FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK

SCHEME OF MITIGATION

FULHAM FOOTBALL CLUB

RIVERSIDE STAND BISHOPS

PARK SCHEME OF MITIGATION

Revision 02

8th April 2019

08/04/19 Scheme of Mitigation Page 1 of 20

Page 2: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK

SCHEME OF MITIGATION

CONTENTS

1. Introduction ............................................................................................................... 2

2. Programme ................................................................................................................. 3

Table 1 - Trees to be removed with stumps ground out and replaced: .......................................... 4

Table 2 - Trees to be removed and replaced if extended concourse is built: ................................. 5

Table 3 - Trees that Require crown lift to facilitate access but will not be removed or replaced: . 5

4. Appendix A – Tree Constraints Plan ............................................................................. 6

5. Appendix B - Temporary Fencing Details ..................................................................... 8

6. Appendix C for the Fulham Football Club Riverside Stand Construction Compound

Condition 47 Tree Replacement Plan ..............................................................................16

1. Introduction This document has been prepared in response to the pre-commencement obligation set out in the Section 106 Agreement Schedule 6, clause 4.1 pursuant to planning consent ref. 2017/04662/FUL. The purpose of this document is to set out the planned scheme of mitigation for the temporary use of Bishops Park as a contractor’s compound for the proposed Fulham Football Club New Riverside Stand. Section 106 Schedule 6: “Scheme of Mitigation” Means the scheme of mitigation for Bishops Park in connection with the Construction Compound, setting out the timescale for works to be undertaken in which the Owner will be responsible for payment of the costs of landscaping and any restoration work following the removal of the Construction Compound. Bishops Park Scheme of Mitigation: 4.1 To submit to the Council for approval the Scheme of Mitigation prior to the erection of the Construction Compound. 4.2 Not to erect the Construction Compound without first submitting the Scheme of Mitigation to the Council for approval and the Scheme of Mitigation has been approved in writing by the Council. 4.3 That in the event that the Council refuses to approve the Scheme of Mitigation the Owner shall submit a revised Scheme of Mitigation to the Council for approval having taken into account the reasons for refusal given by the Council in that regard.

08/04/19 Scheme of Mitigation Page 2 of 20

Page 3: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK

SCHEME OF MITIGATION

4.4 That once the Scheme of Mitigation has been approved by the Council to implement the Scheme of Mitigation as so approved. See Appendix C for the Fulham Football Club Riverside Stand Construction Compound Condition 47 Tree Replacement Plan for the replacement of the Alianthus tree and multi-stemmed London Plane tree located in the north east corner alongside Stevenage Road. A comprehensive photographic dilapidation survey will be carried out by the contractor and issued to LBHF Parks prior to contractor’s mobilisation within Bishops Park.

2. Programme The New Riverside Stand is programmed for a construction period of 108 weeks commencing 20th May 2019 and completing 14 June 2021. The contractor intends to take possession of the agreed area in Bishops Park from 29th April 2019 until 26th July 2021. The table below contains the outline activities that concern Bishops Park:

Activity Start Date Finish Date

Access to Bishops Park Agreed Area 15/04/19 15/04/19

Tree and Shrub Removal subject to agreement with LBHF Parks Officers March 2019 March 2019

Establish Bishops Park Contractors Compound 1. Remove and store existing iron park gates and fencing to form access

to Bishops Park. 2. Form asphalt paved bellmouth access into Bishops Park. 3. Erect temporary steel wire mesh site fencing. 4. Erect timber hoarding as per Temporary Fencing details issued in

respect of planning condition 5 (See appendix B). 5. Lay hard Surfacing: Geotextile membrane, 500mm stone and 100mm

asphalt binder course. 6. Install site welfare and two storey offices. 7. Move dog water tap onto compound fencing, externally mounted.

29/04/19 29/05/19

FFC New Riverside Stand construction 20/05/19 14/06/21

Demobilise Bishops Park Contractors Compound 1. Remove welfare and offices offsite. 2. Remove hard surfacing:

a. Plane off asphalt surface and dispose offsite to licensed waste transfer facility.

b. Excavate subbase and dispose offsite to licensed waste transfer facility.

3. Install temporary steel wire mesh fencing. 4. Remove hoarding:

a. Dismantle timber hoarding and dispose offsite to licenced waste transfer facility

b. Grub out foundations and any buried infrastructure (soil pipe and soil tank). Dispose offsite to licenced waste transfer facility

a. Make good foundation holes with subsoil stored onsite.

