilities needs and opportunities. The following provides a summary of their key
needs and issues related to current and future facilities.
Table 6.13
Summary of Key Stakeholders Interviews
Stakeholder Group Issues Raised
Portland and District
Health
Bring up to 20 people per week to participate at PLACE.
Do water exercise class on Friday morning from 10.30 – 11.30am.
Would like a warm water exercise pool. Would like water temperature to
be at least 34 degrees with greater depth.
The water temperature is too cold for many of their participants.
Additional accessible change rooms required. Disability access is not
good. The change rooms is used for storage and the water wheelchair
often has a flat tyre.
Would run more classes if there was more pool space available.
YMCA run a rehabilitation program in the gym. Many participants
graduate from the Portland and District Health class to the YMCA
rehabilitation program.
Suggested an enclosed walkway to the outdoor pool.
Indoor pool very busy in the mornings especially when the outdoor pool is
closed.
Would support dry consulting suites at the pool.
Air temperatures too cold for people with disabilities.
Portland Swimming
Club
There are 48 schools in the primary schools zone.
5 – 6 competitions run over the summer season.
32 members in the Portland Swimming Club.
90% junior members.
Train 3 afternoons and 2 mornings per week.
Concerns about the poor quality of the pools and concerned that the
plant will break down during 4 day carnivals.
The pools are old and the pipework leaks.
Wannon Water and
Committee for
Portland
More fun is needed at the pools.
Consider geothermal heating opportunities.
Pools currently leak.
The bore will be replaced in Portland soon. Maybe an opportunity to
develop a spa resort facility.
Heywood is a better opportunity for warm water pool due to the distances
the heating has to travel.
Capitalise on the harbour and develop a wave pool on the foreshore.
United Way Suggested the development of a leisure precinct and share facilities.
More storage sheds are required.
Develop more of a youth hub and family area including community
gardens.
Interactive toddlers pool.
Support other allied health services on site.
Ensure pricing is accessible.
Portland Tourist
Association
Support the development of sea baths.
More swimming lessons through summer holidays.
Deliver more family activities.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 92
Stakeholder Group Issues Raised
Advancing Country
Towns
The Advancing Country Towns Advancing Country Towns will focus on
improving cross-government investment by working at a strategic and
local level to identify local needs to improve quality of life. The initiative
supports local communities to develop a range of solutions such as
improved access to early childhood services, educational attainment,
employment opportunities and economic participation
The Advancing Country Towns objectives are:
To improve investment and service coordination and
integration to more efficiently meet identified local priorities
To improve access to education, skills and training and
employment
To identify economic development opportunities
To increase the capacity of regional communities to
participate in decision-making and priority-setting activities.
The Project does not specifically address recreation and aquatic services and
facilities. The opportunity however to create a point of difference for
Heywood would assist with the economic impact on the township by bringing
more people to the area.
Phi Currie DPCD The aquatic facilities within the Glenelg Shire are aging and require
significant maintenance and upgrades.
The improvement of facilities in Heywood could improve economic and
job prospects for the indigenous community.
Warrnambool is current undertaking strategic work to improve water play
areas and capture dry program market locally.
Not sure what is happening in regards to aquatic developments in Mt
Gambier.
Hamilton haven’t capitalised on opportunities.
Warm water, water play and contemporary facilities should be a focus for
Glenelg.
Portland has characteristics for a tourism focus.
There may be potential for private, public partnerships.
Geothermal heating option should be explored.
Funding through RDAF not likely as its for regionally significant infrastructure.
Funding through RDA – Putting Locals First, may be possible for some
elements of projects.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 93
APPENDIX G – YMCA STAFF FOCUS GROUP
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 94
A focus group was held with staff from the YMCA currently operating the facilities. The
following provides a summary of key issues identified:
Stakeholder Group Issues Raised
Health and Fitness Separate spin room required.
Mind body room required.
Outdoor covered area for boot camp.
Separate room for rehabilitation sessions required.
793 aquatic and fitness members.
Only one room for group fitness classes, could do with another multi-purpose
room for spin, vacation care, parties etc.
