April. 24, 2009Research and Innovation Services
www.gu.se
Forskningsservice för EU-finansierade projekt
Margareta Ahlqwist
Ludde Edgren Emilia Rung Pirjo Gustafson
www.gu.se
Budgetar för ramprogram
0
10
20
30
40
50
60
1984-1987 1987-1991 1990-1994 1994-1998 1998-2002 2002-2006 2007-2013
År
Mil
jard
er
Eu
ro
3,27 5,366,6
13,1214,96
17,5
50,5
www.gu.se
EU projekt vid Göteborgs universitet
0
50
100
150
200
250
300
FP4 FP5 FP6
PROJ ECTS GU FP4-6
PROCECTS
FUNDING MKR
www.gu.se
Databas
www.gu.se
FP7 projekttyper
1. Collaborative Projects (CP)
2. Network of Excellence (NoE)
3. Coordination and support action (CSA)
4. Marie Curie (MC)
OBS! Olika Form C för olika projekt!
www.gu.se
EC bidrag
Projekttyp Aktivitet Overhead EC bidrag
Collaborative project
and
Network of Excellence
Forskning
Demonstration
Andra aktiviteter (dissemination, coordination, intellectual properties, promotion)
60%
60%
60%
75%
50%
100%
Coordination and Support Action
Support (stöd) 7% 100%
ERC Forskning 20% 100%
Marie Curie Forskning 10% 100%
www.gu.se
Overhead (Indirect costs)
www.gu.se
Förändringar i terminologi
FP6 FP7
Financial Guidelines
Financial Rules
Contract Grant Agreement
Contractor Beneficiary
Audit Certificate Certificate on Financial Statement
Necessary costs Costs used solely to achieve Project Objectives
www.gu.se
Konsekvenser av förändringarna+ -Kostnader för fast anställd personal är godkända
Högre förskottbetalning och interim betalningar
Förskottsbetalning + interim betalningar högst 85%
Certificate of Financial Statement bara om EC bidraget överstiger 375000 Euro
Certificate of Financial Statement bara om EC bidraget överstiger 375000 Euro
Budget kan omfördelas mellan olika aktiviteter och deltagare
CSA overhead bara 7%
FORCE (web based editor for Form C)
Rapporteringstid 60 dagar
www.gu.se
Vad kollar vi?
• Att kostnaderna för varje aktivitet i Financial Statement är berättigade till EC bidrag
• Att inga ej berättigade kostnader är med
• Transparens/spårbarhet
• Att regelverket har följts
www.gu.se
Godkända kostnader
• faktiska• projektets kostnader• kostnaderna är från projektperioden (undantag:
kostnaderna i samband med slutredovisningen)• i enlighet med GU:s normala regler och praxis• använt för att nå projektets resultat/mål• bokförda • är med i den totala budgeten
www.gu.se
Ej godkända kostnader
• skatter och tullavgifter• räntekostnader• reservations för ev. kommande förluster eller
kostnader• valutadiffar• kostnader för andra projekt• skulder eller förseningsavgifter• onödiga “lyx”-kostnader
www.gu.se
Spårbarhet
Financial Statement (Form C)
Sammanställningar (uträkningsfil)
Huvudbok
Brygga måstefinnas
A
A
B
B
www.gu.se
Spårbarhet
Arbetsledningsbeslut/Förordnande
Tidrapporter
Lönebetalningar
www.gu.se
Regelverk
• Avtalet med EC (Grant Agreement)
inkl. alla bilagor• Ekonomihandboken• Regler för upphandling
www.gu.se
Viktiga interna dokument
• Prefektintyg
Innan en ansökan skickas in ska prefekten godkänna projektet och de ekonomiska risker och det medfinansieringsbehov som projektet kan medföra för institutionen.
