G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
Status Report on Status Report on triple-GEM detectortriple-GEM detector
M.Alfonsi1, G. Bencivenni1, W. Bonivento2,A.Cardini2,C. Deplano2,
P. de Simone1, F.Murtas1, D.Pinci2,3, M. Poli-Lener1, D. Raspino2
• 1 - Laboratori Nazionali di Frascati - INFN, Frascati , Italy
• 2 - Sezione INFN di Cagliari – Cagliari, Italy
• 3 - Università degli Studi di Cagliari, Cagliari, Italy
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
2002 tests beam summary
Module-0 test results (preliminary)
New aging test results (preliminary)
Future Plans
OUTLINE
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
Discharge probability < 10-12
1 %inefficiency due to re-charging time
End of efficiency plateau given by the limit on the discharge probability of 10-12
During the PSI test each detector integratedwithout any damage or aging effect about 5000 discharges, corresponding to a dischargeprobability per incident particle of 10-12 in 10 years at LHCb.
Discharge probability per incident particle
Start of efficiency plateau:99% in 25 ns per station
PSI beam test (June 2002): discharge studies
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
CERN test (July 2002): fast gas efficiency
Single detector
Effi
cie
ncy in
25 n
s
99%
Effi
cie
ncy in
25 n
s
Two detector in OR
These results were obtained with a thr of 3 fC
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
Discharge probability < 10-
12
99% efficiency in 25 ns of two chambers in OR(measured after 10 years LHCb equivalent)
1250 V 1315 V
at least 65 V wide working region
PSI + CERN beam test
Ar/CO2/CF4= 45/15/40
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
Module-0 test at T11-PS (october 2002)
Two coupled triple-GEM;
active area: 20x24 cm2 (top side of each GEM divided in 6 sectors);
2x192 pads (10x25 mm2);
2x120 pads instrumented with ASDQ fee:
HIGH operating threshold: ~ 200mV 5 fC
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
Chamber A: one sector of one GEM foil was disconnected becausethe limiting resistor was broken and the whole GEM had to be supplied at lower voltage
Chamber B: OK
Total Efficiency
Chamber B
Total Efficiency
Chamber A
Module-0 test at T11-PS (october 2002)
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
200 mm
240 mm
34 mm
Holes for SMD decoupling resistor
G10 Frame
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
Good uniformity even though efficiency is a little bit low, due to high thres hold
(5 fC instead of3 fC)
Module-0 test at T11-PS (october 2002)
efficiency in 25 ns
Chamber B
efficiency in 25 ns
A or B
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
Module-0 test at T11-PS (october 2002)
fine scan measurements with small crossed scintillator fingers
Chamber B
Cluster size uniformity
Good and uniform cluster size along the pads
Chamber B
Cluster size-fine scan
CS=1.1 onpad center
CS=1.2 onpad edge
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
10 years of LHCb R1-M1
60-20-20G=2x104
Aging test(I)By irradiating the detector with an X-rays flux of 50 MHz/cm2 :
~ 20 C/cm2 was integrated with 60-20-20 @ G= 2x104 (15 LHCb Y)
~ 4.5 C/cm2 was integrated with 45-15-40 @ G= 6x103 (10 LHCb Y)
Gain change less than 5%
10 years of LHCb R1-M1
45-15-40G=6x103
P and T variations are corrected by using a low irradiated 3-GEM chamber
HV= 1230
HV= 1280
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
Aging test(II)45-15-40G=6x103
5.9 keV X-rayspectrum
5.9 keV X-ray: charge peak
stability duringirradiation
5.9 keV X-ray: peak RMS stability during
irradiation
45-15-40G=6x103
10 years of LHCb R1-M1
45-15-40G=6x103
10 years of LHCb R1-M1
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
iso-C4H10 aging test (very preliminary)
Ar/CF4/iso-C4H10 = 65/28/7 at 1030 V – G=1x 104
To simulate 10 years of LHCb R1-M1, at a gain of104, a charge of 6.4 C/cm2
must be integrated
~ 5 years of LHCb R1-M1
in progress !!!
HV= 1030
G.Bencivenni LNF/INFN Muon Meeting 21-October-2002
Future Plans
ASDQ thr lowering (from 5 fC to 3 fC) by means of a better LV distribution (splitter board) and then possible test at BTF (LNF)
ENEA-Casaccia test with (1.25 MeV) from Co60
for large area irradiation
Light version design: Module 0.1 (light honeycomb panel …)
PSI/CERN beam tests