17/5/21 11/06/21

08/04/19 Scheme of Mitigation Page 3 of 20

Page 4: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK

SCHEME OF MITIGATION

Bishops Park Re-instatement 1. Rotovate existing topsoil and lay topsoil levelling layer

conforming to BS3882 and seed soft landscape area of park with seed type agreed with LBHF parks officers.

2. Plant replacement trees complying with document Fulham Football Club Riverside Stand Construction Compound Condition 47 Tree Replacement Plan issued in respect of discharge of planning condition 47. These trees are also noted in Table 1 below.

3. Plant replacement trees noted in tables 1 and 2.

4. Reinstate stored Bishops Park iron gates and fencing to same

position as removed from.

5. Reinstate stored lamppost at top of Fielders Meadow (adjacent to entrance but within Bishops Park.

6. Remove bellmouth access to Bishops Park

7. Reinstate footpath and road to pre bellmouth configuration.

8. Remove temporary steel wire mesh fencing.

9. Reinstate dog water tap to original position.

01/06/21 26/07/21

10. Maintain tree and nursery stock for one year from end date of lease.

26/07/21 25/07/22

3. Tree Works

See appendix A for Tree Constraints Plan denoting tree positions referred to in tables 1,2 and 3 below.

Table 1 - Trees to be removed with stumps ground out and replaced:

Ref Species Age Condition Class Recommendation / Status

Number of trees to be removed to facilitate works

Number of trees to be replaced following compound removal

T62 Tree of Heaven Semi

Mature Good B Invasive species

1 3

T18 London Plane Over

mature Fair/Poor C Clear for access

1 3

08/04/19 Scheme of Mitigation Page 4 of 20

Page 5: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK

SCHEME OF MITIGATION

T19 Ash Mature Fair C - 1 3

T9 Goat Willow Mature Poor C Dieback in crown, 1 3

G1

Mixed: Elder, Viburnum,

Holly, Cotoneaster,

unknown*

Mature good C -

10 30

* Trees of unknown species to be replaced with any other species shown in table 1 or Table 2 and to be agreed with LBHF Parks Officer. Table 1 G1 is deemed to cover the replacement all plants, bushes and shrubs which are not considered to be trees, this was agreed onsite at Bishops Park with Ian Ross and Pauline McCormack of LBHF on 08/04/19 with Mark Wardle of Buckingham Group Contracting Ltd. It maybe that fewer than ten items are removed and thus the replacement will as per the 3:1 ratio, actual removed plant stock will be agreed with LBHF Parks officers at time of removal.

Table 2 - Trees to be removed and replaced if extended concourse is built:

Ref Species Age Condition Class Recommendation / Status

Number of trees to be removed to facilitate works

Number of trees to be replaced following compound removal

T8 Alder Mature Fair C - 1 3

T10 Elder Mature Fair C - 1 3

T11 Ash Semi

mature fair C -

1 3

Table 3 - Trees that Require crown lift to facilitate access but will not be removed or replaced:

Ref Species Age Class

T21 London Plane Semi mature B

T22 London Plane Semi mature B

T23 False Acacia Over mature A

T24 London Plane Semi mature C

T25 False Acacia Over mature U

T26 Plum Mature C

T27 London Plane Over mature A

T31 London Plane Over mature A

08/04/19 Scheme of Mitigation Page 5 of 20

Page 6: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK

SCHEME OF MITIGATION

4. Appendix A – Tree Constraints Plan

08/04/19 Scheme of Mitigation Page 6 of 20

Page 7: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

Path: \\uk.wspgroup.com\central data\Discipline Management\Environmental\1. Service Lines\Environmental Planning\ES\Arboriculture\04 Projects\2017\Fulham FC\G Drawings - Plans\GIS\Mxd\Fulham_FC_02_Tree_Survey.mxd

08/04/19 Scheme of Mitigation Page 7 of 20

Page 8: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK

SCHEME OF MITIGATION

5. Appendix B - Temporary Fencing Details

08/04/19 Scheme of Mitigation Page 8 of 20

Page 9: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND SCHEME FOR TEMPORARY

FENCING

Temporary Fencing Scheme 18/02/19 Page 1 of 5

FULHAM FOOTBALL CLUB

RIVERSIDE STAND

SCHEME FOR TEMPORARY

FENCING

Revision 00

18th February 2019

08/04/19 Scheme of Mitigation Page 9 of 20

Page 10: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND SCHEME FOR TEMPORARY

FENCING

Temporary Fencing Scheme 18/02/19 Page 2 of 5

CONTENTS

CONTENTS ..................................................................................................................................................... 2

1. Introduction ............................................................................................................... 2

2. Site Fencing Arrangements .......................................................................................... 2

