Format Rfi for Base Plate Stc1
-
Upload
norman-morales -
Category
Documents
-
view
221 -
download
10
description
Transcript of Format Rfi for Base Plate Stc1
ENGINEERING & PROJECT MANAGEMENTDoc. No.:EPM-PM-00-03
Department:Planning and ControlRev. No.:00
Section/System:TQMRev. Date:01-01-2013
Document Title:Document Control ProcedurePage No.:Page 2 of 2
ENGINEERING & PROJECT MANAGEMENTSITE PROJECTS DEPARTMENT
REQUEST FOR INSPECTION
Project Title :UPGRADATION OF POWER STACK FAN IN DR MODULE A & B15-Feb-15
Project No. :AF-1221089Project Type : Affiliate : HADEEDRev. :00
Contractor Contact PersonNORMAN MORALESTel:053-1841298RFI NoM-036
Inspection Date16/02/15Time:1400HRSPlace of InspectionCAMERON FAB SHOP
SSRS No.:Network No:
Discipline:CIVIL MECH. ELECT. INSTR.
S No.Item to be InspectedQuantityDrawings No. / Remarks
6.2.3FINAL DIMENSIONAL INSPECTION OF STC1,RD1&STC2 STACK B
SEE ATTACHED DIMENSIONAL REPORTS4509-S00160-F6-001 REV.B4509-S00160-F6-002 REV.B
4509-S00160-F6-003 REV.A4509-S00160-F6-004 REV.C
4509-S00160-F6-009 REV.A4509-S00160-F6-010 REV.A
4509-S00160-F6-007 REV.B4509-S00160-F6-008 REB.A
Results|_|Satisfactory
|_|Unsatisfactory
Comments
QA/QC Engineer / Inspector NameSignature Date
Construction Supervisor / Project EngineerSignature Date
ContractorNORMAN MORALESSignature Date
PROPRIETARY & CONFIDENTIALThis document and the information contained herein is SABICs proprietary know-how. This document or any part thereof should not be reproduced, stored in a retrieval system or transmitted by any means, electronic or otherwise, or divulged without prior written permission of SABIC.
EPM-SPD-PC-F-008 Rev. No.: 00 Page 1 of 2Ref Doc.: EPM-SPD-PC-P-004