As part of the Gallipoli Barracks upgrade a complete replacement and upgrade of the high voltage network was undertaken. Two 33kV substations and three 11kV substations were installed including state of the art protection and SCADA systems. The protection system is equipped with IRIG-B time stamping to ensure accurate Sequence of Event (SOE) time stamping for the SCADA System. AECOM provided the protection and SCADA specification, including the protection study. ABB 33kV, 11kV switchgear and power factor correction units were installed with two Wilson 33/11kV 25MVA transformers. Schneider MICOM protection relays were utilised for the project, these include: P746—11kV Bus bar protection; P643— 33/11 Transformer differential protection; P543— Tie Feeder differential protection; P145— Radial feeder protection; and P142—PFC protection. ROBSAL (Aust) Pty Ltd provided drawing reviews of the high voltage switchgear, protection logic design and SCADA interface design and settings for the protection relays, and performed site wide protection testing. This testing included 33kv protection testing with ENERGEX. ROBSAL (Aust) Pty Ltd provided the detailed SCADA design and installation, including designing the HMI screens. ROBSAL (Aust) Pty Ltd provided switching sheets and an interface to ENERGEX for the commissioning of HV equipment. ROBSAL (Aust) Pty Ltd provided Design, FAT SAT and O&M documentation. Location ADF Gallipoli Barracks Enoggera Brisbane Client Australian Defence Force Principal Contractor John Holland Contract Type Subcontract Sub Contract Value $400,000 Start/Finish Date November 2012— May 2015 Brief Description A major upgrade of infrastructure at Gallipoli Barracks, included the construction of two 33kV and three 11kV substations. This included two 33kV connections to the ENERGEX network, two 25MVA transformers. Key Personnel Robert Smith -Manager Design Jamie Garton -Manager Construction Referees Des Dykes -Regional Services Manager John Holland +61 7 3867 7134 Simon Lush - Manager NLP Electrics +61 7 3807 7472 tm GALLIPOLI BARACKS HV WORKS

Transcript of GALLIPOLI BARACKS HV WORKS tmrobsal.com.au/project_data_sheet_enoggera.pdf · 2015. 4. 12. ·...

Page 1: GALLIPOLI BARACKS HV WORKS tmrobsal.com.au/project_data_sheet_enoggera.pdf · 2015. 4. 12. · Schneider MICOM protection relays were utilised for the project, these include: P746—11kV

As part of the Gallipoli Barracks upgrade a complete replacement and upgrade of the high voltage network was undertaken. Two 33kV substations and three 11kV substations were installed including state of the art protection and SCADA systems. The protection system is equipped with IRIG-B time stamping to ensure accurate Sequence of Event (SOE) time stamping for the SCADA System.

AECOM provided the protection and SCADA specification, including the protection study.

ABB 33kV, 11kV switchgear and power factor correction units were installed with two Wilson 33/11kV 25MVA transformers.

Schneider MICOM protection relays were utilised for the project, these include:P746—11kV Bus bar protection;P643— 33/11 Transformer differential protection;P543— Tie Feeder differential protection;P145— Radial feeder protection; andP142—PFC protection.

ROBSAL (Aust) Pty Ltd provided drawing reviews of the high voltage switchgear, protection logic design and SCADA interface design and settings for the protection relays, and performed site wide protection testing. This testing included 33kv protection testing with ENERGEX.

ROBSAL (Aust) Pty Ltd provided the detailed SCADA design and installation, including designing the HMI screens.

ROBSAL (Aust) Pty Ltd provided switching sheets and an interface to ENERGEX for the commissioning of HV equipment.

ROBSAL (Aust) Pty Ltd provided Design, FAT SAT and O&M documentation.

Location

ADF Gallipoli Barracks Enoggera Brisbane

Client

Australian Defence Force

Principal Contractor

John Holland

Contract Type

SubcontractSub Contract Value

$400,000

Start/Finish Date

November 2012— May 2015

Brief Description

A major upgrade of infrastructure at Gallipoli Barracks, included the construction of two 33kV and three 11kV substations. This included two 33kV connections to the ENERGEX network, two 25MVA transformers.

Key Personnel

Robert Smith -Manager Design Jamie Garton -Manager Construction

Referees

Des Dykes -Regional Services ManagerJohn Holland +61 7 3867 7134

Simon Lush - ManagerNLP Electrics +61 7 3807 7472