FOG RECEIVING, PRETREATMENT AND ANAEROBIC CODIGESTION
DERRY TOWNSHIP MUNICIPAL AUTHORITY CLEARWATER WWTP, HERSHEY, PA
PRESENTED TO THE VWEA COLLABORATIVE BIOSOLIDS: FUEL FOR THOUGHT WORKSHOP
Wayne A. SchutzDerry Township Municipal Authority
May 11, 2017
![Page 2: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/2.jpg)
A. DTMA Organization & WWTP Facilities OverviewB. Hauled Wastewater [Septage] ReceivingC. Evolution & Current Handling of FOGWD. FOGW CodigestionE. BioGas Utilization
1. Steam Biosolids Dryer2. Combined Heat & Power (CHP) Facilities
F. Future Plans
PRESENTATION OVERVIEW
![Page 3: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/3.jpg)
• Operating Authority – Staff of 36• Two Wastewater Treatment Facilities
• Clearwater WWTP ‐ 5.02 MGD
• Southwest WWTP ‐ 0.6 MGD (“Unmanned” Satellite WWTP
• Fourteen Pumping Stations• 150+ Miles of Sanitary Sewer (6” to 48” DIA)• NEW FOR 2017 – STORMWATER MANAGEMENT
(Another whole presentation!!)
ORGANIZATION & FACILITIES
![Page 4: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/4.jpg)
PROCESS FLOW DIAGRAM
![Page 5: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/5.jpg)
AERIAL VIEW
![Page 6: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/6.jpg)
• 5.02 MGD Activated Sludge• Septage Receiving
• FOG PRETREATMENT• Preliminary Treatment
• Screening & Grit Removal• Primary Clarification
MAJOR LIQUID STREAM COMPONENTS
![Page 7: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/7.jpg)
• Activated Sludge• Mechanical Aeration (Flexible Control)• Biological Nitrogen Removal (Chesapeake Bay compliant)
• (A2O: anoxic ~ oxic ~ anoxic ~ re‐aeration)• Ferric Chloride (FeCl3) Addition for “P” Removal• Enhanced Final Clarification (EDIs & Stamford Baffles)• UV Disinfection
MAJOR LIQUID STREAM COMPONENTS
![Page 8: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/8.jpg)
• Sludge / Biosolids Processing Facilities• Gravity Thickening ‐ Primary Sludge• DAF – WAS• Hershey IPF Sludge• Anaerobic Sludge Digestion (two stage + storage)• Centrifuge Dewatering• Indirect Paddle Dryer
• Class A – “EQ” Beneficial Reuse• Storage & Sale
SOLIDS PROCESSING COMPONENTS
![Page 9: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/9.jpg)
SOURCE VOLUME (DT/D) % of TOTAL
PRIMARY SLUDGE 4.75 54
( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment )
WAS 2.86 32
IPF SLUDGE 1.02 11
DTMA SW WWTP 0.24 3
TOTAL 8.87 (3,238 DT/Y)
ANAEROBIC DIGESTION % REDUCTION
DIGESTED BIOSOLIDS 4.13 (1,512 DT/Y) 53
2016 SLUDGE PRODUCTION
![Page 10: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/10.jpg)
• Septage Receiving• Started in August 1991• “If you build it they will come!”
• Current Receiving Station• Completed in 2000• Two Lane, Hauler Kiosk & DTMA Operator Station• Lime addition to settle load in primaries• Screening & Grit Removal via WWTP Headworks
HAULED WASTEWATER RECEIVING
![Page 11: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/11.jpg)
• Originally Refused FOG Wastewaters (FOGW)• Grease was loosely define as 750 mg/l FOG
• FOGW Acceptance “Evolution”• Accepted FOGW from Derry Restaurants• Requested FOGW be diluted
FOG WASTEWATER
![Page 12: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/12.jpg)
• Problems, Problems, & PROBLEMS • Build up of Grease on Primary Clarifier baffles, weirs, beaches & in the PC center wells.• 30 – 40 CY removed from each PC every 3 months
• Plugging Primary Sludge Line• Tear down & flush line every month
• Visible grease “specks” in digested BFP cake
FOG WASTEWATER
![Page 13: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/13.jpg)
• Accumulation in Primary Clarifier Scum Pit• Genesis of pretreatment idea• Pilot “Digestion” in Scum Pits• Bugs, soda ash, & mixing/aeration
• Design Concept for Aerobic Grease Pretreatment• KISS• Incorporate into existing septage receiving station• Provide 48‐72 hours of detention (40,000 gal tank)• Computer controlled fill & draw
• Decant MLSS to WWTP Headworks
FOGW PRETREATMENT - GENESIS
![Page 14: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/14.jpg)
• Final Design• Chopper Pumps (2)
• Aeration (Venturi w/ draft tube)• Mixing (floor mounted mixing nozzles)• MLSS removal via tank level controlled wasting valve
• Addition of Bacteria Delivery System• ECOBIONICS™ Biogenerator
FOGW PRETREATMENT DESIGN
![Page 15: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/15.jpg)
BioGenerator1 System Fact SheetOperation at the DTMA AGPD
Four BioGenerators24 Hour incubation cycleDaily dose of approximately 30 trillion microbes per BioGeneratorDose at 6 AM, 12 noon, 6 PM & 12 midnight
MICROBE SELECTIONAll Class 1 Organisms (no pathogens)High Enzyme producers1. Information Courtesy of Ecobionics, a division of NCH Corporation
FOGW PRETREATMENT BACTERIA
![Page 16: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/16.jpg)
GENUS SPECIES CAS # CLASS ENZYMES/FOOD
Pseudomonas fluorescens 68332‐93‐4 Aerobic Lipase ‐Multiple Enzyme Sys.
