GANNET COMPLEX 021799 Asset Fact Sheets MARKETING · Outline details of gas treatment facilities:...

2
Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015 GANNET COMPLEX GANNET COMPLEX GANNET COMPLEX The Gannet Complex comprises of a fixed drilling and production platform for Gannet A, B, C, D, E, F and G fields. Gannet Alpha installation is a fixed offshore drilling, production and accommodation platform which processes oil and gas from the Gannet A, B, C, D, E, F and G fields. The Gannet B, C, D, E, F and G fields are exploited via subsea wellheads tied back to the Gannet A installation by oil and gas production, gas lift and gas injection pipelines. FULMAR GAS LINE TO FORTIES CATS (BP) SEAL ST FERGUS ABERDEEN BRAEFOOT BAY TEESSIDE AN HOWE NELSON SOUTH ANASURIA GUILLEMOT TEAL SOUTH TEAL COOK NELSON GOLDENEYE CURLEW CURLEW BITTERN TRITON SHEARW SCO ETAP STARL MERGA SKUA HERON GANNET KEY FACTS Block Approx distance to land Water Depth Hydrocarbons Produced Export Method Operated 22/21, 21/25, 21/30, 21/25b, 21/30b, 21/30c, 21/30d, 22/21a, 22/21b, 22/26a 180km (112 miles) East of Aberdeen 312ft (95m) Oil and Gas Oil is pumped via Fulmar A and exported via the Norpipe Export System to Teesside. Gas is exported to Gannet diverter then piped via Fulmer gas pipeline to St Fergus. Operated Sector Central North Sea

Transcript of GANNET COMPLEX 021799 Asset Fact Sheets MARKETING · Outline details of gas treatment facilities:...

Page 1: GANNET COMPLEX 021799 Asset Fact Sheets MARKETING · Outline details of gas treatment facilities: *Fulmar Gas Pipeline Operating Procedures Manual, 2314-001 Sweet Crude Oil and associated

Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015

GANNET COMPLEX

GANNET COMPLEX

GANNET COMPLEXThe Gannet Complex comprises of a fixed drilling and production platform for Gannet A, B, C, D, E, F and G fields. Gannet Alpha installation is a fixed offshore drilling, production and accommodation platform which processes oil and gas from the Gannet A, B, C, D, E, F and G fields. The Gannet B, C, D, E, F and G fields are exploited via subsea wellheads tied back to the Gannet A installation by oil and gas production, gas lift and gas injection pipelines.

FULMAR GAS LINETO FORTIES

CATS

(BP)

FLAG

S

SEA

L

INTERC

ON

NEC

TOR

BBL

LAN

GEL

ED

ST FERGUS

ABERDEEN

BRAEFOOT BAY

BACTON

STANLOW

TEESSIDE

ORKNEY ISLANDS

SHETLAND ISLANDS

SULLOM VOETERMINAL

PARIS

LONDON

MOSSMORRAN

THE HAGUE

SEAN FIELD

INDE FIELD

SCHIEDAM

ZEEBRUGGE

BALGZANDGREAT YARMOUTH

EASINGTON

HOWE

NELSON SOUTH

BRENT A

BRENT BBRENT C

BRENT D

ANASURIA

GUILLEMOTTEAL SOUTHTEALCOOK

NELSON

GOLDENEYE

CURLEW

CURLEW

HAEWENE BRIM

BITTERN

TRITON

SHEARWATER

SCOTER

BARQUE

BRIGANTINECLIPPER

GALLEON

SKIFF

INDE

SEAN

LEMAN

CORVETTE

ETAP

CARAVEL

SHAMROCK

PIERCE

STARLING

MERGANSER

SKUA

EGRETHERON

KEY

GANNET

KEY FACTS Block

Approx distance to land

Water Depth

Hydrocarbons Produced

Export Method

Operated

22/21, 21/25, 21/30, 21/25b, 21/30b, 21/30c, 21/30d,

22/21a, 22/21b, 22/26a

180km (112 miles) East of Aberdeen

312ft (95m)

Oil and Gas

Oil is pumped via Fulmar A and exported via the Norpipe Export System to Teesside. Gas is exported to Gannet diverter then piped via Fulmer gas pipeline to St Fergus.

Operated

Sector Central North Sea

Page 2: GANNET COMPLEX 021799 Asset Fact Sheets MARKETING · Outline details of gas treatment facilities: *Fulmar Gas Pipeline Operating Procedures Manual, 2314-001 Sweet Crude Oil and associated

ASSEN

OSLO

HOOGEZAND

STAVANGER

LANGELO/NORG

Gra

phic

s, M

edia

and

Pub

licat

ion

Serv

ices

(Abe

rdee

n)

ITV

/UD

: Re

f. 99

209

: M

AY 2

012

SUBSEA SATELLITE

SUBSEA SATELLITE NON OPERATED

SHELL OPERATED ASSET

NON OPERATED FPSO

SHELL PLANT

SHELL FPSO

OFFICE

ONSHORE GAS FIELD

KEY

GANNET COMPLEX

INFRASTRUCTURE INFORMATION

Entry Specification:

Exit Specification:

Outline details of Primary separation processing facilities:

Outline details of gas treatment facilities:*Fulmar Gas Pipeline Operating Procedures Manual, 2314-001

Sweet Crude Oil and associated gas

Two HP and three LP 1st stage separators, multiple stages of gas compression, three further stages of oil/water/gas separation, produced water handling with overboard dischage.

Refer to Fulmar Gas line Entry Specification

Multiple stages of gas compression, glycol contactor for gas dehydration and export coolers

HIGH LEVEL CAPACITY INFORMATION

>25% 5% to 25% <5%

The basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years

Available Capacities

Gannet firm processing capacity available

Oil export capacity - 88,000 bbls/d

Gas compression capacity - 246 mmscf/d

Gas export capacity - 246 mmscf/d

Gas lift capacity - 130 mmscf/d

Produced water handling capacity - 60, 000 bbls/d

H2S removal capacity – N/A

Water injection capacity - N/A

Comment

Dehydration capacity - As compression

2015 2016 2017 2018 2019

CONTACT INFORMATIONShell For further enquiries regarding the above please contact Charles Cole

+44 1224 88 2606 [email protected]

Last update: January 2015

Disclaimer: All the above information is provided by Shell U.K. Limited (for itself, and other Shell group companies including Enterprise Oil U.K. Limited);- In good faith and without any liability- Without warranty, implied or express to its accuracy or relevance of use to any other party- That in any agreement or arrangement with Shell U.K. Limited its use shall be “Subject to Contract” Shell U.K. Limited reserves the right to update and change the data at any time

Unknown

Due to the integrated nature of FLAGS, Fulmar Gas Line pipelines and the St Fergus and Fife NGL plants, gascapacity needs to be read in conjunction with the Fulmar Gas Pipeline, St Fergus Gas and Fife NGL

None present

None present

Ullage as % of system capacity