Would like to run water aerobics in Heywood.
Would like a dry room at Heywood to run classes.
Run pilates in the crèche at Portland.
Birthday Parties Need undercover area outside for birthday parties.
Need more fun indoor and outdoor including an indoor slide.
Wave pool.
More colour.
Parties run in crèche.
2 – 3 parties per weekend. Could do more but no more room and have the
demand.
Do Zumba and rockwall.
Have 3 inflatables.
Need to encourage youth activities.
Outside of School Hours
Care
Run a holiday program 3 days per week for 3 weeks in the school holidays from
the Henry House building.
Run a holiday program 1 day per week for 3 weeks in the school holidays from
the outdoor pools.
Run a before school program one day per month.
Run an after school program 1 – 2 days per week.
Need a multi-purpose building at the pool as there is no-where to run the
program when it rains.
Need more fun.
Pool Operations The spa and courtyard need to be covered.
Equipment should be moved off pool deck and proper storage provided.
Outdoor pools need disability access.
Casterton pool could operate all year round with the right facilities.
Make all facilities family friendly.
Heywood could be youth focused with games room, hub, youth play space
and skate park incorporation.
Use of chlorine gas not ideal.
School Swimming Program Bus preps from Heywood to Portland.
14 schools use Portland.
Horsham use the pool for school competitions.
Run swim program with a fun day at the end of the program.
Run the interschool sports for Primary Schools.
High schools use Portland for carnivals.
Would like separate change facilities for schools.
Need bleachers on the side of the pool (tiered seating)
Additional storage required.
Early Education 19 place crèche.
Would like to separate under 3 and over 3 to different areas.
Need children’s toilets.
Need to improve the outdoor area.
Could double the size.
Need more storage space.
Learn to Swim Water temperature not consistent.
Approximately 290 – 300 in Learn to Swim.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 95
Stakeholder Group Issues Raised
$12 per class or $31.50 for a private lesson.
Limited spaces available.
Not enough teachers.
Need more crèche spots for teachers children.
Need a new wet deck at Portland.
Customer Service Need a new reception and membership enquiry area.
Improved cafe and merchandise.
Office on pool deck for enrolments.
Group fitness room leaks.
General Need a staff room.
Need a first aid room.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 96
APPENDIX H – INTERNAL GLENELG SHIRE COUNCIL STAFF SESSION
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 97
An internal focus group was held with staff from a range of different Glenelg Shire Council
Departments. The following provides a summary of key issues identified:
Area/Department Issue Raised
Youth Services Opening hours are too short on weekends.
Gymnasium needs to be bigger.
Use Warne Ponds.
Program for teen gym then makes gym too small for others.
Not much fun for the youth.
Disability Services Long term physical disabilities need access to rehabilitation.
Need to heat all pools.
Provide accessible change facilities.
Need fold down seating in change facilities.
Improved signage.
Define entrances to the pools.
Staff need to be aware of people with disabilities in the pool and the gym.
Usage of shared space gets too busy.
Environmental
Services
Incorporate ESD principles in designs.
Consider opportunities to minimise greenhouse gases
Contact
Management
There is a need for significant improvements to the facilities
Length of season needs to be reviewed.
Poor communication between Council and YMCA
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 98
APPENDIX I – LEISURE AND AQUATIC TRENDS THAT IMPACT ON LEISURE FACILITIES
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 99
The following summary of general leisure trends impacting on people and their demand for
recreation, sport and leisure activities and in particular aquatic facilities has been developed
using a range of aquatic facility feasibility documents.
General Leisure trends impacting on aquatic leisure facilities design, facility components and
user attraction include:
A gradual ageing of the population. As life expectancy increases, birth rates stay low and
the “baby boomers” of the 1950s and 1960s grow older. This is placing a new demand on
providing programmed hotter water areas as well as pools suitable for therapy and older
adult exercises. It also means it is essential to have a range of pools with different water
depths and temperatures.
