FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

15
1 Overview of the Comprehensive Flood Management Plan for the Chao Phraya River Basin & Lesson Learned from Recent Mega Disaster The views expressed in this paper are the views of the authors and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Directors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequences of their use. Terminology used may not necessarily be consistent with ADB official terms.

Transcript of FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

Page 1: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 1/14

1

Overview of the

Comprehensive Flood Management Planfor the Chao Phraya River Basin

& Lesson Learned from Recent Mega Disaster

The views expressed in this paper are the views of the authors and do not necessarily reflect the views or policies of the Asian

Development Bank (ADB), or its Board of Directors, or the governments they represent. ADB does not guarantee the accuracy of thedata included in this paper and accepts no responsibility for any consequences of their use. Terminology used may not necessarily beconsistent with ADB official terms.

Page 2: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 2/14

••

2 3

4 5

Page 3: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 3/14

6 7

防災科研 2009年フィリピン台風災害調査速報 より

8

9

Page 4: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 4/14

10

11

12

••

13

Page 5: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 5/14

14 15

16 17

Page 6: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 6/14

Page 7: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 7/14

243(=73/30) % of  

normal average of  river discharge 

143 % of  

normal average of  rainfall

The normal value of  cumulative 

rainfall and pan evaporation at the 

Thai Meteorological Department 

(Phitsanulok observatory;  16 47'N, 100 16'E; 45 m above mean sea 

level) in the rainy season were 

1,192 mm and 842 mm, namely ET 

is 70 % of  rainfall.

There was no major change in 

evaporation and infiltration during 

the rainy season between the 

flood year and other years.Evapotranspiration

Runoff 

(Ratio of  normal 

average of  rainfall; %)

22

In the flood years, the increase of  rainfall is directly reflected into 

the increase of  river discharge

100 – 70 =  30

143 – 70 =  73

23

Past flood at the Chao Phraya River basin

24

Chao Phraya Tone Rhine Mississippi

Catchment Area (km2) 159,000 16,480 185,000 3,220,000

River Length (km) 1,100 322 1,230 6,210

Gradient (lower portion) 1/50,000 1/9,000 1/15,000 1/5,000

River Capacity(lower portion m3/s)

3,000~4,000

21,000 14,000? 77,000

Discharge/Basin Area 0.02 1.2 0.08 0.02

Basin Retention Effect big very small small small

Flood (peak) Duration 1-2 month 2 days 2 week 1 month

25

Page 8: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 8/14

2626

2727

28

The 2011 Flood

1. Reconstruction of  dyke, 

ring dyke 

2. River structure (Water 

Gate and canal etc.

1. Flood Forecast and Early 

Warning System

2. Dam Operation

3. Water gate operation

Component 1Component 2 Component 3 

Submission of  Application as an official request 

1 Preparation of  Community‐based 

disaster risk management plan

Submission  of  Application as 

an official request 

1. Short‐term Plan

2. Mid‐Long  term Plan

29

Dispatch of Rescue team

Provision of Rescue supply

Reconstruction and Rehabilitation of Infrastructure

Mental Health Care

Hazard mapping, evacuation drill

Organization Reinforcement

Establishment of Disaster Management Plan

Development of Early Warning System

Page 9: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 9/14

30 31

32

•–

33

Page 10: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 10/14

34 35

36

••

•–

37

Page 11: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 11/14

3838

39

••

•••••

LP

Earth ObservationSatellite Observation

•••••

41

Page 12: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 12/14

42 43

44

2次元水理解析の流況(1/20:Q=130m3 /s)

計画河道

現況河道

(2次元水理解析結果)

河川改修方針の検討の手順

<水平縦断面>

<代表横断面>

<河道条件イメージ>

(改修後の環境区分の予測)

(現況の環境区分)

45

Requested Various Applications for Flood Control= like tip of iceberg =

Monitoring System

Remote Operation

Flood Forecast

Weather Forecast GIS Database

Page 13: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 13/14

46 47

Standardization of System Architecture

Standardization of Data Structure

Operation Guideline in each Field

Guideline for Data Stock & Management

Human Resource Development Program & Practice

Spirally Updated

Short Term Value

Charging Tech.

Coding System

DataSynchronicit y Tech.

Authentication System

Back-up

DataWarehouse

Security DataStorage

Transaction Management

Push,Pull,Agent

DataCompressi on Tech.Hyper Compression Tech.

for Images

DataExchange Tech.

Auto-Research/CollectionTech.by Agent

VPN

Offer ofVarious Interfaces

e-Banking

E-Kiosk

GIS

DataMining System

Collaboration w/Banks

e-Commerce

Revitalization Tech.ofLegacy data/Resources

Other Technologies

Index Repository

Collaboration w/Other AgenciesSubsystems

Communication Infrastructure IT maturity of the Society

Market MechanismSpirally Updated

Short Term Value

DATA is Fortune

Long Term Value

Human Resources= Long Term Value

Application like Satellite usedinnovated SCADA system

Legal Preparation

JICA’s Lesson Learnt from MEGA Disaster=2011 March 11, Tsunami & Thailand Flood=

49

Mainst ream ing Of DRM for Sust a inable Developm ent  

Page 14: FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

7/30/2019 FM-S104a-Overview of the MP for the Chao Phraya River Basin by Kimio Takeya

http://slidepdf.com/reader/full/fm-s104a-overview-of-the-mp-for-the-chao-phraya-river-basin-by-kimio-takeya 14/14

50

→Preparation of MP

taking account for 

climate variation and

urbanization (Kaizen)

→Discussion onvalidity of a scenariolevel and limitations of measuresRisk Literacy

→Leveling of 

highways work as

secondary dyke

(Redundancy

JICA’s Lesson Learnt from MEGA Disaster=2011 March 11, Tsunami & Thailand Flood=

51

Mainst ream ing Of DRM for Sust a inable Development  

52 53