Pseudomonas putida 68332‐91‐4 Aerobic Lipase ‐Multiple Enzyme Sys.
Bacillus subtilis 68038‐70‐0 Aerobic Protease – Amylase
Bacillus licheniformis 68038‐66‐4 FacultativelyAnaerobic Protease – Amylase Cellulose
Bacillus thuringiensis 68038‐71‐1 FacultativelyAnaerobic Protease – Amylase Lipase
1. Information Courtesy of Ecobionics, a division of NCH Corporation1. Information Courtesy of Ecobionics, a division of NCH CorporationSUMMARY OF MICROBES
FOGW PRETREATMENT BACTERIA
![Page 17: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/17.jpg)
• FOGW Pretreatment Facility• Completed in 2005• Aerated & Mixed “Batch Reactor” Tank• Fill & Draw• Lime addition for pH Control• Screening & Grit Removal via WWTP Headworks
• BUT it was/is a work in progress…..
FOGW PRETREATMENT
![Page 18: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/18.jpg)
• Post Construction Improvements• Grinder/macerator on truck discharge to FOGW discharge connection.
• Rock trap in front of macerator.• Mixing Nozzles Modifications• Scum / Foam Control
• At optimal conditions of pH = 7 and D.O. >1.0, the foam/scum becomes problematic.
FOGW PRETREATMENT WORK IN PROGRESS
![Page 19: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/19.jpg)
• pH Adjustment required due to VFA• Original
• Lime addition; manual control (litmus pH paper)• Too much settling
• Current• Magnesium Hydroxide addition; automatic control (pH probe)
FOGW PRETREATMENT IMPLEMENTATION
![Page 20: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/20.jpg)
• 2016 Totals – 20.17 MG (~70,500 GPD)• Septage & Other ‐ 16.11 MG (~56,300 GPD)• FOGW ‐ 3.27 MG (~11,400 GPD)• Misc. Sludges ‐ 0.79 MG (~2,800 GPD)
HAULED WASTEWATER RECEIVING
![Page 21: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/21.jpg)
HAULED WASTEWATER FACILITY LAYOUT
![Page 22: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/22.jpg)
FOGW PRETREATMENTPROCESS SCHEMATIC
![Page 23: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/23.jpg)
HAULED WASTEWATER OVERVIEW
![Page 24: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/24.jpg)
FOGW PRETREATMENT TANK
![Page 25: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/25.jpg)
FOGW UNLOADING STATION DETAILS
![Page 26: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/26.jpg)
• Immediate & Dramatic Results throughout WWTP• Within a few weeks grease buildup through out the WWTP was gone.
• Within a few months grease “specks” in biosolids cake disappeared.
• Change in delivery philosophy• Requested concentrated and if possible dedicated grease trap loads.
• “Adjusted” rates to enhance cooperation
FOGW PRETREATMENT PERFORMANCE
![Page 27: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/27.jpg)
• No Digestion in Reactor but, pretreatment & transformation into a non‐sticking, high FOG, high VFA, MLSS
• FOGW MLSS discharged into headworks with Plant Influent for Screening & Grit Removal
• Settles out as Primary Sludge• Now “CoDigestion”
FOGW PRETREATMENT PERFORMANCE
![Page 28: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/28.jpg)
• Anaerobic digester feed stock• High Volatiles• Very good alkalinity
• Impact of Biogas Production• Because of all the variables involved in the digestion of sludgeand the subsequent generation of methane, it is very difficult, toestablish a quantitative relationship between the amount ofgrease wastes received and the volume of methane produce, butclearly a relationship exists.
