    Franklin Paul MampillyCell :- + 91 9632219590, E-mail : [email protected] ; [email protected];

    OBJECTIVE To perform research that challenges and utilizes my skills andexperience for the overall progress of the organization.

    KEY QUALIFICATIONS Excelled in Project Management, Process Management

    Risk Management, Quality Assurance, SDLC. Worked in Core Networks & Mobile Devices teams at

    Nokia Siemens Networks, Motorola & SamsungElectronics.

    EDUCATION

    College : The Indian Institute of Science (IISc.), Bangalore, IndiaDegree : Master of Engineering in Computer Science and Engineering (CSE)Year of Completion : August 1998

    CERTIFICATIONS : Project Management Professional (PMP)Certification from PMI.

    TECHNICAL SKILLS

    Programming Languages : Expert Programming Skills in C, C++, Java , PERL,Object Oriented Analysis and Design.

    Platforms : System5, HP-UNIX, SUN-SOLARIS, IBM-AIX, IRIS,Silicon-Graphics, LINUX, DOS, Windows 95, Windows98, Windows NT, Real Time Operating System PSOS .

    Software Tools : Clearcase , Single Step Debugger , Rational Purify ,Workshop , Rational Rose , Mat-lab, Source Insight,

    Domain Knowledge : IMS, Core Networks, Mobile Communications, MobileUser Interface and Applications, J2ME, Browser,Multimedia etc., Embedded Systems, Switching Software,SIP, ATM , OAM , SS7.

    Soft Skills : Good Team player with excellent problem-solving andcommunication skills.

    WORK EXPERIENCESummary :- Total work experience of over 13 years in Telecom Software

    R&D in various transnational companies like Nokia SiemensNetworks, Motorola India and Samsung Electronics.

    Current Position : Project Manager, Nokia Siemens Networks,Bangalore.

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 7/27/2019 Franklin Paul Curriculum Vitae

    2/9

  • 7/27/2019 Franklin Paul Curriculum Vitae

    3/9

  • 7/27/2019 Franklin Paul Curriculum Vitae

    4/9

    Duration : July 2006 Till March 2008Scope & Description : Seamless Mobility (SM) project is for the development of the

    Motorolas Converged Services Gateway solution thatprovides a dual-mode (CDMA-WiFi) handset seamless voicecall continuity between the two networks. This was developed

    for the carrier QWEST and the feature set engineering work (Dev/Test etc) was completed following Motorolas M-Gatesprocess by February 2007.

    Role & Contribution : Perform the Role of Process Deployment Champion for theSM Dev & Test team deploying around 80 processimprovements packages covering areas such as requirements,development, testing, peer review, project management,quality etc. All the processes were successfully deployed as perplan meeting all the criteria resulting in a significantimprovement in the quality (significant reduction in defects)

    cost/schedule factors in the program resulting in timelydelivery to customer.

    Project 10 : Enhanced UMACompany : Motorola India Private LimitedLocations : Bangalore, IndiaDuration : March 2006 Till June 2006Scope & Description : e-UMA project is for the development of a presence server

    based , value added , rule based service to UMA handsetsubscribers who would have ability to redirect calls to variousPersonal Numbers (PNs) and Home Numbers (HNs) in eitherSequential or simultaneous ringing during the presence of thePNs in the subscribers home (having the WiFi network forUMA connectivity).

    Role & Contribution : Perform the role of a Project Leader responsible for theDevelopment Team for the development of the PresenceServer and the XDMS (XMLS Data Management System).Development was completed successfully on time anddelivered to test.

    Project 9 : Cingular 3G Genesis Mobile Multimedia Color HandsetCompany : Samsung ElectronicsLocations : South Korea, Bangalore, Germany, Atlanta, Seattle

  • 7/27/2019 Franklin Paul Curriculum Vitae

    5/9

    Duration : March 2005 Till March 2006Scope & Description : Develop the complete Mobile Handset Software from

    Product Conception till Carrier Acceptance. This involvesDeveloping the 3G Protocol (Modem) and Applications suchas Browser, Planner, Call &Call Records, Camera &

    Multimedia, Java, Instant Messenger, Messenger (SMS-Email-MMS) and Middleware Software , Testing and Fixingfor Bugs etc. This is the first Samsung 3G handset(codenamed Genesis) to be released in North Americanmarket in collaboration with Cingular Wireless and is ratedas the Most Important Project in Samsung due vastbusiness potential. The chipset is Qualcomm MSM6275.

    Role & Contribution : Perform the role of a Project Manager responsible for theMobile Applications (such as MMS / SMS / Browser /JavaPhoneshell/ Instant Messenger etc) and User Interface

    development and managing a Team of around 40 engineers

    (including developers and testers). The Project wassuccessfully completed and the carrier (Cingular) approvedthe product for market launch .

    Project 8 : VIVO Glory CDMA Mobile Multimedia Color HandsetCompany : Samsung ElectronicsLocations : South Korea, Bangalore-India, Sao Paulo-Brazil,Duration : April 2004 Till February 2005Scope & Description : Develop the Glory Mobile Handset Software from

    Product Conception till Carrier Acceptance. This involvesDeveloping Applications such as Browser, Planner, Call&Call Records, Camera & Multimedia, Messenger (SMS-Email-MMS) Testing and Fixing for Bugs etc. This is a highend handset that was released in Brazilian and general LatinAmerican market in collaboration with Brazilian CDMAnetwork service provider VIVO. The chipset is QualcommMSM6100 and was a very big commercial success in Brazilafter its market launch.