3. Appendix A – Fencing and Gate Drawings .................................................................... 5

1. Introduction This document has been prepared in response to pre-commencement planning condition 5 of planning consent ref. 2017/04662/FUL. Pre-commencement planning condition 5: No development shall commence until a scheme for temporary fencing and/or enclosure of the site has been submitted to and approved in writing by the Local Planning Authority, and the temporary fencing and/or enclosure has been erected in accordance with the approved details. The temporary fencing and/or enclosure shall thereafter be retained for the duration of the demolition and building works in accordance with the approved details. No part of the temporary fencing and/or enclosure of the site shall be used for the display of advertisement hoardings without the prior written approval of the Local Planning Authority. The aim of this document is to set out the planned scheme of temporary fencing for the proposed Fulham Football Club Riverside Stand.

2. Site Fencing Arrangements

The New Riverside Stand Development site access will be via Bishops Park, where we propose to bring road

deliveries for unloading and access for the workforce and visitors with dedicated vehicle gate and

pedestrian turnstile.

See appendix A for hoarding and gate drawings.

The will be four different types of fencing / hoarding employed;

08/04/19 Scheme of Mitigation Page 10 of 20

Page 11: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND SCHEME FOR TEMPORARY

FENCING

Temporary Fencing Scheme 18/02/19 Page 3 of 5

• Steel wire mesh fence (Heras type)

• Timber hoarding with concrete foundations – Type A

• Timber hoarding with concrete foundations – Type B

• Timber hoarding bolted to Temporary Vehicle Concrete barriers (TCVB’s) – Type C

All timber hoarding design has been carried out by a suitably qualified and experienced temporary works

designer, with ground conditions, wind and crowd loadings considered.

Steel wire mesh fencing will be installed as per the manufacturer’s instructions.

Initially steel wire mesh will be set up to allow timber hoarding to be erected. The steel wire mesh can be

erected in one day whilst the timber hoarding will take two weeks. The steel wire mesh fencing will be

securely chained or where it meets with the existing river wall and Bishops Park boundary wall, as soon as

the timber hoarding has been erected the steel wire mesh fencing will be removed.

Following completion of the steel wire mesh fence installation posts will be either set into the ground or

Temporary Vehicle Concrete barriers (TCVB’s) positioned with posts bolted to the TCVB’s. All external

public facing elevations will be painted dark green RAL 6002.

All gates to all site access points will be kept closed and locked when not in use or supervised. All visitors will

report to the site office and sign in before proceeding onto site. All relevant safety signs will be displayed at

all times.

The site compound will be securely fenced prior to the commencement of any site works and will be

monitored and maintained through the works with all statutory signage in place.

The site perimeter will be fenced at all locations which will prevent access by third parties. Timber hoarding

types A, B or C will be used within the stadium to segregate the work site, this will be a continually changing

arrangement which will be agreed with LBHF licencing prior to public events.

Appropriate lighting will be installed on site to ensure that access/egress points and clearly visible during

operational hours. Care will be taken to ensure that lighting does not cause a nuisance to neighbouring

properties. See Construction Environmental Management Plan issued pursuant to planning condition 4 for

lighting details.

The temporary river platform will form the riverside site boundary and be installed prior to any works

commencing on the existing river wall. The platform will be in place throughout the project period and only

be removed once the final scheme river walkway has been completed.

The temporary river platform will have a steel handrail on the river boundary 1.85m above platform level

which will provide a top of handrail level approx. 2.35m above high tide level. See below:

08/04/19 Scheme of Mitigation Page 11 of 20

Page 12: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND SCHEME FOR TEMPORARY

FENCING

Temporary Fencing Scheme 18/02/19 Page 4 of 5

08/04/19 Scheme of Mitigation Page 12 of 20

Page 13: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND SCHEME FOR TEMPORARY

FENCING

Temporary Fencing Scheme 18/02/19 Page 5 of 5

3. Appendix A – Fencing and Gate Drawings

08/04/19 Scheme of Mitigation Page 13 of 20

Page 14: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

Sheet Size A1 841 x 594

Silverstone Road, Stowe, Buckingham MK18 5LJ

Telephone: 01280 823355 Fax: 01280 812830

www.buckinghamgroup.co.uk

Group Contract ing

Revision

Client

Title

Purpose of Issue

Scale at A1 Issuing Office Project Number

C18050

Project

Notes:

