Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION DURING DIKE OVERFLOW Tobias Kubetzek, Jesper Steuernagel, Hendrik Ramm, Nicole Saenger, Ulrich Zanke

Transcript of Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams...

Page 1: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

Funding Project Management Coordination

Structural Approaches – Dikes, Reservoirs and Dams

IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION DURING DIKE OVERFLOW

Tobias Kubetzek, Jesper Steuernagel, Hendrik Ramm, Nicole Saenger, Ulrich Zanke

Page 2: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 2

• Urbanization brought a great damage potential to the areas along the rivers and to former floodplains. This trend has not been stopped yet

• During the last flood periods several dams and dikes broke, causing enormous damage and the loss of many lives

• As a consequence of the climate change the sea level and the river gauges will rise. Dikes existing could lose their protectional function within the next years

• In the near future the majority of the German river dikes must be redeveloped

Introduction

Experiment Set-up

Dimensioning

Measurement program

Outlook

Introduction

Page 3: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 3

Introduction

Introduction

Experiment Set-up

Dimensioning

Measurement program

Outlook

• Dikes effected by overflow must be built as an overflow structure, otherwise overflowing water erodes the top and the landside of the dike

• In general erosion leads to a quick collapse of the dike

• Common overflow section of dikes are protected by armourstones or concrete sealing. These methods are not suitable for the long distances of river dikes

• Conventional structures of geosynthetics are not practicable for redevelopement

Page 4: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 4

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Experiment set-up

Page 5: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 5

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Experiment set-up

• Full scale research dike (dimensions of a common dike along the Rhine, Germany)

• A closed sheeting and a high capacity propeller pump enable the overtopping of the dike

• Two experimental areas • Weir heads according to the width of the spillway slab

Page 6: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 6

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Experiment set-up

Page 7: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 7

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Experiment set-up

• Revetment with new combinations of geosynthetics– Erosion control mat– Geogrid (top layer)– Non woven geotextile– Geogrid (bottom layer)

• Top soil not as sacrificial layer but as part of the revetment

• Stable with and without vegetation

Page 8: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 8

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Experiment set-up

• Fixing by pegs– State of construction– Worst case scenario

• Stabilization by root penetration– Common loading case– Difficult to calculate– Laboratory test of shear resistance

Page 9: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 9

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Dimensioning

– Erosion of top soil and vegetation

– Gliding of the top soil on the geosynthetics

– Gliding of the geosynthetics on the ground

– Erosion beneath the geosynthetics

– Failure of the geosynthetics or the anchorage

Page 10: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 10

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Dimensioning

– Erosion of top soil and vegetation

– Gliding of the topsoil on the geosynthetics

– Gliding of the geosynthetics on the ground

– Erosion beneath the geosynthetics

– Failure of the geosynthetics or the anchorage

Page 11: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 11

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Dimensioning

• Wire heads up to 1.0 m causes shear stresses of approx. 900 N/m²

• Investigation of heads up to 0.3 m• Loads have to be transferred by pegs

Shear stress against the overflow

0

500

1000

1500

2000

0,0 0,5 1,0 1,5 2,0 2,5

q [m³/s/m]

max

t 0 [

N/m

²]

Page 12: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 12

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Dimensioning

• Minimization of load-displacement • Search for an optimal pitch

• Reduction of effort while increase in efficiency• Reduction of the number of parts lowers the cost of

deployment and maintenance

Experiment 5Ad = 12mm; L = 500mm

0

10

20

30

40

50

60

70

80

0 500 1000 1500 2000 2500 3000 3500

Force [N]

Lo

ad

-dis

pla

ce

me

nt

[mm

]

Page 13: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 13

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Dimensioning

• Finite-Element-Method (FEM) simulation of the deformation – ABAQUS 2-D-model

• FEM-simulation of the estimated forces during the overflow– ABAQUS 3-D-model

– Adaption of the peg pitch

– Adaption of the top anchorage

Page 14: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 14

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Dimensioning

• Starting conditions– Peg dimension of 0.5 m length and Ø=12 mm

– Spillway slab of 20 m to 12 m

– Starting pitch 1 x 1 m

– Non-vegetated (worst case) revetment

Page 15: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 15

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Measurement program

• Pressure sensor– Indikation of turbulences

• Area scanner– Deformation of the geosynthetics

• Ground radar– Erosion beneath the geosynthetics– Change in density of / rearrangement in the subsoil

• If applicable – Resistance strain gauges on the geogrid

• Turbidity sensor– Indication of erosion

Page 16: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 16

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

Outlook

• Short-term experiments in 2008– Certification of the effectivity of the geosynthetic

combination (stability in a worst case scenario)

– Optimizing the pitch for the pegs

• Long-term experiment (winter 2008 / spring 2009)– Laboratory test of the shear resistance

– Overflow on the vegetated testing area

– Experiments with alternative erosion protection measures

• Aim– Consideration of our results in the guidance for the

remediation of the river dikes in Hesse, Germany

Page 17: Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.

11.04.23 | Institut für Wasserbau und Wasserwirtschaft | Fachgebiet Wasserbau | Prof. Dr. -Ing habil U. Zanke | Dipl. -Ing. T. Kubetzek | 17

Introduction

Experiment set-up

Dimensioning

Measurement program

Outlook

End

Thank you for your attention