Page 2: GEBZE TURKEY 1560 MW

CMI HRS Avenue Greiner, 1 4100 Seraing - BelgiumTel: + 32 4 330 24 28Fax : + 32 4 330 22 [email protected]

GEBZE: 2 X 780 MW COMBINED CYCLE BUILD OWN OPERATE,

FOR INTERGEN/ENKA J.V. - TURKEY

FIRST OF THREE REFERENCES FOR THE

SAME CUSTOMER

CMI EPTI, LLC 5300 Knowledge Parkway, Suite 200 Erie, PA - 16510 - USATel: + 1 814 897 7000Fax : + 1 814 897 [email protected]

67 GEBZE - 04/2006

PROJECT DEFINITIONUnder the deregulated Turkish electricity supply, Intergen, a partnership of Bechtel and Shell, joined forces with the Turkish ENKA Group to bid for three power plants to be managed on a Build Own Operate basis with all power produced sold to TEAS, the Turkish Electricity Authority for the first 20 years. Gebze is located at 150 km southwest of Istanbul on the neighboring site to the Adapazari plant that the Group has also build and with which it shares a number of facilities. Gebze station has two 780 MW blocks each with two GE Type 9FA gas turbines with a tri-pressure reheat steam cycle using two HRSGs designed by CMI which supply steam to an Alstom 260 MW steam turbine. Design of both plants pays strict attention to environmental conditions regarding gas, liquid emissions and noise; hyperbolic dry cooling towers are a prominent feature of each site.

THE CONTRACTIn 1997 the Intergen/Enka Group was awared the right to develop power plants at three sites and awarded a contract to GE for four gas turbines at Gebze. The four HSRGs were awarded to CMI and two steam turbines to Alstom. CMI HRSGs are of modular design with all pressure parts fabricated in Europe; the erection was done by local companies under CMI supervision.

PLANT OPERATIONCycling load operation dispatched by TEAS to whom all the power is sold.

GAS TURBINE• GE Type PG9351FA• ISO rated 255.6 MW on natural gas• Site rated at 220 MW on gas at 30°C • Fuel: Natural Gas

HEAT RECOVERY STEAM GENERATOR• CMI Vertical, Assisted circulation design, unfired• Full flow bypass to condenser at each pressure level • Three output pressures with reheat to steam turbine• Stack 80 meters high• High seismic UBC zone 1

PERFORMANCES

GAS °C kg/s

Inlet 609 624

Outlet 120 624

STEAM °C bar t/h

HP 565.8 132.3 277.9

IP 314.7 30.9 39.2

LP 288 5.3 39.9

Reheat 563.3 28.1 315.3

SCHEDULEDate of order ...............................................................June 1999Boiler erection completed .............................November 2001First block at full output ............................................May 2002Full commercial output ...........................................June 2002