Note

Th

e P

rope

rty O

f T

his

Dra

win

g A

nd

De

sig

n I

s V

este

d I

n B

uckin

gh

am

Gro

up

Co

ntr

actin

g L

td A

nd

Mu

st

No

t B

e C

op

ied

Or

Rep

rod

uce

d I

n A

ny W

ay W

ith

out T

he

ir W

ritt

en

Con

se

nt

Created By Date Checked By Date Approved By Date

CommentRev

1:5000 10 20 30 40 50Scale

DONCASTER

NEW RIVERSIDE STAND

SITE COMPOUND HOARDING

C18050-BGC-XX-00-DR-W-0001

FOR PLANNING

1:50, 1:500, 1:100,

1:400

FULHAM FOOTBALL CLUB

2400 2400

AA

B B

2000

CC

1600 1600 1600

REFER TO SECTIONS ASSOCIATED WITH TYPEA HOARDING FOR CONSTRUCTION DETAILS

MIN 1000

900/1

100**

2400

500

SITE IMPORTED 6F5CAPPING COMPACTED INACCORDANCE WITH SHW

75X225 C16 POSTS

100X75 (FLAT) RAILSEQUALLY SPACED

19MM EXTERIOR GRADEPLYWOOD C/W PLY FINISHINGSTRIPS TOP AND BOTTOM

** FOUNDATION DEPTH DEPENDS ONQUALITY OF FORMATION SOIL. IFSOFT/WEAK GROUND IS FOUND THENDEEPER FOUNDATIONS WILL BE REQUIRED

400

2400 2400

TOPSOIL TO BE STRIPPED PRIOR TOCONSTRUCTION OF FOUNDATIONS.

RAIL/POST CONNECTION 1NO.6DIA. X 150 LONG WOOD SCREW

PLY/RAIL CONNECTION 3NO. 5DIA.X 60 LONG WOOD SCREWS PERRAIL PER 1220 WIDE PLY SHEET

FOUNDATIONS TO BE FILLEDWITH ST2 CONCRETE

2400

10MM ALL THREAD ROD C/W 100X100X10WASHER PLATES AND NUTS THROUGHPRE-FORMED 30MM HOLES IN TVCB

SUPPORTING GROUND TO BE LEVELAND FIRM. ANY SOFT SPOTS SHOULD BEREPLACED WITH COMPACTED FILL

STANDARD CONCRETETVCB 800 X 450 X 3000

100X125 C16 POSTS (2NO. PER TVCB)

3NO. 100X50 (FLAT) RAILSEQUALLY SPACED

N

DETAIL 1

TYPE C HOARDING

TYPE B HOARDING

TY

PE

A H

OA

RD

ING

TYPE A HOARDING

D

DCOMPOUND AREA

CRAVENCOTTAGESTADIUM

BISHOPS PARK

STEVENAGE ROAD

5003250

ACCESS GATE

3000

2NO. TURNSTILES6500

ACCESS GATES

TYPE B HOARDING

STEVENAGE ROAD

NOTE! FINAL POSITION AND SIZE OFGATES/TURNSTILES TBA ON SITE

1:50PLAN ON TYPE A HOARDING

1:50PLAN ON TYPE C HOARDING

1:50PLAN ON TYPE B HOARDING

1:50

SECTION A-A

1:50

SECTION B-B

1:50

SECTION C-C

1:500

KEY PLAN

1:100DETAIL 1

1:400SECTION D-D

C03

1. ALL DIMENSIONS ARE GIVEN IN MM.2. LOCATION AND DIMENSIONS OF HOARDING IS SHOWN

APPROXIMATELY. FINAL LOCATION SHOULD BE DISCUSSED ANDAGREED ON SITE.

3. HOARDING TYPES (A, B OR C) HAVE DIFFERENT LOADING REGIMES.TYPE B HOARDING HAS BEEN SPECIFIED ADJACENT TO AREASWHERE IT IS EXPECTED THAT LARGE GROUPS OF PEOPLE WILLCONGREGATE. TYPE A AND C ARE IN MORE GENERAL AREASWHERE CROWDS ARE NOT EXPECTED TO CONGREGATE ADJACENTTO THE HOARDING.

4. ALL TIMBER SHOULD BE GRADE C16 AND ROUGH SAWN.5. ALL CONNECTIONS SHOULD BE INTO THE CENTRE OF THE MEMBER

TO AVOID EDGE SPLITTING.6. SITE TO CHECK FOR SERVICES PRIOR TO BREAKING GROUND. ANY

SERVICES FOUND SHOULD BE DIVERTED OR THE FENCING RE-ALIGNED ACCORDINGLY.

