٧٣ Tishreen University Journal for Research and Scientific Studies - Engineering Sciences Series Vol. (30) No. (1) 2008 2007 project management maturity Generated by Foxit PDF Creator © Foxit Software http://www.foxitsoftware.com For evaluation only.

Transcript of Generated by Foxit PDF Creator © Foxit Software...

Page 1: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٧٣

Tishreen University Journal for Research and Scientific Studies - Engineering Sciences Series Vol. (30) No. (1) 2008

2007

��

project management maturity

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 2: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٧٤

Tishreen University Journal for Research and Scientific Studies - Engineering Sciences Series Vol. (30) No. (1) 2008

Methodology of Project Management Assessment and the Financial Effects of Its Practices

Dr. Bassam Hasan * Dr. Jamal Omran**

Rana Maya***

(Received 19 / 9 / 2007. Accepted 17/12/2007)

� ABSTRACT �

A lot of construction projects fail to complete their processes according plans,

leading to financial and technical problems. The paper tries to study the extent to which the application of best management practices will have a quantitative measurable effect on project success.

We have developed a model (trio assessment methodology) to assess project management maturity for a sample of 18 Syrian projects in Lattakia and Damascus. Results varied with the max was 3 of 5 and a minimum was 1.1.

We then applied regression analysis to find the correlation between project management maturity and project performance, represented by cost and duration deviation coefficient. The diagrams showed that there was a strong relation between them.

The research introduces a practical tool that project mangers can use to identify the organization ability in order to improve project management and the benefits.

Key Words: Project management maturity, Regression analysis

* * Professor, Department of Construction Engineering and Management, Faculty of Civil

Engineering, Tishreen University, Lattakia, Syria.**Associate Professor, Department of Construction Engineering and Management, civil engineering faculty, Tishreen university, Lattakia, Syria * **Postgraduate Student, Department of Construction Engineering and Management, civil engineering faculty, Tishreen university, Lattakia,Syria

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 3: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

Tishreen University Journal. Eng. Sciences Series

٧٥

؟

فوائد مالیة

$

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 4: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٧٦

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 5: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

Tishreen University Journal. Eng. Sciences Series

٧٧

[1]

] [2

(IBBS&KWAK 2002)

]3[( pm)2

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 6: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٧٨

PMBOK ] [4

Project management institute

38

(Kerzner,2001)

international institute for learning (ILL)

] [5

PMI* : www.pmi.org

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 7: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

Tishreen University Journal. Eng. Sciences Series

٧٩

(schiltz 2003)

PM2

]6[

[7]

-

-

-

-

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 8: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٨٠

-

-

-

-

(OPM3)

(OPM3)

organizational project management

[8]

.

-

-

-

-

-

-

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 9: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

Tishreen University Journal. Eng. Sciences Series

٨١

.

opm3

.

[9][10]

[11][12]

2 pm

[13]

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 10: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٨٢

)(

dardizedstan

یحسن باستمرار

غیر مبني

مخطط

نموذجي

مقاس

2

3

4

5

1

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 11: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

Tishreen University Journal. Eng. Sciences Series

٨٣

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 12: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٨٤

pm2

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 13: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

Tishreen University Journal. Eng. Sciences Series

٨٥

[6]

-

-

-

-

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 14: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٨٦

)(

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 15: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

Tishreen University Journal. Eng. Sciences Series

٨٧

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

مستوى النضوج

123456789101112131415161718

عدد المشاریع

نضوج إدارة المشاریع

Series2

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

مستوى النضوج

1 2 3 4 5 6 7 8 9 10

عدد المشاریع

مستوى نضوج إدارة مشاریع البناء الخدمیة

Series1

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 16: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٨٨

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

مستوى النضوج

1 2 3 4 5 6 7 8

عدد المشاریع

مستوى نضوج إدارة المشاریع الطرقیة والبنى التحتیة

Series1

1 1.8 2.22 2.94 2 1.8 1.64 2.13 3 2 1.47 1.39 4 1.4 1.96 1.92 5 1.6 2 2.44

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 17: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

Tishreen University Journal. Eng. Sciences Series

٨٩

)

y = -0.644x3 + 4.5665x

2 - 11.144x + 10.792

R2 = 0.4829

0

0.5

1

1.5

2

2.5

3

3.5

0 0.5 1 1.5 2 2.5 3 3.5

مستوى نضوج اإلدارة لعینة المشاریع المدروسة

فةكل

الف

راح ان

ملعا

م

Series1

Poly. (Series1)

