BACTON 021799 Asset Fact Sheets MARKETING...lines. These include the Leman West area, the Sean area...

2
INTERCONNECTOR BBL SOLE PIT THE SEAN FIELD INDE FIELD SCH ZEEBRUGGE BARQUE CLIPPER GALLEON SKIFF SEAN LEMAN CORVETTE CARRACK CUTTER CARAVEL SHAMROCK EASINGTON GREAT YARMOUTH SSIDE LONDON BACTON INDE BALGZA BRIGANTINE BACTON BACTON BACTON The Bacton gas terminal is located on the Norfolk coast, 32km (19 miles) north of Great Yarmouth. The site is four terminals within one. Perenco, Shell and Eni each operate a separate gas reception and processing facility. The Transco Entry Facility provides a direct link to the UK - Continent Interconnector (a separate asset report for the Interconnector is available). Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015 KEY FACTS Location Export Method Operated/Non Operated 32km North of Great Yarmouth The Shell operated terminal accepts gas from five main offshore lines. These include the Leman West area, the Sean area and the Sole Pit area (Barque and Clipper). Bacton (Shell) also accepts production from the Shearwater Elgin Area Line (SEAL). Operated Hydrocarbons Produced Gas

Transcript of BACTON 021799 Asset Fact Sheets MARKETING...lines. These include the Leman West area, the Sean area...

Page 1: BACTON 021799 Asset Fact Sheets MARKETING...lines. These include the Leman West area, the Sean area and the Sole Pit area (Barque and Clipper). Bacton (Shell) also accepts production

CATS

(BP)

SEA

L

INTERC

ON

NEC

TOR

BBL

SOLE PIT

THE HAGUE

SEAN FIELD

INDE FIELD

SCHIEDAM

EMMEN

ZEEBRUGGE

BARQUE

CLIPPER

GALLEON

SKIFF

SEAN

LEMAN

CORVETTE

AMELAND

CARRACK

CUTTER

CARAVEL

SHAMROCK

EASINGTON

GREAT YARMOUTH

TEESSIDE

LONDON

STANLOW

BACTONBACTON

INDE

BALGZAND

DEN HELDER

GRIJPSKERK

BRIGANTINE

BACTON

BACTON

BACTONThe Bacton gas terminal is located on the Norfolk coast, 32km (19 miles) north of Great Yarmouth. The site is four terminals within one. Perenco, Shell and Eni each operate a separate gas reception and processing facility. The Transco Entry Facility provides a direct link to the UK - Continent Interconnector (a separate asset report for the Interconnector is available).

Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015

KEY FACTS Location

Export Method

Operated/Non Operated

32km North of Great Yarmouth

The Shell operated terminal accepts gas from five main offshore lines. These include the Leman West area, the Sean area and the Sole Pit area (Barque and Clipper). Bacton (Shell) also accepts production from the Shearwater Elgin Area Line (SEAL).

Operated

Hydrocarbons Produced Gas

Page 2: BACTON 021799 Asset Fact Sheets MARKETING...lines. These include the Leman West area, the Sean area and the Sole Pit area (Barque and Clipper). Bacton (Shell) also accepts production

UK-SNS Bacton Gas Plant Gas Treatment Capacity - 900 MMscf/dayCondensate Stabilization Capacity - 8,000 bbls/day

Comment

Interruptable 300MMscf/day capacity all year

2015 2016 2017 2018 2019

Interruptable 1,500bbl/day capacity all year

BACTON

INFRASTRUCTURE INFORMATION

HIGH LEVEL CAPACITY INFORMATION

Entry Specification:

Outline details of primary separation processing facilities

Outline details of gas treatment facilities:

GSV 37-44.5MJ/sm3, Oxygen <0.2%, CO2 Max 2 mol%, H2S <3.3ppm, Total Sulphur <15ppm, WI 48-51.5 MJ/Sm3, Inerts <7%, N2 <5%

Refrigeration Gas processing and Condensate stabilization Facility, No Compression

Disclaimer: All the above information is provided by Shell U.K. Limited (for itself, and other Shell group companies including Enterprise Oil U.K. Limited);- In good faith and without any liability- Without warranty, implied or express to its accuracy or relevance of use to any other party- That in any agreement or arrangement with Shell U.K. Limited its use shall be “Subject to Contract” Shell U.K. Limited reserves the right to update and change the data at any time

The basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years

Available Capacities

CONTACT INFORMATIONShell For further enquiries regarding the above please contact Moataz Darwish

+31 (0) 592368177 [email protected]

Last update: January 2015

>25% 5% to 25% <5% Unknown

Gas HC and Water Dew Point delivered by propane refrigeration plant.

Ullage as % of system capacity

Existing liquid handling constrains to be considered

CapacityDescription