FIFE NGL 021799 Asset Fact Sheets MARKETING - Shell in UK · +44 1224 88 2606...

2
FIFE NGL PLANT FGL FIFE NGL PLANT The Fife NGL Plant processes NGLs from the St Fergus Gas Terminal as well as from the Total and SAGE wet gas terminals. TO FORTIES CATS (BP) ST FERGUS ABERDEEN BRAEFOOT BAY TEESSIDE HO NELSON SO ANASURIA GUILLEMOT TEAL SOUTH TEAL COOK NELSON GOLDENEYE GANNET BITTERN TRITON ETA SKUA EGRE HERO KEY FACTS Location Hydrocarbons Produced Operated / Non Operated The Fractionation Plant is located approximately 3 kilometres (km) south-east of Cowdenbeath, Fife and covers an area of approximately 250 acres Gas Operated Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015 MOSSMORRAN

Transcript of FIFE NGL 021799 Asset Fact Sheets MARKETING - Shell in UK · +44 1224 88 2606...

Page 1: FIFE NGL 021799 Asset Fact Sheets MARKETING - Shell in UK · +44 1224 88 2606 charles.cole@shell.com Last update: January 2015 Subject to the availability of relevant capacity, each

FIFE NGL PLANT

FGL

FIFE NGL PLANTThe Fife NGL Plant processes NGLs from the St Fergus Gas Terminal as well as from the Total and SAGE wet gas terminals.

TO FORTIES

CATS

(BP)

FLAG

S

SEA

L

INTERC

ON

NEC

TOR

BBL

LAN

GEL

ED

ST FERGUS

ABERDEEN

BRAEFOOT BAY

BACTON

STANLOW

TEESSIDE

ORKNEY ISLANDS

SHETLAND ISLANDS

SULLOM VOETERMINAL

PARIS

LONDON

THE HAGUE

SEAN FIELD

INDE FIELD

SCHIEDAM

ZEEBRUGGE

BALGZANDGREAT YARMOUTH

EASINGTON

HOWE

NELSON SOUTH

BRENT A

BRENT BBRENT C

BRENT D

ANASURIA

GUILLEMOTTEAL SOUTHTEALCOOK

NELSON

GOLDENEYE

GANNET

CURLEW

CURLEW

HAEWENE BRIM

BITTERN

TRITON

SHEARWATER

SCOTER

BARQUE

BRIGANTINECLIPPER

GALLEON

SKIFF

INDE

SEAN

LEMAN

CORVETTE

ETAP

CARAVEL

SHAMROCK

PIERCE

STARLING

MERGANSER

SKUA

EGRETHERON

KEY

KEY FACTS Location

Hydrocarbons Produced

Operated / Non Operated

The Fractionation Plant is located approximately 3 kilometres (km) south-east of Cowdenbeath, Fife and covers an area of approximately 250 acres

Gas

Operated

Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015

MOSSMORRAN

Page 2: FIFE NGL 021799 Asset Fact Sheets MARKETING - Shell in UK · +44 1224 88 2606 charles.cole@shell.com Last update: January 2015 Subject to the availability of relevant capacity, each

INFRASTRUCTURE INFORMATION

HIGH LEVEL CAPACITY INFORMATION

Entry Specification:

Exit Specification:

CO2/C2 ratio of 0.1 by weight;H2S: 10 ppmw max;Total Sulphur: 17 ppm wt max;TVP: 13 bar(a) @ 15.5 degrees C max;Specs on other trace contaminants

Propane >95.5 %vol, VP <14.34 bar(g) @ 37.8 degrees CButane >95 %vol, VP <4.83 bar(g) @ 37.8 degrees CGasoline TVP <0.7 bar(a) @ 26.7 degrees C

Disclaimer: All the above information is provided by Shell U.K. Limited (for itself, and other Shell group companies including Enterprise Oil U.K. Limited);- In good faith and without any liability- Without warranty, implied or express to its accuracy or relevance of use to any other party- That in any agreement or arrangement with Shell U.K. Limited its use shall be “Subject to Contract” Shell U.K. Limited reserves the right to update and change the data at any time

The basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years

Available Capacities

Capacity

NGL capacity

2015 2016 2017 2018 2019

>25% 5% to 25% <5% Unknown

OSLO

Gra

phic

s, M

edia

and

Pub

licat

ion

Serv

ices

(Abe

rdee

n)

ITV

/UD

: Re

f. 99

209

: M

AY 2

012

SUBSEA SATELLITE

SUBSEA SATELLITE NON OPERATED

SHELL OPERATED ASSET

NON OPERATED FPSO

SHELL PLANT

SHELL FPSO

OFFICE

ONSHORE GAS FIELD

FIFE NGL PLANT

12,500 tonnes/d Capacity depends on ambient conditions (summer/winter), andinlet composition. Due to the integrated nature of the SEGALsystem, if a wet gas service is required this capacity informationneeds to be read in conjunction with that of the relevant pipeline(FLAGS or FGL) and the St Fergus Gas Terminal.

CommentsDescription Ullage as % of system capacity

Outline details of gas treatment facilities

Three NGL fractionation modules to separate ethane, propane, butane and natural gasoline

CONTACT INFORMATION

Shell For further enquiries regarding the above please contact Charles Cole +44 1224 88 2606 [email protected]

Last update: January 2015

Subject to the availability of relevant capacity, each of Shell and Esso is capable of independently providing transportation and processing services using its own proportionate share of available capacity in the Segal System (“Divided Rights”). Please contact either the Shell or Esso representative for further information:

For further enquiries regarding the above please contact Marc Bong-Schmidt +44 1372 412 354 [email protected]

Esso