• Anhållan om förvaltning
Ska skickas in så snart avtalet är underskrivet
(blankett + kopia på avtalet + budget)
• Forskarintyg
Alla som bidrar till EU-projektets resultat oavsett om lönen finansieras av EU- eller andra medel
• Arbetsledningsbeslut
För samtliga som får sin lön helt eller delvis betald av EU-medel. Prefekt eller projektledare samt arbetstagaren ska skriva under beslutet innan arbetstagaren börjar arbeta inom projektet
www.gu.se
Personalkostnader
• också fast anställd personal• lön och sociala avgifter• enligt GU:s normala regler (ex. sjukskrivning, föräldraledighet)• bara de timmar som arbete för projektet utförts• pålitlig tidredovisning • om kostnader för teknisk/administrativ personal ingår i indirekta
kostnader, de kan inte tas med som direkta kostnader
www.gu.se
Konsult eller ”In-house consult”
• Som vanliga personalkostnader
• Som Subcontractor (underleverantör)
(OBS! inga overhead)
• Som partner i projektet
www.gu.se
Betalningarna• En förskottsbetalning
- till koordinator under 45 dagar efter det att avtalet har blivit giltigt (of the entry into force of the GA)
- koordinator betalar till andra partners efter det att de skrivit under of Form A - om flera än 2 rapporteringsperioder: 160% av det genomsnittliga EC bidraget per rapporteringsperiod- 1 eller 2 rapporteringsperioder : 60-80 % av det totala EC bidraget- 5% av det totala EC bidraget till en garantifond, som är en del av förskottsbetalningen- ränta för förskottsbetalningen dras av från det totala EC bidraget- förskottsbetalning kan inte vara över 90% av det totala EC bidraget
• Interim betalningar- motsvarar godkända kostnader för rapporterad period- förskottsbetalning + interim betalningar kan inte vara över 90% av det totala EC bidraget- koordinator får betalningen inom 105 dagar efter det att periodens rapport har lämnats in till EC
• Slutbetalning- efter godkändandet av slutrapporten- kvarstående 10% av det totala EC bidraget- garantifondspengarna (5%) betalas tillbaka I samband med slutbetalningen
www.gu.se
Eurokurs
• Den dag då faktiska kostnader har utbetalts
eller
• Första vardagen efter rapporteringsperiodens slut
http://www.ecb.int/stats/exchange/eurofxref/html/eurofxref-graph-sek.en.html#4
www.gu.se
Förberedelser för the Financial Statement under rapporteringsperioden
Fyll i uträkningsfilen löpande!Förbered pärmen!
Pärmförsättsblad:Göteborgs universitet, redovisnin av EU-projekt
Projekt:Kontraktsnummer:Program:Projekttyp:GU koordinerar:Löptid:Ansvarig forskare:Ekonomiadministratör:Kontaktperson på Forskningsservice:
www.gu.se
Pärmens innehåll (forts.)
1. Kontrakt med EU (Core contract) + information om projektets syfte/mål (kort sammanfattning)
2. Financial Statement (Form C) + uträkningar 3. Budget, kreditavier för betalningarna, ev. officiell
korrespondens om t.ex. godkända kostnader4. Resultaträkning 5. Transaktionslistor (omkonteringar och korrigeringar: verifikationer
och tydliga förklaringar 6. Leverantörsfakturakopior (exkl. resor)7. Kundfakturor8. Subcontracting9. Personal (förordnande, arbetsledningsbeslut, tidredovisning,
lönekostnadsdetaljer + ev. omkonteringar: verifikationer och förklaringar
10. Resor (fakturor, reseräkningar, agenda/program, inbjudan till konferens eller liknande underlag där ändamålet med resan framgår)
www.gu.se
I rapporteringsperiodens slut
• Fyll i/komplettera uträkningsfilen• Fyll i Financial Statement i FORCE• Pärm till revisorn (Ernst & Young AB) för
granskning om EC-bidraget överstiger 375.000 Euro
• Underskrivet Form C samt ev. Certificate on the Financial Statement (CFS) till koordinatorn
• EC ska ha CFS och Form C inom 60 dagar efter redovisningsperiodens slut
www.gu.se
Ekonomisk rapportering
Faktiska kostnader redovisas i efterhand
Rapportering sker alltid i euro!
Lönedelarna (living-mobility, travel, career allowance: A-B-C) skall redovisas exakt! EU kräver att forskaren får sina schablonbelopp utbetalda till 100% och kontrollerar detta noggrant. Dvs en reglering måste senast göras i samband med slutredovisning.
Övriga kostnader är takbelopp.