6 1.55 2.32 1.56 7 1.9 1.2 1.82 8 1.1 3.33 4.76 9 2.6 1.4 1.09

10 3 1.08 1.19 11 1.6 1.82 1.14 12 1.53 1.82 2.27 13 1.95 2.85 1.33 14 1.86 1.54 1.59 15 1.94 1.05 2.13 16 1.74 1.54 2.7 17 2.2 1.35 1.2 18 1.66 2.86 3.7

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 18: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٩٠

y = -0.9874x3 + 7.1886x2 - 17.816x + 16.449

R2 = 0.5075

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

0 0.5 1 1.5 2 2.5 3 3.5

مستوى نضوج اإلدارة للمشاریع

نزم

الف

رانح

ل اام

مع

Series1

Poly. (Series1)

y = -0.0124x3 + 0.7268x2 - 3.9265x + 6.6431

R2 = 0.7051

0

0.5

1

1.5

2

2.5

3

3.5

0 0.5 1 1.5 2 2.5 3 3.5

مستوى نضوج اإلدارة للمشاریع الخدمیة

ــة لفلكف ا

راحــ

انــل

اممع

Series1

Poly. (Series1)

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 19: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

Tishreen University Journal. Eng. Sciences Series

٩١

y = -0.6274x3 + 4.8896x2 - 13.237x + 13.774

R2 = 0.5492

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

0 0.5 1 1.5 2 2.5 3 3.5

مستوى نضوج اإلدارة للمشاریع الخدمیة

ن زم

�����ال���ف

را�����ح���

انل�����م��عام

Series1

Poly. (Series1)

r2 = 0.483 r2= 0.508

r2 = 0.7051 r2= 0.549

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 20: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٩٢

[1] COOKE, D.; TERENCE, J.; SCHICHTER, f. ; BREDLITTET C.: beyond the BMBOK guide.proceedings of the 32 and annual project management institute seminars and symposium , Nashville, 2001 .

[2]CMMI PRODUCT TEAM (2002) : capability maturity model integration .version 1.1, camegie mellon software engineering institute , pitrusburg ,pa ,2002

[3] IBBS,W.;KWAK.Y. assessing project management maturity. journal of management in engineering ,Vol.18,No.3,julay 2002

[4 ] PROJECT MANAGEMENT INSTITUTE. A guide to the project management body of knowledge .2000 edition , Newtown square, Project management institute,2000,

[5] KERZNER,H. using the project management maturity model :strategic planning for project management. second edition , John Wiley & Sons ,USA, 2005,334.

[6]SCHILTZ ,S.A practical method for assessing the financial benefits of project management. M.s thesis ,graduate school of business and management, Switzerland , 2003,58 2/2005.

www.pmi-switzerland.ch/knowledge/costofbadpm-schiltz-v11.pdf

[7] GANDI,J.: preliminary assessment of project management practices of public housing authorities. Community and Economic Development Program Occasional

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 21: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

Tishreen University Journal. Eng. Sciences Series

٩٣

M.s thesis, school for planning, design , and construction , Michigan state university, August 2005,87.

[8] PROJECT MANAGEMENT INSTITUTE. organizational project management maturity model (opm3). knowledge foundation version Newtown square, Project management institute. Pennsylvania USA, 2003 , 179

[9] PAULK,M.C.;WEBER,C.V.,GARCIA;S.M.,CRISSIS,M.B.; BUSH,M. key practices of the capability maturity model .Software engineering Institute ,version1.1,technical report,SEI-93-TR-025, . 1993

[10] Mc CAUELY,M.:Developing a project-driven organization .PM network ,sep 1993 . 26-30

[11]HINKS,J.,AOUAD,G.; COOPER,R.; SHEATH,D.; kAGIOGLO,M.; SEXTON,M.. IT and the design and construction process , a connectional model for co-maturation .the international journal of construction information technology ,Vo.l5,No.1, 1997, 1-25.

[12] DOOLEY,K.;SUBRA,A.; ANDERSON,j.the impact of maturity and best practices in new product development .quality management conference ,Arizona state ,February 1998

[13] PROJECT MANAGEMENT INSTITUTE . construction extension to a guide to the project management body of knowledge .2000 edition, Newtown square, Project management institute. Pennsylvania USA,2003,162

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.

Page 22: Generated by Foxit PDF Creator © Foxit Software ...tishreen.edu.sy/sites/default/files/Tishreen_Magazine/5...of knowledge .2000 edition , Newtown square, Project management institute,2000,

٩٤

Generated by Foxit PDF Creator © Foxit Softwarehttp://www.foxitsoftware.com For evaluation only.