Flexibility in the times when people recreate. As demands on people’s time increases
and work practices change people are seeking to take their recreation at different times,
over a broad spread of hours and at facilities that offer a lot of activities under the one
roof. Indoor pools and health and fitness facilities are particularly attractive and getting
easier to use as many are open 12 to 16 hours, 7 days a week
Increased variety in recreation and leisure options. People’s leisure and recreation
options are changing towards newer more varied activities offered over a greater range
of timeframes compared to previous decades where limited variety in activities and
scheduling occurred. This has supported the trend to more multi-use facilities to attract a
broader range of users as well as multiple water areas to meet different needs at the one
centre.
Constraints to recreation and leisure participation. Lack of time, lack of facilities close by,
family and work constraints, health problems and cost of service or use of facilities are the
main constraints to many people’s recreation and leisure participation. The development
of targeted markets of users, programs and services at aquatic and health and fitness
centres has assisted in reducing some of these participation constraints
Changing employment structures, trading and work hours. These trends often makes
participation in traditional sports difficult and therefore people are looking for facilities
that are open longer hours and have a lot of activity options at the one site. This makes
opportunities such as indoor pools attractive as their long opening hours and days open
means usage can be made in a wide range of social, training, competition, educational
settings.
Different people want different activities. The broadening different cultural, age, gender
of the population sees the need for facilities to offer potential users a much more varied
range of programs and services than previously offered. All year round indoor aquatic
facilities also provide the greatest diversity of activities throughout the different seasons
impacted by an areas local weather.
Provision of high standards and quality of facilities and services. People are looking for
high standard, high quality facilities and services to meet their recreation and leisure
needs. This has also seen the trend for indoor facilities becoming very popular as they
allow activity in safe and secure spaces in all weather and environmental conditions. This
leads to indicating that building low standard, low cost facilities will not attract the
maximum user market.
Desire for activities to be affordable. The development of multi-purpose aquatic leisure
centres has enabled the high operating cost activity of aquatics (in many cases) to be
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 100
cross subsidised by more profitable activity areas such as health and fitness, food and
beverage and entertainment areas. This has enabled many facilities to keep general
entry fees low to encourage use whilst seeking users who want special services to
contribute at a greater level to the cost of such activities.
Recognition of strong links between physical activity and health. Preventative health
care and active lifestyles are very important to many people’s aquatic and health and
fitness activities are becoming a large part of people’s activity choices.
Expectations of equity and access. Today’s society expects people with special needs to
be catered for in public aquatic and leisure facilities. This has seen improved design
features to increase accessibility to and within such facilities. Added to this is the growing
array of programs and activities offered to people of all different abilities, physical
condition and skill levels.
General Aquatic Facility Trends
The main general aquatic facility trends that can impact on selection of high use activity
components are detailed in the graphic on the following page.
Successful Facilities Model
SUCCESSFUL FACILITIES
KEY COMPONENTS TO
MEET MAIN USER MARKETS
HEALTH & WELLNESS
• Gym and Exercise studios
• Massage/Beauty Treatments
• Warm water program pools
HOSPITALITY
• Training and program rooms
• Meeting/social facilities
• Café and merchandising
LEISURE & ADVENTURE
• Indoor water play complex
• Free form play pools
• Adventure rides and pools
FITNESS & EDUCATION
• Competition/training pools
• Learn to Swim pools
• Spa/saunas
• Club/association
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 101
Specific Aquatic Facility Trends
Specific Aquatic Facility Trends that are impacting on people in the 21st Century include:
(a) Aquatic Facility Trends and Main User Markets
Traditionally many local authority aquatic leisure facilities were built for specialist or limited
market users (i.e. competitive swimmers or high level sport participants). Detailed planning
and comprehensive feasibility studies now are able to show more targeted user profiles.
Such studies usually identify the demographic profile of residents in the project area, their
current aquatic and leisure participation patterns and use of surrounding aquatic facilities
that provide a sound base for more user friendly facilities.
The majority of aquatic facility market research indicates future complexes must equally cater
for four distinct aquatic user markets being:
Recreation and Leisure Market - usually made up of families, people coming with
friends and groups for fun, relaxation, social activity and low level
competition/participation.
