Luce BayouLuce Bayou Interbasin Transfer Project
March 8, 2010
Texas AWWASoutheast Chapter“Current Challenges in Potable Water Industry in SE Texas”
Gary N. Oradat, P. E.Executive DirectorCoastal Water Authority
![Page 2: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/2.jpg)
Who is the CoastaAuthority (“CWA”)?Authority ( CWA )?
► Conservation and Reclamat► Conservation and Reclamatcreated by Special Act of theLegislature in 1967.
► Primarily serve industries anin Chambers, Liberty and Hay
► Given powers, among otherand deliver water inside andand deliver water inside andcounty area.
al Water ??tion Districttion District e Texas
nd municipalities arris Counties.
rs, to transport d outside the 3-d outside the 3
![Page 3: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/3.jpg)
Who is the CoastaAuthority (“CWA”)?Authority ( CWA )?
► Governed by 7-member Board of Direc
► 4 appointed by Mayor, City of Houston
► Dionel E. Avilés, P. E., President
► Kurt F. Metyko, P. E., 1st Vice-Presiden
► Tony L. Council, P. E., 2nd Vice Preside
► Rick Cloutier, P. E., Secretary-Treasure
► 3 appointed by Governor, State of Texa
► Ray Stoesser, Liberty County
► A. R. “Rusty” Senac, Chambers County
► Zebulun Nash, Harris County
al Water ??ctors.
:
t
ent
er
as:
y
![Page 4: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/4.jpg)
What does CWA dWhat does CWA d► Provide raw water to approx► Provide raw water to approx
industrial customers.
Provide raw water for munic► Provide raw water, for municto Houston, Deer Park, and
O t d i t i L k► Operate and maintain Lake Reservoir and Pump StationCanal.Canal.
do?do?ximately 100ximately 100
cipal purposescipal purposes, Baytown.
H t DHouston Dam, n, and the West
![Page 5: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/5.jpg)
What does CWA dWhat does CWA d► Operate and maintain Trinity► Operate and maintain Trinity
Station, Main Canal, and theReservoir and Pump Station
► Operate and maintain assoc(24” to 108”) and facilities.( )
► Own, operate and maintain plant for industrial customerplant for industrial customer
do?do?y River Pumpy River Pump e Lynchburg n.
ciated pipelines
6.5 MGD water rs.rs.
![Page 6: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/6.jpg)
How did CWA get ginvolved in the Luce Bayou Project?y j
► In May 2005, COH requested that CWArequested that CWA proceed with the development of the P j tProject.
► CWA issued “Request for Q lifi ti ”Qualifications”.
► TCB INC was selected.
► “Notice to Proceed” issued April 19, 2006
![Page 7: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/7.jpg)
Where isWhere is Luce Bayou?
Approximately 25 miles northeast of Downtown H t (H i dHouston (Harris and Liberty Counties)
Lake Houston
![Page 8: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/8.jpg)
What is the Luce BaInterbasin TransferInterbasin Transfer
► A conveyance project to tra► A conveyance project to traCOH water supply from the Basin to the San Jacinto RivHouston).
► Estimated Project Cost: $ 30(includes professional servic(includes professional servicland acquisition, environmenpermitting, and primary elec
ayou Project?Project?
ansfer existingansfer existing Trinity River
ver Basin (Lake
00 million ces, construction,ces, construction, ntal mitigation, ctrical service).
![Page 9: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/9.jpg)
What are the ProjeElements?Elements?
► Infrastructure sized to transf► Infrastructure sized to transffeet per year (400 MGD avefrom the Trinity River to LakProject consists of:
► New 500 MGD pump sp p90-acre parcel owned b
► Approximately 3.6 mile► Approximately 3.6 mileand
► Approximately 23 miles► Approximately 23 miles
ect
fer 450 000 acrefer 450,000 acre erage daily flow) ke Houston. The
station located on by CWA;
es of pipeline;es of pipeline;
s of new canals of new canal.
![Page 10: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/10.jpg)
Where Will the WaTreated?Treated?
► Water will be treated at the► Water will be treated at the Plant (located on the west sHouston), and the East WatPlant (located on the east siFederal Road south of I-10)
ater be
Northeast WaterNortheast Water side of Lake ter Purification ide of Houston; .