Redovisas elektroniskt via SESAM:
http://webgate.ec.europa.eu/sesam
www.gu.se
Form C - Model of Financial Statement (to be filled in by each beneficiary )
Project nr 212214 Funding scheme Combination of CP and CPA
Project Acronym CESSDA-PPP
Period from 01/01/2008 Is this an adjustment to a previous statement? NO
To 31/12/2008
Legal Name University of Gothenburg
Organisation short Name UGOT Beneficiary nr 18
Funding % for RTD activities (A) 75% If flat rate for indirect costs, specify % 60%
1- Declaration of eligible costs/lump sum/flate-rate/scale of unit (in €)
Type of Activity
RTD (A)Demonstration
(B) Management (C) Support (D)TOTAL (A+B+C+D)
Personnel costs 0
Subcontracting 0
Other direct costs 0
Indirect costs 0
Lump sums/flat-rate/scale of unit declared 0
Total 0 0 0 0 0
Maximum EC contribution Period 1
Requested EC contribution
2- Declaration of receipts
Did you receive any financial transfers or contributions in kind, free of charge from third parties or did the project generate any income which could be considered a receipt according to Art.II.17 of the grant agreement ?
No
If yes, please mention the amount (in €)
3- Declaration of interest yielded by the pre-financing (to be completed only by the coordinator )
Did the pre-financing you received generate any interest according to Art. II.19 ? No
If yes, please mention the amount (in €)
4. Certificate on the methodology
Do you declare average personnel costs according to Art. II.14.1 ? No
Is there a certificate on the methodology provided by an independent auditor and accepted by the Commission according to Art. II.4.4 ?
No
Name of the auditor
Cost of the certificate (in €), if charged under this project
5- Certificate on the financial statements
Is there a certificate on the financial statements provided by an independent auditor attached to this financial statement according to Art.II.4.4 ?
No
Name of the auditor Cost of the certificate (in €)
6- Beneficiary’s declaration on its honour
We declare on our honour that:
- the costs declared above are directly related to the resources used to attain the objectives of the project and fall within the definition of eligible costs specified in Articles II.14 and II.15 of the grant agreement, and, if relevant, Annex III and Article 7 (special clauses) of the grant agreement ;
- the receipts declared above are the only financial transfers or contributions in kind, free of charge, from third parties and the only income generated by the project which could be considered as receipts according to Art. II.17 of the grant agreement ;
- the interest declared above is the only interest yielded by the pre-financing which falls within the definition of Art. II.19 of the grant agreement ;
- there is full supporting documentation to justify the information hereby declared. It will be made available at the request of the Commission and in the event of an audit by the Commission and/or by the Court of Auditors and/or their authorised representatives.
Beneficiary’s Stamp Name of the Person(s) Authorised to sign this Financial Statement
Form C
www.gu.se
Adressuppgifter till Ernst&Young AB
www.gu.se
People - Marie Curie projekt inom alla vetenskapsområden
• Projekt för ökad mobilitet bland forskare (doktorander, post. doc, seniora forskare)
• Möjligt söka från alla fakulteter• Forskare anställs från 3 månader – 3 år• Projekttiden max. 4 år • Nätverksprojekt och enskilda post.doc.-tjänster
GU i dagsläget:• FP6: 14 projekt, mellan 1-12 st Marie Curie - forskare i varje projekt.• FP7: 9 godkända projekt hittills
www.gu.se
1 62 072,83 2 000,00 4 000,00 9 000,00 9 000,00 600,00 43 400,00 0,00 13007 143 080,112 99 389,00 2 000,00 2 000,00 13 200,00 13 200,00 0,00 25 000,00 0,00 15479 170 267,903 86 829,17 1 000,00 0,00 13 800,00 13 800,00 0,00 25 000,00 0,00 14043 154 472,094 0,00 0,00 0,00 0,00 0,00 6 000,00 25 000,00 3 000,00 3100 37 100,00