Main Aquatic User Markets
MAXIMUM
AQUATIC FACILITY
USER ATTRACTION
SUBJECT TO
DEMOGRAPHIC
PROFILE
EDUCATION
• 10% to 15% of users
• Learn to swim, schools etc.
• Special needs users
•
THERAPY
• 10% to 15% of users
• Hydrotherapy
• Exercise classes in water
REC, LEISURE & ADVENTURE
• 60% - 70% of pool users
• Families, friends, social
groups
• Coming for fun and play
FITNESS & TRAINING
• 20% to 25% of pool users
• Competitive swimmers
• Club/association users
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 102
Competitive/Training/Fitness Market - usually made up of people predominantly
attending facilities alone for structured fitness or competition activities.
Education Market - usually made up of children and adults wishing to increase
water safety and survival skills. Includes Learn to swim classes, school and club use
and individuals improving their skills and techniques. They require hot water pools
and water depths with some straight edges and easy water access etc.
Health and Therapy Market - usually made up of children, adults and older adults
wanting to relax or exercise in hot water. This market also includes specialist health
condition groups such as arthritis, asthma suffers, etc. They require hot water pools
and associated health relaxation areas, i.e. Spa/saunas, etc.
Research indicates that the recreation and leisure market will be the largest as it contains
people of all ages, ability, types, interest and gender. The competitive/ training/fitness
market is a more specialist market as it usually contains younger, fitter and more active
people who have made time to train and compete.
Previous research conducted by SGL Leisure Planning Team indicates that in many cases 60%
to 70% of facility users come from the recreation/leisure sector with 20% to 30% coming from
the competitive/training/fitness markets. The health and therapy and education markets can
range from 10% to 20% of the market subject to the age and health profile of the community
in which the facility is located.
The most successful centres attract all user markets and should be set up to allow people to
participate in a range of activities at the one site. The further addition of health and fitness
facilities, spas and saunas and social areas have been very successful at many aquatic
facilities, as they add to the user experience and contribute to people being attracted to
attend these facilities more often.
(i) Aquatic Facilities Activity Areas
Industry trends indicate that the majority of current indoor standalone aquatic facilities
revenue does not meet annual operating costs. Average losses range from $200,000 to
$500,000 plus per annum. The limited numbers of Centres that are raising their operating costs
show minimal return on capital investment.
A review of the successful Centres' business indicates that these Centres record:
High visits per meter
High expense recovery ability including capital repayment
High operating profits per visit
Excellent program range returns and attendances
High secondary spend returns
Excellent range of attendance types (adult/child ratio)
Draws users from a large catchment area
High revenue returns from health and fitness
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 103
To ensure financial viability and attract potential interest from capital investors, any future
facility development must be designed with the above business aims in mind. This support
usually recommends activity area components that can:
Provide a mix of shallow leisure/recreation water with programmable water areas.
Provide high revenue generating complementary service areas such as spas, saunas,
and food and beverage services.
Are located in a high traffic/visitation area.
Are located as part of other leisure facility development.
Traditionally, commercial investment in aquatic facilities has been in specialist pools such as
learn-to-swim or as additions to health and fitness clubs. The high capital cost and limited
financial returns have contributed to this situation. Recent projects do see an increase in the
number of management groups prepared to invest capital funds in return for longer-term
agreements.
(ii) Health and Fitness Activity Areas
Industry trends indicate that users of aquatic facilities are also significant users of health and
fitness facilities. Location of each of these activity components at the one site improves
financial viability.
Health and fitness has the capacity to record high expense recovery returns, with many
centres returning 125% to 180% of expenditure. Traditionally these returns can also attract
commercial investors and operators to health and fitness facilities. Locating these facilities at
aquatic centres increases the potential of cross-selling and spin-off use. It also improves the
membership/program user and casual user ratio.
(iii) Ancillary Services and Activity Areas
In recent years, there has been a trend to develop a range of complementary businesses in
conjunction with aquatic leisure facilities. These include:
Wellness Centres/Day Spas: There is an emerging trend of adding in an area for
specialist wellness activities, services and merchandising. The key services found at
successful wellness centres include massage, beauty therapy treatments, gentle
exercise classes and relaxation and time out activities.
