Stockholm- on the rocks, not stirred, not shaken
Geoteknikerens hverdag
6. november 2014
René Mølgaard Jensen
Sidefod
Dias 1
Värtahamnen…future…
Sidefod
Dias 2
Færgelinier i Østersøen
Sidefod
Dias 3
Oversigtsplan
Sidefod
Dias 4
Involved parties
The Client
oStockholm Hamnar & Stockholm Stad
The Contractor
oAarsleff
o JV Värtahamnen HB
oAarsleff & Aarsleff Bygg och Anläggnings AB
The Consult
oCOWI
Sidefod
Dias 5
Mængder
– Piling
934 driven – 111 DTH drilled (Ø900-1,200): 36,000 lm. (20,500 ton)
Sheet piles, KC-piles, jet grouting etc.
– Construction:
Dredging: 14,000 m3
”Frysmuddring”: 3,000 m3
Excavation: 81,000 m3
Filling material: 107,000 m3
Concrete: 45,000 m3 (prefab. 30,000 m3) – pile cap, slabs and L
Reinforcement: 12,000 ton (266 kg/m3)
Sidefod
Dias 6
Tidsplan
Contract:
• Start: 2013-02-01
• Finish: 2016-12-01
• Duration: 46 Month
Phases:
• Phase 1 +2: 30 Month
• Phase 3: 7 Month
Sidefod
Dias 7
Aarsleff organisation
Sidefod
Dias 8
Anbefalede tekniske løsninger
Sidefod
Dias 9
Geoteknisk snit
Sidefod
Dias 10
3D-illustration
Sidefod
Dias 11
Tolket bjergniveau
-55m
-50m
-45m
-40m
-40m
-35m
-30m
-25m
-20m-15m
Jordparametre
Sidefod
Dias 13
F1, F2, F3, F4 og F5
Sidefod
Dias 14
KC-pelare
Snit i KC-pelar forstærkning
Snit i spunsvæg
Snit i spunsvæg for overgangszone
Driveability
Sidefod
Dias 19
IHC S280 whitout noise reduction
Sidefod
Dias 20
IHC S280 whit noise reduction
Sidefod
Dias 21
Stålpæle traditionel pælesko samt åben pælesko
Design af bjergsko
Sidefod
Dias 23
Hvilken bjergsko – hvor?
Sidefod
Dias 24
Alternative bjergsko
Sidefod
Dias 25
Clay – rock - friction
Sidefod
Dias 26
Produktion af bjergsko
Sidefod
Dias 27
Rør, rør og atter rør
Sidefod
Dias 28
Asien - Europa
Sidefod
Dias 29
Rørene ankommet i Stockholm
Sidefod
Dias 30
IHC S280
Sidefod
Dias 31
Installation in panels
Sidefod
Dias 32
Crawler crane LR 1300, LR1280 og LR1100
Sidefod
Dias 33
Template and supply barge
Sidefod
Dias 34
60 m rør, Ø1168 mm og mere end 30 t
Sidefod
Dias 35
KC pelare rig
Sidefod
Dias 36
KC pelare rig på A+A
Sidefod
Dias 37
KC pelare rig
Fryssmuddring
Sidefod
Dias 39
Pile Cap
Standard pladeelement
Armering af dækelementer
Sidefod
Dias 42
Forme til elementer
Sidefod
Dias 43
Armering af pile caps
Sidefod
Dias 44
Lastning af elementer
Sidefod
Dias 45
Lodbrok gi’r den gas
Sidefod
Dias 46
Building information model (BIM)
BIM advantages:
o Geometry
o Build ability
o Visualization of time schedule
o Quantity optimization and minimized waste
o Reporting
o Machine control
o Bar bending schedule from 3d models
o Data filtering
o Better understanding of construction
o Logistics
o Tolerances
Sidefod
Dias 47
BIM is used to optimize the project by building the model in 4D which incl. time schedule.
BIM will be used doing the planning- and execution phase.
Sidefod
Dias 48
Sidefod
Dias 49
Sidefod
Dias 50
Det former sig
Sidefod
Dias 51
Sidefod
Dias 52
Sidefod
Dias 53
Sidefod
Dias 54
Sidefod
Dias 55
3d surfacesPier excavation model for L-Walls
Dias 56
L-walls
Sidefod
Dias 57
ReinforcementBuildability
Dias 58
ReinforcementCut & Bent
2013-09-26
Dias 59
Elementært
Sidefod
Dias 60
Sidefod
Dias 61
Pladen fuld
Sidefod
Dias 62
Sheet PilesAnchors installation sequence
Dias 63
L-WallsAnchors installation sequence
Dias 64
Dias 65
L-WallsAnchors installation sequence
Dias 66
L-WallsGravel bed
Dias 67
L-WallsGravel bed machine
Rock surfaceMisleading anticipated rock level Before and after investigation
Dias 68
Rock surfaceDiff. before and after investigation
Dias 69
ReportingQuantity take-off
Dias 70
ReportingQuantity take-off
Dias 71
As BuiltDry Mix (KC-Piles) piles
2013-09-26
Dias 72
As BuiltDry Mix (KC-Piles) piles
Dias 73
LogisticsPiles / Pile Caps / Deck Elements
Available elements on a certain date are selected and ordered.
Dias 74
Dias 75
WorkflowPiles/Pile Caps/Deck Elements
In background dots – steel pile deliveriesDots in background – steel pile deliveries
Colorful squares – deck element deliveries
Bauer BG46
Sidefod
Dias 76
Planning sketchPiles/Pile Caps/Deck Elements
Dias 77
Sketch is made for distribution after determining workflow.
Dias 78
Planning sketchOverall planning
Sketch is made for distribution after determining workflow.
Dias 79
Sketch is made for distribution after determining workflow.
Planning sketchL-Wall installation
Dias 80
Planning sketchSheet Piles installtion
Dias 81