![Page 11: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/11.jpg)
The Luce Bayou Phas Regional Impohas Regional Impo
► Over 3600 square miles► Over 3600 square miles
► 2 U. S. Senators
► 6 U. S. Representatives
► 10 State Senators
► 32 State Representatives
Ultimately 9+ million► Ultimately, 9+ million people by 2060 (2007 State Water Plan)
Project ortanceortance
![Page 12: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/12.jpg)
Project BackgrounProject Backgroun► Project originally conceived► Project originally conceived
► Primary purpose was, and sCOH raw water supplies in tCOH raw water supplies in tand San Jacinto River.
P j t d i d d► Project was designed and reconstruction in the 1980’s. postponed.postponed.
ndndin 1938in 1938.
still is, to link the Trinity Riverthe Trinity River
d feady for Project was
![Page 13: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/13.jpg)
What is driving the development of thedevelopment of the
► Houston Galveston Subside► Houston Galveston Subsideregulations have created a nadditional surface water to afrom groundwater to surface
► City of Houston (Area 3) and& West Harris County WA’sfrom 100% groundwater to:from 100% groundwater to:► 30% surface water by 20► 70% surface water by 202y► 80% surface water by 203
Project?Project?
ence Districtence District need for allow conversion e water.
d North, Central must convert
102030
![Page 14: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/14.jpg)
What is driving the development of thedevelopment of the
► Conversion deadlines have► Conversion deadlines have developed for Fort Bend Co► 30% surface water by 201► 60% surface water by 202
► Lone Star Groundwater Conis implementing regulations County (2015)County (2015).
Project?Project?
also beenalso been unty:1325
nservation District for Montgomery
![Page 15: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/15.jpg)
What is driving the development of thedevelopment of the
► Population in Harris Fort Be► Population in Harris, Fort BeMontgomery Counties is prothan double from approxima(current) to 9+ million (2060)
Project?Project?
end andend and ojected to more ately 4 million ).
![Page 16: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/16.jpg)
Is the Luce Bayou Psolution?solution?
The Luce Bayou Pr►The Luce Bayou Proptimal regional proidentified in the adoState Water Plan tothe conversion fromgroundwater to surfgroundwater to surfby providing additio
t t th iwater to the region.
Project the
roject is theroject is the oject opted 2007 o facilitate m face waterface water onal surface
![Page 17: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/17.jpg)
How will the ProjeFunded?Funded?
► Texas Water Development B► Texas Water Development Bcurrently has a loan program“Water Infrastructure Fund” defer project development c
► TWDB is anticipated to havepoffer attractive construction
► TWDB has the WIF money► TWDB has the WIF money provide similar financing in tguaranteed.
ct be
Board (TWDB)Board (TWDB) m through its (WIF) which will
costs.
e a program to p gfunding.
now. Ability tonow. Ability to the future is not
![Page 18: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/18.jpg)
How much water is needHow much water is needLake Houston? Who neewater?water?
By January 1 2020►By January 1, 2020
► City of Houston (NEWPP)► City of Houston (NEWPP) ► City of Houston (West Can► NHCRWA
WHCRWA► WHCRWA ► NFBWA ► CHCRWA
► TOTAL DEMAND
ed fromed from eds the
0:0:
80 0 MGD 80.0 MGDnal) 60.0 MGD
122.0 MGD56 0 MGD 56.0 MGD
34.0 MGD 5.4 MGD
357.4 MGD
![Page 19: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/19.jpg)
How much water is needHow much water is needLake Houston? Who neewater?water?
By January 1 2040►By January 1, 2040
Cit f H t (NEWPP)► City of Houston (NEWPP) ► City of Houston (West Can► NHCRWA ► WHCRWA ► NFBWA ► CHCRWA► CHCRWA
► TOTAL DEMAND
ed fromed from eds the
0:0:
140 0 MGD 140.0 MGDnal) 80.0 MGD
159.0 MGD 82.0 MGD 56.0 MGD
6 3 MGD 6.3 MGD
523.3 MGD
![Page 20: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/20.jpg)
Projected Demand vfor the City of Houstfor the City of Houst
Total COH Water Rights
vs Supply tonton
![Page 21: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/21.jpg)
Projected Demand vsProjected Demand vs Lake Houston for the CHoustonHouston
Lake Houston Supply (San Jacinto RiveLake Houston Supply (San Jacinto Rive
Supply inSupply in City of
er)er)
![Page 22: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/22.jpg)
Projected Demand vs Lake Houston for the RLake Houston for the R
Lake Houston SupplyLake Houston Supply
Lake Houston Supply
Supply in RegionRegion
![Page 23: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/23.jpg)
The Luce Bayou Projethe problem for the Rethe problem for the Re
Lake Houston (San Jacinto) + Luce Bayou (
Lake Houston SupplyLake Houston Supply
Lake Houston Supply
ect solves egionegion
Trinity) = 550 MGD +
![Page 24: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/24.jpg)
Are We Developing “NewAre We Developing New
► No The Luce Bayou Projec► No. The Luce Bayou Projecportion of existing COH wateTrinity River to Lake HoustoSan Jacinto River). Togethesufficient surface water to mprojected demands of the Cprojected demands of the Cand the Regional Water Aut2040.