Inclusion of such facilities offers a broader range of activities to a larger age profile of
people. The massage and beauty therapy are high yield sales activities and also can
have high linked merchandising product sales.
It is essential in developing such areas that they are located with good views, away
from general public noise and viewing areas and have very good finishes and fittings.
There needs to be a close by lounge for relaxation after treatment or classes.
Sports Medicine: Development of consulting rooms, with patient access to health and
fitness and pools, have been excellent revenue generators.
Health and Therapeutic Services: Health consultancies, weight loss and therapeutic
services linking in worker and accident rehabilitation patients to use the range of
facilities with centre memberships paid by relevant authorities.
Health and Beauty Services: Leased areas to services such as beauticians, hair salons
and body toning.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 104
Potential Future Aquatic Facility Trends
Aquatic Facility reviews completed in Australia, North America, Canada, the Middle East and
China during the past two years by SGL provides a guide to likely new aquatic facility
innovations and trends.
Key features that should be considered when redeveloping or retrofitting high use aquatic
facilities are:
(i) Leisure Play Equipment
Changing static shallow water areas into water play and fun zones is one of the most popular
renovations. This can be done by adding simple play equipment, water sprays and
interactive equipment to existing pools. Added to this is the option to introduce inflatable
play equipment to allow the area to be changeable.
Many such outdoor pools that have been retrofitted have been linked to high use indoor
pools.
(ii) Major Attraction Leisure Features
Water slides and similar challenge and adventure type activities have remained popular as
long as the venue has a range of slides/rides to keep peoples interest. Single ride facilities
struggle to keep interest due to the lack of variety. Multi ride areas allow users to try different
length and configuration rides.
There are also a range of new water rides that have a slide component leading to another
ride experience such as dropping into a bowl and then water, or onto a ramp and then into
a splash pool.
A key design trend is to link all slides to a common entry platform to ensure one staff person
can supervise the area. A common splash down zone also allows one lifeguard to control a
range of ride water entry points.
(iii) Special Effects
A range of North American Indoor leisure parks have added computerised light shows and
sound systems to allow night time areas to be changed. The use of lights and sound provided
users with new indoor facility experiences at night-time.
Some centres have gone further by adding projection walls to incorporate movies and short
video clips with their new light and sound effects.
(iv) Leisure Furniture
Many centres aimed to keep parents and children at centres longer (to encourage greater
secondary spending on food/beverage/merchandising) by providing quality furniture. The
use of pool side lounges, tables, chairs, umbrellas, has allowed families to stay close to the
water areas in relative comfort.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 105
(v) Food/Beverage/Merchandising
This area has seen some major changes through development of pool side and dry area multi
serving zones. Linked to these are high quality wet and dry lounge zones where people are
encouraged to sit down and relax.
A number of innovative centres provide extensive lounge areas as well as pool side furniture.
These centres use mobile food and beverage carts to sell items directly to centre users (i.e.
they take the product to the customer). A number of other centres visited have used
merchandising innovations, such as all existing customers having to go through the sales area.
Other innovations included:
Multi-media video screens through the centre reminding customers about
programs, special promotions, and food/beverage and merchandising specials.
Providing customers with discount vouchers (at entry to centre) to spend in food/
beverage and merchandising outlets or on their next visit.
Offering combination sales specials to attract a higher spend per person.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 106
APPENDIX J – ESD INITIATIVES
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 107
ESD Initiative Description
Energy and CO2 Emissions
Active Systems
Solar Pool Heating Standard poly propylene heating mats
Solar Pool Heating Evacuated tube collectors or concentrating solar
collectors
Heat Exchanger for Pool Hall
Ventilation
Air-Air heat exchanger reduce heating/cooing
requirements for incoming outside air (make-up air).
Pool Hall Ventilation
controlled by Humidity
Sensors
Efficient approach to control dew, especially over
night when pool not in operation'
Solar Photo Voltaics Solar PV installation on roof and/or shading structure
Solar PV carpark lighting Carpark lights with solar panels.
