Presented to: By: Date: Federal Aviation Administration GIM-S Outreach Meeting CSA Users David Gray/Curt Rademaker September 10th, 2014

Transcript of GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration...

Page 1: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Presented to:

By:

Date:

Federal Aviation Administration GIM-S Outreach

Meeting

CSA Users

David Gray/Curt Rademaker

September 10th, 2014

Page 2: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

Topics • Overview • GIM-S Concept • ZAB Changes • Post IOC

2

Page 3: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

3

Overview • Ground spacing tool that was baselined & funded as part of the

2007 SBS JRC decision • Ground Interval Management – Spacing (GIM-S) comprises a set of

ground functions to: – Improve metering by reducing long freeze horizons to shorter distances – Minimize the use of vectoring for problem resolutions – Increase fuel efficiency by absorbing delay at higher altitudes than in the TRACON – Provide speed advisories to assist in the delivery of aircraft to a Meter Point/Meter Fix – Improve ETA/STA performance as the NAS equips with ADS-B avionics

• Functionality allocated across multiple platforms, creating this NextGen capability

• ZAB selected as the GIM-S Key Site, for the arrival metering into PHX on the EAGUL5/6 – EAGUL5 will become the EAGUL6 on Sept 18, 2014 – GIM-S IOC on Sept 22, 2014

3

Page 4: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

4 4

Ground Interval Management – Spacing Concept

TBFM Meter Point (MP)

TBFM Meter Fix (MF)

Controller issued speed instructions for Meter Points

Aircraft STA not frozen at the MP/MF

Aircraft STA frozen at the MP/MF Aircraft handoff to Terminal Airspace

MP

MF

Arrival Airport

En Route ATC

TBFM Meter Point (MP) Freeze Horizon

TBFM Meter Fix (MF) Freeze Horizon

Aircraft flying published RNAV arrival

TOD

Aircraft Top of Descent (TOD)

Page 5: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

PHX Arrival Traffic

5

Page 6: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

Traditional Metering

6

1

2

Page 7: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

GIM-S Metering

7

1

7

Page 8: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

GIM-S Metering

8

1

7

Page 9: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

Speed Advisory Details • Mach speed instructions will be issued at-or-above FL240

– It is understood that currently, pilots expect Mach/IAS transition to occur ~FL290-FL300,

– Improves the GIM-S performance and accuracy – At FL280, difference in M0.01 = 4 knots vs. FAA required IAS

increments of 10 knots – Speeds issued in Mach may be as low as M0.68 – Winter months in ZAB – adverse rides in mid 30s flight levels result in

greater number of aircraft in mid 20s flight levels

9

Page 10: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

Speed Advisory Details • Speed instructions provided only when aircraft are in

level flight • GIM-S speed instructions will not be issued after SLIDR

on EAGUL5

10

Page 11: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

Summary • ZAB will begin metering 500NM from PHX on

EAGUL 5/6 vs. traditional metering of 160NM on the EAGUL5

• Delays to be absorbed in ZAB are now segregated between sectors and flows further upstream than today,

• Speed instructions can be provided to absorb these delays

11

Page 12: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

Post IOC

12

Page 13: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

FY15 Planned Sites

ZFW

ZLC

ZID

ZJX

ZOB

ZMA

ZME

ZTL

ZAU

ZMP

ZKC

ZOA

ZAB

ZDV

ZLA

ZBW

ZNY

ZSE

ZHU

ZDC

ACM Airport

Adjacent Center Metering

LAX

PHX

SLC

Page 14: GIM-S Outreach Administration Federal Aviation Meeting€¦ · GIM-S Outreach Administration Meeting . CSA Users . September 10th, 2014 . Federal Aviation 2 Administration Topics

Federal Aviation Administration

Notional Program Plan • SIG Development and Testing Oct14 – Dec14 • PR Verification Oct14 – Nov14 • WJHTC Risk Reduction Nov14 – Jan15 • SRMD Jan15 – Feb15 • Site Adaptation Oct14 – Mar15 • Site Checkout Mar15 – Apr15 • Pair 1 Operational Apr15 • Pair 2 Operational May15 • Deploy GIM-S at PHX, LAX, SLC, DEN May15 – Sept30

14