    Role & Contribution : Perform the role of a Project Lead responsible for theMobile Applications (such as MMS / SMS /Browser /Java / Phoneshell/ Instant Messenger etc) and UserInterface development and leading a Team of 13 engineers (including developers and testers) till the successfullaunch of the product in Brazilian market in March 2005.

    Project 7 : Reliance Kimera CDMA Mobile Multimedia Color HandsetCompany : Samsung ElectronicsLocations : Bangalore-India, Mumbai-India

  • 7/27/2019 Franklin Paul Curriculum Vitae

    6/9

  • 7/27/2019 Franklin Paul Curriculum Vitae

    7/9

    J2ME Virtual Machine porting and User Interfacedevelopment and leading a Team of 3.

    Project 4 : Service Management System (SMS).

    Company : Samsung ElectronicsLocation : Dallas, TXDuration : September 2000 to April 2002Scope & Description : The SMS is a part of the Samsungs Intelligent Network

    (IN) architecture for telecom infrastructure. Its functionalitiesinclude primarily to receive service and data packages andcomponents from the Service Creation Environment (SCE) ; toconfigure the Network Elements (NEs); to deploy & removeservices , load & unload , activate & deactivate services in theNEs. SMS also is responsible for provisioning the various datacategories related to Services, Subscribers, Subscriptions &

    Service Providers.Role & Contribution: I was involved in the high-level design for the Graphical UserInterface (GUI) for the SMS. It involved the use of RationalRose UML object oriented design tool. This GUI was madecompletely data driven and capable of being dynamicallygenerated from XML and other proprietary data. Theimplementation was done using C++ and Java with CORBA.

    Project 3 : Bearer Independent Call Control Protocol (ITU-T Q.1901)Company : Samsung ElectronicsLocation : Bangalore, India.Duration : March 2000 to July 2000. (five months)Description :The BICC Protocol is to be used for call setup an release

    procedures for the Network-Network Interface (NNI) for theNetwork elements in Samsung's 3rd generation UMTSSwitching System.

    Contribution : I was primarily involved in the high-level design for the BICCprotocol. It involved the use of Rational Rose UML objectoriented design tool for making the class diagrams, sequencediagrams which went into the design of the protocol finite statemachine.

    Project 2 :Samsung CDMA 2000 Switching SoftwareCompany : Samsung Electronics Corporations.Location : Seoul, South Korea.Duration : August 1999 to February 2000 (7 months) projectDescription : The cdma2000 ATM access Network provides dos

    guaranteed services in ATM network and traffic paths for call

  • 7/27/2019 Franklin Paul Curriculum Vitae

    8/9

    control, voice and packet data, and management trafficbetween the cdma200 systems comprising the BTS (BasestationTransceiver System), BSC (Base StationController) and the GAN (Global ATM Network). The BTS( Basestation Transceiver System) is the ATM CellBus

    architecture and it has 600Mbps switching capacity.The BSC is the ATM Switch Fabric architecture and it has2.5Gbps switching capacity.

    Contribution :a) During the first phase of the project, I was involved in theprocess of Detailed Design of the SVCM moduleimplementation of software prototype in C on PSOS Real TimeOperating System and IPC software developed for real-timesystems over Sun Solaris. The prototype SVCM wasintegrated with the UNI4.0 signaling stack provided byTrillium.b) During the next phase of the project, I developed the full

    commercial version of the SVCM software, including the ATMdevice driver settings for the UPC, RT & MUX ATM devicesfor transmission of user ATM cells. Also block testing wasdone for the SVCM on a variety of target switchconfigurations.c) The final phase of the project included, System Integrationwith other modules and integration testing, performancetesting, aging tests , reliability & fault tolerance tests etc .

    Project 1 :Samsung Next Generation Networking System (NGNS) OAM&P .Company : Samsung India Software OperationsLocation : Bangalore, India.Duration : August 1998 to July 1999Description :The NGNS system architecture is based on the Intelligent networks

    concepts where the intelligence for processing various servicerequests are moved away from the switch known as the TransportPlatform (TP), and are located in Managed the Intelligent Platform(MIP) consisting of many Managed Intelligent Nodes (MINs). TheOAM&P software manages and configures the NGNS system both theMINs and the TP.

    Contribution : Implemented the OMAP User Interface (both CLI and GUI).The UI was developed to incorporate the run-time extensibility of the3rd Generation switching software wherein commands could bedynamically created at the SCE and provisioned via the SMF. TheCLI i.e., the Command Line Interface was developed in C++. TheGraphical User Interface was developed using C++ and Java usingCORBA as the Communication pipeline.

    Industrial Training

  • 7/27/2019 Franklin Paul Curriculum Vitae

    9/9

    1. Company : Samsung India Software Operations (SISO)Description : Study of Java language and implementation of a word processor

    in JavaDuration : 1st May 1996 to 30th July 1996 (3 months)

    2. Company : Motorola India Electronics Lt.Description : Study of ISDN Q.931 Call-Control protocol and design of test

    cases for PHS Call Control Function.Duration :1st May 1997 to 30th July 1996 (3 months)

    3. Institute : Institute of Electronic and Telecommunication EngineersDescription : Embedded SystemsDuration : 3 months.

    Affiliations/Achievements

    1. IETE - Institute of Electronic and Telecommunication Engineers

    2. IISC - Indian Institute of Science Alumni Association.

    3. Filed for a Patent on Mobile UI domain.

    4. IELTS (English Language Test) Average Score of 7.5 Out of 8.