Wind Turbines Small 1kW to 3kW installation to showcase renewables
Passive Systems
Pool Shell Insulation Insulation to reduce heat losses to soil
Pool Blanket Reduce heat and evaporation losses over night
Water/water heat
exchanger
Water going to sewer/recycling exchanges heat with
incoming make-up water.
Natural Ventilation Building to be naturally ventilated.
Daylighting Façade and roof light design for appropriate daylight
design.
Re-commissioning, building
tuning
Re-commissioning and building tuning after 12 months
of operation
Green Roof Provides thermal protection to building.
Geothermal Air Tempering Incoming outdoor air to be pre-tempered.
External Reflection Pond Reflects daylight into building.
Heat Reflective External
Surface Finish for Roof &
Walls
Reduces heat load on building. Might only be required
for part of the building.
Water
Water Saving Initiatives - Pool
Blanket
Depends on pool hall ventilation strategy
Pool Water Treatment Advanced treatment systems to reduce requirements
for chemical treatment and energy
Backwash Water Treated and for toilet flushing
Greywater Treated and stored for landscape irrigation
Rainwater Capture from roof & shading structures, treated and
stored for use as pool top-up
Water Efficiency Water efficient showerheads and mechanical timers,
efficient taps, toilets and urinals.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 108
ESD Initiative Description
Water Meters Separate check meters for pool, showers, toilets,
cleaning, water harvest, tanks, etc.
Electronic shower timers Electronic shower timers display shower time and/or
water usage. Reset when cubicle door is opened or
locked.
Stormwater Collected from reserve. Stored in bio swale, wetlands
etc. Treatment and use on demand.
Leak detection Water meter monitoring through BMS to include leak
detection
Wetlands Wetlands in strategic locations can provide cool
breezes through evaporation. Assists with natural
ventilation strategy.
User Health & Education
Ventilation Strategy to
remove Chlorine from air.
Ensures fresh air over pool surface.
Hydration Station Provide hydration stations (drink fountains) at strategic
locations, including information about dehydration.
Learning Resources Signage, leaflets, digital displays in entry area.
Informative seminars for stakeholders and pool users.
Environmental Displays Digital 'live' displays of energy and water used, air
quality, ESD initiatives, comparison to standard pool
installations.
Bio-Filtration Wall Active filtration on indoor air through plant wall. Air is
drawing through wall by fan.
Display of ESD technologies ESD initiatives openly displayed (not hidden within
building structure)
Monitoring of existing pool Extra water and electricity meters to be installed in
existing pool facilities
Display of air quality CO2 / CO, VOC's, O2 sensors, displayed on
environmental displays.
Environmental Management
Environmental Management
Plan (EMP)
Comprehensive EMP or is to be ISO14001 accredited
Waste Management Plan Must include waste targets, roles & responsibilities,
waste reporting etc.
Building Users Guide (BUG) BUG helps understanding how the building works,
provides do's and don'ts, describes building systems
and ESD initiatives
Building User Education BUG workshop to form part of staff induction process.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 109
ESD Initiative Description
Ongoing monitoring and
reporting
Monthly analysis of water & energy. Quarterly analysis
of waste management, operational performance of
equipment and building and reporting.
Transport
Bicycles Facilities Provide secure bicycle parking facilities incl.
compressed air and drink fountain.
Discounts for public transport
users / bicycle users
Entry ticket discounts or other incentives to promote
use of public transport and bicycle riding.
Small car parking spaces Promote/rewards use of small cars
Future proofing carpark Provide infrastructure for future installation of electric
car charging stations
Display of train departure
times
Electronic display showing departure time, minutes to
departure, delay/cancellation details.
Materials
Timber Construction Timber structural frame work using engineered
(laminated) timber sections.
Choice of Building Materials ESD review of all materials proposed.
Alternative Materials Durra wall, rammed earth, mod-wood, recycled
materials, etc.
