Glen &dimplex Process improvements

7
MANUFACTURING IMPROVEMENT PROJECT 2 Rework Trend improvement 3 Relocation of testing area for the Range 4 Rebalance of R12 Range

Transcript of Glen &dimplex Process improvements

Page 1: Glen &dimplex Process improvements

MANUFACTURING IMPROVEMENT PROJECT2 Rework Trend improvement

3 Relocation of testing area for the Range4 Rebalance of R12 Range

Page 2: Glen &dimplex Process improvements

REWORK TREND IMPROVEMENT Assembly Rework Trends

• Introduced Production Quality Review Meetings• Discuss & Implement containments for defects• Encouraged Repairmen to feedback to workgroup Defects

repaired.• Created Sign off Compliance sheets for defects found in

workgroups• Ensured Ownership is understood Between

Operator/Process/Component and actioned• Tracked Defect By Station• Introduced a Standardised Working Mind set• Tracked Trends to improvement level• Introduced Quality Alerts & Process Audits to ensure

improvement.• Introduced Problem Solving Summary Sheets to Resolve Key

Issues• Coached a Go look See approach to Problem Solving and Provide

Support as Required• Created a Escalation & Tip Level Reaction Plan.

nigel charles
Department Daily meeting started
nigel charles
Department Daily meeting started
nigel charles
Department Daily meeting started
nigel charles
Department Daily meeting started
Page 3: Glen &dimplex Process improvements

RELOCATION OF TESTING AREA

FOR THE RANGETop Right Picture Showing Status of the Area Identified for New Testing Area for the Range.

Middle Right Showing Track being Fitted from redundant Tracking Scrapped off on site.

Platform Steps Enter & Exit Made for Recycled Steel Scrapped, Motors used to Power Rollers were Redundant ones refurblished .

Bottom Right Picture is Area waiting to be Painted and up and running Orange Boxes are Testing units, Cookers waiting in station to be tested.

Overhead Lights Relocated and fitted by the Maintenance Team.

Overhead Signs Brought in

Nigel Charles
Vision of Testing Area prior to transformasion
Page 4: Glen &dimplex Process improvements

• T- CARD TORQUE CONTROL SYSTEM

Torque Calibration Data Collection Process

All check recorded in collection folderAll results found out of calibration Process is stopped and product held and Torque gun removedEscalated to Supervisor and Maintenance informedSupervisor/ Managers Folder & Job instruction and Confirmation Check Sheet Located in Bottom Right folder

Job instruction in Process folder.

Page 5: Glen &dimplex Process improvements

LOGO TO ADD JOB INSTRUCTION SHEETDESCRIPTION: KAMISHIBAI

CARDS Delivery of Parts Ref No: PSHOP PART DELIV -001STEP No MAIN STEPS KEY POINTS

1 Pick up T CARD Ensure that TCARDS is for correct DELIVERY & TIME & LINE SEE CARD HEADING2 KIT ISSUER Confirm area FOR DELIVERY & TIME & LINE CONFIRM ACTIONS line name written on card and time of delivery. Turn Kamishibai card Turn card to reflect complete (green) to visually communicate task completion on return from Delivery.3 4 Team Leaders actions Maintenance of T Card Paperwork. Hourly visual checks on T Cards and any Reds escalated to Relevant Supervisor 5 Supervisor MAINTENANCE OF T CARD PAPERWORK Visual Checks on T Cards Process. Data collection of issues (CCAR ) And closure of issues raised6 7 8 9 Turn Kamishibai card Turn card to reflect complete (green) to visually communicate task completion

EXAMPLE

SIGN OFF Team Leader Supervisor Manager

Revision History Date TL SUPERVISOR

Part Name and Line Name

Delivery Time

Turn Card to Green when task is complete

LINE 51What time of delivery

KAMISHIBAI STEP CONFIRMATIONJOB INSTRUCTIONS SHEET.

Follow Job Instruction Sheet from Step 1 to 9Main Steps are Owners of that Steps.Key Points are actions takenExample is what the T Card Looks Like.

Page 6: Glen &dimplex Process improvements

T Card Process Parts Delivery Hourly StatusBlue T Card is Hourly Delivery Times

Red T Card has Part Name and line to be delivered to Must be Turned to Green when Delivered.

If Parts are not Delivered Card Must Stay Red and Escalated to Team Leader CCAR must Actioned By Team Leader & Supervisor and Containment agreed to support Production.

Team Leader Visual Must visit T Card Process Hourly and Sign in and out.

Supervisor Must Ensure Process is adhered to By Visual Ensuring every 2 hours Process is on Plan.

Manager Visit Visually Daily and reviews CCAR Weekly to Ensure Process is Robust.

Page 7: Glen &dimplex Process improvements

REBALANCE OF R 12 RANGE• Task was to rebalance R12• Currently Running 10.5 Hours• Producing 40 units a Day

• Video all Process to Validate Process Times• These Video’s were analysed by the work group to

establish realistic, repeatable timings• Documented the details using Quality Process sheets,

and Standard operating procedures.• Identify Process Bottlenecks (14.9) Cycle time currently• Identify Non Valve added activities to eliminate waste.• Created Yamazumi Boards to assist work groups in

effective job design as well as highlighting opportunities for improvement.

• Results 42 units Processed in 8.5 Hours improved Cycle Time (11.5)

• 2 hours overtime daily Eliminated• 8 hours a week -32 hours a month saving. (£544)• Production increase 32 more Monthly. Product cost per

unit 1000 (£32,000)