1 98 553,00 5 500,00 6 000,00 12 000,00 12 600,00 0,00 0,00 0,00 13465 148 118,302 115 096,67 1 000,00 0,00 16 800,00 16 800,00 0,00 0,00 0,00 14970 164 666,343 45 427,33 1 000,00 0,00 7 200,00 7 200,00 0,00 0,00 0,00 6083 66 910,064 0,00 0,00 0,00 0,00 0,00 3 000,00 8 000,00 3 000,00 1100 15 100,00
1 88 290,00 4 000,00 4 000,00 14 400,00 15 000,00 0,00 0,00 0,00 12569 138 259,002 79 456,00 2 000,00 0,00 14 400,00 14 400,00 6 000,00 8 000,00 0,00 12426 136 681,603 79 456,00 2 000,00 0,00 14 400,00 14 400,00 24 000,00 10 000,00 0,00 14426 158 681,604 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3 000,00 0 3 000,00
1 81 972,00 3 000,00 6 000,00 12 000,00 12 000,00 0,00 0,00 0,00 11497 126 469,202 106 664,67 1 000,00 0,00 16 800,00 16 800,00 6 000,00 8 000,00 0,00 15526 170 791,143 42 099,33 1 000,00 0,00 7 200,00 7 200,00 0,00 0,00 0,00 5750 63 249,264 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3 000,00 0 3 000,00
1 87 154,67 2 000,00 4 000,00 11 400,00 11 400,00 6 000,00 8 000,00 0,00 12995 142 950,142 66 854,67 2 000,00 2 000,00 11 400,00 11 400,00 0,00 0,00 0,00 9365 103 020,143 59 817,33 1 000,00 0,00 10 200,00 10 200,00 0,00 0,00 0,00 8122 89 339,064 17 593,33 0,00 0,00 3 000,00 3 000,00 0,00 0,00 3 000,00 2359 28 952,66
1 49 212,92 2 000,00 4 000,00 7 800,00 7 800,00 9 000,00 8 000,00 0,00 8781 96 594,212 87 068,75 1 000,00 0,00 13 800,00 13 800,00 0,00 0,00 0,00 11567 127 235,633 45 427,33 1 000,00 0,00 7 200,00 7 200,00 0,00 0,00 0,00 6083 66 910,064 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3 000,00 0 3 000,00
1 82 346,58 3 000,00 6 000,00 15 000,00 15 000,00 0,00 0,00 0,00 12135 133 481,242 61 554,08 1 000,00 0,00 13 800,00 13 800,00 0,00 0,00 0,00 9015 99 169,493 32 115,34 1 000,00 0,00 7 200,00 7 200,00 6 000,00 8 000,00 0,00 6152 67 666,874 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3 000,00 0 3 000,00
1 32 016,33 2 000,00 4 000,00 4 800,00 4 800,00 0,00 0,00 0,00 4762 52 377,962 80 367,67 0,00 0,00 9 600,00 9 600,00 0,00 0,00 0,00 9957 109 524,443 0,00 0,00 0,00 0,00 0,00 9 000,00 8 000,00 0,00 1700 18 700,004 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3 000,00 0 3 000,00
1 45 427,00 1 000,00 2 000,00 7 200,00 7 200,00 0,00 0,00 0,00 6283 69 109,702 49 212,58 2 000,00 2 000,00 7 800,00 7 800,00 6 000,00 8 000,00 0,00 8281 91 093,843 45 427,00 1 000,00 0,00 7 200,00 7 200,00 0,00 0,00 0,00 6083 66 909,704 41 641,42 0,00 0,00 6 600,00 6 600,00 0,00 0,00 3 000,00 5484 63 325,56
1 627 045,33 24 500,00 40 000,00 93 600,00 94 800,00 15 600,00 59 400,00 0,00 95495 1 050 439,862 745 664,09 12 000,00 6 000,00 117 600,00 117 600,00 18 000,00 49 000,00 0,00 106586 1 172 450,503 436 598,83 9 000,00 0,00 74 400,00 74 400,00 39 000,00 51 000,00 0,00 68440 752 838,714 59 234,75 0,00 0,00 9 600,00 9 600,00 9 000,00 33 000,00 27 000,00 12043 159 478,23
Total 1 868 543 45 500 46 000 295 200 296 400 81 600 192 400 27 000 282 564 3 135 207
TOTAL MAX. EC CONTRIBUTION (€)Year
Monthly living and mobility
Travel Career
exploratory Participation
expenses Training
expenses Events Management Audit Overhead Total
MAXIMUM EC CONTRIBUTION (€)
Pengar för anställd forskareA-B-C = lön
Pengar till ”host. organisation”, dvs inst. vid GU
A B C
Alla belopp A-B-C är inklusive sociala avgifter (LOP) och skatt!
Institutionen måste betala det exakta beloppet enligt ”Marie Curie rates” eller mer.
www.gu.se
Ersättning till anställd Marie Curie-forskare består av fyra olika delar, alla fastställs genom schablonbelopp av Europeiska Kommissionen. På samtliga lönedelar gäller (i dagsläget) vanlig svensk skattelagstiftning och ordinarie löneavgifterna (LOP) dras, inklusive semestertillägg.