Environmental Pollutants
Pool Chemicals Develop Environmental Management Plan for Pool
Chemicals
Waste Management Plan Develop Operational Waste Management Plan
E-water cleaning E-water system splits water into alkaline and acidic
solutions for chemical free cleaning and disinfection
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 110
APPENDIX K – BENCHMARKING OF LEISURE AND AQAUTIC FACILITIES IN SIMILAR
MUNICIPALITIES
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 111
Council and
Facility
Issues Raised
Colac Otway
Shire (population
22,100) -
Blue Water Fitness
Centre
Apollo Bay
Community Pool
Colac Otway operates two aquatic facilities including the Blue Water
Fitness Centre and the Apollo Bay Community Pool.
The Blue Water Fitness Centre comprises of the following components:
o 6 lane 25m indoor pool
o Spa and steam room
o Gymnasium
o 2 basketball/netball courts
o 2 squash courts
o Program rooms
o Group fitness
o Creche
The Apollo Bay Community Pool comprises of the following components:
o 6 lane 25m pool
o Beach entry
o Water play area
o Single court indoor multipurpose stadium
The Colac Otway Shire secured $10million to redevelop the Blue Water
Fitness Centre.
The redevelopment will consist of the addition of water play features to
the existing 25m indoor aquatic facilities. This will include a zero depth
splash pad and 4 or 5 water features.
A 14m x 9m warm water pool will be developed which will be divided into
two parts via an accessible ramp entry. One side of the warm water pool
will be used for Learn To Swim activities with a depth between 600mm –
900mm. The other side will be used for warm water activities such as
rehabilitation and warm water exercise with a depth of 1300mm –
1600mm.
The project also includes the development of an additional sports court
and increasing the size of the gymnasium and other dry facilities.
Funding was received from a number of sources including Federal, State,
Local and Community funding. $2.8m was sought through the Health and
Hospitals Fund for the Warm Water Exercise Pool and funds were obtained
through the CFFP – Better Pools Program for the development of the splash
pad and water features.
A small warm water pool serviced clients and the general community to
some degree at the Colanda Disability Centre, however, this was
demolished in 2012.
DHS funded a feasibility study in 2005. Colac Area Health were supportive
of the development of a Warm Water Pool however, were not interested
in direct management or development responsibilities.
Corangamite
Shire Council
(population
17,500) -
Rodney Grove
Aquatic Centre
6 outdoor pools
The Corangamite Shire Council operates 6 outdoor pools in the towns of:
o Camperdown
o Cobden
o Lismore
o Skipton
o Terang
o Timboon
Council also supports the operations of the Rodney Grove Aquatic Centre
operated by the Cobden and District Health Services.
The Rodney Grove Aquatic Centre was opened in March 2011 and
consists of a 12m x 8m warm water exercise pool and 2 separate spa pools
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 112
Council and
Facility
Issues Raised
(with the ability to swim against the current).
There is no ramp entry into the warm water pool or spa pools however, the
warm water pool has step entry and a hoist.
The facility is run by the Cobden District Health Service and managed by
the YMCA on their behalf.
The facility operates on a programmed hours of operation model. During
school terms, the centre is open on average 45 hours per week – 26.5
hours for specific programs and 18.5 for public swimming. During school
holidays the centre is open on average 22.5 hours per week mostly for
public swimming and the occasional private booking.
The spa pools can be booked by patrons wishing to swim against the
current. The spa pools are used approximately 75% of the time for general
spa use and 25% for swimming for fitness.
The facility cost approximately $1million to build and was funded via a
number of partners including $500,000 from Council, $500,000 from
community fundraising (approximately half from deceased estates and
half from fundraising), $50,000 from the Department of Health and $38,500
from BHP. Council subsidises the operations of the centre by $20,000 per
year for 5 years and a local charity shop contributes funds to assist in the
ongoing operating costs.
Casual fees are charged for entry - $4.60 for adults, $3.50 children and
$3.80 for concession. Memberships are being considered to incorporate
use of the pool and other district health programs and services.
