Fma congress walk talk 12.3.2012
-
Upload
lisa-barnard -
Category
Documents
-
view
322 -
download
1
description
Transcript of Fma congress walk talk 12.3.2012
![Page 1: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/1.jpg)
Center for
Building Excellence Walking the Talk
in Sustainable Construction
1
![Page 2: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/2.jpg)
BASF
What is the CBE?
BEYOND Decommissioning –
Case Study
Retrofit Checklist
West Memphis, AR Facility / LEED NC –
Case Study
2
agenda
![Page 3: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/3.jpg)
BASF The world’s leading chemical company
2011 Sales: $100 Billion
Employees: 111,000+ (9,000 focused on R&D)
385 production facilities including six Verbund sites
Intelligent, sustainable system solutions
$2 billion invested annually on R&D
Collaboration with nearly 2,000 universities,
institutions and companies worldwide
Average of 1,200 patents filed per year
![Page 4: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/4.jpg)
solutions We create chemistry to help power, move, house and feed a
growing world population:
Wind and Solar power
Biotechnology
Water solutions
Fuel Cell technology
Energy-efficiency
Sustainable construction
About $700 million of BASF’s annual research expenditures go into energy
efficiency, climate protection, and resource conservation
![Page 5: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/5.jpg)
involved
5
Developing transparent methodologies, tools and strategies to
drive a new generation of products and supply networks.
![Page 6: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/6.jpg)
Platzhalter für Bild
We create chemistry
for a sustainable future
proven
![Page 7: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/7.jpg)
7
what is cbe?
CBE
Commercial
Residential Technical
Center for Building Excellence is
an in-house team of Building Science
professionals with Construction,
Design and Sustainability expertise:
![Page 8: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/8.jpg)
consult working
with the
cbe
![Page 9: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/9.jpg)
Transparency
Collaboration
High
performance
standards
The EASY
button
case studies
![Page 10: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/10.jpg)
Applied Systems
Tight Construction
Fresh Air Ventilation
Improved Thermal
Efficient Mech. Design
Pressure Balanced
Moisture Managed
Combustion Safety
Structural Efficiency
Efficient Lighting Design
Advanced IEQ
Efficient H2O Design
MEL & Appliance Specs
Advanced Infrastructure
Cycle time Efficiency
Quality Training
Occupant Commissioning
BEYOND Decommissioning CBE Westinghouse Headquarters, Charlotte, NC
![Page 11: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/11.jpg)
• Structure outdated from thermal
perspective
– R6 Roof Deck
– R8 Sidewall Cavity
SOLUTIONS
• BASF Spray Foam Roof
– R-30
• BASF EIFS (using Neopor
technology)
– R-17.4
Phase I: Improved Thermal BEYOND Decommissioning
![Page 12: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/12.jpg)
• Reduced load allowed
– Reduced HVAC
• Existing – 40 Tons
• Final 13 tons separately metered, staged HVAC load
RESULTING IN
• Reduced Capitol Replacement Cost
• Reduced Operating Cost
• Improved Indoor Comfort
18.4% Heating Improvement
51.8% Cooling Improvement
Phase I: Right-size HVAC BEYOND Decommissioning
Existing air intake prior to retrofit
![Page 13: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/13.jpg)
Ligh
tin
g Ef
fici
en
cy
F34 T12 fixtures to F28 T8 fixtures with high efficiency ballast.
Existing system: 1.05 W/SF
Advanced system: .79 W/SF
Save up to $1,232 annually
Infr
astr
uct
ure
Parking lot improvements
Pervious pavement to:
Manage storm water runoff
Reduce heat island effect
Include recycled content
Ince
nti
ves
/ Ta
x C
red
its Review IRS 179d
deduction/credit Potential Tax deduction: $3,784 for lighting efficiency tax deductions for HVAC improvements still being investigated and modeled
Phase II Opportunities BEYOND Decommissioning
![Page 14: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/14.jpg)
Form a team / start early
Set goals & create accountability
Realistic budget
Quick ROI
HVAC life
Building envelope
Shading
Failure
Occupant behavior
Operations efficiency
Retrofit Checklist Collaboration & Education
14
![Page 15: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/15.jpg)
West Memphis Arkansas Admin Bldg LEED New Construction
• Major Impact
– Energy
– Building Products
– Water
– Green Construction
15
• LEED-NC 2009 v.3.0
Silver Certification • Building Area: 9,248 SF
Building Occupants: 30 FTE,
5 Peak = 35 Total
![Page 16: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/16.jpg)
Energy Conservation West Memphis Arkansas Admin Building
• Efficient Use of Daylight
– Adjustable solar tubes
• Daylight sensors
• Occupancy Sensors
• 18% improvement over ASHRAE 90.1
35,209 pounds of CO2
(17.6 tons)
5.87 acres of trees
CO
2 S
avin
gs
![Page 17: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/17.jpg)
Building Products - Envelope West Memphis Arkansas Admin Building
– BASF Technologies:
Envelope
• Admixtures
• Elastospray
Insulation – R21
walls / R32 roof
• Senergy –
EIFs system
• Gypsum with
Micronal® – Thermal
buffer for hot days
• Oldcastle Windows
with BASF Oppanol
![Page 18: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/18.jpg)
Building Products - Interior West Memphis Arkansas Admin Building
BASF Technologies: Interiors
• Features –Low VOC Materials
– AcysealAS –Low VOC Sealant
– Sonneborn–Low VOC Joint
Sealants
– Thoro–Low VOC paints and
coatings
– BASF Polymers and Pigments
–Behr, Sherwin Williams,
Duron/Gensis paints
– Chemflex–Carpet and floor tile
adhesives
VCT Floor Tiles
Shaw Modular Carpet Tiles
![Page 19: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/19.jpg)
Additional Sustainable Strategies West Memphis Arkansas Admin Building
19
Water
– 100% Savings of potable water
for irrigation, No Potable Water
Use or No Irrigation
– 40% Savings in indoor
domestic water use reduction
from baseline EPAct1992
Standards,
– Photovoltaic powered lavatories
with aerators achieve .5 gpm flow
rate
– Pint flush urinals and dual flush
low-flow water closets
Construction
• Construction Waste Management
• Construction Indoor Air Quality
Management Plan
• Features –Sustainable Materials
• Regional priority credits
– Alternative Transportation, Public
Transportation Access
– Stormwater Design, Quality
Control
– Water Use Reduction, 40%
– Optimize Energy Performance,
28%
– EAc2: On-Site Renewable Energy,
1%
– Thermal Comfort, Design
![Page 20: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/20.jpg)
The West Memphis facility “demonstrates BASF’s
strategic focus on sustainable development through
the utilization of energy efficient construction
materials and technologies – many of which are
made possible through BASF chemistry.“
Beate Ehle, President, Market and Business Development,
BASF North America
purpose
![Page 21: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/21.jpg)
Connect •With CBE for product & project resources
Collaborate •With the CBE as part of your IPD team
Innovate •With the CBE to create solutions to
material challenges
engage
![Page 22: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/22.jpg)
Lisa A. Barnard, CSI, LEED AP O&M
Senior Advisor – Commercial
BASF Center for Building Excellence
[email protected] | (602) 578-7930
Michael R. Fletcher, LEED AP BD+C
Senior Advisor – Commercial
BASF Center for Building Excellence
[email protected] | (347) 380-3402
[email protected] | www.construction.basf.us | (888) 307-6602
let’s talk
![Page 23: Fma congress walk talk 12.3.2012](https://reader033.fdocuments.us/reader033/viewer/2022051609/5479f7a6b479598a098b48d9/html5/thumbnails/23.jpg)
23