FOGW CODIGESTION
![Page 29: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/29.jpg)
CO-DIGESTION BIOGAS PRODUCTION
MATERIAL GAS PRODUCED METHANE
( Ft3 / Lb Digested ) ( % )
Fats 20 – 25 62-72
Scum 15 – 17 70 -75
Grease 18 68
Crude Fiber 13 – 14 45 – 50
Protein 11 – 12 73Reference Buswell and Neave, 1939
![Page 30: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/30.jpg)
IMPACT OF CODIGESTION - PRE-FOG PRETREATMENT
200,000
250,000
300,000
350,000
400,000
450,000
500,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M
SCAL
E AS
NO
TED
MONTH
BIOGAS PRODUCTION vs. FOGW VOLUME ACCEPTED
BIOGAS x 10 CF
FOGW GALLONS
2004 20052003
![Page 31: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/31.jpg)
IMPACT OF CODIGESTION - POST FOGW PRETREATMENT
200,000
250,000
300,000
350,000
400,000
450,000
500,000
550,000
600,000
650,000
M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
SCAL
E AS
NO
TED
MONTH
BIOGAS PRODUCTION vs. FOGW VOLUME ACCEPTED
2006
BIOGAS x 10 CF
FOGW GALLONS
2008
UNIT
START-UP
2005 2007 2009
![Page 32: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/32.jpg)
IMPACT OF CODIGESTION - CURRENT FOGW PRETREATMENT
180,000
220,000
260,000
300,000
340,000
380,000
420,000
460,000
500,000
540,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
SCAL
E AS
NO
TED
MONTH
BIOGAS PRODUCTION vs. FOGW VOLUME
BIOGAS x 10 CF
FOG GALLONS
2014 2015 2016
![Page 33: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/33.jpg)
• 2000 ‐ ES Anaerobic Digester On‐line• 2003 – BioGas Utilization
• BioGas used to produce steam and dry biosolids into Class A, EQ Product for sale
• Some BioGas still wasted
• 2007 – Centrifuge• Increased cake solids (18% ‐> 22%) = 50% reduction in biogas use• Increased biogas production from grease acceptance
BIOGAS UTILIZATION BACKGROUND
![Page 34: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/34.jpg)
• 2009 – Cogen & Gas Conditioning Design & Bid• Award Contract ($2,200,000)• $500,000 PA Green Energy Works (ARRA/DOE) Grant
• 2010 ‐ Unit start‐up June • 2011 ‐ Unit destroyed September flood• 2012 ‐ Unit replaced March
BIOGAS UTILIZATION BACKGROUND
![Page 35: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/35.jpg)
BIOGAS CONDITIONING
![Page 36: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/36.jpg)
CHP FACILITES COGENERATION ENGINE
![Page 37: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/37.jpg)
CHP FACILITES - INSIDE THE ENGINE “BOX”
![Page 38: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/38.jpg)
CHP FACILITES - CONNECTIONSHeat Recovery Connections
Waste Heat Radiator
![Page 39: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/39.jpg)
• Electric Power (2016‹)• 937,100 kWh Power Production• Approximately 16% of WWTP consumption• ~$72,000 savings @ $0.0768 / kWh
[ ‹~8 weeks downtime for major service ]
• Recovered Heat (2016)• Waste Heat recovered to heat three buildings• ~18,000 gallons of #2 fuel oil saved• $45,000 savings (@ $2.50 / G)
CHP FACILITES - SYSTEM PERFORMANCE
![Page 40: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/40.jpg)
• Cell Lysis• Pilot Testing
• More Food (Trucked‐In)• Bulk Food & Off Spec Food Waste• PTP DAF Sludges
• Second CoGeneration Unit• Sufficient Gas• Insufficient ROI (dropping power costs ‐ $0.059/kWH)
FUTURE PLANS
![Page 41: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/41.jpg)
CONVERTING FOGW INTO BIOGAS FOR ELECTRIC
POWER & HEAT
![Page 42: FOG RECEIVING, PRETREATMENT AND ANAEROBIC ...2017/05/10 · ( Includes estimated 1.2 DT/D (~14 %) from Septage / FOG Pretreatment ) WAS 2.86 32 IPF SLUDGE 1.02 11 DTMA SW WWTP 0.24](https://reader035.fdocuments.us/reader035/viewer/2022071406/60fba17d0c64dd5f54187f45/html5/thumbnails/42.jpg)