B Travel Allowance (ersättning för resor till och från hemlandet) Ersättning som baseras på avståndet till hemlandet. Betalas med den första lönen, om anställningen 13-24 månader ges två resebidrag och den andra utbetalningen sker med lönen i den 13e månaden etc. lönekonto 40251
A Monthly Living Allowance (lön)Månadslön, beror på forskarens erfarenhet. lönekonto 4025
Mobility Allowance (utlandstillägg)Månadsvis ersättning för extra omkostnader som uppkommer vid utlandsvistelse, bidragets storlek beror på familjesituation. lönekonto 40252
D Career Exploratory Allowance (medel för karriärutveckling)Utbetalas i månad 13 som klumpsumma för de flesta MC forskare anställda längre än 12 månader. lönekonto 40253
Lön och lönetillägg
www.gu.se
Number of
months
Count ry of the research
locat ion
Count ry correct ion coefficient of the research locat ion
Yearly reference living
allowance
Monthly reference mobility allowance
Yearly reference t ravel allowance
Career Exploratory
allowance
36 Sweden 110,7 47 000,00 € 800,00 € 1 500,00 € 2 000,00 €
T ravel allowanceMobility
allowanceCareer Exploratory
allowance
4 500,00 € 31 881,60 € 2 000,00 €
1 € = 9,00 k r
4 335,75 € /month 39 022 kr /month
885,60 € /month 7 970 kr /month
1 500,00 € /year 13 500 kr /year
2 000,00 € lump sum 18 000 kr lump sum
Marie Curie Rates* according to the European Commission's handbook
Marie Curie Rates*
*) Nota bene: All amounts include social fees and taxes, which will be deducted at payment in accordance with internal rules and Swedish regulations. Different allowances are distinguished and specified in the monthly wage slip s.
Total allowance
Career Exploratory allowance
**) Provisional Counter Values. Reports will be made afterwards in connection with the financial statement and according to the official ECB exchange rate. Due to conversion rates, additional payments are made by the end of the researcher's employment in
T otal allowance
194 468,60 €
Living allowance
156 087,00 €
Monthly living allowance
Göteborg University internal exchange rate for indication only!**
Monthly mobility allowance
T ravel allowance
Löneberäkning
www.gu.se
1 € = 9,00 k r
8 454,71 € /month 76 092 kr /month
885,60 € /month 7 970 kr /month
1 500,00 € /year 13 500 kr /year
2 000,00 € lump sum 18 000 kr lump sum
**) Provisional Counter Values. Reports will be made afterwards in connection with the financial statement and according to the official ECB exchange rate. Due to conversion rates, additional payments are made by the end of the researcher's employment in order to agree with the M arie Curie rates in Euro.
Monthly living allowance
Göteborg University internal exchange rate for indication only!**
Monthly mobility allowance
T ravel allowance
Marie Curie Rates*
*) Nota bene: All amounts include social fees and taxes, which will be deducted at payment in accordance with internal rules and Swedish regulations.
Career Exploratory allowance
Monthly living allowance refers to the basic amount paid to the researcher adjusted by a correction coefficient according to the location of the host institution.
Mobility allowance is a monthly payment that helps compensate the researcher for the additional expenses that are normally incurred when working abroad. The reference amount depends on the family situation of the researcher at the time of recruitment.
Travel allowance is a fixed amount contribution based upon the direct distance between the location of the host institution and the researcher's p lace of origin. Each M arie Curie fellow is entitled to at least one travel allowance paid upon taking up employment. Fellows with a fellowhip between 13-24 months are entitled to two travel allowances and the second payment is made in the 13th month etc.
Career Exploratory allowance is paid only once as a lump sum for some fellowships of at least one-year duration. The allowance is paid in the 13th month.
Avtal skrivs mellan GU och forskaren utifrån EUs löneschablonen (förbereds av forskningsservice).
Alla belopp inkluderar LOP och skatter
Agreement - avtal med forskaren
www.gu.se
Ekonomisk rapportering
Faktiska kostnader redovisas i efterhand
Rapportering sker alltid i euro!
Lönedelarna (living-mobility, travel, career allowance: A-B-C) skall redovisas exakt! EU kräver att forskaren får sina schablonbelopp utbetalda till 100% och kontrollerar detta noggrant. Dvs en reglering måste senast göras i samband med slutredovisning.
Övriga kostnader är takbelopp.
Redovisas elektroniskt via SESAM:
http://webgate.ec.europa.eu/sesam
www.gu.se
Projektstöd för FP7
• http://www.gu.se/forskninginnovation/forskningsservice/EU-finansiering/FP7/FP7_projektrutiner/