7. FENCING TO BE PAINTED COLOUR RAL 60028. ANY DISCREPANCIES TO BE DIRECTED THROUGH THE TWD.

ADDITIONAL DRAWINGS:C18050-BGC-XX-DR-W-0002 - HOARDING GATE

C01

R THORPE 01-02-19 S O'DONNELL 01-02-19 S O'DONNELL 01-02-19

FIRST ISSUE

C02

R THORPE 04-02-19 S O'DONNELL 04-02-19 S O'DONNELL 04-02-19

MINOR AMENDMENTS

C03

R THORPE 13-02-19 S O'DONNELL 13-02-19 S O'DONNELL 13-02-19

SECTION D-D ADDED

08/04/19 Scheme of Mitigation Page 14 of 20

Page 15: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

08/04/19 Scheme of Mitigation Page 15 of 20

Page 16: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK

SCHEME OF MITIGATION

6. Appendix C for the Fulham Football Club Riverside Stand Construction Compound Condition 47 Tree Replacement Plan

08/04/19 Scheme of Mitigation Page 16 of 20

Page 17: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND

TREE REPLACEMENT PLAN

Tree Replacement Plan Page 1 of 4

FULHAM FOOTBALL CLUB

RIVERSIDE STAND

CONSTRUCTION COMPOUND

CONDITION 47 TREE

REPLACEMENT PLAN

Revision 00

26st February 2019

Produced by J Stokesberry

08/04/19 Scheme of Mitigation Page 17 of 20

Page 18: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND

TREE REPLACEMENT PLAN

Tree Replacement Plan Page 2 of 4

CONTENTS

1. Introduction ............................................................................................................... 2

2. Existing Trees .............................................................................................................. 3

1. Introduction This document has been prepared in response to pre-commencement condition 47 of planning consent ref. 2017/04662/FUL. Condition 47: The Ailanthus tree and multi-stemmed London plane tree located in the north east corner of Bishops Park alongside Stevenage Road to be removed during the construction period shall be replaced by semi mature trees within the planting season following completion of the construction work. Details of the replacement trees, including species and height, shall be submitted and approved in writing by the Council before the tree is removed. The aim of this document is to set out the planned tree replacement for the Alianthus tree and multi-stemmed London Plane tree located in the north east corner alongside Stevenage Road. This document applies specifically to condition 47. Details of other Bishops Park restoration and maintenance will be addressed via the separate Bishops Park lease agreement and section 106 agreement for the development.

08/04/19 Scheme of Mitigation Page 18 of 20

Page 19: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND

TREE REPLACEMENT PLAN

Tree Replacement Plan Page 3 of 4

2. Existing Trees The existing Ailanthus and London Plane trees must be removed to provide safe access to the Bishops Park construction compound for the new Riverside Stand Development. This requirement is consistent with the details provided in the WSP Detailed Arboricultural Report (Appendix C1 of the Environmental Statement, November 2017) that formed part of the new Riverside Stand planning application (Ref: 2017 04662/FUL). The WSP Detailed Aboricultural Report states the following regarding these two trees: 6.3.1.1 Page 10: The access is currently proposed to remove T62 tree of heaven (Ailanthus altissima) and T18 London plane (Platanus x hispanica) will need removing also in the north east corner of the site. T18 London Plane is a stump that has regenerated. This regeneration has later been pollarded at around 6m. There is decay at the base from Ganorderma adspersum. Consequently the loss of this tree is not considered significant as the tree has limited future potential. T62 Tree of Heaven is marked as a Category B tree due to its condition. However LBHF policy and the GB non-native species secretariat (NNSS) describe this species as invasive. Specifically, LBHF SPD Sustainability Policy 18 states: “Where a site is to be developed, developers should identify the presence of any invasive species at an early stage and introduce measures to prevent the spread of these species during and after construction.” Consequently neither of these trees are deemed particularly suitable and could reasonably be removed for access.”

08/04/19 Scheme of Mitigation Page 19 of 20

Page 20: FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK … · 2019-04-09 · FULHAM FOOTBALL CLUB RIVERSIDE STAND BISHOPS PARK SCHEME OF MITIGATION 4.4 That once the Scheme of Mitigation

FULHAM FOOTBALL CLUB RIVERSIDE STAND

TREE REPLACEMENT PLAN

Tree Replacement Plan Page 4 of 4

Marked up excerpt from WSP Detailed Aboricultural Report November 2017 showing T18 and T62 location

3. Replacement Trees In line with LBHF’s tree replacement agreement with Fulham Club (three trees for every tree removed) we propose replacing the Ailthanus and London Plane trees with six semi-mature London Plane trees with a minimum girth of the main stem 20cm measured 1m above the ground (diameter about 6cm) and a height of 5.0m. The location of the replacement trees to be agreed with LBHF Parks officers. The trees are to be planted within 12 weeks of the project completion (currently programmed for June 2021) or during the following tree planting season mid-November 2021 to March 2022 as directed by LBHF.