Programs conducted at the facility and co-ordinated by the YMCA,
Cobden Health and other providers include:
o Infant Learn to Swim
o Kinder Swim
o Water Aerobics
o Gentle Water Fitness
o Aquasafe Program
o Arthritis Exercise Program
o Physio Programs
The pool depth is 1.2m to 1.6m and platforms are used for swim lessons.
The water temperature is on average 33 degrees to 34 degrees and caters
for the rehabilitation, learn to swim and elderly programs market.
Horsham Rural
City Council
(population
20,400)
Horsham Aquatic
Centre
Horsham Rural Council has one aquatic facility servicing the community.
The Horsham Aquatic Centre comprises of the following components:
o 25m indoor pool
o Leisure water
o 50m outdoor pool
o Creche
o Cafe
The Horsham Aquatic Centre is managed on behalf of the Council by the
YMCA.
The Horsham Rural City Council has no immediate plans for further aquatic
facility developments.
There are no warm water exercise pools located within Health Services
within the municipality.
Golden Plains
Shire (population
19,000)
The Golden Plains Shire does not operate any aquatic facilities due to the
fact that they are 20 minutes from Geelong and 20 minutes from Ballarat.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 113
Council and
Facility
Issues Raised
Moyne Shire
Council
(population
16,900)
Moyne Shire Council operates three outdoor pools at Mortlake, Macarthur
and Hawkesdale.
Council supported the development of community driven project to
develop an indoor pool in Port Fairy.
In March 1991 a collection of community minded Port Fairy residents
banded together to discuss the feasibility of constructing an aquatics
centre in Port Fairy. After strong community consensus, discussion
snowballed into a vision for the development of an indoor, four-lane, 25
metre swimming pool to be based in Port Fairy’s Southcombe Park. In July
2001, following 10 years of lobbying, Council approval for the construction
of an aquatics centre.
In June 2007 the community vision was ultimately realized when the
community owned and operated aquatics centre, Belfast Aquatics,
opened its doors to the public. With facilities and services catering for a
range of ages and abilities, and an emphasis on improving the fitness and
lifestyle of Port Fairy residents and visitors, Belfast Aquatics provide Learn to
Swim programs, Water Aerobics, Aquafit, Deep Water Running, Spin Cycle,
Body Fit, Strength training and Group Sessions.
The facility consists of the following components and programs:
o 25m four-lane lap pool
o 30-degree heated pool
o Beach entry
o Toddler area 0-1.2m
o Spa jets - Hydro therapy
o Gym and cycle studio
o Classes water and gym
o Learn to swim
o Memberships
o Swimwear and accessories
o Inflatable fun days
o Birthday parties
Council subsidises the operations of the facility by $150,000 per annum.
The total capital cost of the construction was funded via a number of
sources including State Government, Local Government, Moyne Festival,
Philanthropic Trusts and community fundraising.
Given that the facility was constructed 6 years ago as cost effectively as
possible, the facility is now requiring additional funds for facility upgrades
and maintenance.
The facility is now requiring additional funding to retrofit environmentally
sustainable components to the facility and undertake major maintenance.
Southern
Grampians Shire
(population
17,400)
Hamilton Indoor
Leisure and
Aquatic Centre
6 outdoor pools
Southern Grampians Shire manages the Hamilton Indoor Leisure and
Aquatic Centre which consists of the following components:
o 8 lane 25m pool
o Leisure and program pool with beach entry
o Gymnasium and program area
o Multipurpose room for group fitness and meetings
o 4 squash courts
o 8 bay table tennis area
o 4 squash courts
o 4 court stadium
o Crèche.
Revised Report 290713.docx VIC 53.2012) - 1 August 2013 Page 114
Council and
Facility
Issues Raised
Outdoor pools are located in the following townships:
o Hamilton (50m)
o Balmoral (26m)
o Coleraine (50m)
o Dunkeld (26m)
o Glenthompson (25m)
o Penshurst (25m)
Vitality Health operates the gymnasium and group fitness facilities at the
Hamilton Indoor Leisure and Aquatic Centre on a licence agreement.
Vitality Health are charged a licence fee and receive a percentage of
membership sales.