Geomagnetic Disturbances (GMD): A Utility Perspective Mike Steckelberg Principal Engineer Transmission Planning Great River Energy

Transcript of Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances...

Page 1: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Geomagnetic Disturbances (GMD):A Utility Perspective

Mike SteckelbergPrincipal EngineerTransmission PlanningGreat River Energy

Page 2: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Review of TPL‐007‐1■ Purpose■ Applicability■ Process■ Why do we need TPL‐007‐1?

GRE’s Responsibilities and Efforts to Comply as:■ Transmission Planner■ Transmission Owner■ Generator Owner

TPL‐007‐1 Timeline

Overview of Presentation

Page 3: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

TPL‐007‐1  (Title and Purpose)

Page 4: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

TPL‐007‐1 (applicability)

Page 5: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Why TPL‐007Solar Eclipse‐August 21, 2017‐Lusk, Wyoming

To take the Beatles Literally:  ‐”Here comes the Sun”

Page 6: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups
Page 7: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Space weather

Page 8: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Space Weather

Page 9: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups
Page 10: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Geomagnetically Induced Currents (GIC)

Page 11: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Modeling for GIC calculationsTask:  Model this thing (Large Power Transformer)

Page 12: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

GIC circuit

Page 13: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

TPL-007 Compliance Timeline

13

R2: Assemble model(s) and equipment data

(7/1/2018) R5: Provide GIC Data(1/1/2019)

R1: Determine responsibilities

(7/1/2017)

R6: Transformer Thermal Impact

Assessment (GO/TO)(1/1/2021)

R3: Planning CriteriaR4: GMD Vulnerability

Assessment(1/1/2022)

R7: Corrective Action Plan(s)

(1/1/2022)

You (We)Are Here

Page 14: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

I Winding dc resistance (ohms/phas

e)

J Winding dc resistance 

(ohms/phase)

K Winding dc resistance 

(ohms/phase)

I Winding GIC blocking device

J Winding GIC blocking device

K Winding GIC blocking device

Vector Group

0.3022 0.6060 0.0295 0 0 0 YNa0d1

0.2148 0.0573 0.0084 0 0 0 YNa0d1

0.2135 0.0495 0.0074 0 0 0 YNa0d1

MISO data request Excerpt from the MISO data request per MOD‐032 (Data for Power System 

Modeling and Analysis) with an example of data entry for TPL‐007‐1

Page 15: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

For ‘applicable’ equipment■ Shunt reactors■ Transformer DC resistances

Substation ground resistances Transmission line resistances are optional at this point

Great River Energy’s efforts

Page 16: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Search through your one‐lines for ‘applicable’ equipment

Reactors.....

Page 17: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Shunt reactors on tertiaries

Only if connected from 200 kV to ground

Connected to delta tertiary‐‐not modeled

Page 18: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Shunt reactor connected to line

DC resistance data is needed

Page 19: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Data from:■ Nameplate■ Substation drawings■ Transformer test records

Determine if the transformer data is ‘applicable’

Transformer data

Page 20: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Transformer vector groups

Page 21: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Search through your one‐lines for ‘applicable’ equipment

Transformers

Page 22: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Transformer Name Plate

Page 23: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Transformer test reports

Page 24: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Transformer Test Reports

Page 25: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

Gather information about applicable transformers ■ GRE has about 35‐40 transformers that might meet the criteria

• Mostly autotransformers• Some eliminated due to delta on the >200 kV side• CU HVDC transformers require special attention (Y‐Δ in parallel with Δ‐Y)• No applicable reactors (all reactors are connected to the delta tertiary)• Ongoing review for accurate modeling• How was the winding resistance measured?

■ Xcel has about 62 transformers that may meet the criteria

GRE activities ‐‐ summarized

Page 26: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

TPL‐007 Compliance Timeline

26

R2: Assemble model(s) and equipment data

(7/1/2018) R5: Provide GIC Data(1/1/2019)

R1: Determine responsibilities(7/1/2017)

R6: Transformer Thermal Impact 

Assessment (GO/TO)(1/1/2021)

R3: Planning CriteriaR4: GMD Vulnerability 

Assessment(1/1/2022)

R7: Corrective Action Plan(s)

(1/1/2022)

MISO requests MISO requests data by

December 1, 2017

Page 27: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

TPL‐007‐1  steps• R1 – determine who is responsible for which requirements in TPL‐007‐1 (MISO ‐‐ DONE) (required a ‘look ahead’ at the other requirements)

• R2 – develop system models for GIC (MISO – IN PROGRESS‐MISO has requested modeling data)

• R4 – MISO to do the GIC Vulnerability Assessment (7/1/2018)• R5 – MISO to provide GIC flows to TO and GO• R6 – Transformers with GICs above 75 amps will require thermal assessment (Owners of the equipment, i.e. GO and TO – 1/1/2021)– Tools being developed by EPRI– GRE will get there.....

27

Page 28: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

TPL‐007‐1  steps• R3 – Criteria for acceptable system performance during a GMD event (Transmission Planners – 1/1/2022)–NOT OK:  Voltage collapse, Cascading and Uncontrolled islanding

–OK:  Generation loss, load loss, firm transaction curtailments–Voltage: What is acceptable voltage during a GMD event?– Loading:  What is acceptable loading during a GMD event?–GRE – We will be discussing this with our neighbors

28

Page 29: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

TPL‐007‐1   Corrective Action Plans (R7)• List deficiencies in performance due to the GMD event• Describe actions needed to achieve required performance

– Install equipment– Modify equipment– Operating procedures– Demand‐side management

• Provide corrective action plan to Reliability Coordinator, Planning Coordinators, and other functional entities as requested.

29

Page 30: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

TPL‐007‐1   What’s next ?• Ongoing work to do

– Continue to review equipment data– Transformer assessment tools will be needed– What constitutes a good corrective action plan?– What about criteria during such rare events?

• TPL‐007‐2 is out for review• Keep an eye on the sun (use the proper equipment)

30

Page 31: Geomagnetic Disturbances (GMD): A Utility Perspective A Utility... · Geomagnetic Disturbances (GMD): A Utility Perspective ... Vector Group 0.3022 0.6060 ... Transformer vector groups

?? Questions  ??

31

R2: Assemble model(s) and equipment data

(7/1/2018) R5: Provide GIC Data(1/1/2019)

R1: Determine responsibilities(7/1/2017)

R6: Transformer Thermal Impact 

Assessment (GO/TO)(1/1/2021)

R3: Planning CriteriaR4: GMD Vulnerability 

Assessment(1/1/2022)

R7: Corrective Action Plan(s)

(1/1/2022)

You (We)Are Here