w” Water?w” Water?
ct transfers act transfers a er rights in the n (located on the er, there is
meet the ity of Houstonity of Houston horities beyond
![Page 25: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/25.jpg)
Are There Other OpAre There Other Op
► Water conservation measur► Water conservation measureliminate the need for Luce
Other surface water supplie► Other surface water supplieRiver) do not currently haveavailability.y
► Existing COH infrastructure capacities and transmissioncapacities and transmissionmeet the needs of the RegioAuthorities.
ptions?ptions?
res will notres will not Bayou.
s (i e Brazoss (i.e., Brazos e sufficient
(treatment plant lines) cannot lines) cannot
onal Water
![Page 26: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/26.jpg)
1
Examination
1
of Possible CorridorsCorridors
Lake Livingston Diversion
Capers Ridge Diversion
Existing Trinity River Pump Station Diversion
4A
Lake2/3/4
2/3
Lake Livingston
22
23
4
2
3
4
3
65
55
A/5A6 6
6A
![Page 27: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/27.jpg)
Comparison of PreliConstruction CostsConstruction Costs
Corridor 1 $195 MMCo do $ 95
Corridor 2 $160 MM
Corridor 3 $175 MMCorridor 3 $175 MM
Corridor 4 $470 MM
C id 4 $940 MMCorridor 4a $940 MM
Corridor 5 $355 MM
Corridor 5a $720 MM
Corridor 6 $390 MM
Corridor 6a $665 MM
minary (2006 dollars)(2006 dollars)
► Construction costs for► Construction costs for Corridors 4, 5 & 6 are 80% to 500% higher than Corridors 1, 2 & 3
► Construction costs for Corridors 1, 2 & 3 are within 20% of each other
![Page 28: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/28.jpg)
Corridor 3 selected as the least environmentally damaging practicable alternative.
3
$ 220 million (2009 dollars)
33
33
![Page 29: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/29.jpg)
What’s the “BottomWhat s the Bottom
► Combined COH Water Righ► Combined COH Water Righand San Jacinto River are thsupply currently available.
► EWPP does not have the treand the infrastructure does the water to where it is need
► Other options for conveying► Other options for conveyingfrom the Trinity River to Lakmore expensive.
Line”?Line ?
hts in Trinity Riverhts in Trinity River he only water
eatment capacity not exist to move ded.
surface water surface water ke Houston are
![Page 30: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/30.jpg)
What’s the “BottomWhat s the Bottom
► The Luce Bayou Interbasin► The Luce Bayou Interbasin is the identified project to adconversion needs in the targ
► The Luce Bayou Interbasin needs to be delivering additgwater to Lake Houston by Ju
► The NEWPP needs to be ex► The NEWPP needs to be exthe additional surface waterby the Luce Bayou Project.
Line”?Line ?
Transfer ProjectTransfer Project ddress the get areas.
Transfer Project ional surface une 2019.
xpanded to treatxpanded to treat r to be supplied
![Page 31: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/31.jpg)
Major Milestones fMajor Milestones f
► Submit USACOE applicatio
► Complete “Preliminary EngReport”. Obtain approval bPWE.
► Complete acquisition of rigp q gand/or easements.
for 2010for 2010
on by March 31.
gineering by Houston
hts-of-way y
![Page 32: G Oradat 030810 Setawwa](https://reader031.fdocuments.us/reader031/viewer/2022020207/54c1d50f4a79598e338b456d/html5/thumbnails/32.jpg)
For Additional InfoFor Additional Info
Coastal WateOne Allen Cente
500 DaHouston, Texas
(713) 658(713) 658
www.coastalwate
www.luceba
ormationormation
er Authorityer, Suite 2800allas 77002-47088 90208-9020
erauthority.org
ayou.com